Snow-proof shading shed structure connected with tunnel hole
By designing snow-proof and shading shed structures for prefabricated steel pipe piles and prefabricated factory-prefabricated light-shading panels in high-altitude areas, the problems of freezing and construction difficulties in concrete shed holes are solved, and efficient and stable construction, snow-proof and light-reduction effects are achieved. .
Patent Information
- Application Number
- CN202420792607.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-17
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-04-17
AI Technical Summary
The existing concrete shed caves are prone to freezing and cracking during construction in high-altitude areas, resulting in a decrease in structural strength and difficulty in artificial construction in high-altitude and high-altitude areas, affecting the construction quality.
A snow-proof and light-shielding shed structure connected to the tunnel hole is designed, using prefabricated steel pipe piles and factory prefabricated light-shielding plates, beams, arch frames and supporting angle steel to achieve structural stability and construction efficiency through connection devices and weather-resistant sealants.
This structure is less affected by temperature when constructed in high-altitude areas, ensuring construction quality and efficiency, reducing snow accumulation and glare effects, and meeting the needs of windproof and light reduction.
Smart Images

Figure CN221973521U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of wind and snow protection for tunnels, and specifically relates to a wind and snow protection awning structure applied to the entrance and exit of a highway tunnel in a severely cold mountainous area in Central Asia. Background Art
[0002] In highway tunnels in high-altitude and cold areas, wind and snow disasters are an important reason affecting the normal operation of highway tunnels in high-altitude and cold mountainous areas. The sudden changes in the light environment and spatial environment at the entrance and exit of the tunnel are the risk sources of traffic accidents. By setting up shed tunnels, we can prevent snow accumulation and halos from affecting traffic.
[0003] The current shed tunnel is made of cast-in-place concrete, but there are the following problems: 1) In cold regions, during winter construction, the concrete will freeze and crack, which will reduce the structural strength and restrict the construction time due to temperature; 2) In cold and high-altitude areas, manual construction is difficult, and the construction quality is affected by the construction personnel;
[0004] Therefore, it is necessary to design a shed-hole structure that improves the above problems. Utility Model Content
[0005] The utility model aims to overcome the defects of the prior art and provide a snowproof sunshade shed structure connected with a tunnel.
[0006] The utility model provides a snowproof sunshade shed structure connected to a tunnel hole, comprising a shed frame connected to the end face of the tunnel hole; a sunshade portion is arranged on the outer side of the shed frame, the shed frame and the sunshade portion are connected by a connecting device, and the connecting parts of the sunshade portion and the connecting device are covered with weather-resistant sealant;
[0007] Connecting piles, a plurality of said connecting piles are arranged along the axial direction of the tunnel opening on both sides of the outside of the tunnel opening, said connecting piles are prefabricated steel pipe piles, and the bottoms of both sides of the greenhouse frame are connected to the ground through prefabricated steel pipe piles;
[0008] Furthermore, the shading portion is composed of a plurality of shading plates arranged at intervals to form an arched structure, and both ends of the shading portion located at the outer end of the greenhouse frame are reverse curved structures;
[0009] The shading plate at the reverse bending position of the shading portion is connected to the greenhouse frame via an inclined support member;
[0010] Furthermore, the connecting piles are prefabricated steel pipe piles;
[0011] Further, the oblique support member is an angle steel;
[0012] Furthermore, the greenhouse scaffolding is composed of a plurality of cross beams arranged laterally away from the tunnel opening and a plurality of arch frames arranged longitudinally connected to each other;
[0013] Further, the cross beam is a steel tube purlin;
[0014] Further, the connecting device includes a first connecting member and a second connecting member which are arranged opposite to each other in the upper and lower parts, the first connecting member is a T-shaped structure, a first arc-shaped groove is arranged at a vertical end of the first connecting member, concave grooves for installing a sunshade are arranged on both sides of a horizontal end of the first connecting member, and a second arc-shaped groove is arranged at the second connecting member, one end of the first connecting member and the second connecting member are connected by a bearing, and the other ends of the first connecting member and the second connecting member are connected by a second fixing bolt to form a circular hole structure that wraps the arch frame;
[0015] The plate ends of two adjacent shading plates close to each other are respectively connected to the two sides of the horizontal end of the first connecting member through first fixing bolts;
[0016] Compared with the prior art, the beneficial effects of the utility model are:
[0017] (1) The utility model sunshade shed structure not only meets the requirements of wind and snow protection, but also reduces the glare effect when exiting the tunnel. The sunshade part used in the sunshade shed structure, the beams and arch frames in the greenhouse shed frame, and the supporting angle steel are all prefabricated in the factory and assembled on site, ensuring the construction quality. The bottom of the greenhouse shed frame is connected to the ground through prefabricated connecting piles. The prefabricated connecting piles are steel pipe piles. The steel pipe piles are prefabricated in the factory and are less affected by temperature, thereby shortening the construction period of the sunshade shed structure.
[0018] (2) The utility model has anti-bend structures at both ends of the shading portion, which can reduce the accumulation of snow on the road surface and the roof. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The following drawings are only used to illustrate and explain the present invention, and are not intended to limit the scope of the present invention, wherein:
[0020] Figure 1 : A schematic diagram of the structure of the snowproof sunshade shed connected to the tunnel of the utility model;
[0021] Figure 2 : Schematic diagram of the connection structure of the snow-proof sunshade shed connected to the tunnel of the utility model;
[0022] Figure 3 :for Figure 1 Schematic diagram of the connection between the connecting device and the sunshade at A in the middle;
[0023] In the figure: 1-shading plate; 2-arch beam; 3-cross beam; 4-support angle steel; 6-prefabricated connecting pile; 7-anchor rod; 8-connecting device; 81-first fixing bolt; 82-second fixing bolt; 83-bearing. DETAILED DESCRIPTION
[0024] In order to make the purpose, technical solution, design method and advantages of the utility model clearer, the utility model is further described in detail through specific embodiments in conjunction with the accompanying drawings. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.
[0025] like Figure 1-Figure 3 As shown, the utility model provides a snowproof sunshade structure connected to a tunnel hole, comprising a greenhouse frame connected to the end face of the tunnel hole entrance; a sunshade portion is arranged on the outside of the greenhouse frame, the greenhouse frame is connected to the sunshade portion via a connecting device 8, and the connecting parts of the sunshade portion and the connecting device 8 are covered with weather-resistant sealant;
[0026] Connecting piles 6, a plurality of connecting piles 6 are arranged along the axial direction of the tunnel opening on both sides of the tunnel opening, the connecting piles 6 are prefabricated steel pipe piles, and the bottoms of both sides of the greenhouse frame are connected to the ground through prefabricated steel pipe piles;
[0027] It should be noted that the utility model sunshade shed structure is used to prevent snow accumulation at the road surface opening caused by wind and snow at the exit of highway tunnels in high-cold areas, and effectively prevents the glare effect caused by drivers leaving the tunnel; the sunshade shed structure not only meets the requirements of wind and snow protection, but also reduces the glare effect when exiting the tunnel. The several sunshades 1, beams 3, arch frames 2 and supporting angle steels 4 used in the sunshade shed structure are all prefabricated in the factory and assembled on site, which ensures the construction quality. The bottom of the greenhouse frame is connected to the ground through connecting piles 6, which are prefabricated steel pipe piles. The prefabricated steel pipe piles are prefabricated in the factory and are less affected by temperature during construction, thereby shortening the construction period of the sunshade shed structure; at the same time, reverse bending structures are arranged at both ends of the shading part to reduce the accumulation of snow on the road surface and the roof.
[0028] Furthermore, the shading portion is composed of a plurality of shading plates 1 arranged at intervals to form an arched structure, and both ends of the shading portion located at the outer end of the greenhouse frame are reverse curved structures;
[0029] The shading plate 1 at the reverse bending position of the shading portion is connected to the greenhouse frame via an inclined support member;
[0030] It should be noted that the purlin at the reverse bending part of the sunshade 1 at the outer end of the greenhouse scaffolding is welded to the greenhouse scaffolding through the supporting angle steel 4; a plurality of sunshades 1 are arranged at intervals of 20%, 30%, and 60% with different light transmittances to achieve an anti-glare effect;
[0031] Further, the connecting piles 6 are prefabricated steel pipe piles;
[0032] Further, the oblique support member is an angle steel 4;
[0033] Furthermore, the greenhouse scaffolding is composed of a plurality of cross beams 3 arranged transversely away from the tunnel opening and a plurality of arch frames 2 arranged longitudinally connected to each other; the plurality of cross beams 3 and the arch frames 2 are connected by welding;
[0034] Further, the cross beam 3 is a steel tube purlin;
[0035] It should be noted that a number of anchor rods 7 are evenly arranged in the tunnel door wall at the end face of the tunnel entrance along the axial direction of the tunnel entrance; the greenhouse frame is connected to the end face of the tunnel entrance through the anchor rods 7;
[0036] Further, the connecting device 8 includes a first connecting member and a second connecting member arranged opposite to each other in the upper and lower parts, the first connecting member is a T-shaped structure, a first arc groove is arranged at a vertical end of the first connecting member, concave grooves for mounting the sunshade 1 are arranged at both sides of a horizontal end of the first connecting member, and a second arc groove is arranged at the second connecting member, one end of the first connecting member and the second connecting member are connected by a bearing 83, and the other end of the first connecting member and the second connecting member are connected by a second fixing bolt 82 to form a circular hole structure wrapping the arch frame 2;
[0037] The plate ends of two adjacent shading plates 1 close to each other are respectively connected to both sides of the horizontal end of the first connecting member through first fixing bolts 81;
[0038] The on-site construction sequence of this utility model is:
[0039] 1) Clean the tunnel portal and external road surface to avoid dislocation of prefabricated assembly structures;
[0040] 2) Construction of the foundation of the connection pile 6: measure and lay out the lines according to the spacing and row spacing required by the design and the elevation provided by the design; place the drilling machine at the designated position and level it to prevent tilting; lift the drill rod to the side of the drilling machine, connect the water pipe to the drill rod, start the drilling machine and the water pipe, and drill slowly; every 2m of depth, the drill rod needs to be connected once until the designed effective depth is reached; clean the hole, lower the Φ219 connection pile 6, and grout;
[0041] 3) Weld the galvanized seamless prefabricated greenhouse scaffolding with a diameter of 76 mm and a wall thickness of 4 mm to the connection pile 6 foundation one by one;
[0042] 4) Weld the 60mm diameter beam 3 to the arch frame 2 and connect it to the tunnel portal with anchor rods 7. Figure 2 ;
[0043] 5) Construct the reverse bends at both ends of the shading part and fix them by welding using supporting angle steel 4.
[0044] 6) Construct the shading part, and arrange several shading plates 1 at intervals of 20%, 30%, and 60% with different transmittances to achieve an anti-glare effect, and use a connecting device 8 to fix the connection with the greenhouse frame; the first connecting member and the second connecting member of the connecting device 8 are connected to the greenhouse frame, and the shading plate 1 is sealed with a sealant after being connected to the connecting device 8, and fixed by a first fixing bolt 81.
[0045] The embodiments of the present invention have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and changes will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments. The selection of terms used herein is intended to best explain the principles of the embodiments, practical applications, or technical improvements in the market, or to enable other persons of ordinary skill in the art to understand the embodiments disclosed herein.
Claims
1. A snowproof sunshade structure connected to a tunnel, characterized in that: It comprises a greenhouse frame connected to the end face of the tunnel opening; a shading portion is arranged on the outer side of the greenhouse frame, the greenhouse frame and the shading portion are connected via a connecting device (8), and the connection parts between the shading portion and the connecting device (8) are covered with weather-resistant sealant; Connecting piles (6), a plurality of connecting piles (6) are arranged on both sides of the tunnel opening along the axial direction of the opening, the connecting piles (6) are prefabricated steel pipe piles, and the bottoms of both sides of the greenhouse frame are connected to the ground through prefabricated steel pipe piles.
2. The snowproof sunshade structure connected to a tunnel according to claim 1, characterized in that: The shading portion is composed of a plurality of shading plates (1) arranged at intervals to form an arched structure, and both ends of the shading portion located at the outer end of the greenhouse frame are inverted structures; The shading plate (1) at the inverted part of the shading portion is connected to the greenhouse frame via an inclined support member.
3. The snowproof sunshade structure connected to a tunnel according to claim 1, characterized in that: The connecting piles (6) are prefabricated steel pipe piles.
4. The snowproof sunshade structure connected to a tunnel according to claim 2, characterized in that: The oblique support member is an angle steel (4).
5. The snowproof sunshade structure connected to a tunnel according to claim 1, characterized in that: The greenhouse scaffolding is composed of a plurality of crossbeams (3) arranged transversely away from the tunnel opening and a plurality of arch frames (2) arranged longitudinally, which are connected to each other.
6. The snowproof sunshade structure connected to a tunnel according to claim 5, characterized in that: The cross beam (3) is a steel tube purlin.
7. The snowproof sunshade structure connected to a tunnel according to claim 6, characterized in that: The connecting device (8) comprises a first connecting member and a second connecting member which are arranged opposite to each other in an upper and lower direction, the first connecting member being a T-shaped structure, a first arc-shaped groove being arranged at a vertical end of the first connecting member, concave grooves for mounting the sunshade (1) being arranged at both sides of a horizontal end of the first connecting member, and a second arc-shaped groove being arranged at the second connecting member, one end of the first connecting member and the second connecting member being connected via a bearing (83), and the other end of the first connecting member and the second connecting member being connected via a second fixing bolt (82) to form a circular hole structure that wraps around the arch frame (2); The plate ends of two adjacent shading plates (1) that are close to each other are respectively connected to the two sides of the horizontal end of the first connecting member via first fixing bolts (81).
