Open cut tunnel lining steel bar machining trolley
By designing open-cut tunnel lining steel bar processing trolleys, the combination of inner and outer trolleys and multiple components is used to solve the problem of inconvenient steel bar binding operation, efficient positioning and protection of steel bars is achieved, and construction quality and efficiency are improved.
Patent Information
- Application Number
- CN202323126380.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-20
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2033-11-20
AI Technical Summary
During tunnel construction, the on-site binding of the steel bar skeleton is inconvenient, it is difficult to ensure the quality of the project, and there is a lack of equipment to improve the operating efficiency and the quality of the steel bar skeleton.
A open-cut tunnel lining steel bar processing trolley was designed, including inner and outer trolleys and multiple components, such as electric sports cars, vertical and horizontal support frames, hydraulic cylinder telescopic platform and longitudinal sliding beams, to realize the positioning and determination of steel bars. Protect and improve operational efficiency and quality.
Through the combination of internal and external trolleys, the positioning and protection of double-layer steel bars can be achieved, labor costs are reduced, the quality of steel bar binding is improved, the operating efficiency is improved, and the limitations of the traditional binding model are escaped.
Smart Images

Figure CN221973526U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of lining steel bar processing, in particular to an open-cut tunnel lining steel bar processing trolley. Background Art
[0002] During the construction of tunnel projects, secondary lining is often required. The steel skeleton in the secondary lining needs to be tied and installed on site. At present, during construction, a steel bar tying stand is generally used, and the workers install and tie the steel bars one by one on site. During construction, the operation is extremely inconvenient and the quality of the project cannot be guaranteed. There is a lack of a tunnel lining steel bar processing trolley that can improve the operation efficiency and steel bar tying quality. Utility Model Content
[0003] In view of the deficiencies in the prior art, the utility model provides an open-cut tunnel lining steel bar processing trolley, which solves the problems raised in the above-mentioned background technology.
[0004] In order to solve the above technical problems, according to one aspect of the utility model, more specifically, a trolley for processing steel bars for lining of an open-cut tunnel comprises a tunnel, an inner trolley is provided on the inner side of the tunnel, an outer trolley is provided on the outer side of the tunnel, the outer trolley comprises a gantry, electric sports cars are fixed on both sides of the bottom of the gantry, a plurality of vertical and horizontal support frames are fixed on the inner side wall of the gantry, an annular beam 1 is fixed at the bottom end of the vertical and horizontal support frames, a steel pipe is passed through the inside of the annular beam 1, the inner trolley comprises two columns 1, a cross beam 1 is fixed on the top of the two columns 1, and a plurality of There are two dry columns, and a crossbeam 2 is commonly fixed on the top of the two columns. Support cylinders are fixed to the upper surface of the second crossbeam and the outer surface of the first column. The end of the support cylinder close to the inner side of the tunnel is detachably connected with a ring beam 2. An oblique brace is welded between the crossbeam 1 and the first column. Working platforms are fixed to the left and right sides of the upper surface of the first crossbeam, the outer surface of the first column, and the upper surface of the second crossbeam. A ladder 1 is fixed between the working platforms. Two electric sports cars are fixed to the bottom of the first column. Multiple ladders 2 are fixed to the outside of the gantry. The front and rear ends of the external trolley are provided with the longitudinal hanging sliding beam.
[0005] Furthermore, an inner side of the annular beam is in contact with the outer surface of the tunnel.
[0006] Furthermore, the second outer surface of the annular beam fits the inner surface of the tunnel.
[0007] Furthermore, a track is provided at the bottom of the second electric sports car, and the track is fixedly connected to the lower surface of the tunnel.
[0008] Furthermore, the working platform has a total of 5 layers, and all are designed as hydraulic cylinder retractable platforms. The ends of the retractable platforms are designed as 10cm spacing positioning slots, and the positioning and spacing targets of the steel bars are achieved through the external support steel bars of the hydraulic cylinder retractable platform. The entire length of the inner trolley is 11.2 meters, and the end is reserved for articulated connection rods with the lining trolley.
[0009] Furthermore, the portal frame is composed of a lower column, an upper column and a cross beam. The lower column is welded into a box shape with 400×300, the upper column is welded into a box section with a trapezoidal column of 850×300mm, and the cross beam is a 500×300mm welded box beam. There are 5 portal frames in total. The vertical and horizontal support frames are designed with hydraulic cylinder retractable steel bar positioning plate grooves to position the outer layer of steel ring main bars at intervals. The longitudinal hanging slide beam is designed to be wheel-rail movable, and the hoisting part is designed to be a hydraulic cylinder to achieve vertical lifting. The inner wall of the portal frame and the outer surface of the vertical and horizontal support frames are jointly welded with a 125b arch ring positioning beam, and the vertical and horizontal support frames are both made of I25b I-beams.
[0010] The beneficial effects of the open-cut tunnel lining steel bar processing trolley of the utility model are:
[0011] The utility model is composed of an inner trolley and an outer trolley. The trolley has a positioning function. It can position and fix the protective layer of double-layer steel bars, reduce labor costs, improve technology and improve quality; it gets rid of the traditional steel bar binding operation mode, reduces manual work, and improves operation efficiency and the quality of steel bar binding. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] The utility model is further described in detail below with reference to the accompanying drawings and specific implementation methods.
[0013] Figure 1 It is a structural schematic diagram of the utility model;
[0014] Figure 2 This is a side structural diagram of the inner trolley in the utility model;
[0015] Figure 3 It is a side structural schematic diagram of the Chinese and foreign trolley of the utility model.
[0016] In the figure: 1. Tunnel; 2. Inner trolley; 3. Outer trolley; 4. Gantry; 5. Electric sports car; 6. Vertical and horizontal support frames; 7. Annular beam one; 8. Steel pipe; 9. Column one; 10. Crossbeam one; 11. Column two; 12. Crossbeam two; 13. Support cylinder; 14. Diagonal brace; 15. Ladder one; 16. Annular beam two; 17. Working platform; 18. Electric sports car two; 19. Ladder two; 20. Longitudinal hanging slide beam. DETAILED DESCRIPTION
[0017] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict.
[0018] like Figure 1-3 As shown, according to one aspect of the utility model, a trolley for processing steel bars for lining of an open-cut tunnel is provided, including a tunnel 1, an inner trolley 2 is provided on the inner side of the tunnel 1, an outer trolley 3 is provided on the outer side of the tunnel 1, the outer trolley 3 includes a gantry 4, electric sports cars 5 are fixed on both sides of the bottom of the gantry 4, a plurality of vertical and horizontal support frames 6 are fixed to the inner side wall of the gantry 4, an annular beam 7 is fixed to the bottom end of the vertical and horizontal support frames 6, a steel pipe 8 is passed through the inside of the annular beam 7, the inner trolley 2 includes two columns 9, a cross beam 10 is fixed to the top of the two columns 9, a plurality of columns 11 are fixed to the upper surface of the cross beam 10, and the columns A crossbeam 12 is fixed to the top of the two columns 11, and a supporting cylinder 13 is fixed to the upper surface of the crossbeam 12 and the outer surface of the column 19. The end of the supporting cylinder 13 close to the inner side of the tunnel 1 is disassembled and connected with a ring beam 16. A diagonal brace 14 is welded between the crossbeam 10 and the column 19. Working platforms 17 are fixed to the left and right sides of the upper surface of the crossbeam 10, the outer surface of the column 19 and the upper surface of the crossbeam 12. A ladder 15 is fixed between the working platforms 17. An electric sports car 18 is fixed to the bottom of the column 19. A plurality of ladders 19 are fixed to the outer side of the gantry 4. Longitudinal hanging sliding beams 20 are provided at the front and rear ends of the external trolley 3.
[0019] In this embodiment, the inner side of the annular beam 7 is in contact with the outer surface of the tunnel 1 .
[0020] In this embodiment, the outer surface of the second annular beam 16 is in contact with the inner surface of the tunnel 1 .
[0021] In this embodiment, a track is provided at the bottom of the electric sports car 18, and the track is fixedly connected to the lower surface of the interior of the tunnel 1.
[0022] In this embodiment, the working platform 17 has a total of 5 layers, and all are designed as hydraulic cylinder retractable platforms. The ends of the retractable platforms are designed as 10 cm spacing positioning slots. The positioning and spacing targets of the steel bars are achieved by supporting the external steel bars of the hydraulic cylinder retractable platform. The entire length of the inner trolley 2 is 11.2 meters, and a hinged connecting rod is reserved at the end for connection with the lining trolley.
[0023] In this embodiment, the portal frame 4 is composed of a lower column, an upper column and a cross beam. The lower column is welded into a box shape with 400×300, the upper column is welded into a box section with a trapezoidal column of 850×300mm, and the cross beam is a 500×300mm welded box beam. There are 5 portal frames in total. The vertical and horizontal support frames 6 are designed with hydraulic cylinder retractable steel bar positioning plate grooves to position the outer layer of steel ring main bars at intervals. The longitudinal hanging slide beam 20 is designed to be wheel-rail mobile, and the lifting part is designed to be a hydraulic cylinder to achieve vertical lifting. The outer surfaces of the portal frame 4 and the vertical and horizontal support frames 6 are jointly welded with 125b arch ring positioning beams, and the vertical and horizontal support frames are both made of I25b I-beams.
[0024] The working principle of this device is: the inner trolley 2 can be supported by the contraction of the oil cylinder 13, and the steel bars are suspended by the outer gantry 3 without collapse. After the lining trolley is demolded, it moves forward with the steel bar trolley to its position. The hydraulic oil rainbow of the outer gantry sliding beam descends to drop the entire steel bar skeleton onto the trolley, the steel pipe 8 in the annular beam is removed, the sliding beam slides outward and lifts the annular beam, and the outer gantry 3 moves forward to the next working section and is in position for the next operation.
[0025] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by ordinary technicians in this technical field within the essential scope of the present invention also fall within the protection scope of the present invention.
Claims
1. A trolley for processing steel bars for lining of an open-cut tunnel, comprising a tunnel (1), characterized in that: An inner trolley (2) is provided on the inner side of the tunnel (1), and an outer trolley (3) is provided on the outer side of the tunnel (1). The outer trolley (3) includes a gantry (4). Electric sports cars (5) are fixed on both sides of the bottom of the gantry (4). A plurality of vertical and horizontal support frames (6) are fixed to the inner side walls of the gantry (4). An annular beam (7) is fixed to the bottom ends of the vertical and horizontal support frames (6). A steel pipe (8) is passed through the inside of the annular beam (7). The inner trolley (2) includes two columns (9). A cross beam (10) is fixed to the tops of the two columns (9). A plurality of columns (11) are fixed to the upper surface of the cross beam (10). A cross beam (12) is fixed to the tops of the columns (11). The cross beam (12) is fixed to the tops of the columns (11). A supporting cylinder (13) is fixed to the upper surface of the column (12) and the outer surface of the column (9); a ring beam (16) is detachably connected to one end of the supporting cylinder (13) close to the inner side of the tunnel (1); a diagonal brace (14) is welded between the cross beam (10) and the column (9); working platforms (17) are fixed to the left and right sides of the upper surface of the cross beam (10), the outer surface of the column (9), and the upper surface of the cross beam (12); a ladder (15) is fixed between the working platforms (17); an electric trolley (18) is fixed to the bottom of the column (9); a plurality of ladders (19) are fixed to the outer side of the portal frame (4); and longitudinal hanging slide beams (20) are provided at the front and rear ends of the outer trolley (3).
2. The open-cut tunnel lining steel bar processing trolley according to claim 1, characterized in that: The inner side of the annular beam 1 (7) is in contact with the outer surface of the tunnel (1).
3. The open-cut tunnel lining steel bar processing trolley according to claim 1, characterized in that: The outer surface of the second annular beam (16) is in contact with the inner surface of the tunnel (1).
4. The open-cut tunnel lining steel bar processing trolley according to claim 1, characterized in that: The bottom of the second electric sports car (18) is provided with a track, and the track is fixedly connected to the lower surface of the interior of the tunnel (1).
5. The open-cut tunnel lining steel bar processing trolley according to claim 1, characterized in that: The working platform (17) has a total of 5 layers, and all are designed as hydraulic cylinder retractable platforms. The ends of the retractable platforms are designed with 10 cm spacing positioning slots. The positioning and spacing targets of the steel bars are achieved by the hydraulic cylinder retractable platform externally supporting the steel bars. The inner trolley (2) has a total length of 11.2 meters, and a hinged connecting rod is reserved at the end for connection with the lining trolley.
6. The open-cut tunnel lining steel bar processing trolley according to claim 1, characterized in that: The portal frame (4) is composed of a lower column, an upper column, and a cross beam. The lower column is welded into a box shape using 400×300, the upper column is welded into a box section using a trapezoidal column 850×300mm, and the cross beam is a 500×300mm welded box beam. A total of 5 portal frames are provided. The vertical and horizontal support frames (6) are designed with a hydraulic cylinder retractable steel bar positioning plate groove to perform spacing positioning on the outer steel ring main reinforcement. The longitudinal hanging slide beam (20) is designed to be wheel-rail movable, and the hoisting part is designed to be a hydraulic cylinder that can achieve vertical lifting. The inner wall of the portal frame (4) and the outer surface of the vertical and horizontal support frames (6) are welded with a 125b arch ring positioning beam, and the vertical and horizontal support frames are both made of I25b I-beam.