Pipeline laying auxiliary device for hydraulic engineering construction

By adopting rotating and snap-in connection and limit collar structure in the auxiliary device for water conservancy engineering construction, the problems of cumbersome pipeline limit operation and tools required for disassembly in the prior art are solved, and the rapid limit of pipeline position and Convenient disassembly, suitable for pipeline docking work in water conservancy projects.

CN221974534UActive Publication Date: 2024-11-08YISHUI COUNTY WATER CONSERVANCY BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420792280.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-17
Publication Date
2024-11-08
Estimated Expiration
2034-04-17

AI Technical Summary

Technical Problem

The existing auxiliary devices for water conservancy projects are cumbersome to operate when limiting the pipeline, and after completing the pipeline docking, they need to be disassembled with tools, resulting in inconvenient operation.

Method used

A rotary and snap-in connection method including the first bracket and the second bracket is designed, and the limiting collar and limiting components are used to achieve rapid limit fixation, and is conveniently disassembled without tools, using elastic parts and limiting. The structure of the bit block achieves the clamping effect.

Benefits of technology

It realizes rapid limiting and convenient disassembly of pipeline locations, simplifies the pipeline docking workflow in water conservancy projects, and improves operating efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221974534U_ABST
    Figure CN221974534U_ABST
Patent Text Reader

Abstract

The utility model discloses a pipeline laying auxiliary device for hydraulic engineering construction, which relates to the technical field of hydraulic engineering and comprises a first support, a second support is arranged above the first support, a rotating part is arranged at the joint of the second support and the first support, and the right side of the second support is rotatably connected with a limiting lantern ring. A limiting component is arranged at the position, corresponding to the limiting lantern ring, of the first support, and the limiting component used for limiting the limiting lantern ring comprises a fixing block, an elastic piece and a limiting block. The first support and the second support are connected in a rotary clamping mode, the limiting lantern ring of the structure completes convenient limiting and fixing through the limiting component, then the purpose of rapidly limiting the position of the pipeline can be achieved, and during disassembly, the pipeline can be conveniently and rapidly disassembled. The first support and the second support can be rotationally opened without tools, the whole limiting process is convenient to operate, and the pipeline butt joint device is suitable for pipeline butt joint work in water conservancy projects.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water conservancy projects, in particular to a pipeline laying auxiliary device for water conservancy project construction. Background Art

[0002] Water conservancy projects refer to various projects built to control, regulate and utilize natural surface water and groundwater to achieve the purpose of eliminating harm and promoting benefits. Water conservancy projects can be divided into flood control projects (embankments, reservoirs, flood storage and diversion areas, culverts, drainage projects, etc.), farmland water conservancy projects (irrigation projects), hydropower projects, shipping and urban water supply and drainage projects according to their service objects. During the construction of water conservancy projects, pipelines need to be laid, and auxiliary devices are needed to support and fix the pipelines during the laying process.

[0003] When the existing auxiliary device limits the pipeline, it generally uses the combination of bolts and fastening nuts. The pipeline is placed in the auxiliary device, and the staff needs to use tools to tighten the nuts of the auxiliary device respectively. This operation method is relatively cumbersome. After completing the docking work of the pipeline, it is necessary to use tools to disassemble it. Utility Model Content

[0004] The purpose of the utility model is to provide a pipeline laying auxiliary device for water conservancy project construction, so as to solve the problem that the existing auxiliary device proposed in the above background technology has a cumbersome operation method when limiting the pipeline, and after the pipeline docking work is completed, it needs to be disassembled with tools.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A pipeline laying auxiliary device for water conservancy project construction, comprising a first bracket, a second bracket is arranged above the first bracket, a rotating member is arranged at the connection between the second bracket and the first bracket, the right side of the second bracket is rotatably connected to a limiting collar, and a limiting component is arranged at the corresponding position of the first bracket and the limiting collar;

[0007] The limiting component for limiting the limiting ring includes a fixed block, an elastic member and a limiting block. The fixed block is fixed to the outer wall of the first bracket, the elastic member is installed inside the fixed block, and the limiting block is fixed to the bottom end of the elastic member.

[0008] Furthermore, the second bracket is connected to the rotating member by welding.

[0009] Furthermore, anti-slip pads are provided on the inner walls of the first bracket and the second bracket.

[0010] Furthermore, a mounting base plate is provided below the first bracket.

[0011] Furthermore, a motor is installed on one side of the installation base plate.

[0012] Furthermore, the second bracket can be connected to the first bracket in a limiting manner through the limiting ring.

[0013] Furthermore, the elastic member is a spring.

[0014] Compared with the prior art, the beneficial effects of the utility model are as follows:

[0015] The first bracket and the second bracket designed by the utility model are connected in a rotating snap-fitting manner, and the limiting collar of the structure itself is conveniently fixed by a limiting component, thereby achieving the purpose of quickly limiting the position of the pipeline, and when disassembling, the first bracket and the second bracket can be rotated open without using tools. The entire limiting process is easy to operate and is more suitable for pipeline docking work in water conservancy projects. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a three-dimensional structural diagram of a pipeline laying auxiliary device for water conservancy project construction (open state);

[0017] Figure 2 This is a three-dimensional explosion structure diagram of a pipeline laying auxiliary device for water conservancy project construction;

[0018] Figure 3 This is a three-dimensional structural diagram of a pipeline laying auxiliary device for water conservancy project construction (closed state);

[0019] Figure 4 This is a partial cross-sectional structural diagram of a pipeline laying auxiliary device for water conservancy project construction;

[0020] Figure 5 The utility model provides a front view structural schematic diagram of a pipeline laying auxiliary device for water conservancy project construction.

[0021] In the figure:

[0022] 1. First bracket; 2. Rotating member; 3. Second bracket; 4. Limiting collar; 5. Limiting component; 501. Fixed block; 502. Elastic member; 503. Limiting block; 6. Mounting base plate; 7. Motor; 8. Anti-skid pad. DETAILED DESCRIPTION

[0023] The following is a further detailed description of the implementation of the present invention in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but cannot be used to limit the scope of the present invention.

[0024] like Figure 1-5As shown, the utility model provides a pipeline laying auxiliary device for water conservancy project construction, the auxiliary device specifically comprises a first bracket 1, a second bracket 3 is arranged above the first bracket 1, a rotating member 2 is arranged at the connection between the second bracket 3 and the first bracket 1, the second bracket 3 is rotatably connected to a limiting collar 4 on the right side, and a limiting component 5 is arranged at the corresponding position of the first bracket 1 and the limiting collar 4, the purpose of which is that the designed first bracket 1 and the second bracket 3 are a rotating snap-fit ​​connection mode, and the limiting collar 4 of the structure itself is conveniently limited and fixed by the limiting component 5, so as to realize the purpose of quickly limiting the position of the pipeline, and when disassembling, the first bracket 1 and the second bracket 3 can be rotated and opened without using tools, the whole limiting process is easy to operate, and is more suitable for pipeline docking work in water conservancy projects.

[0025] like Figure 4 As shown, the limiting component 5 for limiting the limiting collar 4 includes a fixed block 501, an elastic member 502 and a limiting block 503. The fixed block 501 is fixedly connected to the outer wall of the first bracket 1. The elastic member 502 is installed inside the fixed block 501. The bottom end of the elastic member 502 is fixedly connected to the limiting block 503. Specifically, when the limiting collar 4 is rotated to the position of the limiting block 503, the limiting block 503 will move to the side of the fixed block 501 through the elastic member 502, and the limiting collar 4 will reach the left side of the limiting block 503, thereby achieving the purpose of engagement.

[0026] As an implementation mode, the second bracket 3 is welded to the rotating member 2, and the rotating member 2 is rotatably connected to the left end of the first bracket 1, and the second bracket 3 can be rotated open with the first bracket 1 below through the rotating member 2.

[0027] As an implementation manner, anti-skid pads 8 are provided on the inner walls of the first bracket 1 and the second bracket 3. The anti-skid pads 8 are made of rubber material and can increase the friction between the mechanism and the tube body.

[0028] As an implementation manner, a mounting base plate 6 is disposed below the first bracket 1 .

[0029] As an implementation mode, a motor 7 is installed on one side of the mounting base plate 6, and a screw is fixedly connected to the output end of the motor 7. The rotation of the screw can make the two first brackets 1 above the mounting base plate 6 make relative movement.

[0030] As an implementation manner, the second bracket 3 can be connected to the first bracket 1 in a limiting manner through a limiting collar 4 .

[0031] As an implementation manner, the elastic member 502 is a spring, and when the limiting collar 4 needs to be disassembled, the limiting block 503 can be pushed upward through the elastic member 502 .

[0032] Working principle:

[0033] When the pipeline laying auxiliary device for water conservancy project construction is in use, first place the water conservancy pipeline on one side above the first bracket 1, then rotate and close the second bracket 3 through the rotating member 2, and then rotate the limiting collar 4 to the position of the limiting block 503. The limiting block 503 will move toward the fixed block 501 through the elastic member 502, and the limiting collar 4 will reach the left side of the limiting block 503, thereby achieving the purpose of engagement, and finally start the motor 7 of the installation base plate 6 to bring the first brackets 1 on both sides close to each other, so that the pipelines can be docked.

[0034] The embodiments of the present invention are provided for the purpose of illustration and description, and are not intended to be exhaustive or to limit the present invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described to better illustrate the principles and practical applications of the present invention, and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.

Claims

1. A pipeline laying auxiliary device for water conservancy project construction, comprising a first bracket (1), characterized in that: A second bracket (3) is arranged above the first bracket (1); a rotating member (2) is arranged at the connection between the second bracket (3) and the first bracket (1); the right side of the second bracket (3) is rotatably connected to a limiting collar (4); and a limiting component (5) is arranged at the corresponding position between the first bracket (1) and the limiting collar (4); The limiting component (5) for limiting the limiting ring (4) comprises a fixed block (501), an elastic member (502) and a limiting block (503); the fixed block (501) is fixedly connected to the outer wall of the first bracket (1); the elastic member (502) is installed inside the fixed block (501); and the limiting block (503) is fixedly connected to the bottom end of the elastic member (502).

2. A pipeline laying auxiliary device for water conservancy project construction according to claim 1, characterized in that: The second bracket (3) is welded to the rotating member (2).

3. A pipeline laying auxiliary device for water conservancy project construction according to claim 1, characterized in that: Anti-slip pads (8) are provided on the inner walls of the first bracket (1) and the second bracket (3).

4. A pipeline laying auxiliary device for water conservancy project construction according to claim 1, characterized in that: A mounting base plate (6) is provided below the first bracket (1).

5. A pipeline laying auxiliary device for water conservancy project construction according to claim 4, characterized in that: A motor (7) is installed on one side of the installation base plate (6).

6. The pipeline laying auxiliary device for water conservancy project construction according to claim 1, characterized in that: The second bracket (3) can be connected to the first bracket (1) in a limiting manner via the limiting collar (4).

7. The pipeline laying auxiliary device for water conservancy project construction according to claim 1, characterized in that: The elastic member (502) is a spring.