Offshore photovoltaic engineering cable bearing system
By using assembled steel pipe pile platform and integrated trest module in offshore photovoltaic engineering, the problems of large self-weight and weak bending ability of prestressed pipe piles are solved, material savings and construction costs are achieved, and structure stability is ensured. Sex and safety.
Patent Information
- Application Number
- CN202323503196.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-21
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2033-12-21
AI Technical Summary
The use of prestressed pipe piles in existing offshore photovoltaic projects has problems such as large self-weight, weak bending resistance, easy damage, and high material usage, resulting in structural safety hazards and high construction costs.
The assembled steel pipe pile platform and integrated trest module are adopted, and a single steel pipe pile is used to replace three prestressed pipe piles, combining the non-frame structure of longitudinal main beams, cross beams and railings to reduce material usage and improve structural strength.
It reduces material usage and construction costs, improves the bending resistance and stability of the structure, meets the support strength requirements of offshore photovoltaic projects, and reduces construction cycle and personnel operation risks.
Smart Images

Figure CN221978542U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of offshore photovoltaic engineering, in particular to an offshore photovoltaic engineering cable connection system. Background Art
[0002] At present, offshore photovoltaic projects are in a stage of rapid development and construction. In offshore photovoltaic power generation projects, the collection lines between photovoltaic arrays are long, and due to the difficulty of offshore construction, the layout and installation of cables at all levels have always been one of the key difficulties in project implementation. In order to meet the stability and safety requirements of the support system under harsh sea conditions, the Chinese utility model patent with the authorization announcement number CN219627271U discloses a large-span cable bundle support system for offshore photovoltaic projects, which uses prestressed pipe piles to support a three-legged support platform and cooperates with a cable bundle trestle with a spatial tube truss structure to meet the needs of cable layout and personnel passage. However, the prestressed pipe piles used for support in the patent have a large deadweight and weak bending resistance. They are prone to cracking during the hoisting process and are also prone to minor damage during the piling process. In the complex environment of the ocean, the pile body is subjected to the cyclic effects of waves, currents, sea ice, etc. for a long time, and minor damage will bury huge hidden dangers to the safety of the structure. In addition, the solution of using three prestressed pipe piles in combination with the spatial tube truss structure uses a large amount of materials. On the one hand, the utilization rate of some structures is low, resulting in waste, and on the other hand, it increases the construction cost and construction period. Utility Model Content
[0003] In order to solve the deficiencies of the prior art, the purpose of the utility model is to provide an offshore photovoltaic engineering cable connection system to overcome the defects of using prestressed pipe piles, while reducing material consumption on the basis of ensuring structural strength.
[0004] In order to achieve the above-mentioned purpose, the utility model provides an offshore photovoltaic project cable connection system, including an assembled steel pipe pile platform and an integrated trestle module; the assembled steel pipe pile platform includes steel pipe piles and an insert-type platform arranged on the upper part of the steel pipe piles; the number of the assembled steel pipe pile platforms is at least two, and the two ends of the integrated trestle module are respectively arranged on the insert-type platforms of adjacent assembled steel pipe pile platforms; the integrated trestle module includes a longitudinal main beam, a cross beam and a railing, the cross beam is arranged between the longitudinal main beams at intervals, the railing is arranged above the longitudinal main beams on both sides of the integrated trestle module, and a cable trough box channel is also arranged on the inner side of the railing.
[0005] Preferably, the number of steel pipe piles in each assembled steel pipe pile platform is 1.
[0006] Preferably, the top of the insertable platform is a deck, steel pile legs are provided under the deck, and four diagonal braces are provided between the deck and the pile legs.
[0007] Preferably, the bottom of the pile leg has a truncated cone-shaped tip.
[0008] Preferably, a support leg is provided at the bottom of the steel pipe pile, and the support leg is in a truncated cone shape.
[0009] Preferably, the integrated trestle module comprises three longitudinal main beams arranged in parallel, and the railings are arranged on the longitudinal main beams on both sides.
[0010] Preferably, a steel grille is provided between the longitudinal main beam and the cross beam.
[0011] Preferably, the cable trough box channel includes a cable bracket, and the cable bracket is connected to the railing.
[0012] Preferably, it further comprises a cable post, wherein the cable post is arranged on a side of the cable support away from the railing.
[0013] Preferably, a fence is provided on the upper portion of the insertable platform.
[0014] Compared with the prior art, the beneficial effects of the utility model are:
[0015] The utility model provides an offshore photovoltaic project cable connection system, which uses steel pipe piles to replace the prestressed pipe piles in the prior art, thereby overcoming the defects of using prestressed pipe piles; considering the characteristics of the offshore photovoltaic site being close to the shore, shallow water and small waves, a single steel pipe pile is used to replace three prestressed pipe piles, thereby reducing material usage and construction costs; at the same time, the trestle structure is optimized, and a non-frame structure formed by a longitudinal main beam, a cross beam and a railing is used to replace the existing space pipe truss structure, which can further save material usage, and at the same time, the lightweight integrated trestle module can also reduce the pressure on the steel pipe piles, so that the steel pipe piles can meet the support strength requirements.
[0016] Advantages of additional aspects of the present invention will be partially given in the following description, and partially become apparent from the following description, or be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention.
[0018] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0019] Figure 2 It is a structural diagram of the plug-in platform and the integrated trestle module;
[0020] Figure 3It is a structural schematic diagram of the assembled steel pipe pile platform;
[0021] Figure 4 It is a structural schematic diagram of the cable trough box bracket.
[0022] Among them, 1. Assembled steel pipe pile platform; 11. Steel pipe piles; 12. Plug-in platform; 2. Integrated trestle module; 21. Longitudinal main beam; 22. Cross beam; 23. Railing; 3. Cable column. DETAILED DESCRIPTION
[0023] The utility model is further described below in conjunction with the accompanying drawings and embodiments.
[0024] Embodiment 1
[0025] like Figure 1-Figure 2 As shown, a cable connection system for an offshore photovoltaic project includes an assembled steel pipe pile platform 1 and an integrated trestle module 2. The assembled steel pipe pile platform 1 includes a steel pipe pile 11 and an insertable platform 12 arranged on the upper part of the steel pipe pile 11. The number of assembled steel pipe pile platforms 1 is at least two, and the two ends of the integrated trestle module 2 are respectively arranged on the insertable platform 12 of the adjacent assembled steel pipe pile platform 1. The integrated trestle module 2 includes a longitudinal main beam 21, a cross beam 22 and a railing 23, the cross beam 22 is arranged at intervals between the longitudinal main beams 21, the railing 23 is arranged above the longitudinal main beams 21 on both sides of the integrated trestle module 2, and a cable trough box channel is also arranged on the inner side of the railing 23.
[0026] This embodiment aims to optimize the cable support structure in the prior art, and on the basis of meeting the strength requirements, minimize the use of materials and improve the material utilization rate. The structure is mainly divided into two parts: the foundation and the bridge deck, so the design is mainly deepened from these two directions. For the foundation, in order to better support the bridge deck and resist the overturning moment, the prior art often uses more than two pile foundations (such as PHC pipe piles) for support. However, on the one hand, although the use of multiple pile foundations can meet the strength and stability requirements, it also increases the material cost and construction cost accordingly, and the construction efficiency is low. On the other hand, PHC pipe piles are prefabricated with concrete, and have the defects of heavy weight, weak bending resistance, and easy damage during hoisting and piling. For the bridge deck, the prior art adopts a spatial tube truss structure design. Since it needs to meet the requirements for personnel passage, the height of the top of the frame needs to be above 2m, resulting in material waste and increased deadweight.
[0027] Based on this, this embodiment proposes corresponding optimization measures for the foundation and bridge deck structure. Due to the high cost of offshore construction and complex operation, the foundation and bridge deck are both modularly designed. The foundation adopts an assembled steel pipe pile platform, including steel pipe piles and an insert platform. The steel pipe pile adopts a single steel pipe pile as the foundation. The ability of a single steel pipe pile to resist overturning is reduced. In order to improve the overall rigidity, four diagonal braces are added to the lower part of the insert platform to increase the integrity of the structure. There are at least two groups of assembled steel pipe pile platforms, and there is a certain distance between adjacent platforms. A single pile insert platform is set on top of the steel pipe piles, the top is a deck composed of steel plates prepared by steel sections, the pile legs are made of steel, in a single pile style, and a truncated cone-shaped plug tip is set at the bottom, which cooperates with the steel pipe piles to form an assembled steel pipe pile platform. Fences are installed on both sides of the insert platform, which play a role of enclosure together with the railings of the integrated trestle module. The bottom of the steel pipe pile is designed with a truncated cone-shaped support leg to increase the stability of the steel pipe pile structure.
[0028] The integrated trestle module 2 includes three parallel longitudinal main beams composed of H-shaped steels at the bottom, and a transverse H-shaped steel is set every 1-3 meters between the longitudinal main beams as a cross beam to strengthen the integrity of the structure and provide support points for the cable bracket and the steel grille of the pedestrian passage. The railings 23 are set on the longitudinal main beams on both sides, and the railing posts correspond to the positions of the cross beams.
[0029] The integrated trestle module is also equipped with a cable trough channel, with a personnel passage area in the middle. According to functional requirements, the overall width can be controlled below 3 meters. The side railings are truss structures, and the height can be configured according to the number of troughs. Generally, it can be configured below two meters. Compared with the previous space tube truss structure, it greatly saves material consumption. A steel grille is set at the bottom of the personnel passage area. The cable trough channel is located on the railings on both sides of the integrated trestle module.
[0030] In order to support the collector line, a cable bracket is set every 1-3 meters in the longitudinal direction. The cable bracket is made of angle steel or channel steel, connected to the railing, and the position corresponds to the railing column. The cable bracket forms multiple groups of cable trough channels along the height direction. In addition, considering that the cable bracket may shake under the action of waves, which is easy to damage the cable, the present embodiment also sets a cable column 3 on the inner side of the cable bracket to support the cable bracket and protect the cable. The cable column 3 is set on the side away from the railing connected to the corresponding cable bracket, and the cable column, cable bracket and railing column together form a rectangular cable trough channel.
[0031] While meeting the function of connecting cables, the utility model greatly reduces the amount of materials used, thereby reducing construction time and construction costs. Different from the previous two or more pile foundation supports, considering the characteristics of offshore photovoltaic sites being close to the shore, shallow water and small waves, an attempt is made to use a single steel pipe pile for support. After calculation, 700-1000mm diameter steel pipe piles are sufficient to resist the risk of rollover caused by wind and waves. At the same time, truncated cone-shaped legs are set at the bottom of the steel pipe piles to further ensure the stability of the single steel pipe piles. The use of a single steel pipe pile for support reduces the amount of materials and material costs compared to multiple steel pipe piles or PHC pipe piles. And because of the high cost and difficulty of offshore construction, it is more suitable to use the single steel pipe pile solution of the utility model for construction in areas with shallow water and small waves near the shore. The upper integrated trestle module has been optimized, the amount of steel used has also been reduced, and the pressure on the lower steel pipe piles has been reduced, while reducing costs and material usage, ensuring stability.
[0032] In view of the functional requirements of the trestle at this time, the width of the bridge deck is controlled below 3 meters to meet the requirements of traffic and cable layout and reduce the amount of materials used. The upper structure of the integrated trestle module is further designed. After the coupling calculation of the pile foundation and the upper structure under wave conditions, the integrated trestle module supported by three main beams is designed. The non-spatial tube truss structure can also meet the strength requirements, so that the height of the side truss can be reduced, thereby further reducing the amount of steel used, saving materials, reducing weight and reducing costs.
[0033] The cable connection system provided by the utility model is modular in design. The single-pile assembled steel pipe pile platform and the integrated pier module can be prefabricated as a whole on land and hoisted at sea, which greatly reduces the amount of manual bulk operations at sea, reduces the operating risks of personnel, and further controls the cost price.
[0034] The above description is only the preferred embodiment of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. An offshore photovoltaic engineering cable connection system, characterized in that: It includes an assembled steel pipe pile platform and an integrated trestle module; the assembled steel pipe pile platform includes steel pipe piles and an insert-type platform arranged on the upper part of the steel pipe piles; the number of the assembled steel pipe pile platforms is at least two, and the two ends of the integrated trestle module are respectively arranged on the insert-type platforms of adjacent assembled steel pipe pile platforms; the integrated trestle module includes longitudinal main beams, cross beams and railings, the cross beams are arranged between the longitudinal main beams at intervals, the railings are arranged above the longitudinal main beams located on both sides of the integrated trestle module, and a cable trough box channel is also arranged on the inner side of the railing.
2. The offshore photovoltaic engineering cable connection system according to claim 1, characterized in that: The number of steel pipe piles in each assembled steel pipe pile platform is 1.
3. The offshore photovoltaic engineering cable connection system according to claim 2, characterized in that: The top of the inserted platform is a deck, steel pile legs are arranged under the deck, and four diagonal braces are arranged between the deck and the pile legs.
4. The offshore photovoltaic engineering cable connection system according to claim 3, characterized in that: The bottom of the pile leg is provided with a truncated cone-shaped plug tip.
5. The offshore photovoltaic engineering cable connection system according to claim 1, characterized in that: A supporting leg is arranged at the bottom of the steel pipe pile, and the supporting leg is in a truncated cone shape.
6. The offshore photovoltaic engineering cable connection system according to claim 1, characterized in that: The integrated trestle module comprises three longitudinal main beams arranged in parallel, and the railings are arranged on the longitudinal main beams on both sides.
7. An offshore photovoltaic engineering cable connection system as claimed in claim 6, characterized in that: A steel grille is arranged between the longitudinal main beam and the cross beam.
8. The offshore photovoltaic engineering cable connection system according to claim 1, characterized in that: The cable trough box channel includes a cable bracket, and the cable bracket is connected to the railing.
9. The offshore photovoltaic engineering cable connection system according to claim 8, characterized in that: Also included is a cable post, which is arranged on a side of the cable support away from the railing.
10. The offshore photovoltaic engineering cable connection system according to claim 1, characterized in that: A fence is arranged on the upper part of the insertable platform.