Precast beam steel bar machining and binding assembly line
By setting up tracks and trolleys between the steel bar processing and binding areas, combining lifting components and connecting parts, the automatic transportation and rapid bundling of steel bars is achieved, solving the problem of manual handling difficulties during the transportation and binding of long and thin steel bars, significantly reducing the problem of The labor intensity and construction efficiency are improved.
Patent Information
- Application Number
- CN202322924606.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-31
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2033-10-31
AI Technical Summary
In the prefabrication of the railway standard span simple-support box beam, long and thin steel bars are prone to bending deflection during transportation and binding, which requires a large amount of manual handling, resulting in high labor intensity and affecting construction efficiency.
A prefabricated beam steel bar processing and binding assembly line is designed, including a steel bar processing area and binding area arranged in the longitudinal direction. There are tracks and moving vans on both sides to automatically transport steel bars, thereby reducing manual handling, and using lifting components and connections. Quickly tie and transport rebars.
It effectively reduces the labor intensity of staff, improves the efficiency of steel bar transportation and binding, reduces the demand for manual handling, and improves construction efficiency.
Smart Images

Figure CN221983783U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of prefabricated beam processing and manufacturing, in particular to a prefabricated beam steel bar processing and binding assembly line. Background Art
[0002] At present, the most common layout of steel bar processing workshop is horizontal row type, and the steel bar processing workshop is parallel to the binding pedestal. Steel bars are usually processed in the steel bar processing yard. After the processing is completed and inspected by the quality inspector, some small materials can be loaded with special tools and moved to the steel bar binding area by forklift. Due to the long length of the box girder, the box girder needs a lot of manual lifting to the steel bar binding pedestal. In the prefabrication process of the railway standard span simply supported box girder, a large number of steel bars need to be tied, among which the longitudinal distribution of the box girder is long, the number is large, and the diameter is thin. For long and thin steel bars, large bending deflection will occur during the lifting and transportation process. The semi-finished steel bars require a lot of labor for manual handling. In this process, 8-10 construction workers are required to cooperate, and only 8-10 bars can be transported at a time. The labor intensity is extremely high, which seriously affects the construction efficiency of the box girder steel bar binding. Utility Model Content
[0003] In view of the defects existing in the prior art, the utility model provides a prefabricated beam reinforcement processing and binding production line, which can solve the problems of difficult reinforcement transportation and high labor intensity of workers, and achieve the effect of facilitating the transportation of reinforcement, reducing the labor intensity of workers, and accelerating the efficiency of box beam reinforcement binding construction.
[0004] In order to solve the above technical problems, the utility model is solved by the following technical solutions:
[0005] A prefabricated beam reinforcement processing and binding production line comprises a reinforcement processing area and a reinforcement binding area arranged in a longitudinal direction; tracks extending into the reinforcement processing area are arranged on both sides of the reinforcement binding area; a plurality of overhead cranes moving along the length direction of the tracks are arranged on the tracks, and the overhead cranes are used to transport the reinforcement processed in the reinforcement processing area to the reinforcement binding area for binding.
[0006] Through the utility model, after the steel bars are processed in the steel bar processing area, they are lifted by an overhead crane. If the steel bars are long, they can be lifted to the steel bar binding area by multiple overhead cranes, thus eliminating the need for manual handling and effectively reducing the labor intensity of the staff; at the same time, it also speeds up the transportation efficiency of the steel bars and the construction efficiency of the box girder steel bar binding.
[0007] Preferably, a lifting assembly for lifting steel bars is provided at the lower end of the overhead crane hoisting rope, and the lifting assembly includes a binding piece for binding the steel bars and a connecting piece for connecting the overhead crane hoisting rope; a connecting mechanism for connecting the binding piece is provided at the connecting piece.
[0008] With the utility model, the staff can quickly bundle the steel bars through the bundling pieces, and connect the bundled steel bars with the connecting pieces through the connecting mechanism, so that the staff can quickly place the bundled steel bars on the connecting pieces at the lower end of the overhead crane, which is convenient for the overhead crane to lift.
[0009] Preferably, the binding parts include a first clamping plate and a second clamping plate in a semicircular shape, and one end of the first clamping plate and the second clamping plate are hinged to each other; the first clamping plate and the second clamping plate together constitute a clamping section for clamping steel bars; the first clamping plate and the second clamping plate are each provided with a connecting plate at one end away from the hinge, and a limiting hole is provided on the connecting plate; the connecting part includes a mounting seat connected to the overhead crane hoisting rope; a mounting groove is provided at the lower end of the mounting seat for the connecting plate to extend into; a mounting hole communicating with the mounting groove is provided at the side wall of the mounting seat, and a limiting pin passes through the mounting hole and extends into the limiting hole.
[0010] With the utility model, the staff places multiple steel bars into the clamping interval, then closes the first clamp and the second clamp, sets several clamping points along the length direction of the steel bars, and clamps the steel bars with the first clamp and the second clamp; after the steel bars are clamped, the lifting rope of the overhead crane is lowered, and then the staff inserts the connecting plates of the first clamp and the second clamp into the mounting grooves of the mounting seat, and then inserts the limit pins into the limit holes on the connecting plates to connect the mounting seat and the first clamp and the second clamp; then the steel bars are lifted and transported to the steel bar binding area by several overhead cranes at the same time, so that it is convenient for the staff to quickly bundle the steel bars together and convenient for the overhead crane to quickly lift the steel bars.
[0011] Preferably, the inner side wall of the mounting hole is recessed inward along the circumferential direction to form a mounting cavity, and the side wall of the limit pin located in the mounting cavity expands outward along the circumferential direction to form a first flange. A spring is also provided in the mounting cavity to push the first flange so that the limit pin extends into the mounting groove; a second flange is provided at one end of the limit pin away from the first flange, which fits with the side wall of the mounting seat.
[0012] With the utility model, the staff first pulls the limit pin, then inserts the connecting plate into the installation groove, loosens the limit pin, and the limit pin is inserted into the limit hole on the connecting plate under the push of the spring, so that the staff can quickly connect the binding parts and the connecting parts; when the vehicle transports the steel bars to the steel bar binding area, the staff pulls the limit pin, pulls the limit pin out of the limit hole, releases the fixation of the first clamping plate and the second clamping plate, and then separates the first clamping plate and the second clamping plate, so that the staff can take out the steel bars from the clamping interval conveniently.
[0013] Preferably, a guide rod is provided in the installation cavity along the depth direction of the installation cavity, the spring is sleeved on the guide rod, and a through hole for the guide rod to pass through is provided at the first flange.
[0014] Through the utility model, when the staff pulls the limit pin, the first flange slides along the guide rod, thereby preferably improving the stability of the limit pin when moving.
[0015] Preferably, a handle is provided at one end of the second flange away from the mounting seat.
[0016] With the utility model, the staff can pull the limit pin to move by the handle, so it is convenient for the staff to pull the handle.
[0017] Preferably, one end of the limiting pin extending into the installation groove is provided with an inclined surface matching with the connecting plate.
[0018] With the utility model, when the staff inserts the connecting plate into the installation groove, the connecting plate squeezes the inclined surface on the limit pin, thereby pushing the limit pin into the installation cavity, so that the staff does not need to pull the limit pin when inserting the connecting plate into the installation groove.
[0019] Preferably, a sliding wheel is provided at the upper end of the mounting seat for the overhead crane hoisting rope to pass through.
[0020] Through the utility model, the installer passes the suspension rope at the lower end of the overhead crane through the sliding wheel, thereby conveniently connecting the installation seat with the suspension rope. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 This is a schematic diagram of the locations of the steel bar processing area and the steel bar binding area in Example 1.
[0022] Figure 2 Schematic diagram of the overhead crane in Example 1.
[0023] Figure 3 This is a schematic diagram of the lifting assembly in Example 1.
[0024] Figure 4 This is a schematic diagram of the bundling piece in Example 1.
[0025] Figure 5 This is a schematic diagram of the connecting piece in Example 1.
[0026] Figure 6 This is a schematic diagram of the connection mechanism in Example 1.
[0027] Figure 7 Schematic diagram of the mounting hole in Example 1.
[0028] Figure 8 Schematic diagram of the limit pin in Example 1. DETAILED DESCRIPTION
[0029] In order to further understand the content of the utility model, the utility model is described in detail in conjunction with the accompanying drawings and embodiments. It should be understood that the embodiments are only used to explain the utility model but not to limit it.
[0030] Example 1
[0031] like Figure 1-8 As shown, this embodiment provides a prefabricated beam reinforcement processing and binding production line, which includes a reinforcement processing area 120 and a reinforcement binding area 110 arranged in the longitudinal direction; rails 100 extending into the reinforcement processing area 120 are provided on both sides of the reinforcement binding area 110; a plurality of overhead cranes 210 moving along the length direction of the rails 100 are provided at the rails 100, and the overhead cranes 210 are used to transport the processed reinforcement in the reinforcement processing area 120 to the reinforcement binding area 110 for binding.
[0032] Through this embodiment, after the steel bars are processed in the steel bar processing area 120, they are lifted by the overhead crane 210. If the steel bars are long, they can be lifted to the steel bar binding area 110 by multiple overhead cranes, thus eliminating the need for manual handling and effectively reducing the labor intensity of the staff; at the same time, it also speeds up the transportation efficiency of the steel bars and the construction efficiency of the box girder steel bar binding.
[0033] In this embodiment, a lifting assembly 220 for lifting steel bars is provided at the lower end of the lifting rope of the overhead crane 210. The lifting assembly 220 includes a binding member 320 for binding the steel bars and a connecting member 310 for connecting the lifting rope of the overhead crane 210. A connecting mechanism for connecting the binding member 320 is provided at the connecting member 310.
[0034] Through this embodiment, the staff quickly bundles the steel bars through the binding pieces 320, and connects the tied steel bars to the connecting piece 310 through the connecting mechanism, so that the staff can quickly place the tied steel bars on the connecting piece 310 at the lower end of the overhead crane, which is convenient for the overhead crane to lift.
[0035] In this embodiment, the binding member 320 includes a first clamping plate 410 and a second clamping plate 420 which are semicircular in shape, and one end of the first clamping plate 410 and the second clamping plate 420 are hinged to each other; the first clamping plate 410 and the second clamping plate 420 together constitute a clamping section for clamping steel bars; the first clamping plate 410 and the second clamping plate 420 are both provided with a connecting plate 430 at one end away from the hinge, and a limiting hole 440 is provided on the connecting plate 430; the connecting member 310 includes a mounting seat 530 connected to the lifting rope of the overhead crane 210; the lower end of the mounting seat 530 is provided with a mounting groove 610 for the connecting plate 430 to extend into; a mounting hole 710 which is communicated with the mounting groove 610 is provided at the side wall of the mounting seat 530, and a limiting pin 810 passes through the mounting hole 710 and extends into the limiting hole 440.
[0036] Through this embodiment, the staff places multiple steel bars into the clamping interval, then closes the first clamping plate 410 and the second clamping plate 420, sets several clamping points along the length direction of the steel bars, and clamps the steel bars with the first clamping plate 410 and the second clamping plate 420; after the steel bars are clamped, the lifting rope of the overhead crane 210 is lowered, and then the staff inserts the connecting plate 430 on the first clamping plate 410 and the second clamping plate 420 into the mounting groove 610 of the mounting seat 530, and then inserts the limiting pin 810 into the limiting hole 440 on the connecting plate 430 to connect the mounting seat 530 and the first clamping plate 410 and the second clamping plate 420; then the steel bars are transported to the steel bar binding area 110 by lifting them simultaneously by several overhead cranes, so as to facilitate the staff to quickly bundle the steel bars together and facilitate the overhead crane to quickly lift the steel bars.
[0037] In this embodiment, the inner side wall of the mounting hole 710 is recessed inward along the circumferential direction to form a mounting cavity 670, and the side wall of the limit pin 810 located in the mounting cavity 670 expands outward along the circumferential direction to form a first flange 620. The mounting cavity 670 is also provided with a spring 650 that pushes the first flange 620 so that the limit pin 810 extends into the mounting groove 610; the end of the limit pin 810 away from the first flange 620 is provided with a second flange 640 that fits with the side wall of the mounting seat 530.
[0038] Through this embodiment, the staff first pulls the limit pin 810, then inserts the connecting plate 430 into the installation groove 610, loosens the limit pin 810, and the limit pin 810 is inserted into the limit hole 440 on the connecting plate 430 under the push of the spring 650, so as to facilitate the staff to quickly connect the binding member 320 and the connecting member 310; when the vehicle transports the steel bars to the steel bar binding area 110, the staff pulls the limit pin 810, pulls the limit pin 810 out of the limit hole 440, releases the fixation of the first splint 410 and the second splint 420, and then separates the first splint 410 and the second splint 420, so as to facilitate the staff to take the steel bars out of the clamping interval.
[0039] In this embodiment, a guide rod 630 is provided in the installation cavity 670 and arranged along the depth direction of the installation cavity 670 . The spring 650 is sleeved on the guide rod 630 . A through hole 820 for the guide rod 630 to pass through is provided at the first flange 620 .
[0040] Through this embodiment, when the staff pulls the limit pin 810, the first flange 620 slides along the guide rod 630, thereby better improving the stability of the limit pin 810 when moving.
[0041] In this embodiment, a handle 520 is provided at one end of the second flange 640 away from the mounting seat 530 .
[0042] Through this embodiment, the staff pulls the limit pin 810 through the handle 520 to move, thereby making it convenient for the staff to pull the handle 520 .
[0043] In this embodiment, one end of the limiting pin 810 extending into the installation groove 610 is provided with an inclined surface 660 that matches the connecting plate 430 .
[0044] Through this embodiment, when the staff inserts the connecting plate 430 into the installation groove 610, the connecting plate 430 squeezes the inclined surface 660 on the limit pin 810, thereby pushing the limit pin 810 into the installation cavity 670, so that the staff does not need to pull the limit pin 810 when inserting the connecting plate 430 into the installation groove 610.
[0045] In this embodiment, a sliding wheel 510 is provided at the upper end of the mounting seat 530 for the suspension rope of the overhead travelling vehicle 210 to pass through.
[0046] According to this embodiment, the installer passes the suspension rope at the lower end of the overhead travelling vehicle 210 through the sliding wheel 510 , thereby facilitating the connection between the mounting seat 530 and the suspension rope.
[0047] In short, the above is only a preferred embodiment of the present utility model, and all equivalent changes and modifications made according to the scope of the patent application of the present utility model should fall within the scope of the present utility model patent.
Claims
1. A prefabricated beam reinforcement processing and binding line, characterized by: The invention comprises a steel bar processing area (120) and a steel bar binding area (110) arranged in a longitudinal direction; tracks (100) extending into the steel bar processing area (120) are provided on both sides of the steel bar binding area (110); a plurality of overhead cranes (210) movable along the length direction of the tracks (100) are provided at the tracks (100); the overhead cranes (210) are used to transport processed steel bars in the steel bar processing area (120) to the steel bar binding area (110) for binding; A lifting assembly (220) for lifting steel bars is provided at the lower end of the lifting rope of the overhead traveling crane (210); the lifting assembly (220) comprises a binding member (320) for binding the steel bars and a connecting member (310) for connecting the lifting rope of the overhead traveling crane (210); a connecting mechanism for connecting the binding member (320) is provided at the connecting member (310); The binding member (320) comprises a first clamping plate (410) and a second clamping plate (420) both of which are semicircular in shape, wherein one end of the first clamping plate (410) and the second clamping plate (420) are hinged to each other; the first clamping plate (410) and the second clamping plate (420) together constitute a clamping section for clamping steel bars; a connecting plate (430) is provided at one end of the first clamping plate (410) and the second clamping plate (420) away from the hinge, and a limiting hole (440) is provided on the connecting plate (430); the connecting member (310) comprises a mounting seat (530) connected to a suspension rope of a crown block (210); a mounting groove (610) for the connecting plate (430) to extend into is provided at the lower end of the mounting seat (530); a mounting hole (710) communicating with the mounting groove (610) is provided at a side wall of the mounting seat (530), and a limiting pin (810) passes through the mounting hole (710) and extends into the limiting hole (440) at the mounting hole (710).
2. The prefabricated beam reinforcement processing and binding line according to claim 1 is characterized in that: The inner side wall of the mounting hole (710) is recessed inwardly along the circumferential direction to form a mounting cavity (670); the side wall of the limit pin (810) located in the mounting cavity (670) is expanded outwardly along the circumferential direction to form a first flange (620); a spring (650) is also provided in the mounting cavity (670) to push the first flange (620) so that the limit pin (810) extends into the mounting groove (610); and a second flange (640) is provided at one end of the limit pin (810) away from the first flange (620) and is in contact with the side wall of the mounting seat (530).
3. The prefabricated beam reinforcement processing and binding line according to claim 2 is characterized in that: A guide rod (630) is provided in the installation cavity (670) and is arranged along the depth direction of the installation cavity (670). The spring (650) is sleeved on the guide rod (630). A through hole (820) is provided at the first flange (620) for the guide rod (630) to pass through.
4. The prefabricated beam reinforcement processing and binding line according to claim 2 is characterized in that: A handle (520) is provided at one end of the second flange (640) away from the mounting seat (530).
5. The prefabricated beam reinforcement processing and binding line according to claim 1 is characterized in that: One end of the limiting pin (810) extending into the installation groove (610) is provided with an inclined surface (660) that matches the connecting plate (430).
6. The prefabricated beam reinforcement processing and binding line according to claim 1 is characterized in that: A sliding wheel (510) is provided at the upper end of the mounting seat (530) for the suspension rope of the overhead travelling vehicle (210) to pass through.
