Maintenance device for precast concrete component

By designing a maintenance device with adjustable brackets and intelligent spray system, the problem of the inability to adjust the height of the maintenance device in the prior art is solved, and the effect of adapting to the maintenance of components of different heights and energy-saving and water-saving is achieved.

CN221985400UActive Publication Date: 2024-11-12CHINA RAILWAY SIXTH GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420524623.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-18
Publication Date
2024-11-12
Estimated Expiration
2034-03-18

AI Technical Summary

Technical Problem

The prior art cannot adjust the height of the maintenance device according to the size of small prefabricated concrete components, resulting in the inability to effectively cure components of different heights.

Method used

A maintenance device including an adjustable bracket and a spraying device is designed. The bracket achieves flexible height adjustment through adjustable vertical poles and pulleys. The spraying device controls the temperature of the spraying liquid through a temperature and humidity sensor and a temperature controller. Humidity, spray tee head increases spray area, and water pump and controller adjust water pressure to achieve different maintenance effects.

Benefits of technology

It has achieved the maintenance of prefabricated concrete components that are adapted to different heights, improved the flexibility and efficiency of equipment, saved manpower and water resources, and adapted to the maintenance needs of different seasons.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221985400U_ABST
    Figure CN221985400U_ABST
Patent Text Reader

Abstract

The utility model discloses a curing device for a precast concrete component. The curing device for the concrete prefabricated part comprises a curing device body, the curing device body comprises a heat preservation top plate and spraying equipment, the heat preservation top plate, the spraying equipment, a plurality of supports and a water tank, the heat preservation top plate and the ground are arranged in a spaced mode, so that a containing space can be formed below the heat preservation top plate, and the containing space is used for containing the concrete prefabricated part; the spraying equipment is arranged below the heat preservation top plate; each support comprises a vertical rod and a pulley, the top end of the vertical rod is connected with the heat preservation top plate, the length of the vertical rod is adjustable, and the pulley is installed at the bottom end of the vertical rod; and the water tank is located on one side of the curing device body and communicates with a water path of the spraying equipment, and liquid in the water tank can be sprayed to the concrete prefabricated part through the spraying equipment. According to the curing device of the precast concrete component, the problem that the height of the curing device cannot be adjusted according to the size of the precast concrete component is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of highway construction, in particular to a maintenance device for prefabricated concrete components. Background Art

[0002] With the rapid development of the current construction industry, the quality requirements for small prefabricated components are getting higher and higher, and the scope of use of small prefabricated components is also wider than before. The maintenance of small concrete prefabricated components is an important link to ensure quality. The maintenance of existing small prefabricated components such as side ditches, intercepting ditches, hexagonal blocks, curbstones, slope protection frames, cable trough covers, etc. has not received much attention from the industry. The existing maintenance methods have the problem of being unable to adjust the height of the maintenance device according to the size of the prefabricated components. Utility Model Content

[0003] The embodiment of the utility model provides a curing device for a prefabricated concrete component, which solves the problem that the height of the curing device cannot be adjusted according to the size of the prefabricated component.

[0004] The utility model provides a maintenance device for precast concrete components, comprising a maintenance device body, the maintenance device body comprising an insulating top plate and a spraying device, the insulating top plate being spaced apart from the ground so that a receiving space can be formed below the insulating top plate, the receiving space being used to receive the precast concrete components, and the spraying device being arranged below the insulating top plate; a plurality of brackets, each of the brackets comprising a vertical pole and a pulley, the top end of the vertical pole being connected to the insulating top plate, the length of the vertical pole being adjustable, and the pulley being installed at the bottom end of the vertical pole; a water tank, the water tank being located at one side of the maintenance device body, the water tank being connected to a water channel of the spraying device, and the liquid in the water tank being able to be sprayed on the precast concrete components through the spraying device.

[0005] According to the curing device for precast concrete components of the embodiment of the utility model, the curing device body is supported by a bracket, and the vertical rods of the bracket are arranged to be adjustable in length, so that the accommodating space formed below the curing device body can be expanded accordingly to accommodate precast components of different heights.

[0006] According to the aforementioned embodiment of the utility model, the vertical pole includes a first pole and a second pole, the top end of the first pole is connected to the thermal insulation top plate, the pulley is installed at the bottom end of the second pole, the first pole can reciprocate relative to the second pole, so that the length of the vertical pole can be adjusted, and the bracket also includes a locking piece, which can simultaneously connect the first pole and the second pole to lock the length of the vertical pole.

[0007] According to any of the aforementioned embodiments of the utility model, the first vertical pole is penetrated by the second vertical pole, a plurality of first positioning holes are provided on the first vertical pole, a plurality of second positioning holes are provided on the second vertical pole, and the locking member is a latch, which is inserted into the first positioning hole and the second positioning hole at the same time to lock the length of the vertical pole.

[0008] According to any of the aforementioned embodiments of the utility model, the maintenance device for the precast concrete component further comprises a first nut, a second nut, a first gasket and a second gasket, the top end of the vertical pole has a thread, the vertical pole is connected to the first nut and the second nut through the thread, the vertical pole is passed through the insulation top plate, the insulation top plate is arranged between the first nut and the second nut, the first gasket is arranged between the first nut and the insulation top plate, and the second gasket is arranged between the second nut and the insulation top plate. Two nuts fix the insulation top plate to the vertical pole, and a gasket is added between the nut and the insulation top plate to disperse the pressure of the nut and prevent the insulation top plate from deforming.

[0009] According to any of the above embodiments of the present invention, the spacing between adjacent brackets is 3 to 5 meters. The spacing between brackets can be adjusted as appropriate according to actual construction conditions.

[0010] According to any of the above embodiments of the utility model, the maintenance device body further includes a plurality of insulation boards surrounding the accommodation space, and the insulation boards are connected to the insulation top board. The insulation boards are removable to facilitate operation in different environments in winter and summer. In summer, the insulation boards are removed, which is conducive to ventilation and cooling. In winter, the insulation boards are installed to prevent freezing and keep warm.

[0011] According to any of the above embodiments of the utility model, the spraying equipment includes a plurality of pipes and a plurality of spraying tees, the spraying tees are connected to the pipes, and the pipes are connected to the water channel of the water tank. The spraying tees can increase the water spraying area.

[0012] According to any of the aforementioned embodiments of the utility model, the maintenance device for the precast concrete component further includes a temperature and humidity sensor, the temperature and humidity sensor is arranged below the thermal insulation top plate, the water tank further includes a temperature controller, the temperature controller is used to control the temperature of the liquid in the water tank, and the temperature controller is connected to the temperature and humidity sensor signal. The temperature and humidity sensor is used to measure the temperature and humidity in the accommodation space. After the temperature and humidity sensor is connected to the temperature controller, the water temperature in the water tank can be adjusted according to the temperature and humidity in the accommodation space, so as to achieve the effect of controlling the appropriate temperature and humidity in the accommodation space.

[0013] According to any of the above embodiments of the utility model, the water tank further comprises a heating rod, the heating rod is connected to the temperature controller signal, and the temperature controller controls the temperature of the liquid in the water tank by controlling the heating of the heating rod. The water tank heating rod is connected to the temperature controller to control the water temperature at 20±2℃.

[0014] According to any of the aforementioned embodiments of the utility model, the maintenance device for the precast concrete component also includes a delivery pipeline, at least two water pumps, and a controller, wherein the delivery pipeline connects the water tank with the spraying equipment, the at least two water pumps are arranged on the delivery pipeline, the controller is connected to the at least two water pump signals, and the controller is configured to control the liquid output efficiency of the spraying equipment by controlling the number of water pumps turned on. The water pump is used to transfer the liquid in the water tank to the spraying equipment. The opening of different numbers of water pumps affects the water pressure in the water pipe of the spraying equipment. When the water pressure increases, the water droplets sprayed from the spray tee will turn into water mist, achieving different maintenance effects. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.

[0016] Figure 1 It is a front cross-sectional schematic diagram of an embodiment of the curing device for precast concrete components of the utility model;

[0017] Figure 2 A side cross-sectional schematic diagram of an embodiment of a curing device for precast concrete components of the utility model;

[0018] Figure 3 The utility model is a schematic top view of an embodiment of a maintenance device for precast concrete components.

[0019] Description of reference numerals:

[0020] 100-maintenance device body; 110-insulation top plate; 120-spraying equipment; 121-pipeline; 122-spraying tee; 130-insulation board;

[0021] 200-bracket; 210-vertical pole; 211-first pole; 211a-first positioning hole; 212-second pole; 212a-second positioning hole; 220-pin; 230-pulley;

[0022] 300-water tank; 310-heating rod; 320-temperature controller;

[0023] 411-first nut; 412-first gasket; 421-second nut; 422-second gasket;

[0024] 500-temperature and humidity sensor;

[0025] 600-transmission pipeline;

[0026] 700-water pump;

[0027] 800-controller;

[0028] 900-Motor.

[0029] The realization of the purpose, functional features and advantages of the utility model will be further explained in conjunction with the embodiments with reference to the accompanying drawings. DETAILED DESCRIPTION

[0030] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0031] It should be noted that all directional indications in the embodiments of the present invention (such as up, down, left, right, front, back...) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0032] In addition, the descriptions of "first", "second", etc. in the present utility model are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in this field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present utility model.

[0033] In this embodiment, if Figure 1As shown, it includes a maintenance device body 100, which includes a heat-insulating top plate 110 and a spraying device 120. The heat-insulating top plate 110 is spaced apart from the ground so that a receiving space can be formed below the heat-insulating top plate 110. The receiving space is used to receive the precast concrete components. The spraying device 120 is arranged below the heat-insulating top plate 110; a plurality of brackets 200, each bracket 200 includes a vertical pole 210 and a pulley 230. The top end of the vertical pole 210 is connected to the heat-insulating top plate 110. The length of the vertical pole 210 is adjustable. The pulley 230 is installed at the bottom end of the vertical pole 210; a water tank 300, which is located on one side of the maintenance device body 100. The water tank 300 is connected to the spraying device 120 by water, and the liquid in the water tank 300 can be sprayed on the precast concrete components through the spraying device 120.

[0034] In the above embodiment, the maintenance device body 100 is supported by the bracket 200, and the vertical poles of the bracket 200 are set to be adjustable in length, so that the accommodating space formed below the maintenance device body 100 can be expanded accordingly to accommodate prefabricated components of different heights. In addition to the vertical poles 210, the bracket 200 can also use oblique poles or support plates, etc., as long as the insulation top plate 110 can be supported. There are many optional ways to adjust the length of the vertical poles 210 of the bracket 200, including hand-cranked telescopic poles, pneumatic telescopic poles, hydraulic telescopic poles, electric telescopic poles, etc.

[0035] In some embodiments, the vertical pole 210 includes a first pole 211 and a second pole 212, the top end of the first pole 211 is connected to the thermal insulation top plate 110, the pulley 230 is installed at the bottom end of the second pole 212, the first pole 211 can reciprocate relative to the second pole 212, so that the length of the vertical pole 210 can be adjusted, and the bracket 200 also includes a locking member, which can simultaneously connect the first pole 211 and the second pole 212 to lock the length of the vertical pole 210. The locking member may not be provided, and the first pole 211 and the second pole 212 are mutually clamped and fixed, as long as the length of the vertical pole 210 is adjustable.

[0036] In some embodiments, the first vertical pole 211 is inserted into the second vertical pole 212, a plurality of first positioning holes 211a are provided on the first vertical pole 211, and a plurality of second positioning holes 212a are provided on the second vertical pole 212. The locking member is a latch 220, and the latch 220 is inserted into the first positioning hole 211a and the second positioning hole 212a at the same time to lock the length of the vertical pole 210. The first vertical pole 211 and the second vertical pole 212 can be overlapped or hollow poles can be selected, one of which is inserted into the inner cavity of the other, and the latch 220 can also be replaced by other locking members, such as bolts and nuts.

[0037] In some embodiments, the maintenance device of the precast concrete component further includes a first nut 411, a second nut 421, a first gasket 412 and a second gasket 422. The top of the vertical pole 210 has a thread. The vertical pole 210 is connected to the first nut 411 and the second nut 421 by threads. The vertical pole 210 is inserted into the insulation top plate 110. The insulation top plate 110 is arranged between the first nut 411 and the second nut 421. A first gasket 412 is arranged between the first nut 411 and the insulation top plate 110, and a second gasket 422 is arranged between the second nut 421 and the insulation top plate 110. The two nuts fix the insulation top plate 110 on the vertical pole 210. The gasket is added between the nut and the insulation top plate 110 to disperse the pressure of the nut and prevent the insulation top plate 110 from deforming. The insulation top plate 110 and the vertical pole 210 can also be fixed by bonding or welding.

[0038] In some embodiments, the spacing between adjacent brackets 200 is 3 to 5 meters. The spacing between brackets 200 can be adjusted as appropriate according to actual construction conditions.

[0039] In some embodiments, the maintenance device body 100 further includes a plurality of insulation boards 130 surrounding the accommodation space, and the insulation boards 130 are connected to the insulation top board 110. The insulation boards 130 are removable to facilitate operation in different environments in winter and summer. In summer, the insulation boards 130 are removed, which is conducive to ventilation and cooling. In winter, the insulation boards 130 are installed to reduce heat loss and achieve the effect of antifreeze and heat preservation. The insulation boards 130 can be made of common insulation materials such as polystyrene foam boards, extruded polystyrene insulation boards 130, and rock wool insulation boards 130.

[0040] In some embodiments, the spraying device 120 includes a plurality of pipes 121 and a plurality of spraying tees 122, the spraying tees 122 are connected to the pipes 121, and the pipes 121 are connected to the water tank 300. The spraying tee 122 can increase the water spraying area. One end of the tee is connected to the pipe 121, and the other two ends are equipped with atomizing nozzles. When the water pressure is low, water droplets flow out of the nozzles, and when the water pressure is high, the nozzles spray water mist. Adjacent spraying tees 122 can be set to a spacing of 2 meters, and the actual spacing can be adjusted according to the spraying radius of the spraying tee 122.

[0041] In some embodiments, the maintenance device for the precast concrete component further includes a temperature and humidity sensor 500, which is disposed below the thermal insulation top plate 110. The water tank 300 further includes a temperature controller 320, which is used to control the temperature of the liquid in the water tank 300. The temperature controller 320 is connected to the temperature and humidity sensor 500 by signal. The temperature and humidity sensor 500 is used to measure the temperature and humidity in the accommodation space. After the temperature and humidity sensor 500 is connected to the temperature controller 320, the water temperature in the water tank 300 can be adjusted according to the temperature and humidity in the accommodation space, so as to achieve the effect of controlling the appropriate temperature and humidity in the accommodation space.

[0042] In some embodiments, the water tank 300 further includes a heating rod 310, which is connected to a temperature controller 320 by signal. The temperature controller 320 controls the temperature of the liquid in the water tank 300 by controlling the heating of the heating rod 310. The heating rod 310 of the water tank 300 is connected to the temperature controller 320 to control the water temperature at 20±2°C. The size of the water tank 300 is preferably set to 1m 3 , the heating rod 310 uses 6KW.

[0043] In some embodiments, the curing device for precast concrete components further comprises a delivery pipe 600121, at least two water pumps 700, and a controller 800. The delivery pipe 600121 connects the water tank 300 with the spraying device 120. The at least two water pumps 700 are arranged on the delivery pipe 600121. The controller 800 is connected to the at least two water pumps 700 by signal. The controller 800 is configured to control the liquid discharge efficiency of the spraying device 120 by controlling the number of water pumps 700 that are turned on. The water pumps 700 are used to transfer the liquid in the water tank 300 to the spraying device 120. The opening of different numbers of water pumps 700 affects the water pressure in the water pipe of the spraying device 120. When the water pressure increases, the water droplets sprayed from the spraying tee 122 will become water mist, achieving different curing effects.

[0044] In the above embodiment, a motor 900 is also provided, the motor 900 is connected to the water pump 700, the controller 800 is connected to the motor 900, one or more delivery pipelines 600121 may be provided, the controller 800 controls the opening and closing of the motor 900, and the motor 900 controls the opening and closing of the water pump 700, thereby controlling the water pressure in the water pipe of the spraying equipment 120 to achieve different maintenance effects.

[0045] In the drawings of this embodiment, certain internal parts are visualized to clearly show the internal structure.

[0046] The utility model achieves the following technical effects: the height of the bracket 200 is adjustable so as to adapt to concrete precast components of different heights; the equipment has a pulley 230 for easy movement; the thermal insulation top plate 110 is detachable to realize the switching of maintenance equipment in winter and summer, and is compatible with winter and summer; the spray three-way head 122 increases the maintenance range and saves water resources; the heating rod 310, the temperature and humidity sensor 500, the controller 800, the temperature controller 320, etc. are used to realize fully automatic control of temperature and humidity, saving manpower; a plurality of water pumps 700 and corresponding motors 900 are provided to realize automatic switching of different maintenance modes.

[0047] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.

Claims

1. A curing device for precast concrete components, characterized in that: include: The curing device body comprises a heat-insulating top plate and a spraying device, wherein the heat-insulating top plate is spaced apart from the ground so that a receiving space can be formed below the heat-insulating top plate, wherein the receiving space is used to receive the precast concrete component, and the spraying device is arranged below the heat-insulating top plate; A plurality of brackets, each of which comprises a vertical pole and a pulley, the top end of the vertical pole is connected to the thermal insulation top plate, the length of the vertical pole is adjustable, and the pulley is installed at the bottom end of the vertical pole; A water tank is located at one side of the curing device body, the water tank is connected to the water channel of the spraying equipment, and the liquid in the water tank can be sprayed on the precast concrete component through the spraying equipment.

2. The curing device for precast concrete components according to claim 1, characterized in that: The vertical pole includes a first pole and a second pole, the top end of the first pole is connected to the thermal insulation top plate, the pulley is installed on the bottom end of the second pole, the first pole can reciprocate relative to the second pole, so that the length of the vertical pole can be adjusted, and the bracket also includes a locking piece, which can simultaneously connect the first pole and the second pole to lock the length of the vertical pole.

3. The curing device for precast concrete components according to claim 2, characterized in that: The first vertical pole is inserted into the second vertical pole, the first vertical pole is provided with a plurality of first positioning holes, the second vertical pole is provided with a plurality of second positioning holes, the locking member is a latch, and the latch is inserted into the first positioning hole and the second positioning hole at the same time to lock the length of the vertical pole.

4. The curing device for precast concrete components according to claim 1, characterized in that: The maintenance device for the precast concrete component also includes a first nut, a second nut, a first gasket and a second gasket. The top end of the vertical pole has a thread, and the vertical pole is connected to the first nut and the second nut through the thread. The vertical pole is penetrated by the thermal insulation top plate, and the thermal insulation top plate is arranged between the first nut and the second nut. The first gasket is installed between the first nut and the thermal insulation top plate, and the second gasket is installed between the second nut and the thermal insulation top plate.

5. The curing device for precast concrete components according to claim 1, characterized in that: The distance between adjacent supports is 3 to 5 meters.

6. The curing device for precast concrete components according to claim 1, characterized in that: The maintenance device body also includes a plurality of insulation plates surrounding the accommodating space, and the insulation plates are connected to the insulation top plate.

7. The curing device for precast concrete components according to claim 1, characterized in that: The spraying equipment comprises a plurality of pipelines and a plurality of spraying tees, wherein the spraying tees are connected to the pipelines, and the pipelines are connected to the water channels of the water tank.

8. The curing device for precast concrete components according to claim 1, characterized in that: The maintenance device for the precast concrete component also includes a temperature and humidity sensor, which is arranged below the thermal insulation top plate. The water tank also includes a temperature controller, which is used to control the temperature of the liquid in the water tank. The temperature controller is connected to the temperature and humidity sensor signal.

9. The curing device for precast concrete components according to claim 8, characterized in that: The water tank further comprises a heating rod, which is connected to the temperature controller by signal. The temperature controller controls the temperature of the liquid in the water tank by controlling the heating of the heating rod.

10. The curing device for precast concrete components according to claim 1, characterized in that: The maintenance device for the precast concrete component also includes a delivery pipeline, at least two water pumps, and a controller. The delivery pipeline connects the water tank with the spraying device. The at least two water pumps are arranged on the delivery pipeline. The controller is signal-connected with the at least two water pumps. The controller is configured to control the liquid discharge efficiency of the spraying device by controlling the number of times the water pumps are turned on. The water pump is used to transfer the liquid in the water tank to the spraying device.