Stable and safe soft foundation improved CFG pile construction structure
By using foundation pits, concrete cushions and casing immersive pipe structures on the soft soil foundation, and combining pile bottom expansion, the problem of poor stability of soft soil foundation in traditional construction is solved, and construction efficiency and stability are achieved. promote.
Patent Information
- Application Number
- CN202420489325.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-13
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-03-13
AI Technical Summary
Under soft soil foundation conditions, traditional sinking pipes are squeezed and drained gravel piles have soil tamping and ground uplifting problems, which affects the bearing capacity of the foundation foundation of the building, especially when it is impossible to implement strong tamping treatment near the building. Construction is difficult and affects stability.
The foundation pit, concrete cushion layer, casing and immersive pipe structure is adopted. The location of CFG piles and pile caps are determined through the concrete cushion layer and casing, combined with the pile bottom expansion, form an overall structure, avoid deflection and cleaning work, and increase the foundation Contact area to improve stability.
The accuracy and stability of the CFG pile position is achieved, construction time is saved, the stability and safety of soft soil foundations are improved, and deflection and cleaning work are avoided in traditional construction.
Smart Images

Figure CN221989291U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of engineering construction, in particular to a stable and safe soft foundation improved CFG pile construction structure. Background Art
[0002] At present, in the case of insufficient bearing capacity of soft soil foundation, the commonly used construction plans include three categories: replacement cushion layer, composite foundation and pile foundation. In general, the composite foundation method is to use immersed tube compaction drainage gravel piles to compact the foundation, but when there are buildings near the construction site, compaction treatment cannot be carried out, and the soil extrusion phenomenon is serious, and the ground shows varying degrees of uplift and damage, which seriously affects the bearing capacity of the building foundation.
[0003] Based on this, a stable and safe soft foundation improved CFG pile construction structure is now provided, which can eliminate the disadvantages of the prior art. Utility Model Content
[0004] The utility model aims to provide a stable and safe soft foundation improved CFG pile construction structure to solve the problems in the background technology.
[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0006] A stable and safe soft foundation improved CFG pile construction structure, comprising a foundation pit, wherein the top of the foundation pit is provided with enclosures around, a concrete cushion layer is cast at the bottom of the foundation pit, a formwork system for casting concrete piles is provided below the concrete cushion layer, the inner surface of the foundation pit is provided with a support system for preventing the foundation pit from collapsing, the outer side of the enclosure is provided with a drainage system for draining the foundation pit, concrete is injected into the interior of the formwork system to form CFG piles, pile caps and pile expansion bottoms, and a crushed stone layer, a mattress layer and a building foundation cushion layer are laid in sequence on the top of the concrete cushion layer from bottom to top.
[0007] On the basis of the above technical solutions, the present invention also provides the following optional technical solutions:
[0008] In an optional solution: the support system includes a support wall, the support wall is fixedly arranged on the inner surface of the foundation pit, and two upper and lower support beams are fixedly arranged on the surface of the support wall.
[0009] In an optional solution: the formwork system includes a plurality of evenly distributed casings, the casings are fixedly arranged on the surface of the concrete cushion layer, immersed tubes are inserted into the interiors of the casings, and a bottom expansion cavity is provided below the immersed tubes.
[0010] In an optional solution: the drainage system includes two drainage ditches, the drainage ditches are arranged on the side of the enclosure away from the foundation pit, and a water collection well is provided at one end of the drainage ditch.
[0011] In an optional solution, the top of the casing is in a horizontal state, and the bottom elevation of the casing is the top elevation of the CFG pile.
[0012] In an optional solution, the immersed tube is vertically inserted into the casing, and the verticality deviation is less than 0.5%.
[0013] In an optional solution: the thickness of the crushed stone layer is greater than 500 mm, the compaction coefficient of the crushed stone layer is greater than 90%, and the particle size is 20-30 mm.
[0014] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0015] The utility model uses a concrete cushion layer, a casing and a sunken tube. The casing and the sunken tube are arranged on the concrete cushion layer to determine the position of the CFG pile and the pile cap, thereby avoiding the deflection of the sunken tube project due to a soft foundation, ensuring the accuracy of the CFG pile position and the stability of the soil between the CFG piles. At the same time, the casing serves as a steel template for the pile cap, and casts the CFG pile and the pile cap into a whole, avoiding the work of cleaning the soil between the piles, cutting the pile head, and building the pile cap caused by over-pouring in traditional construction, saving a lot of cleaning time, and making the soft soil foundation more stable and safe under the effect of pile bottom expansion. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 The utility model provides a three-dimensional structural schematic diagram of a stable and safe soft foundation improved CFG pile construction structure arranged before pouring.
[0017] Figure 2 It is a schematic diagram of the front and side three-dimensional structure of the utility model.
[0018] Figure 3 The utility model provides a three-dimensional structural schematic diagram of a stable and safe soft foundation improved CFG pile construction structure arranged after pouring.
[0019] Notes on figure numbers: 100 casing, 101 immersed tube, 102 bottom expansion cavity, 200 concrete cushion layer, 300 foundation pit, 400 retaining wall, 401 supporting beam, 500 enclosure, 601 drainage ditch, 602 collection well, 701 pile bottom expansion, 702 CFG pile, 703 pile cap, 801 gravel layer, 802 cushion layer, 803 building foundation cushion layer. DETAILED DESCRIPTION
[0020] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments.
[0021] In one embodiment, Figure 1 , Figure 2 and Figure 3As shown, a stable and safe soft foundation improved CFG pile construction structure includes a foundation pit 300, wherein the top of the foundation pit 300 is provided with enclosures 500, and the enclosures 500 are used to prevent workers from falling into the foundation pit 300. A concrete cushion layer 200 is poured at the bottom of the foundation pit 300, and a formwork system for pouring concrete piles is provided below the concrete cushion layer 200. The inner surface of the foundation pit 300 is provided with a support system for preventing the foundation pit 300 from collapsing, and the outer side of the enclosure 500 is provided with a drainage system for draining the foundation pit 300. Concrete is injected into the interior of the formwork system to form CFG piles 702, pile caps 703 and pile expansion bottoms 701. The pile expansion bottom 701 is used to increase the contact area between the pile bottom and the foundation to increase the bearing capacity of the foundation, and the top of the concrete cushion layer 200 is paved with a crushed stone layer 801, a cushion layer 802 and a building foundation cushion layer 803 from bottom to top.
[0022] In this embodiment, the staff first defines the scope of the foundation pit 300 according to the dimensions of the design drawings, excavates according to the designed depth, and sets up drainage systems on both sides of the foundation pit 300 to drain the accumulated water and prevent rainwater from entering the foundation pit 300 and causing damage to the bearing capacity of the base. After the foundation pit 300 is excavated, the bottom of the foundation pit 300 is simply leveled, and a support system is set up to prevent the foundation pit 300 from collapsing. Subsequently, the formwork system is buried, and the concrete cushion layer 200 is poured. After the concrete cushion layer 200 is cured, concrete is poured into the formwork system, and finally a gravel layer 801, a cushion layer 802 and a building foundation 803 are laid.
[0023] In one embodiment, Figure 1 and Figure 2 As shown, the support system includes a support wall 400, which is fixedly arranged on the inner surface of the foundation pit 300. Two upper and lower support beams 401 are fixedly arranged on the surface of the support wall 400. The support system is used to prevent the foundation pit from collapsing.
[0024] In one embodiment, Figure 1 As shown, the template system includes a plurality of uniformly distributed casings 100, which are fixedly arranged on the surface of the concrete cushion layer 200, and the casings 100 are all inserted with immersed tubes 101 inside, and a bottom expansion cavity 102 is arranged below the immersed tubes 101. The staff first demarcates the center line of the CFG pile 702 according to the design position, and then buries the casing 100 so that the center of the casing 100 coincides with the center of the CFG pile 702, and then pours the concrete cushion layer 200 so that the casing 100 is fixed on the concrete cushion layer 200. When the pile driver is in place, the immersed tube 101 should be aligned in a vertical state and vertically inserted into the positioned casing 100, and finally the bottom expansion drill bit is replaced to drill the bottom expansion cavity 102.
[0025] In one embodiment, Figure 1 and Figure 2As shown, the drainage system includes two drainage ditches 601, which are arranged on the side of the enclosure 500 away from the foundation pit 300, and a water collection well 602 is arranged at one end of the drainage ditch 601. During construction, the workers use a water pump to drain the accumulated water in the foundation pit 300 into the drainage ditch 601 and into the water collection well 602 to prevent rainwater from entering the foundation pit 300 and causing damage to the bearing capacity of the base.
[0026] In one embodiment, Figure 3 As shown, the top of the casing 100 is in a horizontal state, and the bottom elevation of the casing 100 is the top elevation of the CFG pile 702 .
[0027] In one embodiment, Figure 1 As shown, the immersed tube 101 is vertically inserted into the casing 100, and the verticality deviation is less than 0.5%, ensuring the construction quality to prevent damage to the bearing capacity of the foundation.
[0028] In one embodiment, Figure 1 As shown, the thickness of the crushed stone layer 801 is greater than 500 mm, the compaction coefficient of the crushed stone layer 801 is greater than 90%, and the particle size is 20-30 mm, so as to ensure the bearing capacity of the soft foundation.
[0029] In one embodiment, Figure 1 and Figure 2 As shown, it is characterized in that the drainage ditch 601 has a 3% slope toward the water collection well 602, so that the accumulated water can flow into the water collection well 602 more smoothly.
[0030] The above embodiment discloses a stable and safe soft foundation improved CFG pile construction structure, wherein the staff first defines the scope of the foundation pit 300 according to the design drawing size, excavates according to the designed depth, and has two drainage ditches 601 on both sides of the foundation pit 300. A water collection well 602 is provided at one end of the drainage ditch 601. The staff uses a water pump to drain the accumulated water in the foundation pit 300 into the drainage ditch 601 and into the water collection well 602 to prevent rainwater from entering the foundation pit 300 and causing damage to the bearing capacity of the base; after the foundation pit 300 is excavated, the bottom of the foundation pit 300 is pumped. Simple leveling is performed, and a support system is set up to prevent the foundation pit 300 from collapsing. Then, the center line of the CFG pile 702 is delineated according to the designed position, and the casing 100 is buried accordingly, so that the center of the casing 100 coincides with the center of the CFG pile 702, and then the concrete cushion layer 200 is poured, so that the casing 100 is fixed on the concrete cushion layer 200; when the pile driver is in place, the immersed tube 101 should be aligned in a vertical state and vertically inserted into the positioned casing 100, and then the bottom expansion drill bit is replaced to drill the bottom expansion cavity 102, and then the concrete cushion layer 200 is poured. After the concrete cushion layer 200 is cured and the sinking pipe 101 is finished, after checking that there is no silt or water in the pipe, the CFG pile 702 and the pile expansion bottom 701 should be poured in time. When pulling out the pipe, the method of reverse punching is adopted. The pipe is pulled out and hammered at the same time. The free fall hammer is used to tap lightly at a small drop distance for no less than 40 times / min. The pulling speed should be uniform, and it is appropriate to be no more than 1m / min for general soil layers; at the junction of soft and hard soil layers and close to the ground, it should be controlled within 0.6-0.8m / min. During the pulling process, the hammer should be used to Check the descending situation of the concrete in the pipe at the same time. When the bottom of the pipe has not been pulled out of the top surface of the casing 100, the back hitting and tapping shall not be interrupted; when the immersed tube 101 is pulled out of the top surface of the casing 100, stop pouring concrete. At this time, the concrete fills the casing 100, so that the CFG pile 702 and the casing 100 form a whole. The pile body and the pile head are poured at one time, which saves the operation of chiseling the pile head and improves the construction efficiency. When pouring the pile body concrete, a test block should be retained according to relevant regulations. Finally, the crushed stone layer 801, the cushion layer 802 and the building foundation 803 are laid.
[0031] The above is only a specific implementation of the present disclosure, but the protection scope of the present disclosure is not limited thereto. Any person skilled in the art who is familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present disclosure, which should be included in the protection scope of the present disclosure. Therefore, the protection scope of the present disclosure should be based on the protection scope of the claims.
Claims
1. A stable and safe soft foundation improved CFG pile construction structure, comprising a foundation pit (300), wherein the top of the foundation pit (300) is surrounded by enclosures (500), It is characterized in that A concrete cushion layer (200) is poured at the bottom of the foundation pit (300), a formwork system for pouring concrete piles is provided below the concrete cushion layer (200), a support system for preventing the foundation pit (300) from collapsing is provided on the inner surface of the foundation pit (300), a drainage system for draining water from the foundation pit (300) is provided on the outer side of the enclosure (500), concrete is injected into the interior of the formwork system to form CFG piles (702), pile caps (703) and pile expansion bottoms (701), and a crushed stone layer (801), a cushion layer (802) and a building foundation cushion layer (803) are laid in sequence from bottom to top on the top of the concrete cushion layer (200).
2. A stable and safe soft foundation improved CFG pile construction structure according to claim 1, It is characterized in that The support system comprises a support wall (400), wherein the support wall (400) is fixedly arranged on the inner surface of the foundation pit (300), and two upper and lower support beams (401) are fixedly arranged on the surface of the support wall (400).
3. A stable and safe soft foundation improved CFG pile construction structure according to claim 1, It is characterized in that The formwork system comprises a plurality of evenly distributed casings (100), wherein the casings (100) are fixedly arranged on the surface of a concrete cushion layer (200), and immersed tubes (101) are inserted into the interiors of the casings (100), and a bottom expansion cavity (102) is provided below the immersed tubes (101).
4. A stable and safe soft foundation improved CFG pile construction structure according to claim 1, It is characterized in that The drainage system comprises two drainage ditches (601), wherein the drainage ditches (601) are arranged on a side of the enclosure (500) away from the foundation pit (300), and a water collection well (602) is arranged at one end of the drainage ditch (601).
5. A stable and safe soft foundation improved CFG pile construction structure according to claim 3, It is characterized in that The top of the casing (100) is in a horizontal state, and the bottom elevation of the casing (100) is the top elevation of the CFG pile (702).
6. A stable and safe soft foundation improved CFG pile construction structure according to claim 3, It is characterized in that The immersed tube (101) is vertically inserted into the interior of the casing (100), and the verticality deviation is less than 0.5%.
7. A stable and safe soft foundation improved CFG pile construction structure according to claim 1, It is characterized in that The thickness of the crushed stone layer (801) is greater than 500 mm, the compaction coefficient of the crushed stone layer (801) is greater than 90%, and the particle size is 20-30 mm.
8. A stable and safe soft foundation improved CFG pile construction structure according to claim 4, It is characterized in that The drainage ditch (601) has a slope of 3% toward the water collection well (602).