Double-layer carrier pile structure

By setting up a double-layer carrier layer and a tight soil layer in the carrier pile structure, combined with the gourd-shaped composite pile body design, the problems of small contact area and low connection tightness of the single-layer carrier structure are solved, and the resistance of the carrier pile is significantly improved Pulling force and overall carrying capacity.

CN221989299UActive Publication Date: 2024-11-12江苏韶卿建设工程有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420475999.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-12
Publication Date
2024-11-12
Estimated Expiration
2034-03-12

AI Technical Summary

Technical Problem

The existing carrier pile structure is constructed with a single-layer carrier, resulting in a small contact area between the prestressed hollow pipe pile and the carrier and a low connection tightness, which affects the bearing capacity and pull-out resistance.

Method used

Design a double-layer carrier pile structure, including prestressed hollow pipe piles fixedly connected to the vibrator on the top, and a first pile end carrier layer and a second pile end carrier layer are arranged at the bottom, combining with the extruded soil layer to increase the contact area and connection Tightness, and a concrete layer and a gourd-like structure are installed in the composite pile body to improve pull resistance.

Benefits of technology

Through the double-layer carrier structure, the contact area between the prestressed hollow pipe piles and the carrier is larger and closely connected, which significantly improves the pull-out resistance, and enhances the overall load-bearing capacity of the structure through the design of the hoist-like structure and composite pile body.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221989299U_ABST
    Figure CN221989299U_ABST
Patent Text Reader

Abstract

According to the technical scheme, the double-layer carrier pile structure is characterized in that the double-layer carrier pile structure comprises a prestressed hollow pipe pile, a vibrator is fixedly connected to the top of the prestressed hollow pipe pile, and a first pile end carrier layer and a second pile end carrier layer are sequentially arranged at the bottom of the prestressed hollow pipe pile from top to bottom; a first compaction soil body layer is arranged on the outer side of the first pile end carrier layer, and a second compaction soil body layer is arranged on the outer side of the second pile end carrier layer. The first pile end carrier layer and the second pile end carrier layer are arranged, the two-layer pile end carrier layer structure is adopted, compared with a traditional one-layer pile end carrier layer structure, the contact area between the prestressed hollow pipe pile and a carrier is larger, contact is more sufficient, meanwhile, the first compaction soil body layer and the second compaction soil body layer are matched, and the compaction effect is better. And the prestressed hollow pipe pile can be tightly connected with the carrier into a whole, so that the pulling resistance of the double-layer carrier pile structure is further improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of carrier piles, in particular to a double-layer carrier pile structure. Background Art

[0002] A carrier pile is different from a pile in the ordinary sense. The carrier pile is mainly composed of an upper pile body and a lower "composite carrier". The pile body is generally a cast-in-place concrete structure or a high-strength prestressed prefabricated pile. The "composite carrier" is a composite body located at the bottom of the pile body and compacted by deep fillers. The free fall motion of the heavy hammer is used to repeatedly compact and compact the deep soil at the pile end, so that the soil within a certain range below the pile end is most effectively reinforced and compacted to form a "composite carrier", which is the technical core of this type of pile. It can diffuse and reduce the stress at the pile end layer by layer, changing the traditional relationship between the pile end and the foundation soil, fully mobilizing the bearing capacity of the foundation soil at the pile end, and greatly improving the bearing capacity of the pile.

[0003] The existing carrier pile structure generally adopts a single-layer carrier construction method to form a carrier layer, resulting in a smaller contact area between the prestressed hollow pipe pile and the carrier, and a lower connection tightness, which affects the overall bearing capacity of the carrier pile, thereby reducing the pull-out resistance of the carrier pile structure. For this purpose, a double-layer carrier pile structure is designed. Utility Model Content

[0004] In view of the problems mentioned in the background technology, the purpose of the utility model is to provide a double-layer carrier pile structure to solve the problems mentioned in the background technology.

[0005] The above technical objectives of the utility model are achieved through the following technical solutions:

[0006] A double-layer carrier pile structure comprises a prestressed hollow pipe pile with a vibrator fixedly connected to the top, the bottom of the prestressed hollow pipe pile is provided with a first pile end carrier layer, a second pile end carrier layer, a compacted soil layer and an impact soil layer in sequence from top to bottom, a first filling port for filling a first pile end carrier is provided on one side of the top of the prestressed hollow pipe pile, a second filling port for filling a second pile end carrier is provided on the prestressed hollow pipe pile above the first filling port, a composite pile body is provided inside the prestressed hollow pipe pile, and a concrete layer is cast between the composite pile body and the inner wall of the prestressed hollow pipe pile.

[0007] By adopting the above technical solution, by setting the first pile end carrier layer and the second pile end carrier layer, a two-layer pile end carrier layer structure is adopted. Compared with the traditional one-layer pile end carrier layer structure, the contact area between the prestressed hollow pipe pile and the carrier is larger and the contact is more complete. At the same time, in combination with the first compacted soil layer and the second compacted soil layer, the prestressed hollow pipe pile can be tightly connected to the carrier, thereby further improving the pull-out resistance of the double-layer carrier pile structure.

[0008] Preferably, the first pile end carrier layer and the second pile end carrier layer are both configured as sand layers.

[0009] By adopting the above technical solution, the construction is convenient and the strength of the first pile end carrier layer and the second pile end carrier layer can be ensured.

[0010] Preferably, the first pile end carrier layer and the second pile end carrier layer are arranged in a gourd-shaped structure.

[0011] By adopting the above technical solution and providing a gourd-shaped structure, the composite pile body can be supported at the upper and lower positions of the gourd respectively, thereby improving the pull-out resistance of the double-layer carrier pile structure.

[0012] Preferably, the composite pile body includes reinforced concrete piles, prefabricated pipe piles, prefabricated square piles or prefabricated special-shaped piles.

[0013] Preferably, the reinforced concrete pile includes several groups of longitudinal bars, several groups of first transverse bars, several groups of second transverse bars, and spiral stirrups, wherein the several groups of longitudinal bars are arranged in a circular array, several groups of the first transverse bars are wound between the upper parts of the several groups of longitudinal bars, several groups of the second transverse bars are wound between the lower parts of the several groups of longitudinal bars, and the spiral stirrups are spirally arranged on the circumference of the several groups of longitudinal bars from top to bottom.

[0014] By adopting the above technical solution, the stability of the connection between the composite pile bodies can be increased, thereby improving the pull-out resistance after pouring the concrete layer.

[0015] Preferably, the spacing between several groups of the second transverse ribs is set to three times the spacing between several groups of the first transverse ribs.

[0016] By adopting the above technical solution, the stability of the connection between the composite pile bodies is increased, thereby improving the pull-out resistance after pouring the concrete layer.

[0017] In summary, the utility model mainly has the following beneficial effects:

[0018] The utility model adopts a two-layer pile end carrier layer structure by arranging a first pile end carrier layer and a second pile end carrier layer. Compared with the traditional one-layer pile end carrier layer structure, the contact area between the prestressed hollow pipe pile and the carrier is larger and the contact is more complete. At the same time, in conjunction with the first compacted soil layer and the second compacted soil layer, the prestressed hollow pipe pile can be tightly connected to the carrier, thereby further improving the pull-out resistance of the double-layer carrier pile structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a structural schematic diagram of the utility model;

[0020] Figure 2 It is a schematic diagram of the structure of the utility model for removing a concrete layer;

[0021] Figure 3 It is a schematic diagram of the structure of the utility model when adding the first pile end carrier layer;

[0022] Figure 4 It is a structural schematic diagram of the composite pile body of the utility model;

[0023] Figure 5 This is one of the structural schematic diagrams of the utility model when adding the second pile end carrier layer;

[0024] Figure 6 This is the second structural schematic diagram of the utility model when adding the second pile end carrier layer.

[0025] Figure numerals: 1. vibrator; 2. prestressed hollow pipe pile; 3. first pile end carrier layer; 4. second pile end carrier layer; 5. first compacted soil layer; 6. second compacted soil layer; 7. first filling port; 8. second filling port; 9. composite pile body; 91. longitudinal reinforcement; 92. first transverse reinforcement; 93. second transverse reinforcement; 94. spiral stirrups; 10. concrete layer; 11. heavy hammer. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0027] Example 1

[0028] refer to Figure 1-6A double-layer carrier pile structure comprises a prestressed hollow pipe pile 2 with a vibrator 1 fixedly connected to the top, a first pile end carrier layer 3 and a second pile end carrier layer 4 are arranged in sequence at the bottom of the prestressed hollow pipe pile 2 from top to bottom, a first compacted soil layer 5 is arranged on the outer side of the first pile end carrier layer 3, and a second compacted soil layer 6 is arranged on the outer side of the second pile end carrier layer 4, a first filling port 7 for filling the first pile end carrier is opened on one side of the top of the prestressed hollow pipe pile 2, a second filling port 8 for filling the second pile end carrier is opened on the prestressed hollow pipe pile 2 above the first filling port 7, a composite pile body 9 is arranged inside the prestressed hollow pipe pile 2, and a concrete layer 10 is cast and arranged between the composite pile body 9 and the inner wall of the prestressed hollow pipe pile 2.

[0029] refer to Figure 1-3 In order to facilitate the construction and ensure the strength of the first pile end carrier layer 3 and the second pile end carrier layer 4; the first pile end carrier layer 3 and the second pile end carrier layer 4 are both set as sand layers; the first pile end carrier layer 3 and the second pile end carrier layer 4 are set in a gourd-shaped structure. By setting the gourd-shaped structure, the composite pile body 9 can be carried at the upper and lower positions of the gourd respectively, thereby improving the pull-out resistance of the double-layer carrier pile structure.

[0030] refer to Figure 4 In order to increase the stability of the connection between the composite pile bodies 9, thereby improving the pull-out resistance after pouring the concrete layer; the reinforced concrete pile includes a plurality of groups of longitudinal bars 91, a plurality of groups of first transverse bars 92, a plurality of groups of second transverse bars 93, and spiral stirrups 94. The plurality of groups of longitudinal bars 91 are arranged in a circular array, a plurality of groups of the first transverse bars 92 are wound between the upper part of the plurality of groups of longitudinal bars 91, a plurality of groups of the second transverse bars 93 are wound between the lower part of the plurality of groups of longitudinal bars 91, and the spiral stirrups 94 are spirally arranged from top to bottom on the circumference of the plurality of groups of longitudinal bars 91. The composite pile body 9 includes a reinforced concrete pile, a prefabricated pipe pile, a prefabricated square pile, or a prefabricated special-shaped pile.

[0031] refer to Figure 4 In order to reduce the number of first transverse ribs 92 while meeting the pull-out resistance requirement, thereby saving consumables, the spacing between several groups of second transverse ribs 93 is set to three times the spacing between several groups of first transverse ribs 92.

[0032] Construction principle:

[0033] The prestressed hollow pipe pile 2 is sunk to the designed depth (such as Figure 3), a weight 11 is placed in the prestressed hollow pipe pile 2, and the first pile end carrier is added through the first filling port 7, and the weight 11 is rammed at the same time, so that a first pile end carrier layer 3 is formed at the bottom of the prestressed hollow pipe pile 2, and a first compacted soil layer 5 is formed outside the first pile end carrier layer 3, and then the prestressed hollow pipe pile 2 is sunk to a deeper design depth (such as Figure 5 and Figure 6 ), add the second pile end carrier through the second filling port 8, and perform the tamping operation of the heavy hammer 11 at the same time, so as to form a second pile end carrier layer 4 at the bottom of the prestressed hollow pipe pile 2, and form a second compacted soil layer 6 on the outside of the second pile end carrier layer 4, move the heavy hammer 11 out of the prestressed hollow pipe pile 2, and add the composite pile body 9, and then pour concrete after the composite pile body 9 is added to form a concrete layer 10, and finally take out the prestressed hollow pipe pile 2.

[0034] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A double-layer carrier pile structure, characterized in that: The invention comprises a prestressed hollow pipe pile (2) having a vibrator (1) fixedly connected to the top, a first pile end carrier layer (3) and a second pile end carrier layer (4) being arranged in sequence at the bottom of the prestressed hollow pipe pile (2) from top to bottom, a first compacted soil layer (5) being arranged outside the first pile end carrier layer (3), and a second compacted soil layer (6) being arranged outside the second pile end carrier layer (4), a first filling port (7) for filling the first pile end carrier being provided on one side of the top of the prestressed hollow pipe pile (2), a second filling port (8) for filling the second pile end carrier being provided on the prestressed hollow pipe pile (2) above the first filling port (7), a composite pile body (9) being arranged inside the prestressed hollow pipe pile (2), and a concrete layer (10) being cast and arranged between the composite pile body (9) and the inner wall of the prestressed hollow pipe pile (2).

2. A double-layer carrier pile structure according to claim 1, characterized in that: The first pile end carrier layer (3) and the second pile end carrier layer (4) are both configured as sand layers.

3. A double-layer carrier pile structure according to claim 2, characterized in that: The first pile end carrier layer (3) and the second pile end carrier layer (4) are arranged in a gourd-shaped structure.

4. A double-layer carrier pile structure according to claim 1, characterized in that: The composite pile body (9) comprises a reinforced concrete pile, a prefabricated pipe pile, a prefabricated square pile or a prefabricated special-shaped pile.

5. A double-layer carrier pile structure according to claim 4, characterized in that: The reinforced concrete pile comprises a plurality of groups of longitudinal bars (91), a plurality of groups of first transverse bars (92), a plurality of groups of second transverse bars (93), and spiral stirrups (94); the plurality of groups of longitudinal bars (91) are arranged in a circular array; a plurality of groups of the first transverse bars (92) are arranged between the upper parts of the plurality of longitudinal bars (91); a plurality of groups of the second transverse bars (93) are arranged between the lower parts of the plurality of longitudinal bars (91); and the spiral stirrups (94) are arranged on the circumference of the plurality of groups of longitudinal bars (91) in a spiral manner from top to bottom.

6. A double-layer carrier pile structure according to claim 5, characterized in that: The spacing between the plurality of groups of the second transverse ribs (93) is set to be three times the spacing between the plurality of groups of the first transverse ribs (92).