Pile top plugging device for concrete prefabricated pipe pile

By setting up steel rings, iron plates and screwing mechanisms on concrete prefabricated pipe piles, the problem of soil and foreign matter accumulation during construction is solved, the construction quality and stability of pipe pile foundations is improved, the construction process is simplified, and manpower consumption is reduced .

CN221989314UActive Publication Date: 2024-11-12CHINA CONSTR SECOND ENG BUREAU LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420275709.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-05
Publication Date
2024-11-12
Estimated Expiration
2034-02-05

AI Technical Summary

Technical Problem

During the construction of building foundations, during the construction of concrete prefabricated pipe piles, soil and foreign matters are prone to fall into the pipe pile barrel and accumulate, affecting the construction quality. The traditional hole cleaning method consumes a lot of manpower and time, making it difficult to ensure the quality of hole cleaning.

Method used

A concrete prefabricated pipe pile top sealing device is designed, including a detachable pile feeder, steel bar ring, iron plate, assembly set, bolt rod and screwing mechanism, and the top of the pipe pile is sealed by setting the steel bar ring and iron plate. , use bolt rods and threaded cylinder limit pile feeders, use screw mechanisms to easily tighten or loosen bolt rods, improve stability, and facilitate lifting and maintenance through lifting rings and maintenance ports.

Benefits of technology

It effectively avoids silt and blockage of sand, gravel and soil during construction, improves the stability of the pile feeder, reduces manpower consumption, simplifies the construction process, and improves the construction quality of the pipe pile foundation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221989314U_ABST
    Figure CN221989314U_ABST
Patent Text Reader

Abstract

The utility model provides a concrete prefabricated pipe pile top plugging device. The pile top plugging device for the concrete prefabricated pipe pile comprises a prefabricated pipe pile and a plugging device, wherein a detachable pile feeder is arranged at the top of the prefabricated pipe pile; the steel bar ring is fixed to one side of the prefabricated pipe pile, and an iron sheet plate used for blocking the prefabricated pipe pile is arranged on the steel bar ring; the plurality of assembly sleeves are fixed on the outer wall of the pile feeder at equal intervals; and the multiple bolt rods are used for fastening the pile feeder, the multiple bolt rods are arranged on the corresponding assembling sleeves respectively, the bottom ends of the bolt rods are sleeved with threaded cylinders, and the threaded cylinders are fixedly connected with the prefabricated pipe pile. The pile top plugging device for the concrete prefabricated pipe pile can plug the top of the concrete prefabricated pipe pile, and the situation that during construction, gravel and soil fall into the pile top plugging device to cause silting and plugging, and normal construction is affected is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of building construction, and in particular relates to a pile top blocking device for a prefabricated concrete pipe pile. Background Art

[0002] In the process of building foundation construction, precast concrete pipe pile foundation is a common structural form. This foundation is composed of hollow cylindrical slender components and mainly bears vertical loads. In order to meet the design requirements, the pile core needs to be poured with a certain height of non-shrinkage concrete.

[0003] At present, in ground pile construction, pipe piles are usually buried in the soil. However, due to the influence of soil quality, environment and other factors, mud and foreign objects are easy to fall into the pipe pile barrel and accumulate. The traditional hole cleaning method requires a lot of manpower and time, and it is difficult to ensure the quality of hole cleaning, which not only affects the binding of the pile core steel bars, but also affects the pouring of concrete, and thus affects the construction quality of the entire pipe pile foundation.

[0004] Therefore, it is necessary to provide a new concrete prefabricated pipe pile top plugging device to solve the above technical problems. Utility Model Content

[0005] The utility model provides a prefabricated concrete pipe pile top plugging device, which is designed to solve the technical problem raised in the above background technology that during ground pile construction, mud and foreign matter in the pipe pile are easily dropped into the pipe pile barrel and accumulated, thus affecting the construction quality of the entire pipe pile foundation.

[0006] The utility model provides a concrete prefabricated pipe pile top plugging device, comprising: a prefabricated pipe pile, wherein a detachable pile driver is arranged on the top of the prefabricated pipe pile; a steel bar ring, wherein the steel bar ring is fixed on one side of the prefabricated pipe pile, and an iron plate for plugging the prefabricated pipe pile is arranged on the steel bar ring; a plurality of assembly sets, wherein a plurality of the assembly sets are equidistantly fixed on the outer wall of the pile driver; a plurality of bolt rods for fastening the pile driver, wherein the plurality of the bolt rods are respectively arranged on the corresponding assembly sets, and a threaded barrel is sleeved on the bottom end of the bolt rod, and the threaded barrel is fixedly connected to the prefabricated pipe pile; and a screwing mechanism for screwing the bolt rod, wherein the screwing mechanism is arranged on the pile driver.

[0007] As a further solution of the utility model, the screwing mechanism includes: a mounting shell that can be raised and lowered and adjusted on both sides of the pile driver; a plurality of rotating shafts rotatably mounted in the mounting shell, the bottom ends of the plurality of rotating shafts extending out of the mounting shell; a magnetic spiral sleeve fixed on the bottom end of the rotating shaft and adapted to the knob end of the bolt rod; a motor fixed in the mounting shell for driving the rotating shaft to rotate, a first pulley fixedly mounted on the output shaft of the motor; a second pulley fixed on the corresponding rotating shaft; and a timing belt mounted on the first pulley and the corresponding second pulley for transmission.

[0008] As a further solution of the utility model, telescopic rods for regulating the lifting of the mounting shell are fixedly installed on both sides of the pile driver, and the bottom ends of the telescopic rods are fixedly connected to the mounting shell.

[0009] As a further solution of the utility model, a plurality of lifting rings for lifting are fixedly mounted on the outer wall of the pile driver, and a mounting hole is opened on the iron plate, and the inner diameter of the mounting hole is larger than the steel bar ring.

[0010] As a further solution of the utility model, an inspection port is opened on one side of the installation shell, a detachable baffle is arranged in the inspection port, a plurality of screws for limiting are arranged on the baffle, and the plurality of screws are threadedly connected to the installation shell.

[0011] As a further solution of the utility model, the iron sheet is circular, and the iron sheet is the same in cross-sectional size as the top of the prefabricated pipe pile.

[0012] As a further solution of the utility model, a magnet block capable of adsorbing the bolt rod is embedded on the top inner wall of a plurality of the spiral sleeves, and the assembly sleeve is provided with a thread matched with the bolt rod.

[0013] Compared with the related art, the concrete prefabricated pipe pile top plugging device provided by the utility model has the following beneficial effects:

[0014] The utility model provides a concrete prefabricated pipe pile top blocking device:

[0015] By setting steel rings and iron plates on the prefabricated pipe piles, the tops of the concrete prefabricated pipe piles can be sealed to prevent sand, gravel and soil from falling into them during construction and causing siltation and blockage. The assembly sets, bolt rods and threaded barrels are set to limit the pile driver, which can improve its stability and prevent it from shifting and falling. The screwing mechanism can be used to tighten or loosen the bolt rod easily and laboriously. The lifting ring can be used to lift the pile driver. The inspection port can be used to inspect, maintain and install the components inside the shell. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to facilitate understanding by those skilled in the art, the present invention is further described below in conjunction with the accompanying drawings.

[0017] Figure 1 A schematic diagram of the front cross-sectional structure of a preferred embodiment of the concrete prefabricated pipe pile top plugging device provided by the utility model;

[0018] Figure 2 for Figure 1 A schematic diagram of the enlarged structure of part A;

[0019] Figure 3 It is a schematic diagram of the disassembly structure of the prefabricated pipe pile and the pile driver in the utility model;

[0020] Figure 4 It is a schematic diagram of the structure of the iron sheet in the utility model.

[0021] In the figure: 1. prefabricated pipe pile; 2. pile driver; 3. steel bar ring; 4. iron sheet; 5. assembly set; 6. bolt rod; 7. threaded cylinder; 8. mounting shell; 9. rotating shaft; 10. spiral sleeve; 11. motor; 12. first pulley; 13. second pulley; 14. timing belt; 15. telescopic rod; 16. lifting ring. DETAILED DESCRIPTION

[0022] Please refer to Figure 1-Figure 4 ,in, Figure 1 A schematic diagram of the front cross-sectional structure of a preferred embodiment of the concrete prefabricated pipe pile top plugging device provided by the utility model; Figure 2 for Figure 1 A schematic diagram of the enlarged structure of part A; Figure 3 It is a schematic diagram of the disassembly structure of the prefabricated pipe pile and the pile driver in the utility model; Figure 4 This is a schematic diagram of the iron sheet structure in the utility model.

[0023] It is worth mentioning that in the ground pile construction, the burial of pipe piles is a key construction link. However, due to the influence of various factors, such as soil unevenness, groundwater activity, vibration during construction, etc., soil and foreign matter can easily enter the interior of the pipe pile and accumulate in the pipe pile barrel. This accumulation will not only occupy the effective space of the pipe pile, but also affect the binding of the pile core steel bars and the pouring of concrete; when soil and foreign matter accumulate in the pipe pile barrel, the pile core steel bars are difficult to insert and fix smoothly, which will cause the position of the steel bars to deviate from the design requirements, affecting its bearing capacity and structural stability. In order to ensure the correct position of the steel bars, the construction personnel need to perform additional correction work, which undoubtedly increases the construction time and labor costs. The accumulation of foreign matter and soil in the pipe pile barrel will hinder the flow of concrete, resulting in the inability of concrete to fully fill the interior of the pipe pile, forming a cavity or honeycomb structure. Such pouring quality will seriously affect the compressive and shear strength of the pipe pile, and thus affect the stability of the entire pipe pile foundation.

[0024] The pile top plugging device of a prefabricated concrete pipe pile comprises: a prefabricated pipe pile 1, a detachable pile driver 2 is arranged on the top of the prefabricated pipe pile 1; a steel ring 3, the steel ring 3 is fixed on one side of the prefabricated pipe pile 1, and a sheet metal plate 4 for plugging the prefabricated pipe pile 1 is arranged on the steel ring 3; a plurality of assembly sets 5, a plurality of the assembly sets 5 are equidistantly fixed on the outer wall of the pile driver 2; a plurality of bolt rods 6 for fastening the pile driver 2, a plurality of the bolt rods 6 are respectively arranged on the corresponding assembly sets 5, and the plurality of bolt rods 6 are respectively arranged on the corresponding assembly sets 5. A threaded barrel 7 is sleeved on the bottom end of the bolt rod 6, and the threaded barrel 7 is fixedly connected to the prefabricated pipe pile 1; a screwing mechanism for screwing the bolt rod 6 is arranged on the pile driver 2, and a steel ring 3 and an iron plate 4 are arranged on the prefabricated pipe pile 1 to seal the top of the concrete prefabricated pipe pile to prevent sand, gravel and soil from falling into it during construction and causing siltation and blockage. The assembly set 5, bolt rod 6 and threaded barrel 7 are arranged to limit the pile driver 2, which can improve its stability and prevent it from shifting and falling.

[0025] The screwing mechanism comprises: a mounting shell 8 which is adjustable for lifting and lowering and is arranged on both sides of the pile driver 2; a plurality of rotating shafts 9 which are rotatably mounted in the mounting shell 8, and the bottom ends of the plurality of rotating shafts 9 extend out of the mounting shell 8; a magnetic spiral sleeve 10 which is fixed on the bottom end of the rotating shaft 9 and is adapted to the knob end of the bolt rod 6; a motor 11 which is fixed in the mounting shell 8 and is used to drive the rotating shaft 9 to rotate, and a first pulley 12 is fixedly mounted on the output shaft of the motor 11; a second pulley 13 which is fixed on the corresponding rotating shaft 9; and a timing belt 14 which is sleeved on the first pulley 12 and the corresponding second pulley 13 and is used for transmission. By means of the screwing mechanism, the bolt rod 6 can be tightened or loosened labor-savingly and conveniently.

[0026] Telescopic rods 15 for regulating the lifting of the mounting shell 8 are fixedly installed on both sides of the pile driver 2. The bottom end of the telescopic rod 15 is fixedly connected to the mounting shell 8, and the pile driver 2 is hoisted through a lifting ring 16.

[0027] A plurality of lifting rings 16 for lifting are fixedly mounted on the outer wall of the pile driver 2, and a mounting hole is opened on the iron plate 4, the inner diameter of the mounting hole is larger than the steel ring 3, and an inspection port is provided to facilitate the inspection and maintenance of the components in the mounting shell 8.

[0028] A maintenance opening is provided on one side of the mounting shell 8, a detachable baffle is provided in the maintenance opening, a plurality of screws for limiting are provided on the baffle, and the plurality of screws are threadedly connected to the mounting shell 8, so that the components in the mounting shell 8 can be inspected and maintained through the maintenance opening.

[0029] The iron sheet 4 is circular, and has the same cross-sectional size as the top of the prefabricated pipe pile 1 .

[0030] A magnet block capable of adsorbing the bolt rod 6 is inlaid on the top inner wall of the plurality of spiral sleeves 10 , and a thread matching the bolt rod 6 is provided on the assembly sleeve 5 .

[0031] It is worth noting that the circuits, electronic components and modules involved in the present utility model are all prior art and can be fully implemented by those skilled in the art. Needless to say, the content protected by the present utility model does not involve improvements to software and methods.

[0032] The working principle of the concrete prefabricated pipe pile top blocking device provided by the utility model is as follows:

[0033] When in use, during the delivery process of the prefabricated pipe pile 1, the iron plate 4 is pulled to turn it over to the side of the pile delivery device 2 and lean against it (such as Figure 1 After the pile delivery is completed, the pile delivery device 2 is removed (as shown in Figure 2 As shown in FIG, the iron sheet 4 loses the support of the pile driver 2 and will cover the top of the prefabricated pipe pile 1 under the action of gravity, thereby blocking the opening of the prefabricated pipe pile 1 to prevent sand, gravel and soil from falling into it during construction and causing siltation and blockage. After the excavation and the pile head cleaning are completed, the iron sheet 4 can be removed and recycled;

[0034] During use, in order to improve the stability of the prefabricated pipe pile 1 of the pile driver 2, after the pile driver 2 is docked with the prefabricated pipe pile 1, the motor 11 is started, and the running motor 11 will drive the first pulley 12 to cooperate with the second pulley 13 and the timing belt 14 to drive the bolt rod 6 to rotate, and the bottom end of the rotating bolt rod 6 will spirally enter the threaded barrel 7, thereby tightening the pile driver 2 to prevent it from being displaced and falling. When disassembling, the motor 11 can be started to rotate in the opposite direction to make the bolt rod 6 exit the threaded barrel 7.

[0035] Compared with the related art, the concrete prefabricated pipe pile top plugging device provided by the utility model has the following beneficial effects:

[0036] The utility model provides a concrete prefabricated pipe pile top blocking device, which blocks the top of the concrete prefabricated pipe pile by arranging a steel ring 3 and an iron plate 4 on the prefabricated pipe pile 1 to prevent sand, gravel and soil from falling into the prefabricated pipe pile during construction to cause siltation and blockage. The arranged assembly set 5, bolt rod 6 and threaded tube 7 are used to limit the pile driver 2, thereby improving its stability and preventing it from being displaced and falling. The arranged screwing mechanism can save effort and conveniently tighten or loosen the bolt rod 6, the arranged lifting ring 16 can be used to hoist the pile driver, and the arranged inspection port can be used to inspect and maintain the components in the installation shell 8.

[0037] It should be noted that the equipment structure and drawings of the utility model mainly describe the principle of the utility model. In terms of the technology of the design principle, the settings of the power mechanism, power supply system and control system of the device are not fully described. On the premise that the technical personnel in this field understand the principle of the above utility model, the details of the power mechanism, power supply system and control system can be clearly known. The control method of the application document is automatic control through a controller, and the control circuit of the controller can be realized by simple programming by the technical personnel in this field;

[0038] The standard parts used therein can all be purchased from the market and can be customized according to the instructions and drawings. The specific connection methods of each part adopt conventional means such as mature bolts, rivets, welding, etc. in the prior art. The machinery, parts and equipment all adopt conventional models in the prior art, and the structures and principles of the components known to technical personnel in this field can be known by these technical personnel through technical manuals or through conventional experimental methods.

[0039] Although the embodiments of the present invention have been shown and described, it is understandable to those skilled in the art that various changes, modifications, substitutions and variations or direct or indirect applications may be made to these embodiments without departing from the principles and spirit of the present invention. In other related technical fields, the scope of the present invention is defined by the attached claims and their equivalents, which are equally included in the scope of patent protection of the present invention.

Claims

1. A concrete prefabricated pipe pile top plugging device, It is characterized in that include: Prefabricated pipe piles, the top of which is provided with a detachable pile driver; A steel bar ring, the steel bar ring being fixed to one side of the prefabricated pipe pile, and the steel bar ring being provided with an iron sheet for sealing the prefabricated pipe pile; A plurality of assembly sets, wherein the plurality of assembly sets are fixed on the outer wall of the pile driver at equal intervals; A plurality of bolt rods for fastening the pile driver, wherein the plurality of bolt rods are respectively arranged on the corresponding assembly sets, and a threaded barrel is sleeved on the bottom end of the bolt rod, and the threaded barrel is fixedly connected to the prefabricated pipe pile; A screwing mechanism for screwing the bolt rod, wherein the screwing mechanism is arranged on the pile driver.

2. The concrete prefabricated pipe pile top plugging device according to claim 1, It is characterized in that The screwing mechanism comprises: A mounting shell arranged on both sides of the pile driver and capable of being raised and lowered; A plurality of rotating shafts rotatably mounted in the mounting shell, wherein the bottom ends of the plurality of rotating shafts extend out of the mounting shell; A magnetic spiral sleeve fixed on the bottom end of the rotating shaft and adapted to the knob end of the bolt rod; A motor fixed in the mounting shell for driving the rotating shaft to rotate, wherein a first pulley is fixedly mounted on the output shaft of the motor; a second pulley fixed on the corresponding rotating shaft; A timing belt is sleeved on the first belt pulley and the corresponding second belt pulley for transmission.

3. The concrete prefabricated pipe pile top plugging device according to claim 2, It is characterized in that Telescopic rods for regulating the lifting of the installation shell are fixedly installed on both sides of the pile driver, and the bottom ends of the telescopic rods are fixedly connected to the installation shell.

4. The concrete prefabricated pipe pile top plugging device according to claim 1, It is characterized in that A plurality of lifting rings for lifting are fixedly mounted on the outer wall of the pile driver, and a mounting hole is opened on the iron plate, and the inner diameter of the mounting hole is larger than the steel bar ring.

5. The concrete prefabricated pipe pile top plugging device according to claim 2, It is characterized in that An inspection opening is provided on one side of the installation shell. A detachable baffle is provided in the inspection opening. A plurality of screws for limiting position are provided on the baffle. The plurality of screws are all threadedly connected with the installation shell.

6. The concrete prefabricated pipe pile top plugging device according to claim 1, It is characterized in that The iron sheet is circular, and has the same cross-sectional size as the top of the prefabricated pipe pile.

7. The concrete prefabricated pipe pile top plugging device according to claim 2, It is characterized in that The top inner walls of the plurality of spiral sleeves are inlaid with magnet blocks capable of adsorbing the bolt rods, and the assembly sleeves are provided with threads matched with the bolt rods.