Slag digging barrel for pile foundation construction
By designing a slag-dumping bucket for pile foundation construction with flip blades and inverted V-shaped steel bar handles, the problem of slag cleaning difficulties in offshore pile foundation construction has been solved, and the rapid and effective slag cleaning and environmental protection functions have been achieved, which has improved the Construction efficiency and reliability.
Patent Information
- Application Number
- CN202420090292.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-15
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-01-15
Smart Images

Figure CN221989320U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pile foundation construction operations, in particular to a slag bucket for pile foundation construction. Background Art
[0002] During pile foundation construction, a large amount of slag will be generated. This slag needs to be cleaned up in time to ensure the normal progress of the construction. This is where a slag bucket is needed. However, existing slag removal equipment often has a single function, complex operation, low efficiency, and high production cost, and cannot meet the needs of quickly cleaning slag. In addition, the slag of some offshore pile foundations often contains a large amount of seawater, and the slag is muddy and flowable. At present, the slag bucket used in construction is difficult to clean such mud, resulting in a long construction period and high labor costs. Therefore, it is necessary to design a new type of slag bucket for pile foundation construction to solve the above problems. Utility Model Content
[0003] The utility model aims to provide a slag bucket for pile foundation construction which can quickly and effectively clean up slag generated by offshore pile foundation construction.
[0004] To this end, the technical solution of the utility model is as follows:
[0005] A slag bucket for pile foundation construction, comprising a handle, a slag bucket body, a fan blade mounting shaft, a limit hoop and a flip blade; wherein:
[0006] The slag bucket body is a cylindrical barrel with openings at both ends, and the handle is fixed on the outer wall of the top of the slag bucket body;
[0007] The fan blade installation shaft is arranged horizontally, and its two ends are welded and fixed on the inner wall of the bottom end of the slag bucket body;
[0008] The limiting hoop is fixed on the bottom end surface of the slag bucket body, and its inner diameter is smaller than the inner diameter of the slag bucket body, so that the limiting hoop forms an annular limiting step relative to the inner wall of the slag bucket body;
[0009] The flip blade includes a first blade and a second blade, which are two identical semicircular plates, which are axially symmetrically arranged on both sides of the fan blade mounting axis, and are assembled together with the fan blade mounting axis to form a circular plate that can be closed at the bottom opening of the slag bucket body; the first blade and the second blade are respectively sleeved on the fan blade mounting axis through a plurality of first mounting sleeves and a plurality of second mounting sleeves that are arranged on one side of the plate and are staggered, so that the two blades can be flipped upward 90° around the fan blade mounting axis to open the bottom opening of the slag bucket body, or flipped downward around the fan blade mounting axis to be pressed onto the annular limiting step formed by the limiting hoop and the slag bucket body to close the bottom opening of the slag bucket body.
[0010] Furthermore, the outer diameter of the slag bucket body is adapted to the hole diameter of the pile hole.
[0011] Furthermore, the handle is composed of two inverted V-shaped steel bars, the top ends of which are cross-fixed, and the four connecting ends of the bottom ends of the two are evenly arranged on the top outer wall of the slag bucket body and fixed on the outer wall of the slag bucket body.
[0012] Furthermore, four lifting ears are evenly arranged on the outer wall of the bottom end of the slag bucket body along the circumferential direction.
[0013] Compared with the existing technology, the slag bucket for pile foundation construction has a simple structure, is easy to operate and has a low production cost. It can not only quickly and effectively clean up the slag, mud or rock debris containing a large amount of seawater generated by offshore pile foundation construction, but also has environmental protection functions, can reduce the mud and water discharge at the construction site to meet the needs of offshore construction and improve construction diversity and reliability. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a three-dimensional structural schematic diagram of a slag bucket for pile foundation construction of the utility model;
[0015] Figure 2 It is a side view of the slag bucket for pile foundation construction of the utility model;
[0016] Figure 3 This is a schematic diagram of the bottom structure of the slag bucket for pile foundation construction of the utility model;
[0017] Figure 4 The utility model is a schematic structural diagram of the flip blades of the slag bucket for pile foundation construction. DETAILED DESCRIPTION
[0018] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, but the following embodiments are by no means intended to limit the present invention in any way.
[0019] See also Figure 1 and Figure 2 The slag bucket for pile foundation construction comprises a handle 1, a slag bucket body 2, a fan blade mounting shaft 3, a limiting hoop 4 and a flip blade 5.
[0020] The slag bucket body 2 is a cylindrical barrel with openings at both ends, and its outer diameter is adapted to the diameter of the pile hole; in this embodiment, based on the pile hole diameter of 845mm, the slag bucket body 2 is a steel barrel with an outer diameter of 812mm, an inner diameter of 800mm, and an axial length of 2.5m.
[0021] The handle 1 is fixed on the top outer wall of the slag bucket body 2 for connecting the sling, so as to facilitate lifting and lowering the slag bucket by the crane hook; in the present embodiment, the handle 1 is composed of two inverted V-shaped steel bars, the top ends of which are cross-arranged and fixed, and the four ends of the bottom ends are evenly distributed on the top outer wall of the slag bucket body 2 and welded and fixed to the outer wall of the slag bucket body 2, so that the top ends of the two inverted V-shaped steel bars form a lifting point that can be connected to the crane hook.
[0022] As a preferred technical solution of this embodiment, four lifting ears 6 are evenly distributed along the circumferential direction on the outer wall of the bottom end of the slag bucket body 2, so as to cooperate with the handle 1 to tilt the slag bucket filled with mud and slag to pour the mud and slag in the bucket to a designated position.
[0023] The fan blade mounting shaft 3 is a cylindrical steel bar, which is horizontally arranged, and its two ends are welded and fixed to the inner wall of the bottom end of the slag bucket body 2.
[0024] The limiting hoop 4 is a ring-shaped body formed by bending a cylindrical steel bar and fixing both ends; the limiting hoop 4 is welded and fixed on the bottom end face of the slag bucket body 2, and its inner diameter is smaller than the inner diameter of the slag bucket body 2, so that the limiting hoop 4 forms an annular limiting step relative to the inner wall of the slag bucket body 2.
[0025] See also Figure 3 and Figure 4 The flip blade 5 includes a first blade 5a and a second blade 5b, which are two identical semicircular plates, which are axially symmetrically arranged on both sides of the fan blade mounting shaft 3 and are assembled together with the fan blade mounting shaft 3 to form a circular plate; the diameter of the circular plate is adapted to the inner diameter of the slag removal bucket body 2, so that the flip blade 5 is closed at the bottom opening of the slag removal bucket body 2; three first mounting sleeves 3c are arranged at intervals on the edge of the first blade 5a on the side adjacent to the fan blade mounting shaft 3, and two second mounting sleeves 3d are arranged at intervals on the edge of the second blade 5b on the side adjacent to the fan blade mounting shaft 3, and the two second mounting sleeves 3d are arranged at intervals on the second blade 5 b and the setting positions of the three first mounting sleeves 3c on the first blade 5a are staggered with each other, so that the first blade 5a and the second blade 5b are rotatably inserted into the blade mounting shaft 3 through the first mounting sleeve 3c and the second mounting sleeve 3d respectively, and can be turned upward 90° around the blade mounting shaft 3 to open the bottom opening of the slag bucket body 2 or turned downward around the blade mounting shaft 3 to be pressed onto the annular limiting step formed by the limiting hoop 4 and the slag bucket body 2; in this embodiment, the first blade 5a and the second blade 5b are cut from steel plates, and the first sleeve 5c and the second sleeve 5d are cut from cylindrical steel sleeves.
[0026] The method of using the slag bucket for pile foundation construction in offshore pile foundation construction scenes is as follows:
[0027] The hook of the water crane is hung on the handle 1 of the slag bucket, and then the slag bucket is lifted and lowered into the newly-drilled pile hole for slag removal, so that the slag bucket can freely sink into the muddy slag mixed with a large amount of seawater by gravity; during the sinking process of the slag bucket, the flip blade 5 at the bottom of the slag bucket is subjected to the upwelling force of the mud below, so that the first blade 5a and the second blade 5b are synchronously flipped upward by 90° with the fan blade installation shaft 3 as the axis. At this time, the bottom end opening of the slag bucket body 2 is in an open state, and the muddy slag in the pile hole flows into the slag bucket; when the muddy slag completely submerges the slag bucket, the water crane is controlled again The slag bucket is lifted up. At this time, the first blade 5a and the second blade 5b of the flipping blade 5 are synchronously flipped downward 90° with the fan blade mounting shaft 3 as the axis under the action of the blade's own weight and the gravity of the muddy slag in the bucket, until the first blade 5a and the second blade 5b are pressed onto the limiting hoop 4. At this time, the first blade 5a and the second blade 5b return to their initial planar state, that is, the opening at the bottom end of the slag bucket body 2 returns to a closed state, and the muddy slag in the slag bucket is brought out of the pile foundation through the slag bucket and transported to the designated position; the above-mentioned slag cleaning operation process is repeated until the muddy slag in the pile hole is cleaned up.
[0028] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.
Claims
1. A slag bucket for pile foundation construction, characterized in that: The utility model comprises a handle (1), a slag removal bucket body (2), a fan blade mounting shaft (3), a limiting hoop (4) and a flip blade (5); wherein the slag removal bucket body (2) is a cylindrical barrel with openings at both ends, and the handle (1) is fixed on the outer wall of the top end of the slag removal bucket body (2); the fan blade mounting shaft (3) is arranged horizontally, and its two ends are welded and fixed on the inner wall of the bottom end of the slag removal bucket body (2); the limiting hoop (4) is fixed on the end surface of the bottom end of the slag removal bucket body (2), and its inner diameter is smaller than the inner diameter of the slag removal bucket body (2); the flip blade (5) comprises a first blade (5a) and a second blade (5b), which are two identical semicircular plates, and the two are arranged axially symmetrically on the fan blade mounting shaft (5). 3) on both sides, and are assembled with the fan blade mounting shaft (3) to form a circular plate capable of closing the bottom opening of the slag bucket body (2); the first blade (5a) and the second blade (5b) are respectively sleeved on the fan blade mounting shaft (3) through a plurality of first mounting sleeves (3c) and a plurality of second mounting sleeves (3d) arranged on one side of the plate and arranged in a staggered manner, so that the two blades can be turned upward by 90° around the fan blade mounting shaft (3) to open the bottom opening of the slag bucket body (2), or turned downward around the fan blade mounting shaft (3) to be pressed onto the annular limiting step formed by the limiting hoop (4) and the slag bucket body (2) to close the bottom opening of the slag bucket body (2).
2. The slag bucket for pile foundation construction according to claim 1, characterized in that: The outer diameter of the slag removal bucket body (2) is adapted to the hole diameter of the pile hole.
3. The slag bucket for pile foundation construction according to claim 1, characterized in that: The handle (1) is composed of two inverted V-shaped steel bars, the top ends of which are cross-fixed, and the four connecting ends of the bottom ends of the two are evenly arranged on the top outer wall of the slag bucket body (2) and fixed on the outer wall of the slag bucket body (2).
4. The slag bucket for pile foundation construction according to claim 1, characterized in that: Four lifting ears (6) are evenly distributed along the circumferential direction on the outer wall of the bottom end of the slag removal bucket body (2).