Karst cave or soil cave pressure grouting filling device

By using a device with a pump and a pressure grouting pump combined with a gas pressure gauge in karst caves or soil caves, the problem of incomplete filling caused by excessive cavity pressure is solved, and efficient filling effect is achieved, ensuring project quality and progress .

CN221989325UActive Publication Date: 2024-11-12HENGSHENG WATER ENVIRONMENT MANAGEMENT CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420075031.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-12
Publication Date
2024-11-12
Estimated Expiration
2034-01-12

AI Technical Summary

Technical Problem

In deep closed caves and covered soil caves in karst areas, the cavity pressure caused by changes in water level or the air compressed during grouting, resulting in the inability to inject slurry or incomplete filling. The existing technology solutions take a long time. , high cost and affects project quality and progress.

Method used

The device including a pumping pump device, a pressure grouting pump device, an exhaust pipe and a pressure gauge is adopted. By setting the exhaust pipe in the exhaust drilling hole and a grouting pipe in the pressure grouting drilling hole, the air pressure gauge is used to detect the empty space. The chamber pressure, combined with the exhaust balance technology, ensures complete grouting and filling.

Benefits of technology

It improves construction efficiency, ensures complete filling of caves or soil caves, ensures project quality and progress, and reduces hidden dangers of the project.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221989325U_ABST
    Figure CN221989325U_ABST
Patent Text Reader

Abstract

The utility model discloses a karst cave or soil cave pressure grouting filling device, which relates to the technical field of karst foundation treatment, and comprises an air extracting pump device, a pressure grouting pump device, an exhaust pipe, a grouting pipe and a barometer, the grouting pipe is used for being arranged in a pressure grouting drill hole to be communicated with a karst cave or a soil cave, the top end of the exhaust pipe is connected with the sucking pump device through a first pipeline, the barometer is arranged on the first pipeline, and the top end of the grouting pipe is connected with the pressure grouting pump device through a second pipeline. The grouting filling device is suitable for grouting filling of deep closed type caves and covering type soil caves, can ensure complete filling, and guarantees project quality and progress.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of karst foundation treatment, in particular to a karst cave or soil hole pressure grouting filling device. Background Art

[0002] Karst areas are widely distributed in my country. In the construction of building foundations, water conservancy project dam foundations, highway and bridge pile foundations, railway foundations, and airport foundations in karst areas, karst caves and earth holes are often encountered and need to be filled. In the deep closed caves and covered earth holes in the karst area near the seasonal fluctuation zone of groundwater, the pressure of the karst cavity is too high due to the change of water level, or the air in the karst cavity is compressed due to more grouting during construction. There is a problem that the pressure in the karst cavity is too high to inject slurry, or the filling material cannot be filled, and the cavity cannot be completely filled and stopped. The usual solution to pressure grouting is to exhaust the slurry inlet pipe, but this is easy to cause blockage, or stop grouting for a period of time, and then continue grouting after the pressure is balanced. Therefore, the project takes a long time and the cost increases, which affects the quality and progress of the project. The purpose of completely filling the cave or earth hole has not been achieved, which poses certain hidden dangers to the project. Utility Model Content

[0003] The purpose of the utility model is to provide a karst cave or soil hole pressure grouting filling device to solve the problems existing in the above-mentioned prior art. It is suitable for grouting filling of deep closed caves and covered soil holes, and can ensure complete filling, thereby ensuring the quality and progress of the project.

[0004] To achieve the above purpose, the utility model provides the following solutions:

[0005] The utility model provides a karst cave or soil cave pressure grouting filling device, comprising an air extraction pump device, a pressure grouting pump device, an exhaust pipe, a grouting pipe and a pressure gauge, wherein the exhaust pipe is used to be arranged in an exhaust borehole to communicate with the karst cave or soil cave, the grouting pipe is used to be arranged in a pressure grouting borehole to communicate with the karst cave or soil cave, the top end of the exhaust pipe is connected to the air extraction pump device through a first pipeline, the pressure gauge is arranged on the first pipeline, and the top end of the grouting pipe is connected to the pressure grouting pump device through a second pipeline.

[0006] Preferably, the exhaust pipe and the grouting pipe are steel pipes.

[0007] Preferably, the pressure grouting pump device is connected with a grouting port.

[0008] Compared with the prior art, the utility model has achieved the following technical effects:

[0009] The utility model provides a karst cave or soil hole pressure grouting filling device, by arranging an exhaust pipe in an exhaust borehole to connect the karst cave or soil hole, arranging a grouting pipe in a pressure grouting borehole to connect the karst cave or soil hole, and detecting the cavity pressure of the underground karst cave or soil hole through a barometer; when the air pressure in the cavity displayed by the barometer is too large, or the air pressure in the cavity becomes larger and larger during the grouting process, the karst cave or soil hole is pressurized for grouting while exhausting air to balance the air pressure until the grouting liquid overflows from the exhaust pipe, indicating that the grouting is completely filled; when the barometer shows that the cavity pressure and the surface pressure can be naturally balanced, it is not necessary to exhaust air, and the pressure grouting construction of the underground karst cave or soil hole is directly carried out until the grout overflows from the exhaust pipe, indicating that the grouting is completely filled. The karst cave or soil hole pressure grouting filling device provided by the utility model has high construction efficiency, can ensure that the karst cave or soil hole is completely filled, and ensure the quality and progress of the project. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0011] Figure 1 It is a schematic diagram of grouting a karst cave using the karst cave or soil cave pressure grouting filling device provided by the utility model;

[0012] Figure 2 The utility model is a schematic diagram of grouting a soil hole using the karst cave or soil hole pressure grouting filling device provided by the utility model.

[0013] In the figure: 1-karst cave or soil cave, 2-exhaust borehole, 3-pressure grouting borehole, 4-air suction pump device, 5-pressure grouting pump device, 6-pressure gauge, 7-grouting port, 8-limestone, 9-silty clay, 10-sandy soil, 11-exhaust pipe, 12-grouting pipe, 13-first pipeline, 14-second pipeline. DETAILED DESCRIPTION

[0014] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0015] The utility model aims to provide a karst cave or soil hole pressure grouting filling device to solve the problems existing in the prior art. It is suitable for grouting filling of deep closed caves and covered soil holes, and can ensure complete filling, thereby guaranteeing the quality and progress of the project.

[0016] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0017] like Figure 1-Figure 2 As shown, this embodiment provides a karst cave or soil cave pressure grouting filling device, including an air extraction pump device 4, a pressure grouting pump device 5, an exhaust pipe 11, a grouting pipe 12 and a pressure gauge 6, the exhaust pipe 11 is used to be arranged in the exhaust borehole 2 to connect with the karst cave or soil cave 1, the grouting pipe 12 is used to be arranged in the pressure grouting borehole 3 to connect with the karst cave or soil cave 1, the top end of the exhaust pipe 11 is connected to the air extraction pump device 4 through a first pipeline 13, the pressure gauge 6 is arranged on the first pipeline 13, and the top end of the grouting pipe 12 is connected to the pressure grouting pump device 5 through a second pipeline 14.

[0018] In this embodiment, the exhaust pipe 11 and the grouting pipe 12 are steel pipes. A grouting port 7 is connected to the pressure grouting pump device 5 .

[0019] Geophysical exploration has revealed deep, closed karst caves (not filled or half-filled with mud, sand, or water) or covered earth caves, among which Figure 1 It is a karst cave in limestone 8, and the surface of limestone 8 is covered with sand 10. Figure 2 For the soil cave in the silty clay 9, because the air pressure in the cavity is too high, or when the air pressure in the cavity becomes larger and larger during the grouting process, an exhaust borehole 2 is arranged and the air is pumped out to reduce the pressure, and then the cave or soil cave is pressurized for grouting while the air is pumped out to balance the air pressure; after the distribution of the caves or soil caves is determined by geophysical exploration, exhaust boreholes 2 are arranged in multiple places in the caves or soil caves. Under natural conditions, the cavity pressure of the underground cave or soil cave can be naturally balanced with the surface pressure, and there is no need to use the air pump device 4 to pump air, and pressure grouting construction of the underground cave or soil cave can be carried out directly.

[0020] The construction steps are as follows:

[0021] 1) Use geophysical exploration to identify the distribution of karst caves or earth caves1;

[0022] 2) Drilling exhaust borehole 2 and pressure grouting borehole 3;

[0023] 3) Install the vacuum pump device 4, the pressure grouting pump device 5 and the air pressure gauge 6;

[0024] 4) While implementing the pressure grouting, the vacuum pump device 4 is turned on according to the pressure value of the barometer 6 to adjust the pressure until the slurry can be injected;

[0025] 5) After overflow occurs in the exhaust pipe 11, the vacuum pump device 4 is stopped. The exhaust pipe 11 still naturally overflows with grouting liquid, indicating that the cavity is nearly full. The grouting range and effect can be confirmed by geophysical exploration to complete the grouting project.

[0026] In step 4), when the pressure value of the barometer 6 can be naturally balanced with the surface pressure, there is no need to use the vacuum pump device 4 to evacuate air, and the slurry can be directly injected until overflow occurs in the exhaust pipe 11.

[0027] The present invention uses specific examples to illustrate the principle and implementation of the present invention. The above examples are only used to help understand the method and core idea of ​​the present invention. At the same time, for those skilled in the art, according to the idea of ​​the present invention, there will be changes in the specific implementation and application scope. In summary, the content of this specification should not be understood as limiting the present invention.

Claims

1. A karst cave or soil cave pressure grouting filling device, characterized in that: It includes an air extraction pump device, a pressure grouting pump device, an exhaust pipe, a grouting pipe and a pressure gauge. The exhaust pipe is used to be set in an exhaust borehole to connect to a karst cave or a soil cave. The grouting pipe is used to be set in a pressure grouting borehole to connect to a karst cave or a soil cave. The top end of the exhaust pipe is connected to the air extraction pump device through a first pipeline. The pressure gauge is set on the first pipeline. The top end of the grouting pipe is connected to the pressure grouting pump device through a second pipeline.

2. The karst cave or soil cave pressure grouting filling device according to claim 1 is characterized by: The exhaust pipe and the grouting pipe are steel pipes.

3. The karst cave or soil cave pressure grouting filling device according to claim 1 is characterized by: The pressure grouting pump device is connected with a grouting port.