Construction structure for sealing settlement post-cast strip of large basement in advance

By adopting a pre-enclosed structure of large basement settlement post-pouring strips in high-rise buildings, and using the casting connection between prefabricated closure plates and structural plates, the construction period and rust problems caused by the retention of post-pouring strips are solved, and faster construction speed is achieved. Higher engineering quality.

CN221989397UActive Publication Date: 2024-11-12CHINA MCC5 GROUP CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420578293.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-25
Publication Date
2024-11-12
Estimated Expiration
2034-03-25

AI Technical Summary

Technical Problem

In the construction of high-rise buildings, the retention of the rear pouring belt leads to an extended construction period, rainwater seepage affects the construction, and steel bars are exposed to rust, affecting the quality of the project.

Method used

The large basement settlement post-pouring tape is adopted to seal the structure in advance, including the left and right structural plates, prefabricated closure plates, water barrier plates and grouting casings. The casting connection between the prefabricated closure plates and structural plates is formed to form an integrated structure and seal it in advance. Rear pouring strips reduce the number of support and improve construction speed.

Benefits of technology

The early closure of the rear casting strip is achieved, reducing the space occupied by support, saving construction period, preventing rust, and improving construction speed and project quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221989397U_ABST
    Figure CN221989397U_ABST
Patent Text Reader

Abstract

The construction structure comprises a left side structural plate and a right side structural plate, a post-cast strip is reserved between the left side structural plate and the right side structural plate, and the right side face of the left side structural plate and the left side face of the right side structural plate are each provided with a fast-easy closing-up net. A sealing plate is integrally poured between the left side structural plate and the right side structural plate, the sealing plate is arranged above the post-pouring belt in a shielding mode, and a grouting sleeve communicating the outside with the post-pouring belt is arranged on the sealing plate in a penetrating mode. The post-cast strip has the advantages that the post-cast strip is sealed in advance and is not cast, compared with a traditional steel pipe support, the occupied space is small, basement materials are convenient to transfer, and the influence on basement installation engineering is small; the supporting system is slightly influenced by the outside due to early closing, the number of supports is small, the construction speed is high, and the construction period and measure cost can be saved; the post-cast strip formwork system is based on a prefabricated sealing plate, a formwork hanging mode is adopted, an original bottom formwork can be detached, and garbage accumulation in a post-cast strip is prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of post-cast strips in building construction, and in particular relates to a construction structure for early closure of a post-cast strip of a large-scale basement settlement. Background Art

[0002] The garage roof post-cast strips are mainly divided into settlement post-cast strips and temperature post-cast strips. The post-cast strips are mainly set up to prevent the reinforced concrete structure from causing damage to the building due to shrinkage and uneven settlement. The post-cast strips divide the structure into several areas. After the settlement and shrinkage of each area are stable, micro-expansion concrete with a grade higher than the concrete on both sides is poured.

[0003] Nowadays, the buildings under construction are generally high, and the settlement of the post-casting strip needs 42 days and the main structure can be capped before it can be closed, so the post-casting strip has a long period of time. Therefore, during the construction stage, the post-casting strip also brings many inconveniences to the construction, such as: 1. The backfill soil of the master plan cannot be backfilled in advance, resulting in a delay in the construction period; 2. Rainwater keeps seeping into the basement, affecting the basement construction; 3. The steel bars of the post-casting strip are exposed for a long time, resulting in rust, affecting the quality of the later project. Utility Model Content

[0004] The utility model aims to provide a construction structure for early closing of a post-casting belt of a large-scale basement settlement, thereby solving a series of problems caused by the setting of the post-casting belt.

[0005] The purpose of the utility model is achieved through the following technical solutions:

[0006] A large basement settlement post-cast strip early closing construction structure comprises a left structural plate and a right structural plate, a post-cast strip is reserved between the left structural plate and the right structural plate, the right side of the left structural plate and the left side of the right structural plate are provided with quick closing nets, a closing plate is integrally cast between the left structural plate and the right structural plate, the closing plate is shielded above the post-cast strip, and a grouting sleeve connecting the outside with the post-cast strip is passed through the closing plate.

[0007] Furthermore, the closing plate is a prefabricated plate.

[0008] Furthermore, the closing plate comprises a left closing plate and a right closing plate, the left structural plate is cast connected to the left closing plate, the right structural plate is cast connected to the right closing plate, and a water retaining plate is provided between the left closing plate and the right closing plate.

[0009] Furthermore, the left side closing plate and the right side closing plate are both right-angled trapezoidal cross-sections, and the right-angled ends of the left side closing plate and the right side closing plate are located on the inner side and the oblique angled ends are located on the outer side.

[0010] Furthermore, the left structural plate and the right structural plate both include structural plate steel bars, the left closed plate and the right closed plate include closed plate steel bars, the outer ends of the closed plate steel bars extend into the structural plate and are connected to the structural plate steel bars, and the inner ends of the closed plate steel bars extend into the post-cast joint and are connected to the structural plate steel bars.

[0011] Furthermore, the closed plate steel bar is a right-angled trapezoidal shape without a bottom edge, the outer oblique side end of the closed plate steel bar is provided with a horizontal extension section connected to the structural plate steel bar, and the inner vertical side end of the closed plate steel bar is provided with a horizontal extension section connected to the structural plate steel bar.

[0012] Furthermore, the water retaining plate is a polystyrene plate.

[0013] Furthermore, the grouting sleeve is located between the left closing plate and the right closing plate.

[0014] Furthermore, the right portion of the left structural plate is provided with a water stop plate extending out of the right side surface, and the left portion of the right structural plate is provided with a water stop plate extending out of the left side surface.

[0015] Furthermore, it also includes a template system, which supports the lower end surfaces of the left structural plate and the right structural plate, the template system forms the lower contour surface of the post-casting strip, and the support system supports the template system.

[0016] Beneficial effects of the utility model:

[0017] 1. The post-cast strip is closed in advance and not poured. Compared with the traditional steel pipe support, the support occupies less space, which is convenient for the transportation of basement materials and has less impact on the basement installation project.

[0018] 2. Early closure makes the support system less affected by the outside world, reduces the number of supports, and speeds up the construction, thus saving construction time and measures costs.

[0019] 3. The formwork system for the post-cast zone is based on a prefabricated closed plate and adopts a hanging formwork. The original bottom formwork can be removed to prevent garbage accumulation in the post-cast zone.

[0020] 4. The rear support of the post-cast strip formwork can avoid the need for roughening and cleaning of the post-cast strip.

[0021] The aforementioned main scheme of the utility model and its further options can be freely combined to form multiple schemes, all of which are schemes that can be adopted and protected by the utility model; and in the utility model, (non-conflicting options) options and other options can also be freely combined. After understanding this scheme, those skilled in the art can understand that there are many combinations based on the existing technology and common knowledge, all of which are technical schemes to be protected by the utility model, and they are not exhaustively listed here. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1It is a schematic diagram of the structure of the utility model.

[0023] Figure 2 yes Figure 1 1-1 cross-sectional view.

[0024] Figure 3 yes Figure 1 Sectional view 2-2.

[0025] In the figure: 1- post-cast strip, 2- left structural plate, 3- right structural plate, 4- left closing plate, 5- right closing plate, 6- water retaining plate, 7- grouting sleeve, 8- quick closing net, 9- water stop plate, 10- formwork system, 11- support system, 101- structural plate reinforcement, 102- closing plate reinforcement. DETAILED DESCRIPTION

[0026] The present invention will be further described below in conjunction with specific embodiments and drawings.

[0027] refer to Figure 1 to Figure 3 As shown, a large basement settlement post-casting joint early closure construction structure includes a left structural plate 2, a right structural plate 3, a closing plate (a left closing plate 4 and a right closing plate 5), a water retaining plate 6, a grouting sleeve 7, a quick-closing net 8, a water stop plate 9, a formwork system 10 and a support system 11.

[0028] The left structural plate 2 and the right structural plate 3 are cast-in-place reinforced concrete structures, and the closed plates (the left closed plate 4 and the right closed plate 5) are prefabricated reinforced concrete structures. A post-casting strip 1 is reserved between the left structural plate 2 and the right structural plate 3, and the reserved post-casting strip is used to achieve independent settlement and shrinkage of each area.

[0029] The template system 10 supports the lower end surfaces of the left structural plate 2 and the right structural plate 3. When the structural plate is cast, the template system and the quick-close mesh are used as the casting template of the structural plate to realize the cast-in-place construction of the structural plate. The support system 11 supports the template system 10.

[0030] The right side of the left structural plate 2 and the left side of the right structural plate 3 are both provided with quick-closing nets 8, which can avoid removal of the structural plates after casting and improve the concrete wrapping effect when casting the post-cast strip.

[0031] A closing plate is integrally cast between the left structural plate 2 and the right structural plate 3, that is, when the structural plate is cast, the prefabricated closing plate is placed in place and cast and connected to form an integral body. The closing plate is shielded above the post-cast strip 1, thereby achieving early closure of the post-cast strip, preventing the external sunlight and rain from eroding the internal structure and equipment, and closing the gully can also improve safety and facilitate the movement of personnel and equipment.

[0032] At the same time, the formwork system 10 forms the lower contour surface of the post-casting strip 1, and the upper closing plate, the left and right quick-closing nets and the lower formwork system together form the post-casting strip 1. A grouting sleeve 7 connecting the outside and the post-casting strip 1 is penetrated on the closing plate, and concrete can be poured into the post-casting strip 1 by using the grouting sleeve 7.

[0033] The closed panel includes a left closed panel 4 and a right closed panel 5. The left structural panel 2 is connected to the left closed panel 4 by casting, and the right structural panel 3 is connected to the right closed panel 5 by casting, dividing the closed panel into left and right parts for easy processing, manufacturing, construction and installation.

[0034] A water retaining plate 6 is provided between the left closing plate 4 and the right closing plate 5. The water retaining plate 6 is a polystyrene plate, which blocks water from the gap between the closing plates on both sides. The grouting sleeve 7 is also located between the left closing plate 4 and the right closing plate 5 to facilitate on-site installation. A water stop plate 9 is provided on the right part of the left structural plate 2 and on the left part of the right structural plate 3 to enhance the water stop effect during post-casting.

[0035] The left closing plate 4 and the right closing plate 5 are both of right-angled trapezoidal cross-section, the right-angled ends of the left closing plate 4 and the right closing plate 5 are located on the inner side and the beveled ends are located on the outer side, and the beveled ends make the ends have a good transition effect. The left closing plate 4 and the right closing plate 5 include closing plate reinforcement bars 102, and the closing plate reinforcement bars 102 are in the shape of a right-angled trapezoid without a bottom edge, and the closing plate is parallel and overlapped with the trapezoidal shape of its reinforcement bars.

[0036] The left structural plate 2 and the right structural plate 3 both include structural plate reinforcement bars 101, the outer ends of the closed plate reinforcement bars 102 extend into the structural plate and are connected to the structural plate reinforcement bars 101, and the inner ends of the closed plate reinforcement bars 102 extend into the post-cast strip 1 and are connected to the structural plate reinforcement bars 101. In addition, the outer end bevel ends of the closed plate reinforcement bars 102 are provided with horizontal extension sections connected to the structural plate reinforcement bars 101, and the inner end vertical ends of the closed plate reinforcement bars 102 are provided with horizontal extension sections connected to the structural plate reinforcement bars 101, so as to facilitate welding or binding during on-site connection.

[0037] The working process of the utility model is as follows: erecting formwork frames and tying structural slab surface reinforcements, setting up quick-closing nets at locations where post-cast strips are to be reserved; making prefabricated panels in advance according to the width of the post-cast strips, and reserving prefabricated panel reinforcements; welding the prefabricated panel reinforcements to the structural reinforcements on both sides of the post-cast strips, controlling the gap between the two prefabricated panels to be about 1 cm, and leaving a 125 mm diameter casing in the middle every 5 m; pouring concrete on both sides of the post-cast strips to connect the prefabricated panels and the structural panels on both sides of the post-cast strips into a whole; constructing overall waterproofing and subsequent processes; and pouring concrete from the reserved casings after the settlement on both sides meets the design and specifications.

[0038] The above basic examples and further optional examples of the utility model can be freely combined to form multiple embodiments, which are all embodiments that can be adopted and claimed for protection by the utility model. In the scheme of the utility model, each optional example can be arbitrarily combined with any other basic examples and optional examples.

[0039] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A large basement settlement post-casting strip early closure construction structure, comprising a left structural plate (2) and a right structural plate (3), a post-casting strip (1) is reserved between the left structural plate (2) and the right structural plate (3), characterized in that: The right side surface of the left structural plate (2) and the left side surface of the right structural plate (3) are both provided with a quick-closing net (8), and a closing plate is integrally cast between the left structural plate (2) and the right structural plate (3), the closing plate is shielded above the post-cast strip (1), and a grouting sleeve (7) is passed through the closing plate to connect the outside with the post-cast strip (1).

2. The large-scale basement settlement post-casting strip early closure construction structure according to claim 1 is characterized by: The closing plate is a prefabricated plate.

3. The large-scale basement settlement post-casting strip early closure construction structure according to claim 1 or 2 is characterized in that: The closed plate comprises a left closed plate (4) and a right closed plate (5); the left structural plate (2) is connected to the left closed plate (4) by casting, the right structural plate (3) is connected to the right closed plate (5) by casting, and a water retaining plate (6) is provided between the left closed plate (4) and the right closed plate (5).

4. The large-scale basement settlement post-casting strip early closure construction structure according to claim 3 is characterized by: The left side closing plate (4) and the right side closing plate (5) are both right-angled trapezoidal cross-sections, with the right-angled ends of the left side closing plate (4) and the right side closing plate (5) located on the inner side and the oblique angled ends located on the outer side.

5. The large-scale basement settlement post-casting strip early closure construction structure according to claim 3 is characterized by: The left structural plate (2) and the right structural plate (3) both include structural plate reinforcement (101), and the left closed plate (4) and the right closed plate (5) include closed plate reinforcement (102), the outer ends of the closed plate reinforcement (102) extend into the structural plate and are connected to the structural plate reinforcement (101), and the inner ends of the closed plate reinforcement (102) extend into the post-cast strip (1) and are connected to the structural plate reinforcement (101).

6. The large-scale basement settlement post-casting strip early sealing construction structure according to claim 5 is characterized by: The closed plate steel bar (102) is in the shape of a right-angled trapezoid without a bottom edge, the outer oblique end of the closed plate steel bar (102) is provided with a horizontal extension section connected to the structural plate steel bar (101), and the inner vertical end of the closed plate steel bar (102) is provided with a horizontal extension section connected to the structural plate steel bar (101).

7. The large-scale basement settlement post-casting strip early sealing construction structure according to claim 3 is characterized by: The water retaining plate (6) is a polystyrene plate.

8. The large-scale basement settlement post-casting strip early sealing construction structure according to claim 3 is characterized by: The grouting sleeve (7) is located between the left closing plate (4) and the right closing plate (5).

9. The large-scale basement settlement post-casting strip early sealing construction structure according to claim 1 is characterized by: The right part of the left structural plate (2) is provided with a water stop plate (9) penetrating the right side surface, and the left part of the right structural plate (3) is provided with a water stop plate (9) penetrating the left side surface.

10. The large-scale basement settlement post-casting strip early sealing construction structure according to claim 1 is characterized by: It also includes a template system (10), which supports the lower end surfaces of the left structural plate (2) and the right structural plate (3). The template system (10) forms the lower contour surface of the post-casting strip (1), and the support system (11) supports the template system (10).