Whole-house smart home energy storage scheduling system

Through the design of the whole-house smart home energy storage scheduling system, the power scheduling between the energy storage batteries is achieved by using the inverter rectifier and the controller, which solves the problem that traditional energy storage systems cannot be properly dispatched, and improves the utilization rate and storage of power resources Health status of energy batteries.

CN221995181UActive Publication Date: 2024-11-12FOSHAN QITE TECH CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323140034.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-20
Publication Date
2024-11-12
Estimated Expiration
2033-11-20

AI Technical Summary

Technical Problem

Traditional home energy storage systems cannot intelligently analyze and reasonably schedule the power of multiple energy storage systems, resulting in waste of power resources and overdischarge of energy storage batteries.

Method used

A whole-house smart home energy storage scheduling system is designed, including total energy storage components, sub-energy storage components and distributed energy storage scheduling center. The power scheduling between each energy storage battery is realized through inverter rectifiers and controllers to ensure that Balancing the battery and improving utilization.

Benefits of technology

It effectively avoids waste of power resources, extends the service life of energy storage batteries, ensures that all energy storage batteries are in a healthy state, and improves the efficiency of power resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221995181U_ABST
    Figure CN221995181U_ABST
Patent Text Reader

Abstract

The utility model discloses a whole-house intelligent household energy storage scheduling system which comprises a total energy storage assembly, branch energy storage assemblies and a distributed energy storage scheduling center. The total energy storage assembly is provided with a first connecting end and second connecting ends, the first connecting end is connected with the mains supply, and the second connecting ends are connected in parallel and connected with the branch energy storage assemblies respectively. The branch energy storage assembly comprises an inverter rectifier, an energy storage battery and a third connecting end, the inverter rectifier is connected with the energy storage battery, and the inverter rectifier is connected with regional electric equipment through the third connecting end; the distributed energy storage dispatching center is connected with the branch energy storage assembly and can monitor and dispatch the electric quantity of the energy storage batteries, and when the electric quantity of the energy storage batteries is lower than the set electric quantity, the distributed energy storage dispatching center dispatches the energy storage battery with the highest electric quantity to the energy storage battery with the electric quantity lower than the set electric quantity through the inverter rectifier and the second connecting end. According to the utility model, the problem that the traditional energy storage system cannot intelligently analyze and reasonably dispatch the electric quantity of a plurality of energy storage systems so as to improve the usability of stored electric power resources can be solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of electric energy storage systems, and in particular relates to a whole-house smart home energy storage dispatching system. Background Art

[0002] With the development of science and technology, the intelligence of home products is a major trend in the current home environment. Smart homes are highly dependent on good network communications and stable voltage. The rational allocation and use of electricity can ensure the comfort, convenience and efficiency of smart homes. The electrical equipment in smart homes are generally equipped with new energy power supply and energy storage systems. Combined with the mains supply, the operation of smart homes is guaranteed to the greatest extent. In addition, the new energy power supply and energy storage systems are not affected by the pressure of the mains.

[0003] However, traditional household energy storage systems only have storage functions and are unable to perform intelligent analysis of household electrical equipment, resulting in the inability to balance the scheduling of multiple energy storage systems and the inability to reasonably supply electricity, which easily leads to a waste of electricity resources. Utility Model Content

[0004] The utility model aims to provide a whole-house smart home energy storage scheduling system to solve the problem that traditional energy storage systems cannot intelligently analyze and reasonably schedule the electricity of multiple energy storage systems to improve the usability of stored power resources.

[0005] The technical solutions adopted to solve the above technical problems are:

[0006] The utility model discloses a whole-house smart home energy storage dispatching system, comprising a total energy storage component, a sub-energy storage component and a distributed energy storage dispatching center;

[0007] The total energy storage component is provided with a first connection end and a second connection end, the first connection end is used to connect to the mains, the second connection end and the sub-energy storage components are provided with a plurality of them, and the plurality of the second connection ends are connected in parallel and are respectively connected to one of the sub-energy storage components;

[0008] The sub-energy storage component includes an inverter rectifier, an energy storage battery and a third connection terminal, the inverter rectifier is connected to the energy storage battery, and the inverter rectifier is connected to the regional electrical equipment through the third connection terminal;

[0009] The distributed energy storage dispatching center is connected to the sub-energy storage components for monitoring and dispatching the power of the energy storage batteries. The distributed energy storage dispatching center is configured such that when the power of the energy storage batteries is lower than a set power, the distributed energy storage dispatching center dispatches the energy storage battery with the largest power to the energy storage battery with a power lower than the set power via the inverter rectifier and the second connection end.

[0010] The utility model has at least the beneficial effect that the energy storage battery in each sub-energy storage component can supply power to the regional electrical equipment through the inverter rectifier and the third connection terminal, so that each sub-energy storage component is relatively independent.

[0011] Several sub-energy storage components are connected in parallel through the second connection end, and the distributed energy storage dispatching center can dispatch the power between each energy storage battery through the inverter rectifier and the second connection end, so that some energy storage batteries can recover to a healthy power level higher than the set power level.

[0012] This setting can transfer the power of the energy storage battery with higher power to the energy storage battery with lower power than the set power, balance the power between the two, and avoid the energy storage battery with higher power to waste power resources due to long-term natural discharge, thereby improving the utilization rate of the energy storage battery. It can also avoid the situation where the power consumption of the energy storage battery is always lower than the set power due to the power consumption of the regional power-consuming equipment, causing the energy storage battery to be in a low power state of over-discharge for a long time, which seriously damages the energy storage battery.

[0013] As a further improvement of the above technical solution, when the distributed energy storage dispatching center dispatches the power of the energy storage batteries, the power of several of the energy storage batteries is at the same power level.

[0014] Through the above settings, all energy storage batteries are at the same power level, effectively ensuring that all energy storage batteries are in the same health state.

[0015] As a further improvement of the above technical solution, the distributed energy storage dispatching center includes a controller, and the controller is connected to the sub-energy storage components to achieve dispatching between a number of the energy storage batteries.

[0016] Through the above settings, the controller is connected to the sub-energy storage components, and the connection between each energy storage battery, the inverter rectifier and the second connection end is controlled by the controller to achieve power scheduling.

[0017] As a further improvement of the above technical solution, the distributed energy storage dispatching center also includes a digital display unit, a network unit and a circuit breaker unit connected to the controller, and the circuit breaker units are provided in plurality and are respectively laid at the first connection end, the second connection end and the third connection end.

[0018] Through the above settings, the digital display unit digitally displays information such as the power level, health status, and power consumption of regional power equipment of each energy storage battery, so that people can set usage according to the information. The network unit serves the data transmission between each sub-energy storage component, and can upload relevant data to the cloud for people to monitor and view. People can send data to the controller through the cloud to achieve software remote control. The circuit breaker unit can connect or disconnect the first connection end, the second connection end, or the third connection end to protect circuits, energy storage batteries, regional power equipment and other structures. The controller also directly controls whether the mains power is connected to the total energy storage component, whether the energy storage battery supplies power to the regional power equipment, or whether the power is dispatched between each energy storage battery through the circuit breaker unit.

[0019] As a further improvement of the above technical solution, a plurality of the inverter rectifiers are connected in parallel via the second connection end, and the second connection end is the whole-house energy storage circuit.

[0020] Through the above settings, it is only necessary to lay the whole-house energy storage circuit along the home environment and several sub-energy storage components, and several inverter rectifiers are directly connected in parallel to the whole-house energy storage circuit to make the home environment lines neat and simple, avoiding the situation where several inverter rectifiers connected in parallel have messy lines.

[0021] As a further improvement of the above technical solution, the whole-house smart home energy storage scheduling system also includes a new energy power generation component, and a plurality of the new energy power generation components are provided, and are respectively connected to some of the sub-energy storage components.

[0022] Through the above arrangement, the electric energy converted by the new energy power generation component can be supplied to the sub-energy storage component connected thereto, so that the sub-energy storage component can operate independently, thereby improving the use of new energy resources, reducing the use of city electricity, and lowering electricity bills.

[0023] As a further improvement of the above technical solution, the new energy power generation component is provided with two fourth connection terminals connected in parallel, and the two fourth connection terminals are respectively connected to the inverter rectifier and the energy storage battery, so that the electric energy converted by the new energy power generation component can be supplied to the energy storage battery for storage and to the regional electrical equipment for power consumption.

[0024] As a further improvement of the above technical solution, the controller is connected to the new energy power generation component to control the new energy power generation component to output power to one or both of the inverter rectifier and the energy storage battery.

[0025] Through the above settings, the controller can control whether the new energy power generation component supplies power to the energy storage battery to store electricity for the energy storage battery, or supplies power to the inverter rectifier to directly provide power for the use of regional power equipment, or supplies power to both at the same time, so that the regional power equipment can use electricity and the energy storage battery can be charged at the same time.

[0026] As a further improvement of the above technical solution, the new energy power generation component includes a wind power generation unit or a photovoltaic power generation unit, and the wind power generation unit or the photovoltaic power generation unit is connected in series with the two fourth connection ends connected in parallel.

[0027] Through the above arrangement, the new energy power generation component can use the electric energy converted from light energy or wind energy to power the energy storage battery and regional electrical equipment, thereby improving the utilization rate of the wind power generation unit or the photovoltaic power generation unit.

[0028] As a further improvement of the above technical solution, the new energy power generation component includes a wind power generation unit, a photovoltaic power generation unit and two fifth connection terminals. The wind power generation unit and the photovoltaic power generation unit are connected in parallel through the two fifth connection terminals, and the two fifth connection terminals and the two fourth connection terminals are connected in series.

[0029] Through the above settings, the new energy power generation components can use the electricity converted from light energy and wind energy to power storage batteries and regional electrical equipment, further improving the utilization rate of wind power generation units and photovoltaic power generation units. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] The utility model is further described below in conjunction with the accompanying drawings and embodiments;

[0031] Figure 1 It is a detailed flow chart of the whole-house smart home energy storage scheduling system provided by the embodiment of the utility model;

[0032] Figure 2 It is a detailed flow chart of the sub-energy storage components provided in the embodiment of the utility model;

[0033] Figure 3 It is a detailed flow chart of the distributed energy storage dispatching center provided by the embodiment of the utility model;

[0034] Figure 4 It is a schematic diagram of a distributed energy storage dispatching center provided by an embodiment of the utility model;

[0035] Figure 5 It is a detailed flow chart of the sub-energy storage component provided by the embodiment of the utility model in the pure discharge mode;

[0036] Figure 6 It is a detailed flow chart of the sub-energy storage component provided by the embodiment of the utility model in the full-charge overcharge mode;

[0037] Figure 7 It is a detailed flow chart of the sub-energy storage component provided by the embodiment of the utility model in the slow charging mode of electricity consumption;

[0038] Figure 8It is a detailed flow chart of the sub-energy storage component in the rapid fast charging mode provided by the embodiment of the utility model.

[0039] The following are marked in the accompanying drawings:

[0040] 100. Regional electrical equipment;

[0041] 200, energy storage component; 211, inverter rectifier; 212, energy storage battery; 220, third connection terminal; 230, sixth connection terminal;

[0042] 300, distributed energy storage dispatching center; 310, controller; 320, digital display unit; 330, network unit; 340, circuit breaker unit;

[0043] 400, total energy storage component; 410, first connection end; 420, whole house energy storage circuit;

[0044] 500, new energy power generation component; 510, fourth connection terminal; 520, wind power generation unit; 530, photovoltaic power generation unit; 540, fifth connection terminal;

[0045] 600, City electricity. DETAILED DESCRIPTION

[0046] This section will describe in detail the specific embodiments of the utility model. The preferred embodiments of the utility model are shown in the accompanying drawings. The purpose of the accompanying drawings is to supplement the description of the text part of the specification with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the utility model, but it cannot be understood as a limitation on the protection scope of the utility model.

[0047] In the description of the present invention, it should be understood that descriptions involving orientation, such as up, down, front, back, left, right, etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0048] In the description of the utility model, if there is a word description such as "several", it means one or more, and the meaning of "more" is two or more. Greater than, less than, and more than are understood to exclude the number itself, and above, below, and within are understood to include the number itself. If there is a description of the first, second, and third, it is only used to distinguish the technical features, and cannot be understood as indicating or implying the relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.

[0049] In the description of the present invention, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in the present invention based on the specific content of the technical solution.

[0050] Reference Figures 1 to 8 , several embodiments of the whole-house smart home energy storage scheduling system of the utility model are given below.

[0051] like Figures 1 to 8 As shown, the whole-house smart home energy storage scheduling system of the embodiment of the utility model includes a total energy storage component 400, a sub-energy storage component 200 and a distributed energy storage scheduling center 300.

[0052] It is understandable that the total energy storage assembly 400 is provided with a first connection end 410 and a plurality of second connection ends, such as Figure 1 shown.

[0053] It can be understood that the first connection terminal 410 is connected to the mains electricity 600, providing a path for the whole-house smart home energy storage scheduling system to access the mains network and obtain sufficient mains electricity 600 through the mains network.

[0054] It can be understood that there are also several sub-energy storage components 200, the number of sub-energy storage components 200 matches the number of second connection terminals, each second connection terminal is respectively connected to a sub-energy storage component 200, and several second connection terminals are connected in parallel so that each sub-energy storage component 200 is arranged in parallel, each sub-energy storage component 200 can be relatively independent, and each sub-energy storage component 200 can be connected to the mains 600 through the second connection terminal and the first connection terminal 410.

[0055] It can be understood that each sub-energy storage assembly 200 includes an inverter rectifier 211, an energy storage battery 212 and a third connection terminal 220. Figure 2 The inverter rectifier 211 includes an inversion state and a rectification state. When the inverter rectifier 211 is in the inversion state, direct current can be converted into alternating current; when the inverter rectifier 211 is in the rectification state, alternating current can be converted into direct current.

[0056] It is understandable that the inverter rectifier 211 is connected to the regional power equipment 100 through the third connection terminal 220, and the converted AC or DC power can be transmitted to the regional power equipment 100 to meet the power demand of the regional power equipment 100. The third connection terminal 220 connected to the regional power equipment 100 is a unidirectional line, which can only transmit current from the inverter rectifier 211 to the regional power equipment 100 in one direction.

[0057] It can be understood that since the first connection terminal 410 is connected to several second connection terminals arranged in parallel, several regional power-consuming devices 100 can meet all power demands through the mains 600, and several energy storage batteries 212 can also store sufficient electricity through the mains 600.

[0058] It can be understood that the inverter rectifier 211 is connected to the energy storage battery 212, and the connecting line between the two is the sixth connection terminal 230. The sixth connection terminal 230 is a bidirectional line. The inverter rectifier 211 can convert AC power into DC power and store it in the energy storage battery 212 through the sixth connection terminal 230. The energy storage battery 212 can input DC power to the inverter rectifier 211 through the sixth connection terminal 230, so that the inverter rectifier 211 can convert it into AC power or DC power, which is supplied to the regional electrical equipment 100 after filtering.

[0059] In this embodiment, the distributed energy storage dispatching center 300 is connected to the sub-energy storage component 200, such as Figure 2 shown.

[0060] It is understandable that the distributed energy storage dispatching center 300 can monitor the power of the energy storage battery 212 to prevent the power of a certain energy storage battery 212 from being too low, causing the energy storage battery 212 to be in an over-discharge state for a long time until the power is exhausted, thereby damaging the energy storage battery 212 and reducing the service life of the energy storage battery 212.

[0061] It is understandable that the distributed energy storage dispatching center 300 can dispatch the power of the energy storage battery 212. Specifically, people can set the set power of the energy storage battery 212 through the distributed energy storage dispatching center 300. When the power of the energy storage battery 212 is lower than the set power, the distributed energy storage dispatching center 300 can dispatch the energy storage battery 212 through the sixth connection terminal 230. 、 The inverter rectifier 211 and the second connection end dispatch the power of the energy storage battery 212 with the most power to the energy storage battery 212 with less than the set power, so that the power of the energy storage battery 212 with less than the set power can be restored to a normal power state, ensuring that the power of the energy storage battery 212 is healthy, so that it can continue to supply power to the corresponding regional electrical equipment 100. In this embodiment, the set power is set to the charging value of the energy storage battery 212.

[0062] It is understandable that the distributed energy storage dispatching center 300 can reasonably allocate the power supply between each energy storage battery 212, and dispatch the power of the energy storage battery 212 with a large amount of power to the energy storage battery 212 with a power lower than the charging value, so as to ensure the health of the power of each energy storage battery 212, and extend the power usage time of some energy storage batteries 212 through scheduling, thereby avoiding the natural discharge of some energy storage batteries 212 and causing waste of power resources.

[0063] It is understandable that the charging value of the energy storage battery 212 can be set to 20% to 50% of the power of the energy storage battery 212 .

[0064] Furthermore, when the distributed energy storage dispatching center 300 dispatches the power of the energy storage batteries 212, the power of several energy storage batteries 212 can be at the same power level. Specifically, except for the energy storage batteries 212 that are below the charging value, the distributed energy storage dispatching center 300 can simultaneously dispatch the power of the remaining multiple energy storage batteries 212 to the energy storage batteries 212 that are below the charging value, effectively ensuring that all energy storage batteries 212 are in the same healthy state, quickly and effectively extending the service life of each energy storage battery 212, and improving the utilization rate of each energy storage battery 212, avoiding the situation where the energy storage battery 212 with the highest power cannot restore the power of the energy storage battery 212 below the charging value to a normal state, and in the process of power transmission, it also causes the energy storage battery 212 with the highest original power to be below the charging value, resulting in the need to mobilize the energy storage battery 212 with the second highest original power to transmit power to the two energy storage batteries 212.

[0065] It can be understood that several sub-energy storage components 200 are dispersedly arranged in the home environment, and the number of sub-energy storage components 200 can be set according to the concentrated location and number of regional electrical equipment 100 in the home environment, thereby reducing the laying length of the line, reducing the loss of current in line transmission, and reducing the impact of errors in the whole-house smart home energy storage scheduling system on the regional electrical equipment 100. In addition, the sub-energy storage components 200 installed in different areas disperse the size of the whole-house smart home energy storage scheduling system, which is conducive to saving space.

[0066] It is understandable that the distributed energy storage dispatching center 300 includes a controller 310, and the controller 310 is connected to a plurality of sub-energy storage components 200 to realize the dispatching control between a plurality of energy storage batteries 212. Specifically, the controller 310 is respectively connected to the inverter rectifier 211 and the energy storage battery 212 to control the transmission direction of the electric quantity, so as to control the inverter rectifier 211 to be in a rectifying state or an inverting state, and the energy storage battery 212 to be in a discharging state or a charging state through the controller 310, so as to control other energy storage batteries 212 to charge the energy storage battery 212 whose charge value is lower than the charging value.

[0067] Furthermore, the distributed energy storage dispatching center 300 further includes a circuit breaker unit 340, a digital display unit 320 and a network unit 330, and the controller 310 is connected to the circuit breaker unit 340, the digital display unit 320 and the network unit 330 respectively. Figure 3 shown.

[0068] In this embodiment, a plurality of circuit breaker units 340 are provided, and the controller 310 is respectively connected to the plurality of circuit breaker units 340 . People can control whether the circuit breaker units 340 are in a closed state or an open state through the controller 310 , and the operation is simple and quick.

[0069] It can be understood that the circuit breaker unit 340 is laid on the first connection end 410, and the controller 310 can control whether the first connection end 410 is connected through the circuit breaker unit 340, and then control whether the AC power 600 is connected to the whole-house smart home energy storage scheduling system.

[0070] It can be understood that the circuit breaker unit 340 is also laid at the second connection end, and the controller 310 can control whether the various sub-energy storage components 200 are connected and whether the total energy storage component 400 is connected to the sub-energy storage component 200 through the circuit breaker unit 340, so as to facilitate the control of the scheduling between the various energy storage batteries 212 and the access to the city power 600.

[0071] It is understandable that the circuit breaker unit 340 is also laid on the third connection end 220 , and the controller 310 can control whether the inverter rectifier 211 is connected to the regional electrical equipment 100 through the circuit breaker unit 340 , thereby controlling the switch of the regional electrical equipment 100 .

[0072] It can be understood that the circuit breaker unit 340 is used to connect or disconnect the line, and protects the energy storage battery 212, the regional electrical equipment 100 and the inverter rectifier 211. When a line fault occurs, the circuit breaker unit 340 will automatically disconnect the connected line to ensure the normal use of each electrical equipment.

[0073] It can be understood that the controller 310 is connected to the digital display unit 320 to facilitate the transmission of the received information to the digital display unit 320. The digital display unit 320 displays the power level of the energy storage battery 212 in the corresponding area, the power consumption of the regional electrical equipment 100, etc., so that people can intuitively see the power usage of the regional electrical equipment 100 and the energy storage battery 212.

[0074] It can be understood that the network unit 330 can upload the data of the total energy storage component 400 and each sub-energy storage component 200 to the cloud in real time, so that people can view the real-time or historical power consumption and power consumption values ​​through electronic devices such as mobile phones. People can also send instructions and data to the controller 310 through the software of the electronic device to control the use of the regional power-consuming equipment 100 and the power delivery of the energy storage battery 212 through the controller 310, thereby achieving the functional effect of software remote control.

[0075] It is understandable that a plurality of inverter rectifiers 211 are connected in parallel via the second connection terminal. A plurality of parallel sub-energy storage components 200 are actually a plurality of inverter rectifiers 211 connected in parallel, and one end of each parallel-connected second connection terminal is connected to the inverter rectifier 211 .

[0076] It can be understood that the total energy storage assembly 400 is installed at the starting end of the city grid. Since a plurality of sub-energy storage assemblies 200 are dispersedly arranged in various places in the home environment and connected in parallel through the second connection end, the second connection end is the whole-house energy storage circuit 420. Figure 2 Specifically, the whole-house energy storage circuit 420 is laid along various places in the home environment and the positions of each sub-energy storage component 200, and each inverter rectifier 211 is directly connected to the whole-house energy storage circuit 420 in parallel, so as to realize the parallel connection of each sub-energy storage component 200, and can also directly access the mains 600 through the whole-house energy storage circuit 420, reducing the messy connection and laying of each second connection end.

[0077] It can be understood that the whole-house energy storage circuit 420 is pre-buried in the wall or the ground to achieve hidden circuit settings, thereby preventing long circuits from being exposed in the home environment and affecting the cleanliness and beauty of the home environment.

[0078] In this embodiment, the whole-house smart home energy storage scheduling system also includes a new energy power generation component 500, and a plurality of new energy power generation components 500 are provided, and are respectively connected to some of the sub-energy storage components 200.

[0079] It can be understood that the new energy power generation component 500 converts renewable energy (solar energy, wind energy, etc.) into electrical energy, thereby providing electricity to the sub-energy storage component 200, so as to improve the utilization rate of renewable energy, reduce energy waste, reduce the dependence of the whole-house smart home energy storage scheduling system on the mains 600, and save electricity expenses.

[0080] It can be understood that the number and location of the new energy power generation components 500 can be set according to the energy conversion conditions of the new energy power generation components 500. The new energy power generation components 500 are connected to the adjacent sub-energy storage components 200, so that the electric energy converted by the new energy power generation components 500 can be directly supplied to the nearby regional power equipment 100, thereby meeting the power demand of the regional power equipment 100 nearby.

[0081] It can be understood that the new energy power generation component 500 is provided with two fourth connection terminals 510 respectively connected to the inverter rectifier 211 and the energy storage battery 212, and the two fourth connection terminals 510 are connected in parallel to realize that the electric energy converted by the new energy power generation component 500 can be supplied to the energy storage battery 212 for storage and to the regional electrical equipment 100 for use, such as Figure 2 shown.

[0082] It is understandable that the controller 310 is connected to the new energy power generation component 500 to control the output position of the new energy power generation component 500. Specifically, since the sub-energy storage component 200 includes an inverter rectifier 211 and an energy storage battery 212, the controller 310 can control the new energy power generation component 500 to supply power to the energy storage battery 212 alone to store electricity for the energy storage battery 212; the controller 310 can also control the new energy power generation component 500 to supply power to the inverter rectifier 211 alone to directly provide power for the use of the regional power equipment 100; the controller 310 can also control the new energy power generation component 500 to supply power to the energy storage battery 212 and the inverter rectifier 211 at the same time, so as to realize the power-on use of the regional power equipment 100 and the charging of the energy storage battery 212 at the same time.

[0083] In some embodiments, the new energy power generation assembly 500 includes a wind power generation unit 520, which is connected in series with two fourth connection terminals 510 arranged in parallel. Specifically, the wind power generation unit 520 converts wind energy into electrical energy, and the wind power generation unit 520 is connected in parallel with the two fourth connection terminals 510, so that the electrical energy converted from wind energy can be supplied to the energy storage battery 212 and the regional electrical equipment 100 through the controller 310.

[0084] In other embodiments, the new energy power generation assembly 500 includes a photovoltaic power generation unit 530, which is connected in series with two fourth connection terminals 510 arranged in parallel. Specifically, the photovoltaic power generation unit 530 converts light energy into electrical energy, and the photovoltaic power generation unit 530 is connected in parallel with the two fourth connection terminals 510, so that the electrical energy converted from light energy can be supplied to the energy storage battery 212 and the regional electrical equipment 100 through the controller 310.

[0085] In this embodiment, the new energy power generation component 500 includes a wind power generation unit 520, a photovoltaic power generation unit 530 and a fifth connection terminal 540. Figure 2 The wind power generation unit 520 and the photovoltaic power generation unit 530 are connected in parallel via the fifth connection terminal 540 , and the fifth connection terminal 540 connected in parallel is connected in series with the fourth connection terminal 510 connected in parallel.

[0086] With such an arrangement, when wind energy is sufficient but light energy is insufficient, the wind power generation unit 520 can provide converted electric energy to the sub-energy storage component 200 alone; when light energy is sufficient but wind energy is insufficient, the photovoltaic power generation unit 530 can provide converted electric energy to the sub-energy storage component 200 alone; when both wind energy and light energy are sufficient, the wind power generation unit 520 and the photovoltaic power generation unit 530 simultaneously provide converted electric energy to the sub-energy storage component 200.

[0087] It is understandable that a suitable new energy power generation component 500 can be selected according to the laying position of the new energy power generation component 500 to improve the utilization rate of the wind power generation unit 520 and the photovoltaic power generation unit 530 and avoid the waste of laying of the wind power generation unit 520 and the photovoltaic power generation unit 530 due to insufficient wind energy or light energy at the distribution location.

[0088] In this embodiment, several sub-energy storage components 200 are installed in various areas of the home environment, such as the living room area, bedroom area, dining room area, balcony area, and bathroom area. Since the new energy power generation component 500 converts wind energy and solar energy, the new energy power generation component 500 can be installed outdoors such as by the window and balcony. When the new energy power generation component 500 is installed by the window, the new energy power generation component 500 can be connected to the sub-energy storage components 200 in the bedroom area, dining room area, and bathroom area corresponding to the window; when the new energy power generation component 500 is installed in the balcony area, it can be connected to the sub-energy storage components 200 in the balcony area.

[0089] Furthermore, the new energy power generation assembly 500 can also be installed on the roof to fully utilize solar energy and wind energy.

[0090] In this embodiment, the sub-energy storage assembly 200 is set with four usage modes through the controller 310: pure discharge mode, full charge overcharge mode, slow charge mode and rapid fast charge mode. Figures 4 to 8 shown.

[0091] When the sub-energy storage assembly 200 is in the pure discharge mode, such as Figure 5 As shown, the controller 310 controls the total energy storage component 400 not to be connected to the mains 600, and the new energy power generation component 500 in each sub-energy storage component 200 preferentially transmits electric energy to the regional power equipment 100 through the inverter rectifier 211. If the output power of the new energy power generation component 500 is insufficient, the controller 310 connects to the energy storage battery 212. At this time, the new energy power generation component 500 and the energy storage battery 212 simultaneously supply power to the regional power equipment 100, so that each sub-energy storage component 200 can operate independently.

[0092] It is understandable that in this mode, if the power of some energy storage batteries 212 is lower than the charging value, the controller 310 dispatches the power of the energy storage batteries 212 of other sub-energy storage components 200 to the energy storage batteries 212 below the charging value, ensuring that all energy storage batteries 212 are in a healthy state.

[0093] It is understandable that in the pure discharge mode, which is generally when no one is at home, only the refrigerator, monitoring and other regional electrical equipment 100 that do not lose power are basically started, the power consumption is not high, and there is a new energy power generation component 500 to supplement the power, so the city electricity 600 is not consumed, and the electric energy converted by the new energy power generation component 500 is fully utilized.

[0094] It is understandable that people can set another set power of the energy storage battery 212 through software or controller 310, and the set power is a standard value, that is, after the energy storage battery 212 is charged to a value higher than the standard value, the energy storage battery 212 stops charging to avoid the energy storage battery 212 being fully charged and affecting its service life.

[0095] It is understandable that the standard value of the energy storage battery 212 may be set to 80% to 90% of the power of the energy storage battery 212 .

[0096] When the sub-energy storage assembly 200 is in the full-charge overcharge mode, Figure 6 As shown, the controller 310 controls the total energy storage component 400 not to be connected to the mains 600, the power of the energy storage batteries 212 in some sub-energy storage components 200 is at the standard value, and the new energy power generation component 500 is still working, and the output power of the new energy power generation component 500 meets the corresponding regional power-consuming equipment 100, according to the monitoring information of the controller 310, the excess power of the new energy power generation component 500 is dispatched to the energy storage batteries 212 of other sub-energy storage components 200 that are not fully charged through the whole-house energy storage circuit 420 until all energy storage batteries 212 are at the standard value.

[0097] It is understandable that in the full-charge overcharge mode, the regional power-consuming equipment 100 of some sub-energy storage components 200 consumes too little power or the new energy power generation components 500 generate more power, resulting in the energy storage battery 212 being at the standard value. Generally, when no one is at home for a long time or in a pure discharge mode, some energy storage batteries 212 automatically switch to the full-charge overcharge mode after being at the standard value.

[0098] When the sub-energy storage assembly 200 is in the slow charging mode, Figure 7 As shown, the city grid is at its peak power consumption, the output power of the new energy power generation component 500 is insufficient to cope with the regional power consumption equipment 100, and the energy of all the energy storage batteries 212 is insufficient. At this time, the controller 310 controls the total energy storage component 400 to connect to the city power 600, and the city power 600 supplies all regional power consumption equipment 100. The new energy power generation component 500 is only used to charge the energy storage battery 212. When the city grid is at a valley power consumption value, it is used to charge the energy storage battery 212. At this time, the city power 600 still supplies power to the regional power consumption equipment 100 until the energy storage battery 212 is at the standard value.

[0099] It is understandable that starting the slow charging mode requires that all energy storage batteries 212 are short of energy, the city grid is at its peak power consumption, and the regional power-consuming devices 100 need power.

[0100] It is understandable that the electricity price is adjusted according to the time period, that is, the peak, flat and valley electricity price. The peak period is the peak period of electricity consumption, so the electricity price is the most expensive, and the valley period is the low period of electricity consumption, so the electricity price is the cheapest. Except for the peak period and the valley period, the rest are the normal period, and the electricity price of the normal period is also between the two. Therefore, when the electricity consumption is valley value, the city electricity 600 is used to charge the energy storage battery 212, so as to save electricity costs to the maximum extent.

[0101] When the energy storage component 200 is in the rapid charging mode, Figure 8 As shown, the controller 310 is connected to the mains 600, which meets the power demand of all regional power-consuming devices 100, and the mains 600, the wind power generation unit 520 and the photovoltaic power generation unit 530 charge the energy storage battery 212 at the same time, so that the energy storage battery 212 quickly reaches the standard value.

[0102] It is understandable that the rapid charging mode is used in scenarios where power consumption is at a valley and battery energy is relatively low or the regional power-consuming equipment 100 will not be affected by a sudden power outage in the power grid.

[0103] It is understandable that the regional power-consuming equipment 100 seamlessly switches between the mains power 600, the energy storage battery 212 and the new energy power generation component 500 through the controller 310, thereby achieving uninterrupted power consumption.

[0104] The preferred implementation methods of the utility model are described in detail above, but the invention of the utility model is not limited to the described embodiments. Those skilled in the art may make various equivalent modifications or substitutions without violating the spirit of the utility model. These equivalent modifications or substitutions are all included in the scope defined by the claims of this application.

Claims

1. A whole-house smart home energy storage scheduling system, characterized in that: It includes total energy storage components, sub-energy storage components and distributed energy storage dispatching center; The total energy storage component is provided with a first connection end and a second connection end, the first connection end is used to connect to the mains, the second connection end and the sub-energy storage components are provided with a plurality of them, and the plurality of the second connection ends are connected in parallel and are respectively connected to one of the sub-energy storage components; The sub-energy storage component includes an inverter rectifier, an energy storage battery and a third connection terminal, the inverter rectifier is connected to the energy storage battery, and the inverter rectifier is connected to the regional electrical equipment through the third connection terminal; The distributed energy storage dispatching center is connected to the sub-energy storage components and is used to monitor and dispatch the power of the energy storage battery. The distributed energy storage dispatching center is configured to: when the power of the energy storage battery is lower than the set power, the distributed energy storage dispatching center dispatches the energy storage battery with the largest power to the energy storage battery with less than the set power via the inverter rectifier and the second connection end; When the distributed energy storage dispatching center dispatches the power of the energy storage batteries, the power of a plurality of the energy storage batteries is at the same power level; The distributed energy storage dispatching center includes a controller, and the controller is connected to the sub-energy storage components to achieve dispatching between a plurality of the energy storage batteries.

2. The whole-house smart home energy storage scheduling system according to claim 1 is characterized in that: The distributed energy storage dispatching center also includes a digital display unit, a network unit and a circuit breaker unit connected to the controller. The circuit breaker units are provided in plurality and are respectively laid at the first connection end, the second connection end and the third connection end.

3. The whole-house smart home energy storage scheduling system according to claim 1 is characterized in that: A plurality of the inverter rectifiers are connected in parallel via the second connection end, and the second connection end is a whole-house energy storage circuit.

4. The whole-house smart home energy storage scheduling system according to claim 1 is characterized in that: It also includes a new energy power generation component, and a plurality of the new energy power generation components are provided and are respectively connected to some of the sub-energy storage components.

5. The whole-house smart home energy storage scheduling system according to claim 4 is characterized in that: The new energy power generation component is provided with two fourth connection terminals connected in parallel, and the two fourth connection terminals are respectively connected to the inverter rectifier and the energy storage battery.

6. The whole-house smart home energy storage scheduling system according to claim 5 is characterized in that: The controller is connected to the new energy power generation component to control the new energy power generation component to output power to one or both of the inverter rectifier and the energy storage battery.

7. The whole-house smart home energy storage dispatching system according to claim 6 is characterized in that: The new energy power generation component includes a wind power generation unit or a photovoltaic power generation unit, and the wind power generation unit or the photovoltaic power generation unit is connected in series with the two fourth connection ends connected in parallel.

8. The whole-house smart home energy storage dispatching system according to claim 6 is characterized in that: The new energy power generation component includes a wind power generation unit, a photovoltaic power generation unit and a fifth connection end. The wind power generation unit and the photovoltaic power generation unit are connected in parallel via the fifth connection end, and the fifth connection end and the fourth connection end are connected in series.

Citation Information

Cited By

  • Energy collaboration method, energy storage equipment and energy storage system

    CN121417387A