Rapid positioning mechanism for metallurgical container mould

Through the metallurgical container tire fast positioning mechanism, the accurate positioning of the tire is achieved by using multi-point contact and peripheral positioning components, solving the problem of inaccurate position of the tire in the middle, improving construction efficiency and safety, and reducing quality hazards.

CN222003188UActive Publication Date: 2024-11-15PUYANG REFRACTORIES GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420018370.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-04
Publication Date
2024-11-15
Estimated Expiration
2034-01-04

AI Technical Summary

Technical Problem

The position of the tundra is inaccurate during the metallurgy process, resulting in low construction efficiency, high safety risks and hidden quality risks. It also requires frequent measurement and adjustment during the construction process, affecting efficiency and safety.

Method used

Design a fast positioning mechanism for metallurgical container tires, including a cross-shaped or "T" shape positioning frame and peripheral positioning components, and realize accurate positioning of the upper and lower and peripheral positions of the tires through multiple positioning contact points and placement points that are not on the same line. , use lifting tools to quickly transport and mount them in air to ensure stable coordination between the tire and the container.

Benefits of technology

It realizes fast, safe and reliable positioning of tire tools, improves construction efficiency and accuracy of refractory thickness, reduces on-site measurement and adjustment operations, reduces quality hazards and safety risks, and improves labor efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222003188U_ABST
    Figure CN222003188U_ABST
Patent Text Reader

Abstract

The utility model discloses a quick positioning mechanism for a mould of a metallurgical container, which comprises a positioning frame connected with the top of the mould, at least three positioning contact points which are not on the same straight line are arranged on the top surface of the side wall of the metallurgical container, and the positioning contact points are respectively a first positioning contact point, a second positioning contact point and a third positioning contact point. The bottom surface of the positioning frame is provided with at least three positioning placement points which are not on the same straight line, and the positioning placement points are respectively a first positioning placement point, a second positioning placement point and a third positioning placement point; when all the positioning contact points coincide with the positioning placing points at the same time, the distance between the mould and the bottom wall of the metallurgical container is larger than or equal to zero, and the widths of gaps between the side walls of the periphery of the mould and the side walls of the periphery of the metallurgical container are equal. According to the utility model, operations such as on-site measurement and size adjustment are not needed when the mould is installed, so that the safety of on-site operation is greatly improved, and the on-site labor efficiency is also obviously improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of metallurgical equipment, in particular to a metallurgical container mold quick positioning mechanism. Background Art

[0002] The steel industry is a basic industry of a country and plays an important role in the national economy. Due to the advantages of continuous casting technology such as energy saving, low infrastructure investment, low production cost, and high metal recovery rate, the continuous casting smelting rate continues to increase, and vigorously developing continuous casting has also become an important technical policy for the development of my country's steel industry.

[0003] The tundish is a container located between the ladle and the crystallizer in the continuous casting process. That is, the molten steel in the ladle is first injected into the tundish and then distributed to each crystallizer through the tundish water inlet. With the increasing quality requirements for steel, the tundish is no longer a simple transition container in the continuous casting process. The tundish has become a continuous metallurgical reactor. The role of the tundish in the metallurgical process has gradually increased, its construction frequency has increased significantly, and the construction requirements have become higher and higher.

[0004] The original process of constructing the refractory material of the tundish mold required the bottom to be constructed first, and the bottom thickness was inaccurate; after the bottom was constructed, the wall was constructed. During the construction of the wall, it was necessary to measure at multiple positions and frequencies, and frequently adjust the mold position and refractory thickness; there were certain safety risks during the construction measurement and adjustment process, and the construction efficiency was low. From the perspective of construction quality, the bottom and wall were constructed separately, which would cause problems such as looseness at the joint of the wall and bottom, resulting in quality and safety hazards during the use of the tundish. Utility Model Content

[0005] Therefore, the purpose of the utility model is to provide a new metallurgical container jig positioning mechanism to achieve fast, safe and reliable upper and lower and peripheral positioning of the jig during the construction of the tundish.

[0006] In order to solve the above technical problems, the utility model provides the following technical solutions:

[0007] A metallurgical container jig quick positioning mechanism comprises a positioning frame connected to the top of the jig, at least three non-straight positioning contact points on the top surface of the metallurgical container side wall, the positioning contact points are respectively the first positioning contact point, the second positioning contact point and the third positioning contact point, at least three non-straight positioning placement points on the bottom surface of the positioning frame, the positioning placement points are respectively the first positioning placement point, the second positioning placement point and the third positioning placement point; when the first positioning placement point coincides with the first positioning contact point, the second positioning placement point coincides with the second positioning contact point, and the third positioning placement point coincides with the third positioning contact point, the distance between the jig and the bottom wall of the metallurgical container is greater than or equal to zero, and the gap widths between the side walls around the jig and the side walls around the metallurgical container are equal. During use, the jig is transported to the upper position of the metallurgical container by a hoisting tool, and slowly lowered so that the jig and the metallurgical container cooperate with each other. When each positioning contact point coincides with the positioning placement point, the jig is suspended above the bottom of the metallurgical container through the positioning frame, which can achieve accurate positioning of the jig up and down and around the periphery and determine the thickness of the refractory material at the bottom and side walls of the metallurgical container.

[0008] In the above-mentioned metallurgical container mold quick positioning mechanism, the positioning frame includes a transverse positioning frame and a longitudinal positioning frame, and the transverse positioning frame and the longitudinal positioning frame are relatively fixedly connected.

[0009] In the above-mentioned metallurgical container jig quick positioning mechanism, the positioning frame is cross-shaped. When the jig is placed above the metallurgical container, the positioning frame of the cross-shaped structure has contact points with the four walls of the metallurgical container, which is conducive to the balance of the jig.

[0010] In the above-mentioned metallurgical container jig quick positioning mechanism, the positioning frame is in a "T" shape. The "T"-shaped structure can save the material required for the positioning frame, and also enable the jig to be relatively stably erected on the side wall of the metallurgical container.

[0011] The above-mentioned metallurgical container jig quick positioning mechanism comprises three transverse positioning frames and one longitudinal positioning frame, and the three transverse positioning frames are fixedly connected to the longitudinal positioning frame at equal intervals. Arranging multiple transverse or longitudinal positioning frames can provide more positioning points, so that the mass of the jig is more evenly distributed on each positioning frame, preventing the positioning frame from being deformed due to excessive force, which is conducive to improving the construction effect and safety.

[0012] In the above-mentioned metallurgical container jig quick positioning mechanism, the positioning frame also includes a peripheral positioning component, the peripheral positioning component is relatively fixedly connected to the positioning frame, and the peripheral positioning component is surrounded by a shape that is at least the same as the shape of part of the metallurgical container. When the first positioning placement point coincides with the first positioning contact point, the second positioning placement point coincides with the second positioning contact point, and the third positioning placement point coincides with the third positioning contact point, the distance between the inner surface of the part of the peripheral positioning component that is the same as the shape of the metallurgical container and the outer surface of the side wall of the metallurgical container is 5 to 15 mm. The peripheral positioning component plays an auxiliary role in the positioning of the jig, and the part of the peripheral positioning component that is the same as the shape of the metallurgical container can assist technicians in quickly positioning the jig. The distance between the inner surface of the part of the peripheral positioning component that is the same as the shape of the metallurgical container and the outer surface of the side wall of the metallurgical container is 5 to 15 mm, which limits the distance between the jig and the inner wall of the metallurgical container, ensuring that the refractory thickness of the metallurgical container wall is within the design range; when the refractory thickness of the metallurgical container wall deviates from the design range, the peripheral positioning component cannot be normally fitted at the opening of the metallurgical container.

[0013] In the above-mentioned quick positioning mechanism for the metallurgical container mold, the peripheral positioning component is an annular peripheral positioning component. When the first positioning placement point and the first positioning contact point, the second positioning placement point and the second positioning contact point, and the third positioning placement point and the third positioning contact point coincide with each other, the peripheral positioning component is mounted on the opening of the metallurgical container.

[0014] The metallurgical container mold quick positioning mechanism also includes a lifting lug fixedly connected to the top of the positioning frame for hooking the lifting rope.

[0015] In the above-mentioned metallurgical container mold quick positioning mechanism, the number of the lifting ears is at least 3, which are fixedly installed on the top of the positioning frame, and at least 3 of the lifting ears are not in the same straight line. Such arrangement of the lifting ears can ensure that the posture of the mold can remain relatively stable when it is lifted, avoiding its shaking and causing safety hazards.

[0016] The above-mentioned quick positioning mechanism for the metallurgical container mold, the positioning frame includes a transverse positioning frame and a longitudinal positioning frame, and a peripheral positioning component, the transverse positioning frame and the longitudinal positioning frame are relatively fixedly connected to form a cross-shaped structure; there are three transverse positioning frames and one longitudinal positioning frame, and the three transverse positioning frames are relatively fixedly connected to the longitudinal positioning frame at equal intervals; the peripheral positioning component is surrounded by a shape identical to the outer shape of the metallurgical container, when the first positioning placement point and the first positioning contact point, the second positioning placement point and the second positioning contact point, and the third positioning placement point and the third positioning contact point coincide at the same time, the peripheral positioning component is mounted on the opening of the metallurgical container, and the distance between the inner surface of the part of the peripheral positioning component that is identical to the outer shape of the metallurgical container and the outer surface of the side wall of the metallurgical container is 5 to 15 mm.

[0017] The technical solution of the utility model has achieved the following beneficial technical effects:

[0018] 1. The metallurgical container jig quick positioning mechanism of the utility model is used to install the jig, which can safely and quickly position the jig up and down and around the jig, eliminating the tedious on-site debugging and measurement process. The metallurgical container jig quick positioning mechanism has been tested for application in the repair of tundishes in metallurgical work. The experimental results show that the use of the jig quick positioning mechanism can improve the construction efficiency of the ladle and tundish, the accuracy of the refractory thickness, and ensure the safety of on-site construction.

[0019] 2. During use of the metallurgical container jig quick positioning mechanism of the utility model, the jig is transported to the upper position of the metallurgical container by a lifting tool. During the cooperation between the jig and the metallurgical container, the positioning frame of the mechanism is supported on the upper part of the side wall of the metallurgical container to achieve accurate upper and lower positioning of the jig and determine the thickness of the refractory material at the lower part of the metallurgical container. During the installation of the jig, the peripheral positioning components are used to ensure that the thickness of the refractory material on the wall of the metallurgical container is within the designed thickness range, so as to achieve the purpose of accurately positioning the jig.

[0020] 3. The use of the metallurgical container mold quick positioning mechanism of the utility model does not require on-site measurement and size adjustment operations, which can greatly improve the safety of on-site operations; it can also realize the integrated construction of the bottom and wall refractory materials, effectively reducing the quality risks of poor combination between the bottom and the wall. In addition, reducing measurement and debugging is conducive to a significant improvement in on-site labor efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 A schematic diagram of the combination of the tire, the positioning frame and the peripheral positioning device in Example 1 of the utility model;

[0022] Figure 2Schematic diagram of the jig, positioning frame and peripheral positioning device mounted on the metallurgical container in Example 1 of the utility model;

[0023] Figure 3 Schematic diagram of the mold, positioning frame and peripheral positioning device mounted on the metallurgical container in Example 2 of the utility model;

[0024] Figure 4 Schematic diagram of a mold, a positioning frame and a peripheral positioning device mounted on a metallurgical container in Example 3 of the utility model.

[0025] The reference numerals in the figure are as follows: 1-tire; 2-positioning frame; 21-lateral positioning frame; 22-longitudinal positioning frame; 3-peripheral positioning component; 4-lifting ear. DETAILED DESCRIPTION

[0026] Example 1

[0027] like Figure 1 As shown, the metallurgical container mold quick positioning mechanism in this embodiment includes a positioning frame 2 connected to the top of the mold 1. The positioning frame 2 is cross-shaped, including a transverse positioning frame 21 and a longitudinal positioning frame 22, and the transverse positioning frame 21 and the longitudinal positioning frame 22 are relatively fixedly connected. There are three transverse positioning frames 21 and one longitudinal positioning frame 22, and the three transverse positioning frames are equally spaced and relatively fixedly connected to the longitudinal positioning frame.

[0028] The metallurgical container jig quick positioning mechanism also includes a peripheral positioning component 3, which is relatively fixedly connected to the positioning frame 2, and the peripheral positioning component 3 is surrounded by a shape that is the same as the outer shape of the tundish. The peripheral positioning component 3 is an annular peripheral positioning component, and when all the positioning placement points and the positioning contact points coincide at the same time, the peripheral positioning component 3 will be sleeved on the opening of the tundish.

[0029] A lifting lug 4 is fixedly mounted on the top of the positioning frame 2. Figure 1 As shown, there are three lifting ears 4, which are fixedly mounted on the top of the positioning frame 2, and the three lifting ears 4 are not in the same straight line. Figure 3 As shown, the end of the lifting ear 4 away from the positioning frame is processed with a hook portion for hooking the sling, so that the hoisting equipment can lift the mold and set it on the tundish.

[0030] like Figure 2As shown, when the jig is mounted on the tundish, there are eight positioning contact points on the top surface of the tundish side wall, and the positioning contact points are respectively the first positioning contact point to the eighth positioning contact point, and there are eight positioning placement points on the bottom surface of the positioning frame, and the positioning placement points are respectively the first positioning placement point to the eighth positioning placement point. When all the positioning contact points and positioning placement points coincide with each other, the distance between the jig 1 and the bottom wall of the tundish is greater than or equal to zero, and the gap widths between the side walls of the jig 1 and the side walls of the tundish are equal; the distance between the inner surface of the part of the peripheral positioning component 3 that is the same as the tundish shape and the outer surface of the tundish side wall is 5 to 15 mm.

[0031] The working principle of the metallurgical container mold quick positioning mechanism in this embodiment is:

[0032] First, according to the actual use requirements, determine the height of the jig 1, the relative position of the peripheral positioning component 3 and the tundish, and the distance between the jig 1 and the four walls of the tundish; then, according to the distances determined above, assemble the peripheral positioning component 3, jig 1, and positioning frame 2 together. During assembly, the peripheral positioning component 3 can be first placed on the opening of the tundish so that the parts with the same appearance are close to each other and leave the required distance. Then, adjust the distance between the jig 1 and the surrounding side walls and bottom wall of the tundish. Finally, use the positioning frame to fix the peripheral positioning component 3 and jig 1 together, and install the lifting ears at the appropriate position to obtain the following Figure 1 The combination shown.

[0033] During on-site installation, the assembly is moved to the top of the tundish by means of a lifting tool and slowly lowered. Since the shape of the peripheral positioning component 3 is the same as the shape of the tundish opening, the technician only needs to fit the peripheral positioning component 3 on the tundish opening, and the positioning frame and the jig fixed on the positioning frame can be placed in the correct position.

[0034] After the hoisting tool lowers the above assembly, the jig is suspended above the bottom of the tundish through the positioning frame, which can naturally achieve accurate up and down positioning of the tundish jig. The distance from the jig to the bottom of the tundish is equal to the thickness of the bottom refractory.

[0035] This embodiment has been tested in application at refractory construction sites such as TISCO and Shaoguan Iron and Steel. Using the metallurgical container jig quick positioning mechanism of this embodiment to position the tundish jig can significantly improve the construction efficiency of the ladle and tundish and the accuracy of the refractory thickness.

[0036] Example 2

[0037] like Figure 3As shown, the metallurgical container mold quick positioning mechanism in this embodiment includes a positioning frame 2 connected to the top of the mold 1. The positioning frame 2 is cross-shaped, including a transverse positioning frame 21 and a longitudinal positioning frame 22, and the transverse positioning frame 21 and the longitudinal positioning frame 22 are relatively fixedly connected. There are three transverse positioning frames 21 and one longitudinal positioning frame 22, and the three transverse positioning frames are equally spaced and relatively fixedly connected to the longitudinal positioning frame.

[0038] A lifting lug 4 is fixedly mounted on the top of the positioning frame 2. Figure 3 As shown, there are three lifting ears 4, which are fixedly mounted on the top of the positioning frame 2, and the three lifting ears 4 are not in the same straight line. The end of the lifting ear 4 away from the positioning frame is processed with a hook portion for hooking a sling, so that the hoisting equipment can lift the mold and set it on the tundish.

[0039] like Figure 3 As shown, when the jig is mounted on the tundish, there are eight positioning contact points on the top surface of the tundish side wall, and the positioning contact points are respectively the first positioning contact point to the eighth positioning contact point, and there are eight positioning placement points on the bottom surface of the positioning frame, and the positioning placement points are respectively the first positioning placement point to the eighth positioning placement point. When all the positioning contact points and positioning placement points coincide with each other, the distance between the jig 1 and the bottom wall of the tundish is greater than or equal to zero, and the gap widths between the side walls around the jig 1 and the side walls around the tundish are equal.

[0040] The working principle of the metallurgical container mold quick positioning mechanism in this embodiment is:

[0041] First, install the positioning frame 2 on the jig 1. During installation, the width of the gap between the jig 1 and the side wall of the tundish can be obtained according to the required thickness of the refractory material of the tundish wall to determine the installation position of the positioning frame 2 on the jig 1. The end of the installed positioning frame 2 extends out from the edge of the upper surface of the jig 1, and the extension length should be greater than the required gap width, so that the positioning frame can form contact with the upper surface of the side wall of the tundish, and the jig 1 is set up above the tundish as required. The difference between the height of the jig 1 and the depth of the tundish is equal to the required thickness of the refractory material of the bottom wall of the tundish.

[0042] Then determine the positioning contact point and positioning placement point. Assemble the jig 1 and the positioning frame 2, and then correctly set the jig 1 on the tundish with the positioning frame 3 according to the required gap width between the jig 1 and the tundish side wall, mark the positioning placement point on the lower surface of the positioning frame 2, and mark the positioning contact point on the top surface of the tundish side wall. The marked position is the position where the positioning frame contacts the top surface of the tundish side wall.

[0043] When installing on site, the jig can be accurately positioned by simply aligning the positioning placement point mark and the positioning contact point mark.

[0044] Example 3

[0045] like Figure 4 As shown, the quick positioning mechanism of the metallurgical container mold in this embodiment includes a positioning frame 2 connected to the top of the mold 1, and the positioning frame 2 includes a transverse positioning frame 21 and a longitudinal positioning frame 22. The transverse positioning frame 21 and the longitudinal positioning frame 22 are relatively fixedly connected to form a "T" shape structure.

[0046] The metallurgical container jig quick positioning mechanism in this embodiment further includes a peripheral positioning component 3. The peripheral positioning component 3 is relatively fixedly connected to the positioning frame 2, and the peripheral positioning component 3 is surrounded by a shape that is the same as the outer shape of the metallurgical container.

[0047] The metallurgical container mold quick positioning mechanism in this embodiment also includes a lifting ear 4 fixedly connected to the top of the positioning frame; the number of the lifting ears 4 is three, which are fixedly installed on the top of the positioning frame 2, and the three lifting ears are not in the same straight line; the lifting ear 4 is processed with a hook portion at one end away from the positioning frame for hooking the sling.

[0048] In this embodiment, there are three positioning contact points on the top surface of the side wall of the metallurgical container that are not on the same straight line, and the positioning contact points are respectively the first positioning contact point, the second positioning contact point and the third positioning contact point. There are three positioning placement points on the bottom surface of the positioning frame that are not on the same straight line, and the positioning placement points are respectively the first positioning placement point, the second positioning placement point and the third positioning placement point.

[0049] When the first positioning placement point coincides with the first positioning contact point, the second positioning placement point coincides with the second positioning contact point, and the third positioning placement point coincides with the third positioning contact point, the distance between the jig 1 and the bottom wall of the metallurgical container is greater than or equal to zero, and the gap widths between the side walls of the jig 1 and the side walls of the metallurgical container are equal. The distance between the inner surface of the portion of the peripheral positioning component that is identical to the shape of the metallurgical container and the outer surface of the side wall of the metallurgical container is 5 to 15 mm, and the peripheral positioning component is mounted on the opening of the metallurgical container.

[0050] The working principle of the metallurgical container mold quick positioning mechanism in this embodiment is the same as that in Embodiment 1.

[0051] The three embodiments of the utility model are compared with each other. Embodiment 1 has the best positioning effect, accurate positioning and high efficiency. Embodiment 2 is less efficient than Embodiment 1 because no peripheral positioning components are used in Embodiment 2, and more time is needed to align 8 positioning contact points and positioning placement points. Embodiment 3 only needs to align 3 positioning contact points and positioning placement points, which is more efficient than Embodiment 2, but still lower than Embodiment 1, and can save a part of the positioning frame material. In actual application, different implementation methods can be selected according to actual conditions.

[0052] In the utility model embodiments 1 and 3, the shape formed by the peripheral positioning component 3 is the same as the shape of the metallurgical container opening. In some other embodiments, only a part of the shape formed by the peripheral positioning component 3 is the same as the shape of the metallurgical container to play an auxiliary positioning role.

[0053] In the three embodiments of the utility model, the number of the lifting ears 4 used is three. In some other embodiments, the number of the lifting ears 4 can be more to provide more attachment points for the sling and improve the safety when lifting the tire.

[0054] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the claims of this patent application.

Claims

1. A quick positioning mechanism for a metallurgical container mold, characterized in that: The invention comprises a positioning frame (2) connected to the top of a mold (1), at least three positioning contact points which are not in the same straight line are provided on the top surface of the side wall of the metallurgical container, the positioning contact points are respectively a first positioning contact point, a second positioning contact point and a third positioning contact point, and at least three positioning placement points which are not in the same straight line are provided on the bottom surface of the positioning frame (2), the positioning placement points are respectively a first positioning placement point, a second positioning placement point and a third positioning placement point; when the first positioning placement point coincides with the first positioning contact point, the second positioning placement point coincides with the second positioning contact point, and the third positioning placement point coincides with the third positioning contact point, the distance between the mold (1) and the bottom wall of the metallurgical container is greater than or equal to zero, and the gap widths between the four sides of the mold (1) and the four sides of the metallurgical container are equal.

2. The metallurgical container mold quick positioning mechanism according to claim 1, characterized in that: The positioning frame (2) comprises a transverse positioning frame (21) and a longitudinal positioning frame (22), and the transverse positioning frame (21) and the longitudinal positioning frame (22) are relatively fixedly connected.

3. The metallurgical container mold quick positioning mechanism according to claim 2, characterized in that: The positioning frame (2) is in a cross shape.

4. The metallurgical container mold quick positioning mechanism according to claim 2, characterized in that: The positioning frame (2) is in a "T" shape.

5. The metallurgical container mold quick positioning mechanism according to claim 2, characterized in that: There are three transverse positioning frames (21) and one longitudinal positioning frame (22). The three transverse positioning frames (21) are relatively fixedly connected to the longitudinal positioning frame (22) at equal intervals.

6. The metallurgical container mold quick positioning mechanism according to any one of claims 2 to 5, characterized in that: The positioning frame (2) also includes a peripheral positioning component (3), the peripheral positioning component (3) is relatively fixedly connected to the positioning frame (2), and the peripheral positioning component (3) forms a shape that is at least the same as the outer shape of a part of the metallurgical container. When the first positioning placement point coincides with the first positioning contact point, the second positioning placement point coincides with the second positioning contact point, and the third positioning placement point coincides with the third positioning contact point, the distance between the inner surface of the part of the peripheral positioning component (3) that is the same as the outer shape of the metallurgical container and the outer surface of the side wall of the metallurgical container is 5 to 15 mm.

7. The metallurgical container mold quick positioning mechanism according to claim 6, characterized in that: The peripheral positioning component (3) is an annular peripheral positioning component. When the first positioning placement point and the first positioning contact point, the second positioning placement point and the second positioning contact point, and the third positioning placement point and the third positioning contact point coincide with each other, the peripheral positioning component (3) is sleeved on the opening of the metallurgical container.

8. The metallurgical container mold quick positioning mechanism according to any one of claims 1 to 5, characterized in that: It also includes a lifting lug (4) fixedly connected to the top of the positioning frame (2).

9. The metallurgical container mold quick positioning mechanism according to claim 8, characterized in that: The number of the lifting ears (4) is at least 3, which are fixedly mounted on the top of the positioning frame (2), and at least the 3 lifting ears (4) are not in the same straight line.

10. The metallurgical container mold quick positioning mechanism according to claim 1, characterized in that: The positioning frame (2) comprises a transverse positioning frame (21), a longitudinal positioning frame (22) and a peripheral positioning component (3), wherein the transverse positioning frame (21) and the longitudinal positioning frame (22) are relatively fixedly connected to form a cross-shaped structure; there are three transverse positioning frames (21) and one longitudinal positioning frame (22), and the three transverse positioning frames (21) are relatively fixedly connected to the longitudinal positioning frame (22) at equal intervals; the peripheral positioning component (3) forms a shape identical to the outer shape of the metallurgical container, and when the first positioning placement point coincides with the first positioning contact point, the second positioning placement point coincides with the second positioning contact point, and the third positioning placement point coincides with the third positioning contact point, the peripheral positioning component (3) is sleeved on the opening of the metallurgical container, and the distance between the inner surface of the portion of the peripheral positioning component (3) identical to the outer shape of the metallurgical container and the outer surface of the side wall of the metallurgical container is 5 to 15 mm.