Gantry crane device for off-line welding of steel rails in tunnel

The gantry crane device, which combines an L-shaped support and lifting pulleys, enables direct lifting inside the tunnel without moving the steel rails, solving the problem of inconvenient operation of traditional gantry cranes in narrow tunnels and improving construction efficiency and stability.

CN222007068UActive Publication Date: 2024-11-15SHANGHAI RAIL TRANSIT MAINTENANCE SUPPORT
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323609011.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-28
Publication Date
2024-11-15
Estimated Expiration
2033-12-28

AI Technical Summary

Technical Problem

Traditional gantry cranes are inconvenient to operate in narrow tunnels, requiring manual rail adjustment, which affects construction efficiency and increases labor intensity, and cannot be effectively utilized in confined areas.

Method used

Design a gantry crane device that combines an L-shaped support and a lifting pulley. One end of the support is placed under the rail, and the other end contacts the tunnel wall. The pulley is installed on the hanging steel bars, enabling direct lifting without moving the rail.

Benefits of technology

It solves the problem of limited operating space inside tunnels, reduces manual labor input, improves construction efficiency and stability, and is suitable for steel rail hoisting operations in narrow tunnel spaces.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222007068U_ABST
    Figure CN222007068U_ABST
Patent Text Reader

Abstract

The utility model provides a gantry crane device for offline welding of steel rails in a tunnel. The gantry crane device comprises an L-shaped bracket, a hanging steel bar and a hoisting pulley, the L-shaped support comprises a first supporting rod and a second supporting rod, and the first end of the first supporting rod and the first end of the second supporting rod are connected to form the L-shaped support. The second end of the first supporting rod is placed on one side of the steel rail, the second end of the first supporting rod is lower than the bottom of the steel rail, and the second end of the second supporting rod makes contact with the tunnel pipe wall. A hanging steel bar is installed on the L-shaped support, and a hoisting pulley is installed on the hanging steel bar. According to the gantry crane device, the structure of an original gantry crane is changed, the gantry crane device can be used for adapting to a narrow tunnel space, and direct hoisting can be achieved within the tunnel range without manually shifting a steel rail.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a door hanging device, in particular to a door hanging device used for welding under a rail line in a tunnel. Background Art

[0002] Unlike outdoor work sites, tunnels present a series of challenges to construction work due to their unique structure and limited space. Traditional gantry cranes are usually designed for more spacious outdoor environments, so they may not be well suited to narrow tunnels. This is mainly reflected in their large size, limited mobility, and the need for manual track shifting during operation.

[0003] When lifting rails in tunnels, manual rail shifting is a necessary operation to ensure that the lifting equipment can accurately position and lift the rails. However, manual rail shifting in a narrow operating space may face a series of problems, including inconvenient operation, time-consuming and high manpower input. This situation not only affects construction efficiency, but also increases the labor intensity of workers.

[0004] Chinese patent CN202322135U proposes a detachable simple gantry crane that is designed to adapt to construction environments in narrow spaces. The design of this gantry crane takes into account the limited space of the tunnel, making it more suitable for narrow working areas. However, the design still requires a relatively flat ground, which is not always easy to achieve in the tunnel. In the specific welding construction under the rail line, due to the limited space on both sides of the roadbed in the tunnel, even this detachable simple gantry crane cannot be placed close to the tunnel wall. This results in the inability to effectively use lifting equipment for operations in these small areas, increasing the complexity of the operation and the difficulty of construction. Utility Model Content

[0005] In order to solve the above problems, the utility model proposes a novel gantry crane device, which changes the structure of the original gantry crane, can be used to adapt to the narrow tunnel space, and can directly lift within the tunnel without manually moving the rails.

[0006] The utility model proposes a door hanging device for welding under a rail line in a tunnel, wherein the door hanging device comprises:

[0007] An L-shaped bracket, wherein the L-shaped bracket comprises a first support rod and a second support rod, wherein a first end of the first support rod and a first end of the second support rod are connected to form an L-shaped bracket, a second end of the first support rod is placed on one side of the rail and the second end of the first support rod is lower than the bottom of the rail, and a second end of the second support rod is in contact with a tunnel wall;

[0008] Hanging steel bars and installing them on the L-shaped bracket;

[0009] A lifting pulley is installed on the hanging steel bars.

[0010] In one embodiment, the first support rod and the second support rod are steel pipes.

[0011] In one embodiment, the hanging steel bar is provided with a hole, and the lifting pulley is installed on the hanging steel bar through the hole.

[0012] In one embodiment, the hanging steel bar is provided with a first hole at a portion located on the first support rod.

[0013] In one embodiment, a second hole is provided at a portion of the hanging steel bar located at the second support rod.

[0014] In one embodiment, a socket is disposed on the second end of the first support rod.

[0015] In one embodiment, the second end of the second support rod is a pointed tip.

[0016] In one embodiment, a rubber sleeve is provided on the pointed tip.

[0017] The door hanging device for welding under the rail line in the tunnel of the utility model has the following beneficial effects:

[0018] The utility model changes the original gantry structure into an L-shaped structure. Through the combination of the L-shaped bracket and the lifting pulley, the problem of narrow operating surface and inconvenient operation in the tunnel is solved, and the transportation and construction work of the tunnel rail hoisting are convenient. The utility model can directly hoist the rails within the tunnel without moving the rails, reducing the labor input. The L-shaped structure of the utility model forms a downward force to enhance stability. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 The present invention is a schematic structural diagram of a door hanging device for welding under a rail line in a tunnel according to an embodiment of the present invention.

[0020] Reference numerals

[0021] 1. Gantry crane; 11. L-shaped bracket; 12. Lifting pulley; 13. Hanging steel bars; 2. Tunnel wall. DETAILED DESCRIPTION

[0022] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0023] The utility model proposes a door hanging device for welding under the rail line in the tunnel, such as Figure 1 As shown, the door hanging device 1 includes: an L-shaped bracket 11, a lifting pulley 12 and a hanging steel bar 13.

[0024] The L-shaped bracket 11 includes a first support rod and a second support rod, and the first end of the first support rod and the first end of the second support rod are connected to form an L-shaped bracket. The second end of the first support rod is placed on one side of the rail and the second end of the first support rod is lower than the bottom of the rail, and the second end of the second support rod is in contact with the tunnel wall 2. The hanging steel bar 13 is installed on the L-shaped bracket 11, and the lifting pulley 12 is installed on the hanging steel bar 13, so that the rail hoisting operation in the tunnel can be carried out.

[0025] The second end of the first support rod is lower than the bottom of the rail to ensure that the gantry crane will not interfere with the rail itself during the lifting operation. This can provide sufficient space to make the lifting operation smoother and reduce unnecessary friction and obstruction. It can also ensure that the L-shaped bracket 11 is not prone to problems in the lifting process due to high instability while supporting the rail, thereby increasing the stability of the gantry crane. In addition, it can avoid interfering with other operations, reduce interference with other equipment and pipelines in the tunnel, and ensure that the lifting process is safe and reliable.

[0026] Furthermore, the first support rod and the second support rod are steel pipes, specifically steel pipes with force-bearing conditions, so that the rigidity and strength of the entire door hanging device are improved, and the lifting process is more stable and has a larger load-bearing capacity.

[0027] Furthermore, the hanging steel bar is provided with a hole, and the lifting pulley is installed on the hanging steel bar through the hole.

[0028] Furthermore, a first hole is provided at a portion of the hanging steel bar located at the first support rod.

[0029] Furthermore, a second hole is provided at the portion of the hanging steel bar located at the second support rod.

[0030] In a specific embodiment, a first hole is set at the part of the hanging steel bar located at the first support rod, and a second hole is set at the part of the hanging steel bar located at the second support rod, and the lifting pulley 12 can be installed on the hanging steel bar 13 through the first hole or the second hole. By setting different holes, the position of the lifting pulley 12 on the hanging steel bar 13 can be changed. Such a design makes the lifting operation more flexible, and different hole positions can be selected according to specific needs to adapt to the lifting needs of different positions in the tunnel, and facilitate the lifting operation at different positions in the tunnel. There may be areas of different heights or difficult to reach in the tunnel. By setting multiple hole positions, these different working scenes can be better adapted. In this way, the lifting equipment can cover a wider area and improve the versatility and efficiency of the work. By selecting the hole position according to the needs, the lifting pulley can be quickly adjusted and installed, which helps to deal with different situations more efficiently in the lifting operation, reduce the adjustment time, and improve work efficiency. By providing multiple hole position options, the installation process of the lifting pulley can be simplified. The operator can more easily select the appropriate hole position, reduce the complexity of the operation, and reduce the possibility of error.

[0031] Furthermore, a base is provided on the second end of the first support rod, so that the force bearing fulcrum is more stable and is not prone to accidents such as rollover and slipping during the hoisting process. Specifically, this is because the setting of the base helps to increase the supporting area of ​​the first support rod, thereby improving the stability of the fulcrum and effectively preventing the fulcrum from slipping during the hoisting process. This is particularly important for hoisting operations, because the stability of the fulcrum is directly related to whether the hoisting equipment will encounter dangerous situations such as rollover or slipping during work. The design of the base can provide better anti-rolling ability, and can better maintain the stability of the fulcrum even when facing external lateral forces during the hoisting process. This reduces the risk of fulcrum tilting caused by external forces. In addition, the setting of the base can increase the overall structural strength of the first support rod to a certain extent. This is particularly important when hoisting heavier objects, ensuring that the fulcrum is strong enough and is not prone to structural problems.

[0032] Furthermore, the second end of the second support rod is a pointed tip. The design of the pointed tip enables the second support rod to be more firmly embedded in the tunnel wall, providing more reliable support. This helps to ensure that the support rod will not move or shake easily during the hoisting process, thereby improving the overall stability. The shape of the pointed tip is more easily adapted to the irregular surface of the tunnel wall, ensuring a closer contact with the wall. This can better fit when the surface of the wall is uneven or has bumps and bumps, and increase the contact area between the fulcrum and the wall. The shape of the pointed tip can effectively increase the friction between the second support rod and the tunnel wall, thereby improving the anti-slip ability. This is very important for preventing the support rod from slipping due to the smooth surface of the wall during the hoisting operation. The design of the pointed tip can reduce the lateral pressure of the support point on the tunnel wall, reducing possible damage or deformation to the wall. Such a design helps to protect the tunnel structure and ensure that the hoisting process minimizes the impact on the tunnel itself. The shape of the pointed tip makes it easier to adjust the position of the second support rod when necessary. By changing the insertion depth of the pointed tip, it can flexibly adapt to different hoisting heights and working scenarios. In summary, by designing the pointed end of the second support rod to contact the tunnel wall, the stability, adaptability and safety of the support system can be effectively improved, providing a more reliable fulcrum for lifting operations.

[0033] Furthermore, a rubber sleeve is provided on the tip to protect the tunnel wall 2 .

[0034] When using a gantry crane device for welding under a tunnel rail line according to an embodiment of the utility model for lifting, first place the base of the L-shaped bracket 11 on the lower side of the rail, and the other side of the L-shaped bracket 11 (i.e., the second end of the second support rod) is against the tunnel wall 2, and the chain of the lifting pulley 12 is hooked onto the rail to be lifted, so that the rail can be lifted and subsequent operations can be carried out.

[0035] The door hanging device for welding under the rail line in the tunnel of the utility model has the following beneficial effects:

[0036] The utility model changes the original gantry structure into an L-shaped structure. Through the combination of the L-shaped bracket and the lifting pulley, the problem of narrow operating surface and inconvenient operation in the tunnel is solved, and the transportation and construction work of the tunnel rail hoisting are convenient. The utility model can directly hoist the rails within the tunnel without moving the rails, reducing the labor input. The L-shaped structure of the utility model forms a downward force to enhance stability.

[0037] It should be noted that, unless otherwise clearly specified and limited, the words "installed", "connected", "set" and the like used in the description of this application should be understood in a broad sense. For example, the connection can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, an indirect connection through an intermediate medium, or the internal connection of two elements. The technical personnel in the field can understand its specific meaning in this application according to the specific circumstances. The terms "first" and "second" are used only for descriptive purposes and cannot be understood as indicating or implying relative importance. In addition, as shown in this application and the claims, unless the context clearly indicates an exception, the words "one", "a", "a kind" and / or "the" do not specifically refer to the singular, but may also include the plural. Generally speaking, the terms "including" and "comprising" only indicate the inclusion of clearly identified elements, and these elements do not constitute an exclusive list, and the device may also include other steps or elements.

[0038] The above-mentioned embodiments are only further explanations of the utility model, and are not intended to limit the utility model in other forms. The utility model may also have other various embodiments. Without departing from the spirit and essence of the utility model, those skilled in the art may make various corresponding modifications and changes according to the utility model, but these corresponding modifications and changes shall fall within the protection scope of the utility model.

Claims

1. A door hanging device for welding under rail line in tunnel, characterized in that: The door hanging device comprises: An L-shaped bracket, wherein the L-shaped bracket comprises a first support rod and a second support rod, wherein a first end of the first support rod and a first end of the second support rod are connected to form an L-shaped bracket, a second end of the first support rod is placed on one side of the rail and the second end of the first support rod is lower than the bottom of the rail, and a second end of the second support rod is in contact with a tunnel wall; Hanging steel bars and installing them on the L-shaped bracket; A lifting pulley is installed on the hanging steel bars.

2. The door hanging device for welding under the rail line in the tunnel according to claim 1 is characterized in that: The first support rod and the second support rod are steel pipes.

3. The door hanging device for welding under the rail line in the tunnel according to claim 1 is characterized in that: The hanging steel bar is provided with a hole, and the lifting pulley is installed on the hanging steel bar through the hole.

4. The door hanging device for welding under the rail line in the tunnel according to claim 3 is characterized in that: The hanging steel bar is provided with a first hole at the portion located at the first supporting rod.

5. The door hanging device for welding under the rail line in the tunnel according to claim 3 is characterized in that: The hanging steel bar is provided with a second hole at the portion located at the second supporting rod.

6. The door hanging device for welding under the rail line in the tunnel according to claim 1, characterized in that: A clamping seat is arranged on the second end of the first supporting rod.

7. The door hanging device for welding under the rail line in the tunnel according to claim 1, characterized in that: The second end of the second support rod is a pointed end.

8. The door hanging device for welding under the rail line in the tunnel according to claim 7, characterized in that: A rubber sleeve is arranged on the pointed head.