New and old roadbed pavement splicing structure for road engineering

By designing a retractable splicing groove body and splicing plate structure in road engineering, the pavement problem caused by settlement deformation between new and old roadbeds is solved, and structural stability and safety are improved, avoiding water accumulation and expansion joints. Appear.

CN222008507UActive Publication Date: 2024-11-15HENAN PROVINCIAL COMM PLANNING & DESIGN INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420115605.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-17
Publication Date
2024-11-15
Estimated Expiration
2034-01-17

AI Technical Summary

Technical Problem

During the road widening process, the splicing area between the old and new roadbeds is broken due to settlement deformation, which makes the embankment cracks and road surface damage, and the existing technology is difficult to effectively solve this problem.

Method used

Design a new and old roadbed pavement structure for road engineering including retractable splicing groove body and splicing plate. The splicing groove body is equipped with grooves and permeable holes, and the bent part can be plugged into the plug-in rod, which is realized through positioning holes and connecting grooves. The splicing plate is stably installed and retracted to form an integrated structure.

Benefits of technology

The expansion joints eliminate deformation caused by temperature and humidity, avoid water accumulation and ensure structural stability and safety, while achieving stable installation of splicing plates, reducing expansion joints between new and old roadbeds, and improving the overall service life of the road surface.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008507U_ABST
    Figure CN222008507U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of roadbed and pavement splicing, and particularly relates to a road engineering new and old roadbed and pavement splicing structure which comprises a splicing area arranged between a new roadbed and an old roadbed, and a telescopic splicing groove body and two splicing plates are installed in the splicing area. One ends of the two splicing plates are detachably installed on a new roadbed and an old roadbed respectively, a groove is formed in the splicing groove body in the axial direction, one ends of the two splicing plates horizontally extend to form bent parts inserted into the groove, the lower portion of the splicing groove body is filled with a filling layer, and the filling layer is arranged on the lower portion of the splicing groove body. According to the utility model, the splicing groove body and the two splicing plates are additionally arranged, and the two splicing plates can telescopically move in the splicing groove body, so that the expansion joint is formed between the new roadbed and the old roadbed, the expansion deformation of the bridge caused by environmental factors such as temperature and humidity can be eliminated through the expansion joint, and the structural stability and safety of the bridge are ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of roadbed and pavement splicing, and in particular relates to a new and old roadbed and pavement splicing structure for a road engineering project. Background Art

[0002] When the road surface is widened, a splicing area is formed between the new and old road surfaces, and the splicing area is generally connected by a splicing mechanism.

[0003] The construction of a new embankment when widening an old road will cause new settlement and deformation of the old embankment, and differential settlement between the new and old embankments, leading to defects such as embankment cracking and road surface damage. Utility Model Content

[0004] The utility model aims to provide a new and old roadbed pavement splicing structure for road engineering, so as to solve the problems raised in the above-mentioned background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a new and old roadbed pavement splicing structure for a road engineering project, comprising: a splicing area arranged between the new roadbed and the old roadbed, a retractable splicing trough and two splicing plates installed in the splicing area, one end of the two splicing plates being removably installed on the new roadbed and the old roadbed respectively, a groove being axially opened on the splicing trough, and one end of the two splicing plates both horizontally extending with a bending portion inserted in the groove.

[0006] Preferably, a filling layer is filled below the splicing groove body, and a plurality of water-permeable holes extending into the filling layer are axially penetrated through the groove.

[0007] Preferably, a plurality of through holes extending into the groove are penetrated on both symmetrical sides of the splicing groove body, and a plurality of plug-in rods which can be plugged into the corresponding through holes are installed on the inner side of each of the bent portions.

[0008] Preferably, a first connecting groove and a second connecting groove are respectively provided on the tops of the new roadbed and the old roadbed on opposite sides, and the two splicing plates are respectively detachably installed in the first connecting groove and the second connecting groove.

[0009] Preferably, a plurality of positioning holes are formed in the first connecting groove and the second connecting groove at equal distances, and a plurality of positioning posts which can be plugged into the corresponding positioning holes are installed on each of the splicing plates.

[0010] Preferably, the width of the groove is greater than the thickness of the two bending portions.

[0011] Compared with the prior art, the utility model has the following beneficial effects:

[0012] (1) The utility model adds a splicing trough and two splicing plates, and the two splicing plates can move and expand in the splicing trough, so as to form an expansion joint between the new roadbed and the old roadbed. The expansion joint can eliminate the expansion and contraction deformation of the bridge caused by environmental factors such as temperature and humidity, thereby ensuring the structural stability and safety of the bridge.

[0013] (2) The utility model has additional water-permeable holes, through which the liquid in the splicing tank body can be discharged to the outside, thereby preventing water from accumulating in the splicing tank body.

[0014] (3) The utility model provides additional through holes and plug-in rods, which facilitate telescopic installation of the splicing plate in the splicing slot body through the plug-in rods and through holes, so that the splicing plate and the splicing slot body form an integrated structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a matching schematic diagram of the utility model;

[0016] Figure 2 It is a three-dimensional diagram of the splicing tank body of the utility model;

[0017] Figure 3 It is a three-dimensional diagram of the splicing plate of the utility model;

[0018] In the figure: 1. new roadbed; 2. positioning hole; 3. first connecting groove; 4. splicing plate; 5. through hole; 6. plug-in rod; 7. bending part; 8. second connecting groove; 9. old roadbed; 10. groove; 11. water-permeable hole; 12. filling layer; 13. splicing trough body; 14. positioning column. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0020] refer to Figure 1 As shown, the utility model provides a new and old roadbed pavement splicing structure for a road engineering project, comprising: a splicing area arranged between a new roadbed 1 and an old roadbed 9, in which a retractable splicing trough 13 and two splicing plates 4 are installed, one end of the two splicing plates 4 are respectively detachably installed on the new roadbed 1 and the old roadbed 9, a groove 10 is axially opened on the splicing trough 13, and one end of the two splicing plates 4 are horizontally extended with a bending portion 7 inserted in the groove 10.

[0021] As described above, when using the new roadbed 1, the old roadbed 9, the splicing trough 13 and the two splicing plates 4 provided by the utility model, the two splicing plates 4 are telescopically installed on the splicing trough 13. When the two splicing plates 4 are respectively installed on the new roadbed 1 and the old roadbed 9, the splicing trough 13 is in the splicing area, and the two bending portions 7 on the two splicing plates 4 are telescopically moved in the groove 10, thereby forming a retractable expansion joint between the new roadbed 1 and the old roadbed 9.

[0022] Further, in order to stably telescopically install the splicing plate 4 on the splicing slot 13, refer to Figure 1 and Figure 3 As shown, multiple through holes 5 extending into the groove 10 are penetrated on both symmetrical sides of the splicing slot body 13, and multiple plug-in rods 6 that can be plugged into the corresponding through holes 5 are installed on the inner side of each bent portion 7. The splicing plate 4 is telescopically installed on the splicing slot body 13 through the plug-in rods 6 and the through holes 5, and the splicing plate 4 and the splicing slot body 13 cannot be separated after being installed through the plug-in rods 6 and the through holes 5.

[0023] Further, in order to make the splicing plate 4 and the new roadbed 1 and the old roadbed 9 on the same horizontal plane, refer to Figure 1 As shown, the tops of the new roadbed 1 and the old roadbed 9 on opposite sides are respectively provided with a first connection groove 3 and a second connection groove 8, and the two splicing plates 4 are respectively detachably installed in the first connection groove 3 and the second connection groove 8. The two splicing plates 4 can be embedded and installed on the new roadbed 1 and the old roadbed 9 through the first connection groove 3 and the second connection groove 8, so as to facilitate the passage of vehicles.

[0024] Further, in order to allow the two splicing plates 4 to be detachably installed on the new roadbed 1 and the old roadbed 9, respectively, refer to Figure 1 and Figure 3 As shown, a plurality of positioning holes 2 are evenly spaced in the first connection groove 3 and the second connection groove 8, and a plurality of positioning posts 14 are installed on each splicing plate 4, which can be plugged into the corresponding positioning holes 2. The splicing plates 4 are respectively plugged into the corresponding positioning holes 2 through the plurality of positioning posts 14, and when the splicing plates 4 are detachably installed on the new roadbed 1 and the old roadbed 9, a pulling force can be exerted between the two, thereby avoiding a large expansion joint between the new roadbed 1 and the old roadbed 9.

[0025] Further, in order to allow the bending portion 7 to telescopically move in the groove 10, refer to Figure 1-2 As shown, the width of the groove 10 is greater than the thickness of the two bending portions 7. Since the thickness of the two bending portions 7 is less than the width of the groove 10, the two bending portions 7 can move in the groove 10, so that the distance between the new roadbed 1 and the old roadbed 9 can be adjusted to avoid expansion and contraction deformation between the new roadbed 1 and the old roadbed 9.

[0026] In the present utility model, combined with Figure 1As shown, the bottom of the splicing groove body 13 of this embodiment is filled with a filling layer 12, and a plurality of water-permeable holes 11 extending into the filling layer 12 are axially penetrated in the groove 10.

[0027] As mentioned above, when the filling layer 12 provided by the present invention is used, the splicing tank body 13 can be supported by the filling layer 12 , and the liquid discharged through the water permeable holes 11 can be easily discharged by the filling layer 12 .

[0028] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A new and old roadbed pavement splicing structure for a road project, characterized in that: include: A splicing area is provided between a new roadbed (1) and an old roadbed (9), wherein a retractable splicing trough (13) and two splicing plates (4) are installed in the splicing area, one end of the two splicing plates (4) are detachably installed on the new roadbed (1) and the old roadbed (9), respectively, a groove (10) is provided in the axial direction on the splicing trough (13), and one end of the two splicing plates (4) are both horizontally extended with a bending portion (7) inserted into the groove (10).

2. A new and old roadbed pavement splicing structure for road engineering according to claim 1, characterized in that: A filling layer (12) is filled below the splicing trough body (13), and a plurality of water-permeable holes (11) extending into the filling layer (12) are axially penetrated in the groove (10).

3. The new and old roadbed pavement splicing structure of a road engineering according to claim 1 is characterized by: A plurality of through holes (5) extending into the groove (10) are penetrated on both symmetrical sides of the splicing groove body (13), and a plurality of plug-in rods (6) that can be plugged into corresponding through holes (5) are installed on the inner side of each of the bent portions (7).

4. The new and old roadbed pavement splicing structure of a road engineering according to claim 1 is characterized by: A first connection groove (3) and a second connection groove (8) are respectively provided at the top of the opposite side of the new roadbed (1) and the old roadbed (9), and the two splicing plates (4) are respectively detachably installed in the first connection groove (3) and the second connection groove (8).

5. A new and old roadbed pavement splicing structure for road engineering according to claim 4, characterized in that: A plurality of positioning holes (2) are evenly spaced in the first connecting groove (3) and the second connecting groove (8), and a plurality of positioning posts (14) that can be plugged into the corresponding positioning holes (2) are installed on each of the splicing plates (4).

6. The new and old roadbed pavement splicing structure of a road engineering according to claim 1 is characterized by: The width of the groove (10) is greater than the thickness of the two bent portions (7).