Floor tile combination capable of penetrating underground pipeline
By designing a combination of floor tiles that can be worn underground pipelines, the threaded hole structure is used to achieve convenient maintenance and replacement of pipelines, solving the impact of underground pipeline laying on citizens and residents' lives, and reducing construction costs and noise and dust.
Patent Information
- Application Number
- CN202420162957.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-23
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-01-23
AI Technical Summary
During the laying of underground pipelines in urban construction, road blockade and construction cause traffic congestion, noise and dust to affect residents' quality of life, and frequent construction causes manpower and material loss.
Design a combination of floor tiles that can be worn underground pipelines, which are laid intertwined by the first floor tiles group and the second floor tiles group. The floor tiles are provided with threading holes, and the pipelines can be penetrated in the threading holes. Only the second floor tiles need to be lifted during maintenance. The cover is operated.
The impact of pipeline laying on citizens' travel and residents' lives has been reduced, manpower and material resources have been saved, construction costs and noise and dust have been reduced.
Smart Images

Figure CN222008515U_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the technical field of floor tiles, and in particular to a floor tile combination capable of passing underground pipelines. Background Art
[0002] In urban construction, underground laying of urban pipelines is a relatively complicated project, which mainly involves road closures, road excavation, pipeline laying and road repair. Among them, road closures are prone to cause traffic congestion, causing inconvenience to citizens' travel, and the noise and dust generated by road excavation and repair will affect the quality of life of surrounding residents.
[0003] Some roads are frequently blocked and under construction due to construction work by different departments at different times, which seriously affects the quality of life of surrounding residents and also causes a large amount of manpower and material resources. Summary of the invention
[0004] To solve the above problems, the present invention provides a floor tile combination that can pass underground pipelines. The underground pipelines are collected in the floor tiles, which facilitates pipeline maintenance and replacement, reduces the impact of pipeline laying on citizens' travel and the lives of surrounding residents, and saves manpower and material resources.
[0005] Specifically, the technical solution of the present disclosure is:
[0006] A floor tile combination capable of passing underground pipelines comprises a first floor tile group and a second floor tile group staggeredly laid along a first direction, the first floor tile group comprises at least two first floor tiles laid along the first direction, the second floor tile group comprises at least one second floor tile laid along the first direction, the first floor tile is provided with at least two first threading holes along the first direction, the second floor tile is formed by splicing a floor tile body and a cover body, the cover body is arranged on the side of the floor tile body close to the road surface, the second floor tile is provided with at least one second threading hole along the first direction, and the second threading hole is formed by splicing the floor tile body and the cover body.
[0007] In one embodiment, the length of the first floor tile group along the first direction is 14 to 16 meters.
[0008] In one embodiment, the first floor tile and the second floor tile have the same length, width and height.
[0009] In one embodiment, the first floor tile is provided with four first threading holes, and the second floor tile is provided with two second threading holes.
[0010] Beneficial technical effects of the present disclosure:
[0011] Underground pipelines can be laid in the first threading hole and the second threading hole. When repairing and replacing the pipelines, it is only necessary to lift the cover of the second floor tile, which reduces the impact of pipeline laying on citizens' travel and the lives of surrounding residents and saves manpower and material resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 This is a structural diagram of a first floor tile according to an embodiment of the present disclosure;
[0013] Figure 2 This is an exploded structural diagram of a second floor tile according to an embodiment of the present disclosure;
[0014] Figure 3 This is a structural diagram of a floor tile combination according to an embodiment of the present disclosure. DETAILED DESCRIPTION
[0015] The present disclosure is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0016] See also Figure 3 A floor tile combination includes a first floor tile group and a second floor tile group staggered along a first direction i, the first floor tile group includes a plurality of first floor tiles 1 laid along the first direction i, and the second floor tile group includes a second floor tile 2. In this embodiment, the length, width and height of the first floor tile 1 and the second floor tile 2 are the same. The first floor tile 1 and the second floor tile 2 are laid along the first direction i, and the floor tile combination is laid along the second direction j. The upper side of the first floor tile 1 and the upper side of the second floor tile 2 can be combined to form a paved road surface. In other embodiments, the length, width and height of the first floor tile 1 and the second floor tile 2 can also be different.
[0017] At present, the floor tiles used for paving sidewalks are generally solid rectangular structures, and the pipelines are buried in the soil under the floor tiles. Every time the pipelines are repaired and replaced, a large area of floor tiles must be lifted and the soil must be dug, which is a large amount of work. The present disclosure provides a new floor tile structure, in which the first floor tile 1 is provided with four first threading holes 10 along the first direction i, and the second floor tile 2 is provided with two second threading holes 20 along the first direction i. The pipelines are passed through the first threading holes 10 and the second threading holes 20. In other embodiments, the arrangement and number of threading holes may also be different from that of the present embodiment. The second floor tile 2 is provided with fewer threading holes to facilitate threading and maintenance operations. See Figure 1 The first floor tile 1 is used to separate the "+"-shaped part of each threading hole, which can separate the pipelines in each threading hole, making it easier to thread and inspect. Figure 2 The "I"-shaped portion of the second floor tile 2 used to separate the threading holes can separate the pipelines in the threading holes. The second threading holes 20 are arranged in a 1*N single row form instead of an M*N matrix form like the first threading holes 10 in order to facilitate the threading operation. The second floor tile 2 is formed by splicing a floor tile body 21 and a cover body 22. The cover body 22 is arranged on the side of the floor tile body 21 close to the road surface. When the pipeline needs to be repaired or replaced, it is only necessary to open the cover body 22 for operation.
[0018] The construction method of the above-mentioned floor tile combination is basically the same as that of general floor tiles. It should be noted that the above-mentioned floor tile combination is temporarily not covered with the cover body 22 during the masonry process. After the masonry is completed, the pipeline is first inserted from the floor tile body 21. After all the pipelines are inserted, the cover body 22 is covered. The upper side of the first floor tile 1 and the upper side of the cover body 22 can be directly used as a road surface for pedestrians to walk on. If you want to add / inspect pipelines later, you can open the corresponding cover body 22 to install / inspect the pipelines. Therefore, you only need to block a small area near the cover body 22, which will reduce noise and dust, have little impact on citizens' travel and the lives of surrounding residents, and have low construction costs.
[0019] The recommended length of the first floor tile group along the first direction is 14 to 16 meters. The recommended length, width and height dimensions of the first floor tile 1 and the second floor tile 2 are both 0.6m*0.4m*0.3m. The recommended size of the first threading hole 10 is 225mm*125mm. Generally, one pipeline is passed through each first threading hole 10. If the diameter of the pipeline is small, 2 to 3 pipelines can also be passed through the first threading hole 10.
[0020] The above description is only a preferred embodiment of the present disclosure and is not intended to limit the present disclosure. It should be noted that any modification, equivalent replacement, improvement, etc. made by a person skilled in the art within the spirit and principle of the present disclosure after reading this specification should be included in the protection scope of the present disclosure.
Claims
1. A floor tile assembly capable of passing underground pipelines, characterized in that: The invention comprises a first floor tile group and a second floor tile group which are staggeredly laid along a first direction, wherein the first floor tile group comprises at least two first floor tiles laid along the first direction, the second floor tile group comprises at least one second floor tile laid along the first direction, the first floor tile is provided with at least two first threading holes along the first direction, the second floor tile is formed by splicing a floor tile body and a cover body, the cover body is arranged on the side of the floor tile body close to the road surface, the second floor tile is provided with at least one second threading hole along the first direction, and the second threading hole is formed by splicing the floor tile body and the cover body.
2. The floor tile assembly capable of passing through underground pipelines as claimed in claim 1, characterized in that: The length of the first floor tile group along the first direction is 14 to 16 meters.
3. The floor tile assembly capable of passing through underground pipelines as claimed in claim 1, characterized in that: The first floor tile and the second floor tile have the same length, width and height.
4. The floor tile assembly capable of passing through underground pipelines as claimed in claim 1, characterized in that: The first floor tile is provided with four first threading holes, and the second floor tile is provided with two second threading holes.
