Temporary supporting device for assembling bridge body of bridge girder erection machine
By using screw slide assembly and fluid cavity structure in bridge assembly, the problem of large support height adjustment workload in the prior art is solved, and high flexibility and service life of screws are improved, suitable for variable terrain need.
Patent Information
- Application Number
- CN202323405517.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-13
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2033-12-13
AI Technical Summary
During the bridge assembly process, the existing temporary support devices work a lot when adjusting the support height, and the support height adjustment is not flexible enough, making it difficult to meet the changing terrain needs.
The screw slide assembly and fluid cavity structure are adopted to determine the initial height by the amount of sand in the sandbox, and fine-tune the screw slide assembly, supplemented by the fluid cavity to reduce screw wear and improve service life.
It effectively reduces the workload during support height adjustment, improves the flexibility of support height and the service life of the screw slide assembly. At the same time, the impact on the beam body is reduced through auxiliary support of the fluid cavity, protecting the screw.
Smart Images

Figure CN222008645U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge assembly construction, and more specifically, to a temporary supporting device used for assembling a bridge erection machine beam body. Background Art
[0002] Affected by topographic and geological conditions, a large number of bridge projects need to be designed during the construction of roads, railways and other transportation projects. At present, most bridge projects are modularly constructed, dividing the entire bridge into multiple sections, each of which can be prefabricated in the beam yard. The prefabricated beams will be transported to the construction site, placed at the designated location by the bridge erection machine, and spliced into a complete bridge.
[0003] When assembling the beam body, temporary supports are generally set under the beam body to prevent the beam body from tilting during the assembly process. Chinese patent CN218989896U discloses a temporary pier for bridge construction, which includes a base, a support frame, and a beam frame structure. The base is installed at the bottom end of the support frame, and the beam frame structure is installed at the top of the support frame; the base includes a sandbox structure, the bottom end of the support frame extends into the sandbox structure, and the support height is changed according to the amount of sand filled. The bottom end of the support frame is reinforced at the sandbox structure by bolts; the beam frame structure includes a support plate and a pressure cover. The shape of the support plate is adapted to the inner shape of the pressure cover. The bottom of the support plate is fixedly installed on the top of the support frame. The support plate is provided with a plurality of threaded holes distributed in an array, and a support bolt is installed at each threaded hole. The pressure cover is set on the top of the plurality of support bolts, and the overall support height is adjusted by adjusting the height of the support bolts.
[0004] During the installation of the beam, it is sometimes necessary to gradually increase the support height in order to install the beam in place. The structure described in the above patent can adjust the height of multiple support bolts to achieve the change of support height to meet the height adjustment requirements of the bridge piers; after the beam is installed, the amount of sand filled in the sandbox can be reduced to reduce the overall support height and separate the beam structure from the bridge. However, during the installation of the beam, it is a considerable workload to adjust the height of multiple support bolts, so the above patent needs to be further optimized to reduce the workload when adjusting the support height. Utility Model Content
[0005] In view of the deficiencies in the prior art, the purpose of the utility model is to provide a temporary support device for assembling the beam of a bridge erection machine, which can fine-tune the support height through a screw slider assembly, thereby effectively reducing the workload when adjusting the support height.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a temporary support device for assembling the beam of a bridge erection machine, comprising a quicksand assembly, a screw slider assembly and a top plate; the quicksand assembly comprises a sand box, a first slide seat and a sand valve; the first slide seat is inserted into the sand box from the top of the sand box, and can slide downward as the amount of sand in the sand box decreases; the sand valve is installed at the bottom of the sand box; the screw slider assembly comprises a screw, a slider and a connecting rod; the screw is supported on the first slide seat and rotates relative to the first slide seat; the slider is threadedly connected to the screw and slides along the axis of the screw; the top end of the connecting rotating member rod is rotatably connected to the top plate, and the bottom end of the connecting rod is rotatably connected to the slider; a plurality of screw slider assemblies are provided, and all screw slider assemblies are distributed around the first slide seat.
[0007] The utility model is further configured as follows: it also includes an auxiliary support component, the auxiliary support component includes a second slide and a fluid valve; a slide groove opening upward is provided on the top of the first slide, and an air groove opening downward is provided on the bottom of the second slide, the second slide slides up and down in the slide groove, a sliding seal is provided between the second slide and the first slide, and the slide groove wall and the air groove wall together constitute a fluid cavity; the fluid valve is installed on the top of the second slide and is connected to the air groove; the second slide is fixed to the bottom surface of the top plate.
[0008] The utility model is further configured as follows: the screw rod is a bidirectional screw rod, each screw rod slider assembly has two sliders and two connecting rods, the two sliders move toward or away from each other on the screw rod, the bottom ends of the two connecting rods are respectively rotatably connected to the two sliders, and the top ends of the two connecting rods are rotatably connected to the top plate.
[0009] The utility model is further configured that: when the top plate moves downward, two sliders in the same screw rod slider assembly move toward each other.
[0010] The utility model is further configured as follows: the screw slider assembly also includes an articulated seat, which is installed on the bottom surface of the top plate, and the top end of the connecting rod is hinged to the articulated seat; an elastic pad is fixed between the articulated seat and the top plate.
[0011] The utility model is further configured to include a dimension component, which includes a fixed rod and a movable rod that are slidably connected, the bottom end of the fixed rod is relatively fixed to the sandbox, and the movable rod is fixedly connected to the top plate; vertically distributed scale lines are provided on the fixed rod and the movable rod.
[0012] The utility model is further configured as follows: the bottom surface of the sand box is an inclined surface, and the bottom of the inclined surface is inclined toward a direction close to the sand valve.
[0013] The utility model is further configured as follows: the sandbox is cylindrical.
[0014] The utility model is further configured as follows: the sand valve comprises an annular sleeve and a handle, the annular sleeve is rotatably connected to the sand box, a valve port is arranged on the annular sleeve, a sand outlet is opened on the sand box, as the annular sleeve rotates, the sand outlet is aligned with the valve port or the sand outlet is blocked by the annular sleeve; the handle is fixed on the annular sleeve.
[0015] The utility model is further configured as follows: a through hole for accommodating a hook is provided on the top plate.
[0016] In summary, the present invention has the following beneficial effects compared with the prior art:
[0017] The utility model determines the initial support height by the amount of sand filled in the sand box, and fine-tunes the support height by means of a screw rod and slider assembly, thereby effectively reducing the workload when increasing the support height.
[0018] The utility model uses the fluid support as the auxiliary support of the screw rod and slider assembly, thereby increasing the service life of the screw rod.
[0019] The support height of the utility model can be intuitively obtained through the dimension components. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a schematic diagram of the sand valve opening of this embodiment;
[0021] Figure 2 This is a schematic diagram of the sand valve opening being closed in this embodiment;
[0022] Figure 3 for Figure 2 An enlarged schematic diagram of the A region in FIG.
[0023] Figure 4 This is a cross-sectional view of the sand valve of this embodiment when the valve port is closed;
[0024] Figure 5 for Figure 4 A magnified schematic diagram of area B.
[0025] In the figure: 11, sand box; 111, inclined plane; 112, sand outlet; 12, first slide seat; 13, sand valve; 131, annular sleeve; 132, handle; 21, screw rod; 22, slider; 23, connecting rod; 24, hinged seat; 25, rotating head; 31, second slide seat; 32, fluid valve; 33, fluid chamber; 4, mounting plate; 41, connecting seat; 5, elastic pad; 6, bottom plate; 71, fixed rod; 72, moving rod; 8, top plate; 81, through hole; 9, air layer. DETAILED DESCRIPTION
[0026] The technical solution of the utility model will be clearly described below in conjunction with the accompanying drawings. Obviously, the described embodiments are not all embodiments of the utility model. All other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0027] It should be noted that the terms "center", "up", "down", "horizontal", "left", "right", "front", "back", "lateral", "longitudinal", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the accompanying drawings, and are only for the convenience of describing the utility model and simplifying the description. They do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the utility model.
[0028] Example
[0029] like Figure 1-5 As shown, the basic structure of the preferred embodiment of the utility model is a temporary support device for assembling the beam body of a bridge erection machine, including a quicksand assembly, a screw slider assembly and a top plate 8; the quicksand assembly includes a sand box 11, a first slide 12 and a sand valve 13; the first slide 12 is inserted into the sand box 11 from the top of the sand box 11, and can slide downward as the amount of sand in the sand box 11 decreases; the sand valve 13 is installed at the bottom of the sand box 11; the screw slider assembly includes a screw 21, a slider 22 and a connecting rod 23; the screw 21 is supported on the first slide 12 and rotates relative to the first slide 12; the slider 22 is threadedly connected to the screw 21 and slides along the axis of the screw 21; the top end of the connecting rod 23 is rotatably connected to the top plate 8, and the bottom end of the connecting rod 23 is rotatably connected to the slider 22; a plurality of screw slider assemblies are provided, and all screw slider assemblies are distributed around the first slide 12.
[0030] This embodiment can be placed on a built pier or abutment for use, or can be placed on a rigid bracket fixed on the ground for use. When using a temporary support device, the sand valve 13 is normally closed, and the initial support height of the temporary support device is limited by filling the sand box 11 with sand; the position of the slider 22 is changed by rotating the screw rod 21 through the rotating member, so that the connecting rod 23 lifts or lowers the top plate 8 to fine-tune the support height of the temporary support device; after the construction is completed, the sand valve 13 is opened to lower the height of the temporary support device and separate the temporary support device from the beam body.
[0031] This embodiment also includes an auxiliary support assembly, which includes a second slide 31 and a fluid valve 32; a slide groove opening upward is provided on the top of the first slide 12, and an air groove opening downward is provided on the bottom of the second slide 31, the second slide 31 slides up and down in the slide groove, and a sliding seal is formed between the second slide 31 and the first slide 12, and the slide groove wall and the air groove wall together constitute a fluid cavity 33; the fluid valve 32 is installed on the top of the second slide 31 and is connected to the air groove; the second slide 31 is fixed to the bottom surface of the top plate 8.
[0032] The fluid in the fluid cavity 33 can be liquid or gas or gas and liquid coexist. The fluid valve 32 is normally closed, and the fluid valve 32 is opened when the support height is changed by the screw slider assembly. As the screw slider assembly lifts and lowers the top plate 8, the volume of the fluid cavity 33 changes, and the fluid enters or flows out of the fluid cavity 33. After the height of the screw slider assembly is adjusted, the fluid valve 32 is closed, and the beam body can be auxiliary supported by the fluid in the fluid cavity 33, so as to reduce the wear of the screw 21 teeth and increase the service life of the screw slider assembly. At the same time, the fluid in the fluid cavity 33 can also absorb the impact of dynamic loads, vibrations or other sudden forces generated during the construction process, reducing the impact or damage to the beam body and the temporary support device.
[0033] Specifically, a fluid pump may be provided at the fluid valve 32 to facilitate regulating the pressure in the fluid cavity 33 . The fluid pump is detachably connected to the fluid valve 32 , and the fluid pump is not shown in the figure.
[0034] Specifically, the side walls of the air groove and the side walls of the slide groove are both cylindrical surfaces to ensure that the fluid cavity 33 is subjected to uniform force in all directions around it.
[0035] This embodiment also includes a mounting plate 4, the second slide 31 passes through the mounting plate 4, the first slide 12 is fixedly connected to the mounting plate 4, the top surface of the mounting plate 4 is flush with the top surface of the first slide 12, and a connecting seat 41 for rotationally connecting to the end of the screw rod 21 is installed on the top surface of the mounting plate 4.
[0036] Specifically, the screw rod 21 is a bidirectional screw rod, and each screw rod slider assembly has two sliders 22 and two connecting rods 23. The two sliders 22 move toward or away from each other on the screw rod 21. The bottom ends of the two connecting rods 23 are rotatably connected to the two sliders 22, respectively, and the top ends of the two connecting rods 23 are rotatably connected to the top plate 8. Such an arrangement enables the two connecting rods 23 and the top plate 8 or the screw rod 21 to form a shape approximately in a triangle, which helps to improve the stability of the support.
[0037] In this embodiment, when the top plate 8 moves downward, the two sliders 22 in the same screw slider assembly move toward each other, so as to evenly distribute the supporting force from the first slide seat 12 at various locations of the top plate 8.
[0038] Specifically, the screw slider assembly in this embodiment further includes an articulated seat 24, which is mounted on the bottom surface of the top plate 8, and the top end of the connecting rod 23 is hinged to the articulated seat 24. An elastic pad 5 can be fixed between the articulated seat 24 and the top plate 8. When the fluid cavity 33 is at a positive pressure or equal to atmospheric pressure, the dynamic load, vibration or other sudden force generated during the construction process will be preferentially absorbed by the fluid in the fluid cavity 33, which further protects the tooth profile of the screw 21 and improves the service life of the screw 21. In this embodiment, each screw slider assembly has two articulated seats 24.
[0039] In this embodiment, two screw rod and slider assemblies are provided, and the two screw rods 21 are parallel to each other.
[0040] Specifically, the screw slider assembly also includes a rotating head 25, which is fixedly connected to the end of the screw 21, and the rotating head 25 is used to connect a socket wrench. When rotating the screw 21, an electric socket wrench or a manual socket wrench can be connected to the rotating head 25, and the screw 21 is rotated by electricity or the principle of leverage.
[0041] Specifically, in this embodiment, the bottom surface of the sand box 11 is a slope 111, and the bottom of the slope 111 is inclined toward the direction close to the sand valve 13, so that when the amount of sand in the sand box 11 decreases, the top surface of the sand in the sand box 11 is as horizontal as possible.
[0042] Specifically, the sandbox 11 is cylindrical to ensure that the sandbox 11 is subjected to uniform force in all directions around it.
[0043] Specifically, the sand valve 13 includes an annular sleeve 131 and a handle 132, wherein the handle 132 is fixed on the annular sleeve 131, wherein the annular sleeve 131 is rotatably connected to the sand box 11, wherein a valve port is provided on the annular sleeve 131, wherein the sand box 11 is provided with a sand outlet 112, and as the annular sleeve 131 rotates, the sand outlet 112 is aligned with the valve port or the sand outlet 112 is blocked by the annular sleeve 131. Multiple locations of the annular sleeve 131 where no valve port is provided can be used to block the sand outlet 112, thereby extending the service life of the sand valve 13 and preventing it from being damaged.
[0044] Specifically, a sliding seal is formed between the first slide seat 12 and the sand box 11, and when the sand outlet 112 is blocked by the annular sleeve 131, the annular sleeve 131 and the sand box 11 are sealed. An air layer 9 is sandwiched between the bottom surface of the first slide seat 12 and the top surface of the sand in the sand box 11. The air layer 9 evenly distributes the supporting force from the sand in the sand box 11 to various parts of the bottom surface of the first slide seat 12, thereby facilitating the smooth downward movement of the first slide seat 12.
[0045] Specifically, a sand storage device may be provided at the valve port of the sand valve 13 to temporarily store the sand flowing out of the valve port of the sand valve 13 so as to facilitate the recycling of the sand. The sand storage device is not shown in the figure.
[0046] This embodiment further includes a bottom plate 6 , which is fixed to the bottom surface of the sandbox 11 to reduce wear on the bottom of the sandbox 11 .
[0047] Specifically, the present embodiment further includes a dimension assembly, which includes a fixed rod 71 and a movable rod 72 that are slidably connected, and vertically distributed scale lines are provided on the fixed rod 71 and the movable rod 72. In the present embodiment, the fixed rod 71 is fixedly connected to the bottom plate 6, and the bottom surface of the fixed rod 71 is flush with the bottom surface of the bottom plate 6, and the movable rod 72 is fixedly connected to the top plate 8, and the top surface of the movable rod 72 is flush with the top surface of the top plate 8. When using the temporary support device, the current support height can be intuitively determined by the scale lines marked on the fixed rod 71 and the movable rod 72, and the scale lines are not shown in the figure.
[0048] Specifically, the top plate 8 is provided with a through hole 81 for accommodating a hook, so that the hook of the lifting equipment can hook the top plate 8, so that the temporary support device can be transported to a designated pier, abutment or rigid support by the lifting equipment. In this embodiment, two groups of through holes 81 are provided, each group of two through holes 81, and the two groups of through holes 81 are respectively located on both sides of the second slide seat 31.
[0049] In summary, in this embodiment, the initial support height is determined by the amount of sand filled in the sandbox 11, and the support height is fine-tuned by the screw slider assembly, which effectively reduces the workload when adjusting the support height. At the same time, in this embodiment, the fluid support is used as an auxiliary support of the screw slider assembly to increase the service life of the screw 21. Moreover, the support height of this embodiment can also be intuitively obtained through the size assembly.
[0050] The above description is only the preferred embodiment of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A temporary support device for assembling a bridge erection machine beam, characterized in that: The quicksand assembly comprises a quicksand component, a screw slider component and a top plate (8); the quicksand component comprises a sand box (11), a first slide seat (12) and a sand valve (13); the first slide seat (12) is inserted into the sand box (11) from the top of the sand box (11) and can slide downward as the amount of sand in the sand box (11) decreases; the sand valve (13) is installed at the bottom of the sand box (11); The screw rod and slider assembly comprises a screw rod (21), a slider (22) and a connecting rod (23); the screw rod (21) is supported on a first slider (12) and rotates relative to the first slider (12); the slider (22) is threadedly connected to the screw rod (21) and slides along the axis of the screw rod (21); the top end of the connecting rod (23) is rotationally connected to the top plate (8), and the bottom end of the connecting rod (23) is rotationally connected to the slider (22); A plurality of screw rod and slider assemblies are provided, and all the screw rod and slider assemblies are distributed around the first slide seat (12).
2. A temporary support device for assembling the beam of a bridge erection machine according to claim 1, characterized in that: The invention also includes an auxiliary support component, which includes a second slide seat (31) and a fluid valve (32); the top of the first slide seat (12) is provided with a slide groove opening upward, the bottom of the second slide seat (31) is provided with an air groove opening downward, the second slide seat (31) slides up and down in the slide groove, the second slide seat (31) and the first slide seat (12) are slidingly sealed, and the slide groove wall and the air groove wall together form a fluid cavity (33); the fluid valve (32) is installed on the top of the second slide seat (31) and is connected to the air groove; the second slide seat (31) is fixed to the bottom surface of the top plate (8).
3. A temporary support device for assembling a bridge erection machine beam according to claim 1, characterized in that: The screw rod (21) is a bidirectional screw rod. Each screw rod and slider assembly has two sliders (22) and two connecting rods (23). The two sliders (22) move toward or away from each other on the screw rod (21). The bottom ends of the two connecting rods (23) are rotatably connected to the two sliders (22) respectively, and the top ends of the two connecting rods (23) are rotatably connected to the top plate (8).
4. A temporary support device for assembling the beam of a bridge erection machine according to claim 3, characterized in that: When the top plate (8) moves downward, two sliders (22) in the same screw slider assembly move toward each other.
5. A temporary support device for assembling a bridge erection machine beam according to any one of claims 1 to 4, characterized in that: The screw slider assembly also includes an articulated seat (24), which is installed on the bottom surface of the top plate (8), and the top end of the connecting rod (23) is hinged to the articulated seat (24); an elastic pad (5) is fixed between the articulated seat (24) and the top plate (8).
6. A temporary support device for assembling a bridge erection machine beam according to any one of claims 1 to 4, characterized in that: The device also comprises a dimension assembly, which comprises a fixed rod (71) and a movable rod (72) which are slidably connected, wherein the bottom end of the fixed rod (71) is relatively fixed to the sandbox (11), and the movable rod (72) is fixedly connected to the top plate (8); and vertically distributed scale lines are arranged on the fixed rod (71) and the movable rod (72).
7. A temporary support device for assembling a bridge erection machine beam according to any one of claims 1 to 4, characterized in that: The bottom surface of the sand box (11) is an inclined surface (111), and the bottom of the inclined surface (111) is inclined in a direction close to the sand valve (13).
8. A temporary support device for assembling a bridge erection machine beam according to any one of claims 1 to 4, characterized in that: The sandbox (11) is cylindrical.
9. A temporary support device for assembling the beam of a bridge erection machine according to claim 8, characterized in that: The sand valve (13) comprises an annular sleeve (131) and a handle (132). The annular sleeve (131) is rotatably connected to the sand box (11). The annular sleeve (131) is provided with a valve port. The sand box (11) is provided with a sand outlet (112). As the annular sleeve (131) rotates, the sand outlet (112) is aligned with the valve port or the sand outlet (112) is blocked by the annular sleeve (131). The handle (132) is fixed on the annular sleeve (131).
10. A temporary support device for assembling a bridge erection machine beam according to any one of claims 1 to 4, characterized in that: A through hole (81) for accommodating a hook is provided on the top plate (8).