Temporary support easy to disassemble
By using temporary pads and heating components to easily remove temporary support in the cast-in-place construction of bridge support, and softening thermoplastic crystal soil pads by using quicklime exothermic reaction, the problem of removal of large reaction force of the lower branch of the bridge support is solved, and the problem of removal of the bridge support is realized Fast, simple and recyclable removal effect avoids waste of materials and increased costs.
Patent Information
- Application Number
- CN202323524717.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-22
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2033-12-22
AI Technical Summary
In the construction of bridge support cast-in-place construction, especially after cast-in-place bridge, the lower support has a large support reaction force, and it is impossible to unload and remove the seat smoothly. The existing methods are mostly destructive or time-consuming, resulting in waste of materials and increased costs. .
Using a temporary pad and a heating assembly, a temporary pad is equipped with a chamber, and the two ends of the chamber are open. The heating assembly exposes heat to soften the pad, and controls heating through the control parts to achieve rapid support. tear down. The heating assembly consists of a heating material package and an activator water package. The heating material package is filled with quicklime. The activator water package is connected to the draw rope and metal ring. The lime exothermic reaction is caused by tearing the activator water package to soften the thermoplastic crystal soil pad. .
It realizes rapid, simple and non-destructive unloading removal of bridge bearings, avoids material waste and increase costs, and has the advantage of recycling.
Smart Images

Figure CN222008649U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of rapid force unloading and removal of temporary supports, in particular to an easily removable temporary support. Background Art
[0002] In the cast-in-place construction of bridge supports, especially after the bridge is cast-in-place, there is a large support reaction force at the lower support, which cannot be smoothly unloaded and removed. In this case, destructive methods such as oxy-acetylene gas cutting are usually used to cut it, resulting in material waste and greatly increased costs. Alternatively, the sand leakage method is used to place an iron box filled with sand under the temporary support pressure block, and the sand is leaked out during construction to achieve the effect of unloading and removing the seat, but this method is limited to small batches of temporary supports. It is time-consuming and laborious for the construction of a large number of temporary supports. How to provide a non-destructive, low-cost, simple and convenient method and device for rapid unloading and seat removal is a problem that scientific researchers urgently need to solve. Utility Model Content
[0003] The purpose of the utility model is to provide an easily dismantled temporary support in view of the above-mentioned deficiencies in the prior art.
[0004] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0005] The utility model discloses an easily dismantled temporary support, which is used for cast-in-place construction of bridge supports, and comprises a temporary pad and a plurality of heating components. At least one chamber is arranged in the temporary pad, and both ends of the chamber are open. The heating component is arranged in the chamber. A control component is arranged on the heating component, and the control component controls the heating component to release heat, so that the temporary pad softens and loses strength, thereby achieving the effect of dismantling the temporary support.
[0006] Furthermore, the heating component includes a heating material bag and an activator water bag, and the heating material bag and the activator water bag are both placed in the chamber.
[0007] Furthermore, the control component is arranged on the activator water bag, and the control component comprises a pull rope and a metal ring, one end of the pull rope is arranged on the activator water bag, and the other end of the pull rope is arranged on the metal ring.
[0008] Furthermore, the heating material package is filled with quicklime particles.
[0009] Furthermore, the temporary pad is a thermoplastic crystal soil pad.
[0010] Furthermore, the diameter of the chamber is not less than 10 cm.
[0011] Furthermore, the number of the chambers is 3.
[0012] Furthermore, the shape of the chamber is a cuboid.
[0013] Furthermore, the shape of the chamber is cylindrical.
[0014] Furthermore, during the cast-in-place construction of the bridge support, temporary pads are arranged above and below the cast-in-place concrete blocks, the upper part of the temporary pad located above is provided with a prefabricated T-beam, and the lower part of the temporary pad located below is provided on a pad stone.
[0015] The beneficial effects brought by the technical solution provided by the utility model are:
[0016] The utility model provides an easily removable temporary support for cast-in-place construction of bridge supports, including a temporary pad and multiple heating components. The temporary pad is provided with at least one chamber, with both ends of the chamber open, and the heating component is arranged in the chamber. The heating component is provided with a control component, and the control component controls the heating component to release heat, so that the temporary pad softens and loses strength, thereby achieving the effect of removing the temporary support. The utility model solves the problem that in the cast-in-place construction of bridge supports, especially after the bridge is cast-in-place, its lower support has a large support reaction force and cannot be smoothly unloaded and dismantled. It has the advantages of being simple and convenient, quickly unloading, and being recyclable to avoid waste. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a structural schematic diagram of an easily removable temporary support of the utility model;
[0018] Figure 2 It is a schematic diagram of the structure of a temporary support that is easily removable and has a cylindrical cavity structure;
[0019] Figure 3 This is a schematic diagram of the locations of temporary pads and temporary bearings during cast-in-place construction of bridge supports.
[0020] In the figure: 1. temporary pad; 11. chamber; 2. heating assembly; 21. heating material package; 22. activator water bag; 23. control part; 231. pull rope; 232. metal ring; 3. temporary support; 4. cast-in-place concrete block; 5. prefabricated T-beam; 6. pad stone. DETAILED DESCRIPTION
[0021] The following are specific embodiments of the present invention and the accompanying drawings to further describe the technical solution of the present invention, but the present invention is not limited to these embodiments.
[0022] like Figure 1-3As shown, the utility model provides an easily removable temporary support, the temporary support 3 is used for cast-in-place construction of bridge supports, and includes a temporary pad 1 and multiple heating components 2. At least one chamber 11 is arranged in the temporary pad 1, and both ends of the chamber 11 are open. The heating component 2 is arranged in the chamber 11, and a control component 23 is arranged on the heating component 2. The control component 23 controls the heating component 2 to release heat, so that the temporary pad 1 softens and loses strength, thereby achieving the effect of removing the temporary support.
[0023] In some embodiments, for the convenience of construction and cost saving, the heating component 2 may include a heating material package 21 and an activator water package 22. The heating material package 21 and the activator water package 22 are both placed in the chamber 11. When the heating material in the heating material package 21 meets water, the reaction releases heat, thereby achieving heating.
[0024] In some embodiments, in order to facilitate operation by the staff, a control member 23 may be provided on the activator water bag 22 , and the control member 23 includes a pull rope 231 and a metal ring 232 , one end of the pull rope 231 is provided on the activator water bag 22 , and the other end of the pull rope 231 is provided with a metal ring 232 .
[0025] In some embodiments, in order to obtain sufficient heat, the heating material package 21 may be filled with quicklime particles. Quicklime undergoes an exothermic reaction when in contact with water, generating a large amount of heat.
[0026] In some embodiments, in order to obtain good thermoplasticity and condensation recyclability, and to have sufficient strength to support the upper structure at room temperature, the temporary pad 1 can be a thermoplastic crystal soil pad. The crystal soil pad can be a crystal soil sand mixed material. The crystal soil is placed in a heating container for heating. The heating time is 10-20 minutes. Avoid heating too long to cause the crystal soil to turn black and denature, which affects the strength. In terms of mass content, when the crystal soil melts and approaches liquid, the crystal soil and coarse sand are poured into the crystal soil container at a mass ratio of 1:1.4, and the crystal soil and fine sand are poured into the crystal soil container at a mass ratio of 1:1.67, and stirred. Stir-fry all the time to fry out impurities and bubbles, and then pour it into a container for cooling to obtain a crystal soil composite material; the crystal soil composite material is cast in a mold and solidified at room temperature to obtain a thermoplastic crystal soil pad.
[0027] In some embodiments, in order to facilitate the arrangement of the heating component, the diameter of the recovery chamber 11 is not less than 10 cm.
[0028] In some embodiments, in order to improve the removal efficiency, the number of chambers 11 is three.
[0029] In some embodiments, in order to adapt to different working conditions and application scenarios, the shape of the chamber 11 can be a cuboid or a cylinder.
[0030] During the cast-in-place construction of bridge supports, temporary pads 1 are arranged above and below the cast-in-place concrete blocks 4. The upper part of the temporary pad 1 is provided with a prefabricated T-beam 5, and the lower part of the temporary pad 1 located below is arranged on a pad stone 6.
[0031] The utility model is an easily removable temporary support, wherein the thermoplastic crystal soil pad 1 contains three chambers 11, the heating component 2 is placed inside the chamber 12, the heating material bag 21 is filled with quicklime, the heating component 2 includes the heating material bag 21 and the activator water bag 22, the activator water bag 22 is arranged between the heating material bags 21, the activator water bag 22 is connected to one end of the pull rope 231, and the other end of the pull rope 231 is connected to the metal ring 232. The temporary pad 1 with the heating component 2 is placed at the center of the pad stone 6, the cast-in-place concrete block 4 is placed on the surface of the temporary pad 1 placed at the bottom of the temporary support 3, the upper pad is above the cast-in-place concrete block 4, and the upper structure of the bridge is above the prefabricated T-beam 6. When the temporary support has completed its function and needs to be removed from the support with a large support reaction force, the metal ring 232 is pulled to drive the pull rope 231 to tear the activator water bag 22, so that the water source inside the activator water bag 22 seeps into the heating material bag 21, and an exothermic reaction occurs when quicklime meets water. The temporary pad 1 with the heating bag placed will absorb the heat released by the heating component 2, and the central area will reach the melting point of the crystal soil material itself, thereby softening and losing strength, thereby achieving the effect of unloading and quickly removing the support. After removing the support, the thermoplastic crystal soil material 1 is collected and melted, poured and condensed, and can be recycled for reuse.
[0032] The working principle of the utility model is: using thermoplastic crystal soil material as the raw material for reaction (thermoplasticity refers to the property that a substance can flow and deform when heated, and can maintain a certain shape after cooling. Within a certain temperature range, it can be repeatedly heated to soften and cooled to harden), and preparing an ideal molecular structure and performance cubic mixture by continuously adjusting the amount of each functional monomer, so that the composite material prepared by the invention has better compression resistance, deformability, and temperature-adaptable deformability. After arranging a quicklime heat release combination device in the chamber, the crystal soil is poured into the mold to prepare a thermoplastic crystal soil pad. Then, the crystal soil pad is arranged on the support at the larger support reaction force as shown in the bridge monitoring data. When the support is demoulded and removed after the bridge is completed, the metal ring is pulled to drive the pull rope to tear the water bag so that the quicklime releases heat when it meets water to heat and melt the crystal soil pad. At the same time, the sinking data of the melted pad is monitored, and finally the effect of quickly removing the support and avoiding the waste due to the inability to unload the force is achieved. The method solves the problem that in the cast-in-place construction of bridge supports, especially after the bridge is cast-in-place, the lower support has a large support reaction force, which cannot be smoothly unloaded and removed, and can only be removed by destructive methods such as oxygen-acetylene gas cutting. The method has the advantages of being simple and convenient, quickly unloading, and recyclable to avoid waste.
[0033] For matters not mentioned above, the prior art applies.
[0034] Although some specific embodiments of the utility model have been described in detail through examples, those skilled in the art should understand that the above examples are only for illustration, not for limiting the scope of the utility model. Those skilled in the art of the utility model can make various modifications or supplements to the specific embodiments described or replace them in a similar manner, but they will not deviate from the direction of the utility model or exceed the scope defined by the attached claims. Those skilled in the art should understand that any modification, equivalent replacement, improvement, etc. made to the above implementation methods based on the technical essence of the utility model should be included in the protection scope of the utility model.
Claims
1. An easily removable temporary support, the temporary support (3) is used for bridge support cast-in-place construction, characterized in that: The invention comprises a temporary pad (1) and a plurality of heating components (2), wherein at least one chamber (11) is arranged in the temporary pad (1), and both ends of the chamber (11) are open. The heating component (2) is arranged in the chamber (11), and a control component (23) is arranged on the heating component (2). The control component (23) controls the heating component (2) to release heat, so that the temporary pad (1) softens and loses strength, thereby achieving the effect of removing the temporary support.
2. An easily removable temporary support as claimed in claim 1, characterized in that: The heating component (2) comprises a heat-generating material bag (21) and an activator water bag (22), and the heat-generating material bag (21) and the activator water bag (22) are both placed in the chamber (11).
3. An easily removable temporary support as claimed in claim 2, characterized in that: The control component (23) is arranged on the activator water bag (22), and the control component (23) comprises a pull rope (231) and a metal ring (232), one end of the pull rope (231) is arranged on the activator water bag (22), and the other end of the pull rope (231) is arranged on the metal ring (232).
4. The easily removable temporary support according to claim 2, characterized in that: The heating material bag (21) is filled with quicklime particles.
5. The easily removable temporary support according to claim 1, characterized in that: The temporary pad (1) is a thermoplastic crystal soil pad.
6. The easily removable temporary support according to claim 1, characterized in that: The diameter of the chamber (11) is not less than 10 cm.
7. An easily removable temporary support as claimed in claim 6, characterized in that: The number of the chambers (11) is 3.
8. The easily removable temporary support according to claim 6, characterized in that: The chamber (11) is in the shape of a cuboid.
9. The easily removable temporary support according to claim 6, characterized in that: The chamber (11) is in the shape of a cylinder.
10. The easily removable temporary support according to claim 1, characterized in that: During the cast-in-place construction of the bridge support, the temporary pads (1) are arranged above and below the cast-in-place concrete blocks (4), the upper part of the temporary pad (1) is provided with a prefabricated T-beam (5), and the lower part of the temporary pad (1) located below is arranged on a pad stone (6).