Auxiliary positioning device for pile foundation construction

By using auxiliary positioning devices of towers and elastic parts in pile foundation construction, the problem of pile pipe and pile position misalignment caused by hydraulic track leveling is solved, and rapid calibration and construction efficiency are achieved.

CN222008909UActive Publication Date: 2024-11-15NO 3 ENG COMPANY OF CHINA RAILWAY NO 8 ENG GRP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323469977.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-19
Publication Date
2024-11-15
Estimated Expiration
2033-12-19

AI Technical Summary

Technical Problem

During pile foundation construction, the leveling of the hydraulic track machine will cause the distance between the tower and the pile position to change, resulting in the pile pipe and the pile position no longer being accurately aligned, thereby reducing construction efficiency.

Method used

Design an auxiliary positioning device for pile foundation construction, including a tower base, a tower and elastic parts. One end of the elastic parts is fixedly connected to the tower base and the other end is matched with the pile tube lifting point for rapid calibration of piles. Horizontal position and perpendicularity of the pipe and pile position.

Benefits of technology

By observing the relative positions of the elastic parts and the pile tips and pile positions of the pile pipes, command the operator to adjust the hydraulic track machine, so that the pile pipes and pile positions are quickly aligned, the construction efficiency is improved, and the elastic parts are temporarily fixed through the bayonet to avoid its influence Pile pipe descends.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008909U_ABST
    Figure CN222008909U_ABST
Patent Text Reader

Abstract

The utility model discloses an auxiliary positioning device for pile foundation construction, which comprises a tower base, a tower and an elastic piece, the tower base is fixedly connected to a hydraulic crawler machine, the tower is fixedly connected to the tower base, a pile pipe is hoisted on the tower, the hoisting point of the pile pipe is positioned on the axis of the pile pipe, one end of the elastic piece is fixedly connected to the tower base, and the other end of the elastic piece is fixedly connected to the hydraulic crawler machine. The horizontal position of the other end of the elastic piece is matched with the horizontal position of a hoisting point on the pile pipe; the tower is provided with a bayonet used for clamping the elastic piece. According to the utility model, by observing the relative horizontal position of the other end of the elastic piece with the pile tip of the pile pipe and the pile position, the horizontal relative position of the pile pipe and the pile position can be quickly adjusted, and the perpendicularity of the pile pipe can also be quickly adjusted, so that the construction efficiency can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of pile foundation construction, and particularly relates to an auxiliary positioning device for pile foundation construction. Background Art

[0002] At present, during pile foundation construction, the ground commander needs to direct the operator to move the hydraulic crawler to the pile position and check the distance between the tower and the pile position several times. After the check, the operator needs to level the hydraulic crawler until the level bubble is centered, and then align the pile pipe with the pile position and slowly lower it. After the pile tip drops to about 10 cm from the ground, fine-tune the pile driver to align the pile tip with the pile position, and then continue to lower the pile tip to press the pile pipe into the soil by 0.5 to 1 m. Then, correct the verticality of the pile body from the two orthogonal sides of the pile again until the deviation is less than 1.5% before officially hammering the pile.

[0003] During this construction process, when the hydraulic crawler machine is leveled, the distance between the tower and the pile position will change, causing the pile pipe and the pile position to no longer be accurately aligned, requiring the position of the hydraulic crawler machine to be calibrated and adjusted back and forth multiple times, which in turn reduces construction efficiency. Utility Model Content

[0004] In order to overcome the defects of the prior art, the utility model provides an auxiliary positioning device for pile foundation construction, which can improve the construction efficiency.

[0005] The purpose of the utility model is achieved through the following technical solutions:

[0006] An auxiliary positioning device for pile foundation construction, comprising:

[0007] A tower base, the tower base is fixedly connected to the hydraulic crawler machine;

[0008] The tower frame is fixedly connected to the tower frame base, and a pile pipe is hoisted on the tower frame, and the hoisting point of the pile pipe is located on the axis of the pile pipe;

[0009] An elastic member, one end of which is fixedly connected to the tower base, and the horizontal position of the other end of the elastic member matches the horizontal position of the hoisting point on the pile pipe.

[0010] The beneficial effects of adopting the above technical scheme are as follows: when the pile pipe is vertical, the other end of the elastic member is located on the axis of the pile pipe. At this time, the distance between the end of the elastic member away from the tower base and the pile position can be regarded as the distance between the pile pipe and the pile position, that is, the commander can command the operator of the hydraulic crawler machine according to this distance to operate the hydraulic crawler machine to quickly align the horizontal positions of the pile pipe and the pile position; and because when the pile pipe is vertical, the other end of the elastic member is located on the axis of the pile pipe, that is, the other end of the elastic member is located directly below the pile tip of the pile pipe, that is, the commander can command the operator of the hydraulic crawler machine to quickly calibrate the verticality of the pile pipe according to this relative relationship; therefore, by observing the relative horizontal position of the other end of the elastic member and the pile tip and the pile position, the horizontal relative position of the pile pipe and the pile position can be quickly adjusted, and the verticality of the pile pipe can also be quickly adjusted, thereby improving construction efficiency.

[0011] In one embodiment, a snap-in socket for snapping the elastic member is provided on the tower.

[0012] The beneficial effect of adopting the above technical solution is that after the horizontal relative position of the pile pipe and the pile position and the verticality of the pile pipe are adjusted, the end of the elastic member away from the tower can be clamped on the clamping hole to temporarily fix the elastic member, thereby preventing the elastic member from affecting the descent of the pile pipe and protecting the elastic member.

[0013] In one embodiment, the elastic member is a spring.

[0014] In one embodiment, a tip is provided at one end of the elastic member away from the tower base.

[0015] The beneficial effect of adopting the above technical solution is that a tip is provided at one end of the elastic member away from the tower base, which facilitates observation of the horizontal relative position of the end of the elastic member away from the tower base and the pile pipe and pile position.

[0016] In one embodiment, one end of the elastic member away from the tower base is located outside the tower base.

[0017] The beneficial effect of adopting the above technical solution is that the end of the elastic member away from the tower base is located outside the tower base, that is, the tower base is outside the range of the pile pipe descent, thereby preventing the tower base from interfering with the descent of the pile pipe.

[0018] In one embodiment, one end of the elastic member is fixedly connected to the outer contour of the tower base.

[0019] The beneficial effect of adopting the above technical solution is that one end of the elastic member is fixedly connected to the outer contour of the tower base, so that the length of the elastic member is shortened as much as possible, thereby avoiding large bending deformation caused by the elastic member being too long.

[0020] The beneficial effects of the utility model are:

[0021] When the pile pipe is vertical, the other end of the elastic member is located on the axis of the pile pipe. At this time, the horizontal distance between the end of the elastic member away from the tower base and the pile position can be regarded as the horizontal distance between the pile pipe and the pile position, that is, the commander can command the operator of the hydraulic crawler machine according to this distance to operate the hydraulic crawler machine to quickly align the horizontal positions of the pile pipe and the pile position; and because when the pile pipe is vertical, the other end of the elastic member is located on the axis of the pile pipe, that is, the other end of the elastic member is located directly below the pile tip of the pile pipe, that is, the commander can command the operator of the hydraulic crawler machine to quickly calibrate the verticality of the pile pipe according to this relative relationship; therefore, by observing the relative horizontal position of the other end of the elastic member and the pile tip and the pile position, the horizontal relative position of the pile pipe and the pile position can be quickly adjusted, and the verticality of the pile pipe can also be quickly adjusted, thereby improving construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The present invention will be described in more detail below based on embodiments and with reference to the accompanying drawings.

[0023] in:

[0024] Figure 1 The schematic diagram of the structure of the utility model is shown;

[0025] Figure 2 The schematic diagram of the structure after the elastic member and the tower frame are clamped together in the utility model is shown;

[0026] In the drawings, like reference numerals are used for like parts. The drawings are not necessarily to scale.

[0027] Reference numerals:

[0028] 1-tower base, 2-elastic part, 3-pile position, 4-tower, 5-bayonet. DETAILED DESCRIPTION

[0029] The utility model will be further described below in conjunction with the accompanying drawings.

[0030] The utility model provides an auxiliary positioning device for pile foundation construction, such as Figure 1 and Figure 2 As shown, including:

[0031] A tower base 1, the tower base 1 is fixedly connected to the hydraulic crawler machine;

[0032] A tower 4 is fixedly connected to the tower base 1, a pile pipe is hoisted on the tower 4, and a hoisting point of the pile pipe is located on the axis of the pile pipe;

[0033] An elastic member 2, one end of which is fixedly connected to the tower base 1, and the horizontal position of the other end of the elastic member 2 matches the horizontal position of the hoisting point on the pile pipe.

[0034] It can be understood that when the pile pipe is vertical, the other end of the elastic member 2 is located on the axis of the pile pipe. At this time, the horizontal distance between the end of the elastic member 2 away from the tower base 1 and the pile position 3 can be regarded as the horizontal distance between the pile pipe and the pile position 3, that is, the commander can command the operator of the hydraulic crawler machine according to this distance to operate the hydraulic crawler machine to quickly align the horizontal positions of the pile pipe and the pile position 3; and because when the pile pipe is vertical, the other end of the elastic member 2 is located on the axis of the pile pipe, that is, the other end of the elastic member 2 is located directly below the pile tip of the pile pipe, that is, the commander can command the operator of the hydraulic crawler machine to quickly calibrate the verticality of the pile pipe according to this relative relationship; therefore, by observing the relative horizontal position of the other end of the elastic member 2, the pile tip of the pile pipe and the pile position 3, the horizontal relative position of the pile pipe and the pile position 3 can be quickly adjusted, and the verticality of the pile pipe can also be quickly adjusted, thereby improving construction efficiency.

[0035] It should be noted that, due to the bending deformation of the elastic member 2, the elastic member 2 can be bent out of the lowering range of the pile pipe to avoid the elastic member 2 hindering the lowering of the pile pipe.

[0036] In one embodiment, Figure 2 As shown, a snap-in socket 5 for snapping in the elastic member 2 is provided on the tower 4 .

[0037] It can be understood that after the horizontal relative position of the pile pipe and the pile position 3 and the verticality of the pile pipe are adjusted, the end of the elastic member 2 away from the tower base 1 can be clamped on the clamping hole 5 to temporarily fix the elastic member 2, thereby preventing the elastic member 2 from affecting the descent of the pile pipe and protecting the elastic member 2.

[0038] It should be noted that since the bayonet 5 is located above the tower base 1 and the elastic member 2 is fixed on the tower base 1, the elastic member 2 after being bent and deformed toward the tower 4 tends to rebound away from the tower 4. Therefore, in this embodiment, the bayonet 5 is configured as a U-shaped bayonet with an opening facing downward to limit the rebound of the elastic member 2, thereby stably clamping the elastic member 2 in the bayonet 5.

[0039] In one embodiment, the elastic member 2 is a spring.

[0040] In one embodiment, a tip is disposed at one end of the elastic member 2 away from the tower base 1 .

[0041] It is understandable that the end of the elastic member 2 away from the tower base 1 is provided with a pointed end, so as to facilitate observation of the horizontal relative position of the end of the elastic member 2 away from the tower base 1 and the pile pipe and the pile position 3 .

[0042] In one embodiment, one end of the elastic member 2 away from the tower base 1 is located outside the tower base 1 .

[0043] It can be understood that the end of the elastic member 2 away from the tower base 1 is located outside the tower base 1, that is, the tower base 1 is outside the range of the pile pipe descent, thereby preventing the tower base 1 from interfering with the descent of the pile pipe.

[0044] In one embodiment, one end of the elastic member 2 is fixedly connected to the outer contour of the tower base 1 .

[0045] It can be understood that one end of the elastic member 2 is fixedly connected to the outer contour of the tower base 1, so that the length of the elastic member 2 is shortened as much as possible, thereby avoiding large bending deformation caused by the elastic member 2 being too long.

[0046] It should be noted that although the elastic member 2 will bend and deform under the influence of gravity, as long as the horizontal position of the other end of the elastic member 2 is matched with the horizontal position of the hanging point on the pile pipe during installation, when the elastic member 2 returns to its natural state, the horizontal position of the other end will always match the horizontal position of the hanging point on the pile pipe.

[0047] The working process of the utility model is:

[0048] The commander instructs the operator to move the hydraulic crawler according to the horizontal distance between the end of the elastic member 2 away from the tower base 1 and the center of the pile position 3 until the end of the elastic member 2 away from the tower base 1 is located directly above the center of the pile position 3;

[0049] Lowering the pile pipe so that the pile tip is close to the elastic member 2;

[0050] The commander instructs the operator to move the hydraulic crawler and perform leveling according to the relative horizontal positions of the elastic member 2 away from one end of the tower base 1, the center of the pile position 3 and the pile tip of the pile pipe, so as to quickly align the pile tip of the pile pipe with the center of the pile position 3 and quickly adjust the verticality.

[0051] In the description of the present invention, it should be understood that the terms "upper", "lower", "bottom", "top", "front", "back", "inside", "outside", "left", "right", etc., indicating directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0052] Although the present invention is described herein with reference to specific embodiments, it should be understood that these embodiments are merely examples of the principles and applications of the present invention. It should therefore be understood that many modifications may be made to the exemplary embodiments, and other arrangements may be designed without departing from the spirit and scope of the present invention as defined by the appended claims. It should be understood that the features described in the various dependent claims and herein may be combined in a manner different from that described in the original claims. It may also be understood that the features described in conjunction with the individual embodiments may be used in other described embodiments.

Claims

1. An auxiliary positioning device for pile foundation construction, characterized in that: include: A tower base (1), wherein the tower base (1) is fixedly connected to the hydraulic crawler machine; A tower (4), the tower (4) being fixedly connected to the tower base (1), a pile pipe being hoisted on the tower (4), and a hoisting point of the pile pipe being located on the axis of the pile pipe; An elastic member (2), one end of the elastic member (2) is fixedly connected to the tower base (1), and the horizontal position of the other end of the elastic member (2) matches the horizontal position of the hoisting point on the pile pipe.

2. The auxiliary positioning device for pile foundation construction according to claim 1, characterized in that: The tower frame (4) is provided with a snap-in socket (5) for snapping the elastic member (2).

3. The auxiliary positioning device for pile foundation construction according to claim 1, characterized in that: The elastic member (2) is a spring.

4. The auxiliary positioning device for pile foundation construction according to claim 1, characterized in that: The elastic member (2) is provided with a pointed end at one end away from the tower base (1).

5. The auxiliary positioning device for pile foundation construction according to claim 1, characterized in that: One end of the elastic member (2) away from the tower base (1) is located outside the tower base (1).

6. The auxiliary positioning device for pile foundation construction according to claim 5, characterized in that: One end of the elastic member (2) is fixedly connected to the outer contour of the tower base (1).