Tubular pile observation device and tubular pile hammering system
By using elastic straps to fix the scale on pipe piles or hammering equipment, the problem of traditional scales shifting or falling off during hammering is solved, and high-precision and high-efficiency measurement of pipe pile penetration is achieved.
Patent Information
- Application Number
- CN202323348296.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-08
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2033-12-08
AI Technical Summary
During the hammering process of pipe piles, the traditionally mounted scales are easily displaced or fall off, affecting the measurement accuracy and construction efficiency.
The pipe pile observation device including an observation scale and elastic strap is adopted. Through the annular space and tensioning setting of the elastic strap, the scale is fixed to the outer wall of the pipe pile or hammering device to avoid displacement or fall off caused by vibration. And adapt different outer diameters through the elastic polka dot layer to ensure the accuracy of measurement.
It effectively avoids the displacement or fall of the scale during the hammering process, ensures measurement accuracy and construction efficiency, and ensures accurate recording and rapid construction of pipe pile penetration.
Smart Images

Figure CN222008912U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pipe pile construction, in particular to a pipe pile observation device and a pipe pile hammering system. Background Art
[0002] Hammer pile driving is to use the instantaneous impact mechanical energy of the pile hammer when it falls to overcome the resistance of the soil to the pile, destroy its static equilibrium state, cause the pile body to sink, and reach a new static pressure equilibrium state. By repeatedly hammering the pile head, the pile body will continue to sink. Hammer pile driving is the most commonly used pile driving method for prefabricated pipe piles. This method has a fast construction speed, a high degree of mechanization, and a wide range of applications.
[0003] Since the method of observing the penetration degree of piles driven by suspended hammers is complicated, a scale is often attached to the pile. When observing, it is easy for the scale to shift or fall off during the hammering process, which affects the measurement accuracy and makes it impossible to quickly draw a conclusion on the penetration degree, thus affecting the construction efficiency. Utility Model Content
[0004] The invention purpose of the utility model is to provide a pipe pile observation device and a pipe pile hammering system to solve the problem that the scale ruler is often attached to the pipe pile, which is easily displaced or falls off during the hammering process when observing, thus affecting the measurement accuracy and construction efficiency.
[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is:
[0006] A pipe pile observation device comprises an observation scale and an elastic band, wherein the elastic band is detachably connected to the observation scale, the elastic band encloses an annular space, and the elastic band is tensioned.
[0007] The pipe pile observation device described in the present application includes an observation scale and an elastic band. The elastic band is detachably connected to the observation scale, thereby facilitating the installation and removal of the observation scale. When used in pipe pile measurement, since the elastic band encloses an annular space, the elastic band is sleeved on the outer wall of the pipe pile or the hammering device, so that the pipe pile or the hammering device passes through the annular space, that is, the elastic band is tied to the outer wall of the pipe pile or the hammering device, thereby fixing the observation scale connected to the elastic band on the outer wall of the pipe pile or the hammering device, which is convenient for observing the penetration value of the pipe pile through the observation scale during the hammering process of the pipe pile. At the same time, due to the tensioning setting of the elastic band, the elastic band can buffer vibration, effectively avoiding the displacement or falling off of the traditional attached scale during the hammering process, thereby ensuring measurement accuracy and construction efficiency.
[0008] As a preferred embodiment of the present invention, the observation scale includes a scale body and an elastic wave point layer, the elastic wave point layer is arranged on one side of the scale body, and the elastic band part abuts against the side of the scale body away from the elastic wave point layer. By providing the elastic wave point layer and cooperating with the elastic band, the observation scale can be adapted to pipe piles or hammering equipment of different outer diameters, that is, it can adapt to the observation construction of pipe piles of different outer diameters, and realize shock absorption, avoid displacement of the scale body, and ensure the accuracy and reliability of the measurement structure.
[0009] As a preferred solution of the present invention, a positioning bolt is provided on the side of the ruler body away from the elastic wave point layer, and the positioning bolt is used to connect the elastic binding band.
[0010] As a preferred solution of the utility model, the elastic band is provided with a fixing hole, and the positioning bolt passes through the fixing hole and cooperates with the locking nut. The positioning bolt on the ruler body passes through the fixing hole of the elastic band and cooperates with the locking nut, so that the elastic band is compressed by the locking nut, so that the elastic band is fixed to the ruler body, realizing a detachable connection between the elastic band and the observation scale, which is convenient for disassembly and replacement.
[0011] As a preferred solution of the utility model, the ruler body is an arc-shaped plate.
[0012] As a preferred solution of the present invention, the elastic binding band is formed by a strip structure wound at least once.
[0013] As a preferred solution of the utility model, at least two elastic straps are provided on the observation scale.
[0014] As a preferred solution of the present invention, adjacent elastic binding bands are arranged at intervals.
[0015] The present application also discloses a pipe pile hammering system, comprising a pipe pile, a level, a hammering device and the pipe pile observation device described in the present application, wherein the elastic band is sleeved on the outer wall of the pipe pile or the outer wall of the hammering device so that the pipe pile or the hammering device passes through the annular space, the hammering device can hammer the pipe pile, and the level is used to record the value of the observation scale.
[0016] The pipe pile hammering system described in the present application includes a pipe pile, a level, a hammering device and a pipe pile observation device as described in the present application. The elastic band is sleeved on the outer wall of the pipe pile or the outer wall of the hammering device, so that the pipe pile or the hammering device passes through the annular space, thereby tying the elastic band to the outer wall of the pipe pile or the hammering device. By arranging the pipe pile observation device on the pipe pile or the hammering device to monitor the penetration value of the pipe pile during the hammering process, the problem of displacement or falling off of the traditional attached scale during the hammering process is effectively avoided, and the accuracy and reliability of the measuring structure can be ensured. The value of the observation scale is then recorded by the level to obtain the penetration value of the pipe pile during the hammering process, thereby facilitating the rapid completion of the hammering pile sinking operation of the pipe pile.
[0017] As a preferred solution of the utility model, the elastic wave point layer abuts against the outer wall of the pipe pile or the outer wall of the hammering device.
[0018] In summary, due to the adoption of the above technical solution, the beneficial effects of the utility model are:
[0019] 1. The pipe pile observation device described in the present application includes an observation scale and an elastic band. The elastic band is detachably connected to the observation scale, thereby facilitating the installation and removal of the observation scale. When used in pipe pile measurement, since the elastic band forms an annular space, the elastic band is sleeved on the outer wall of the pipe pile or the hammering device, so that the pipe pile or the hammering device passes through the annular space, that is, the elastic band is tied to the outer wall of the pipe pile or the hammering device, thereby fixing the observation scale connected to the elastic band on the outer wall of the pipe pile or the hammering device, which is convenient for observing the penetration value of the pipe pile through the observation scale during the hammering process of the pipe pile. At the same time, due to the tensioning setting of the elastic band, the elastic band can buffer vibration, effectively avoiding the displacement or falling off of the traditional attached scale during the hammering process, thereby ensuring measurement accuracy and construction efficiency.
[0020] 2. The pipe pile hammering system described in the present application comprises a pipe pile, a level, a hammering device and a pipe pile observation device as described in the present application, wherein the elastic band is sleeved on the outer wall of the pipe pile or the outer wall of the hammering device so that the pipe pile or the hammering device passes through the annular space, thereby tying the elastic band to the outer wall of the pipe pile or the hammering device. By arranging the pipe pile observation device on the pipe pile or the hammering device to monitor the penetration value of the pipe pile during the hammering process, the problem of displacement or falling off of the traditional attached scale during the hammering process is effectively avoided, and the accuracy and reliability of the measuring structure can be ensured. The value of the observation scale is then recorded by the level to obtain the penetration value of the pipe pile during the hammering process, thereby facilitating the rapid completion of the hammering pile sinking operation of the pipe pile. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram (front view) of the utility model being applied to a pipe pile.
[0022] Figure 2 yes Figure 1 Top view of the .
[0023] Figure 3 yes Figure 2 A partial enlarged view of point A.
[0024] Figure 4 It is a top view of the scale of the utility model.
[0025] Figure 5 It is a left side view of the scale of the utility model.
[0026] Figure 6 It is a schematic diagram of a scale, an elastic band, etc. of the utility model.
[0027] Figure 7 It is a schematic diagram of the hammering system of the utility model.
[0028] Markings in the figure: 1- observation scale, 11- ruler body, 12- elastic wave point layer, 121- circular elastic protrusion, 122- elastic layer, 13- positioning bolt, 2- elastic binding band, 21- fixing hole, 3- locking nut, 4- pipe pile, 5- level, 6- hammering device. DETAILED DESCRIPTION
[0029] The utility model is described in detail below in conjunction with the accompanying drawings.
[0030] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.
[0031] Example 1
[0032] like Figure 1-Figure 3 As shown, a pipe pile observation device described in this embodiment includes an observation scale 1 and an elastic band 2, wherein the elastic band 2 is detachably connected to the observation scale 1, the elastic band 2 encloses an annular space, and the elastic band 2 is tensioned.
[0033] The pipe pile observation device described in this embodiment includes an observation scale 1 and an elastic band 2. The elastic band 2 is detachably connected to the observation scale 1, so as to facilitate the installation and removal of the observation scale 1. Figure 7As shown, when applied to the measurement of the pipe pile 4, since the elastic band 2 encloses an annular space, the elastic band 2 is sleeved on the outer wall of the pipe pile 4 or the hammering device 6, so that the pipe pile 4 or the hammering device 6 passes through the annular space, that is, the elastic band 2 is tied to the outer wall of the pipe pile 4 or the hammering device 6, so that the observation scale 1 connected to the elastic band 2 is fixed on the outer wall of the pipe pile 4 or the hammering device 6, which is convenient for observing the penetration value of the pipe pile 4 through the observation scale 1 during the hammering process of the pipe pile. At the same time, since the elastic band 2 is tensioned, the elastic band 2 can buffer vibration, effectively avoiding the displacement or falling off of the traditional attached scale during the hammering process, and ensuring the measurement accuracy and construction efficiency. .
[0034] like Figure 4 , Figure 5 As shown, the observation scale 1 includes a scale body 11 and an elastic wave point layer 12, wherein the elastic wave point layer 12 is arranged on one side of the scale body 11, and the elastic band 2 partially abuts against the side of the scale body 11 away from the elastic wave point layer 12. When the pipe pile 4 is hammered, the elastic wave point layer 12 of the observation scale 1 abuts against the outer wall of the pipe pile 4 or the outer wall of the hammering device 6. By setting the elastic wave point layer 12 and cooperating with the elastic band 2, the elasticity of the elastic wave point layer 12 and the tension of the elastic band 2 are used to make the observation scale 1 adaptable to pipe piles 4 or hammering devices 6 of different outer diameters, that is, it can adapt to the observation construction of pipe piles 4 of different outer diameters, and shock absorption is achieved by the elastic wave point layer 12, thereby avoiding displacement of the main body of the observation scale 1 and ensuring the accuracy and reliability of the measurement structure;
[0035] Among them, Figure 3 As shown, when fixing the observation scale 1 on the outer wall of the pipe pile 4, the elastic wave point layer 12 of the observation scale 1 is firstly abutted against the outer wall of the pipe pile 4, and then the elastic band 2 is circumferentially wrapped around the pipe pile 4, and the head and tail parts of the elastic band 2 are fixed by Velcro. When wrapping, part of the elastic band 2 abuts against the ruler body 11, that is, the observation scale 1 is wrapped around the pipe pile 4 by the elastic band 2, so that the observation scale 1 is fixed.
[0036] In a preferred embodiment, the elastic wave point layer 12 is made of rubber or polymer plastic.
[0037] In a preferred embodiment, the elastic wave-dot layer 12 refers to an elastic layer 122 having a plurality of circular elastic protrusions 121 .
[0038] A preferred method is as follows Figure 3 , Figure 6As shown, a positioning bolt 13 is provided on the side of the ruler body 11 away from the elastic wave point layer 12, and the positioning bolt 13 is used to connect the elastic band 2. The elastic band 2 is fixed by setting the positioning bolt 13, so that the elastic band 2 is indirectly connected to the ruler body 11, thereby facilitating the elastic band 2 to better install the ruler body 11 on the outer wall of the pipe pile 4 or the outer wall of the hammering device 6.
[0039] like Figure 6 As shown, the elastic band 2 is provided with a fixing hole 21, and the positioning bolt 13 passes through the fixing hole 21 and cooperates with the locking nut 3. After the positioning bolt 13 on the ruler body 11 passes through the fixing hole 21 of the elastic band 2 and cooperates with the locking nut 3, the elastic band 2 is compressed by the locking nut 3, so that the elastic band 2 is fixed on the ruler body 11, and the elastic band 2 is detachably connected to the observation scale 1, which is convenient for disassembly and replacement.
[0040] In a preferred manner, the ruler body 11 is a curved plate so as to better fit the curved side wall of the pipe pile 4 or the curved side wall of other equipment.
[0041] In a preferred manner, the elastic band 2 is formed by winding a strip structure at least once, such as after the elastic band 2 is wound around the outer wall of the pipe pile 4 or the outer wall of the hammering device 6 once, Velcro is set on the head and tail of the elastic band 2 to connect the head and tail together, so that the elastic band 2 is sleeved on the outer wall of the pipe pile 4 or the side wall of the hammering device 6, or after the elastic band 2 is wound around the outer wall of the pipe pile 4 or the outer wall of the hammering device 6 N times, Velcro is set on the head and tail of the elastic band 2 to connect the head and tail together, so that the elastic band 2 is sleeved on the outer wall of the pipe pile 4 or the side wall of the hammering device 6.
[0042] In a preferred manner, at least two elastic straps 2 are provided on the observation scale 1. By providing at least two elastic straps 2, the observation scale 1 can be better fixed.
[0043] In a preferred manner, adjacent elastic bands 2 are arranged at intervals.
[0044] In a preferred embodiment, the elastic band 2 is made of rubber or polymer plastic.
[0045] Example 2
[0046] like Figure 7 As shown, on the basis of Example 1, this embodiment discloses a pipe pile hammering system, including a pipe pile 4, a level 5, a hammering device 6 and the pipe pile observation device described in Example 1, the elastic band 2 is sleeved on the outer wall of the pipe pile 4 or the outer wall of the hammering device 6, so that the pipe pile 4 or the hammering device 6 passes through the annular space, the hammering device 6 can hammer the pipe pile 4, and the level 5 is used to record the value of the observation scale 1.
[0047] The pipe pile hammering system described in this embodiment includes a pipe pile 4, a level 5, a hammering device 6 and a pipe pile observation device as described in the present application. The elastic band 2 is sleeved on the outer wall of the pipe pile 4 or the outer wall of the hammering device 6, so that the pipe pile 4 or the hammering device 6 passes through the annular space, thereby binding the elastic band 2 on the outer wall of the pipe pile 4 or the hammering device 6. By arranging the pipe pile observation device on the pipe pile 4 or the hammering device 6 to monitor the penetration value of the pipe pile 4 during the hammering process, the problem of displacement or falling off of the traditional attached scale during the hammering process is effectively avoided, and the accuracy and reliability of the measurement structure can be ensured. The value of the observation scale 1 is then recorded by the level 5 to obtain the penetration value of the pipe pile 4 during the hammering process, thereby facilitating the rapid completion of the hammering pile sinking operation of the pipe pile.
[0048] like Figure 2-Figure 3 As shown, the elastic wave point layer 12 abuts against the outer wall of the pipe pile 4 or the outer wall of the hammering device 6. When the pipe pile 4 is hammered, the elastic wave point layer 12 of the observation scale 1 abuts against the outer wall of the pipe pile 4 or the outer wall of the hammering device 6. By setting the elastic wave point layer 12 and cooperating with the elastic band 2, the elasticity of the elastic wave point layer 12 and the tension of the elastic band 2 are used to make the observation scale 1 adaptable to pipe piles 4 or hammering devices 6 of different outer diameters, that is, it can adapt to the observation construction of pipe piles 4 of different outer diameters, and the elastic wave point layer 12 is used to achieve shock absorption, thereby avoiding the displacement of the main body of the observation scale 1, ensuring the accuracy and reliability of the measurement structure.
[0049] Example 3
[0050] like Figure 7 As shown, based on Example 2, this example discloses a method for observing the penetration of a pipe pile, and the observation method is as follows:
[0051] The observation method is as follows:
[0052] Step 1: Before the last three hammer strikes, place the observation scale 1 against the outer wall of the pile 4 or the hammering device 6, such as first fitting the observation scale 1 to the outer wall of the pile 4 or the hammering device 6 in a set direction, and then tying the observation scale 1 to the outer wall of the pile 4 or the hammering device 6 with an elastic band 2, wherein at least two elastic bands 2 are used to tie the observation scale 1 tightly, and the elastic bands 2 are spaced apart, such as when two elastic bands 2 are used, one is located at the upper part of the observation scale 1, and the other is located at the lower part of the observation scale 1;
[0053] Step 2: Use the level 5 to observe and record the value of the scale 1 before hammering;
[0054] Step 3: Use level 1 to observe the last three hammer strikes and then observe and record the value of scale 1;
[0055] Step 4: Subtract the value after hammering from the value before hammering to get the penetration of the last three arrays;
[0056] Step 5: Disassemble the observation scale 1.
[0057] Further, the installation position of the observation scale 1 is referred to the following method:
[0058] Calculate the length of the pipe pile 4 in advance. If the pipe pile 4 needs to be driven below the ground, set the observation scale 1 on the side wall of the hammering device 6. If the pipe pile 4 needs to be partially exposed above the ground, set the observation scale 1 in advance on the side wall of the part of the pipe pile 4 that needs to be exposed above the ground.
[0059] The pipe pile penetration observation method disclosed in this embodiment reduces the observation process and improves the observation efficiency when observing the final penetration, an important data during the hammering construction of the pipe pile 4, thereby greatly improving the construction efficiency of the pipe pile 4.
[0060] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A pipe pile observation device, It is characterized in that It comprises an observation scale (1) and an elastic band (2), wherein the elastic band (2) is detachably connected to the observation scale (1), the elastic band (2) encloses an annular space, and the elastic band (2) is tensioned.
2. The pipe pile observation device according to claim 1, It is characterized in that The observation scale (1) comprises a scale body (11) and an elastic wave point layer (12), wherein the elastic wave point layer (12) is arranged on one side of the scale body (11), and the elastic band (2) partially abuts against a side of the scale body (11) away from the elastic wave point layer (12).
3. The pipe pile observation device according to claim 2, It is characterized in that A positioning bolt (13) is provided on the side of the ruler body (11) away from the elastic wave point layer (12), and the positioning bolt (13) is used to connect the elastic binding band (2).
4. The pipe pile observation device according to claim 3, It is characterized in that The elastic binding band (2) is provided with a fixing hole (21), and the positioning bolt (13) passes through the fixing hole (21) and cooperates with the locking nut (3).
5. The pipe pile observation device according to claim 2, It is characterized in that The ruler body (11) is an arc-shaped plate.
6. The pipe pile observation device according to any one of claims 2 to 5, It is characterized in that The elastic binding band (2) is formed by a strip structure wound at least once.
7. The pipe pile observation device according to claim 6, It is characterized in that At least two elastic straps (2) are arranged on the observation scale (1).
8. The pipe pile observation device according to claim 7, It is characterized in that Adjacent elastic binding bands (2) are arranged at intervals.
9. A pile hammering system, It is characterized in that It comprises a pipe pile (4), a level (5), a hammering device (6) and a pipe pile observation device as described in any one of claims 2 to 8, wherein the elastic band (2) is sleeved on the outer wall of the pipe pile (4) or the outer wall of the hammering device (6) so that the pipe pile (4) or the hammering device (6) passes through the annular space, the hammering device (6) can hammer the pipe pile (4), and the level (5) is used to record the value of the observation scale (1).
10. A pipe pile hammering system according to claim 9, It is characterized in that The elastic wave point layer (12) abuts against the outer wall of the pipe pile (4) or the outer wall of the hammering device (6).