Combined tunnel segment structure
Through the mismatch assembly and skeleton design of the combined tunnel pipe segment structure, the problems of insufficient assembly of traditional steel pipe segments are solved, and fast and stable tunnel support is achieved, which is suitable for TBM construction under different geological conditions.
Patent Information
- Application Number
- CN202420658241.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-01
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-04-01
AI Technical Summary
During the open TBM construction process, the assembly of traditional quadrilateral steel pipes has problems such as local deformation, resulting in installation difficulties, long construction period and insufficient support structure strength.
Using a combined tunnel pipe piece structure, six arc-shaped blocks are assembled through the first and second splicing surfaces of 60°-150°, forming an annular structure, reducing the assembly complexity and workload, and passing through steel plates, Concrete and skeleton structures improve compressive strength.
The rapid formation of annular support structure is achieved, the assembly process is simplified, the construction stress is reduced, the construction period efficiency and structural stability are improved, and it is suitable for weak surrounding rocks and hard rock excavation environments.
Smart Images

Figure CN222010223U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tunnel construction, and in particular to a combined tunnel segment structure. Background Art
[0002] During the construction of open TBM, collapse of weak surrounding rock and rock burst of hard rock are often encountered. The current conventional construction response method is to use steel arch frame (density) + steel bar support measures. However, for the operators, this still has the problem of partially exposed face. At the same time, there is a certain design space for strengthening the strength of the support structure. In order to make the open TBM more adaptable, further ensure construction safety, and minimize the collapse of weak surrounding rock and TBM shutdown caused by rock burst of hard rock, the design and use ideas of combined tunnel segment structure have been derived.
[0003] In traditional open-type TBM tunnels, when steel pipe segments are used for support, this type of steel pipe segment is usually composed of (6 to 8) segments spliced into a ring shape, with staggered assembly in the longitudinal direction, and the appearance is mainly a quadrilateral rectangular structure. The installation method of the open-type TBM segment is longitudinal insertion. When assembling the last segment, it is easy to fail to assemble the segment due to insufficient space caused by local deformation of the steel structure. In addition, the traditional quadrilateral segment needs to complete the assembly of all the segments in each ring before the next TBM excavation process can be carried out. The assembly is relatively complicated, the workload is large, and it is easy to increase the overall construction period. Utility Model Content
[0004] The utility model aims to provide a combined tunnel segment structure, which can quickly form an annular support structure during construction, and the workload of assembly is greatly reduced, which is conducive to shortening the process time and achieving the purpose of overall construction period control.
[0005] In order to achieve the above-mentioned purpose, the utility model provides a combined tunnel segment structure, including a bottom block, two side lower blocks, two side upper blocks and a top block, a total of six arc-shaped blocks, the six blocks are sequentially spliced together to form an annular segment structure; wherein each of the blocks is provided with a first splicing surface and a second splicing surface at both ends along the annular direction, the angle between the first splicing surface and the second splicing surface is 60°-150°, any first splicing surface is abutted against the second splicing surface adjacent to the annular direction, and the lengths of the abutted first splicing surface and the second splicing surface are the same.
[0006] Preferably, the front and rear ends of the bottom block are formed with raised portions and / or recessed portions of the same shape.
[0007] Preferably, the bottom block comprises a shell formed by splicing steel plates and concrete filled therein.
[0008] Preferably, a hoisting hole matching the assembling machine is reserved at the upper end of the bottom block; and bolt holes for splicing with adjacent blocks are provided on the side.
[0009] Preferably, the side lower block comprises a skeleton structure and a steel mesh arranged on the outer arc surface.
[0010] Preferably, the skeleton structure includes I-beams arranged in the circumferential direction and channel steels arranged along the periphery of the blocks and along the longitudinal direction of the tunnel.
[0011] Preferably, the side upper block comprises a skeleton structure and a steel plate and a steel mesh arranged on the outer arc surface, and the steel plate is located above the steel mesh.
[0012] Preferably, the skeleton structure includes I-beams arranged in the circumferential direction and channel steels arranged along the periphery of the blocks and along the longitudinal direction of the tunnel.
[0013] Preferably, the top block comprises a skeleton structure and a steel plate arranged on the outer arc surface.
[0014] Preferably, it further comprises: an inverted arch block, the bottom surface of which is a curved surface identical to that of the bottom block, and the top surface of which is a flat surface.
[0015] According to the above description and practice, in the combined tunnel segment structure described in the utility model, each block is hexagonal, and staggered assembly is adopted when assembling into a ring. The installation space of the last block in a single ring is in an outward eight-shaped shape open to one end. Even if the blocks in the ring are deformed to a certain extent, the last block can be easily inserted to form a ring structure, which can avoid the situation where the conventional quadrilateral steel pipe segment cannot be installed due to local deformation. In addition, when the combined tunnel lining structure continues to be constructed forward, the number of single assembly blocks is three, which is easy to assemble and convenient for construction. It is easy to position and relatively accurate during assembly. The longitudinal bolts and annular bolts are relatively easy to install. The assembly construction stress is small and the longitudinal compaction is good. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the three-dimensional structure of a combined tunnel segment structure involved in one embodiment of the utility model.
[0017] Figure 2 It is a schematic diagram of the three-dimensional structure after a plurality of combined tunnel segment structures involved in one embodiment of the utility model are assembled together.
[0018] Figure 3 The present invention is a schematic diagram of the three-dimensional structure of a bottom block in a combined tunnel segment structure according to an embodiment of the present invention.
[0019] Figure 4 It is a schematic diagram of the three-dimensional structure of a side lower block in a combined tunnel segment structure involved in an embodiment of the utility model.
[0020] Figure 5 It is a schematic diagram of the three-dimensional structure of the upper side block in the combined tunnel segment structure involved in one embodiment of the utility model.
[0021] Figure 6 The present invention is a schematic diagram of the three-dimensional structure of a top block in a combined tunnel segment structure according to an embodiment of the present invention.
[0022] Figure 7 The utility model is a top view of a top block in a combined tunnel segment structure according to an embodiment of the utility model.
[0023] The reference numerals in the figure are:
[0024] 11. Bottom block 12. Lower side block 13. Upper side block
[0025] 14, top block 15, invert block 21, first joint surface
[0026] 22, second joint surface 31, raised portion 32, recessed portion
[0027] 41. Shell 42. Concrete 51. I-beam
[0028] 52. Channel steel 53. Steel mesh 54. Steel plate DETAILED DESCRIPTION
[0029] The exemplary embodiments will now be described more fully with reference to the accompanying drawings. However, the exemplary embodiments can be implemented in many forms and should not be construed as limited to the examples set forth herein; rather, these embodiments are provided so that the disclosure will be more comprehensive and complete and fully convey the concepts of the exemplary embodiments to those skilled in the art. The described features, structures, or characteristics may be combined in any suitable manner in one or more embodiments.
[0030] In addition, the accompanying drawings are only schematic diagrams of the present disclosure and are not necessarily drawn to scale. The same reference numerals in the figures represent the same or similar parts, and thus their repeated descriptions will be omitted. It should be noted that in the present disclosure, the terms "including", "configured with", and "set in" are used to express the meaning of open-ended inclusion, and mean that in addition to the listed elements / components / etc., there may be other elements / components / etc.; the terms "first", "second", etc. are only used as marks, and are not restrictions on the number or order of their objects; the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate the orientation or position relationship based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the utility model.
[0031] Unless otherwise clearly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this utility model can be understood according to specific circumstances.
[0032] This embodiment discloses a combined tunnel segment structure, which can take into account the advantages of traditional segment through-seam splicing and staggered splicing when splicing and installing in the tunnel, while avoiding the disadvantages of both to a certain extent. Figure 1-Figure 7 The combined tunnel segment structure in this embodiment mainly includes a bottom block 11 at the bottom, two side lower blocks 12 at both sides of the lower part, two side upper blocks 13 at both sides of the upper part and a top block 14 at the top, a total of six blocks, and the six blocks are spliced together in sequence to form an annular segment structure.
[0033] In the six blocks, each block is provided with a first splicing surface 21 and a second splicing surface 22 at both ends along the circumferential direction, and the angle between the adjacent first splicing surfaces 21 and the second splicing surfaces 22 on each block is 60°-150°. In the six blocks, any first splicing surface 21 abuts against the second splicing surface 22 adjacent to the circumferential direction, and the lengths of the abutting first splicing surface 21 and the second splicing surface 22 are the same. In other words, the six blocks are not completely on the same loop line along the circumferential direction, but are staggered to a certain extent. Figure 2Taking the splicing surface at the right end of one of the bottom blocks 11 as an example, the first splicing surface 21 abuts against the second splicing surface 22 of the two side lower blocks 12 on the right side, which is closer to the left side lower block 12; the second splicing surface 22 abuts against the first splicing surface 21 of the two side lower blocks 12 on the right side, which is closer to the right side lower block 12.
[0034] That is, in actual application, one end of a bottom block 11 will be connected to two adjacent side lower blocks 12, and the entire bottom block 11 will be connected to four adjacent side lower blocks 12. For the other side lower blocks 12, side upper blocks 13 and top blocks 14, any block that is not at the two ends in the longitudinal direction will be connected to four adjacent blocks. Figure 2 As shown in the assembly effect, the longitudinal installation seam is a continuously bent structure, which is different from the installation seams formed by traditional through-seam splicing and staggered seam splicing. The longitudinal direction here refers to the length direction of the tunnel.
[0035] in addition, Figure 2 Also shown is an inverted arch block 15 located above the bottom block 11. The inverted arch block 15 can be prefabricated and directly installed at the bottom of the combined tunnel lining structure to complete the installation process of the inverted arch block. Specifically, the bottom surface of the inverted arch block 15 is the same arc surface as the bottom block 11, and the top surface is a plane. Pre-reserved holes for embedding reinforcement of the later secondary lining are reserved at both ends of the inverted arch block 15 to facilitate the construction of the secondary lining. Connectors are reserved at appropriate positions on the outer sides of the two ends of the inverted arch block 15 so that the inverted arch block and the secondary lining of the later tunnel form a whole.
[0036] With the above-mentioned segment blocks and the continuously bent installation seams, only the positioning of the first bottom block 11 at the starting position is relatively complicated during assembly, while the positioning of the remaining blocks is easy and accurate during assembly, the longitudinal bolts and the annular bolts are easy to install, the assembly construction stress is small, and the longitudinal compaction is good. Finally, multiple segment structures are spliced together to form a support structure with good integrity and a flat and stable annular surface in the tunnel.
[0037] In this embodiment, the front and rear ends of the bottom block 11 are formed with protrusions 31 and / or recesses 32 of the same shape, which are relative to the tunneling direction, so that two adjacent bottom blocks 11 can be quickly aligned and connected together, thereby improving the assembly speed. Figure 3As shown, a recessed portion 32 is provided at the front end of the bottom block 11, and a raised portion 31 is provided at the rear end, and the raised portion 31 and the recessed portion 32 have the same shape. After the first bottom block 11 is positioned, the raised portion 31 of the subsequent bottom block 11 can be inserted into the recessed portion 32 at its front end, so that the subsequent bottom block 11 can be positioned quickly, and then the adjacent side lower block 12 can be quickly positioned between the side ends of the two bottom blocks 11, which can further improve the assembly efficiency of the combined tunnel segment structure. In other embodiments, the front end of the bottom block 11 can also be provided with a plurality of recessed portions 32 and / or raised portions 31, and the corresponding raised portions 31 and / or recessed portions 32 are provided at the rear end, so that two adjacent bottom blocks 11 can be quickly and tightly connected.
[0038] Furthermore, in this embodiment, the bottom block 11 includes a shell 41 formed by splicing steel plates and concrete 42 filled therein. The upper end of the shell 41 is open to fill the interior with concrete 42. The bottom block 11 of this structural form has a certain strength before installation in the tunnel, will not be significantly deformed during transportation and installation, and can provide relatively stable support for adjacent blocks, ensuring that the splicing operation can be completed smoothly.
[0039] A hoisting hole matching the assembling machine is reserved at the upper end of the bottom block 11, so the bottom block 11 can be installed with TBM equipment, which can further improve the assembly efficiency. Bolt holes for splicing with adjacent blocks are provided on the side of the bottom block 11. Each block is connected by bolts, which can not only increase the installation speed, but also facilitate later maintenance. In other embodiments, the connection between each block is not limited to bolt connection. Other existing connection methods, such as clamping, welding, etc., can be applied to the connection between each block as long as a stable ring structure can be formed.
[0040] In this embodiment, the side lower block 12 includes a skeleton structure and a steel mesh 53 arranged on the outer arc surface. The skeleton structure can provide the main support for the segment structure, and the steel mesh 53 can improve its own bonding strength with the subsequent concrete. In addition, compared with the prefabricated concrete block as a single segment, this type of side lower block 12 has a certain strength and is also easy to transport and install due to its light weight. Specifically, the skeleton structure includes an I-beam 51 arranged along the circumference of the block and a channel steel 52 arranged along the outer periphery of the block and along the longitudinal direction of the tunnel. Among them, the I-beam 51 serves as the main supporting structure, and the channel steel 52 serves as a stiffening rib. The side lower block 12 of this structural form can also be applied to the auxiliary thrust system of the TBM to provide support for the hydraulic rod along the longitudinal direction of the tunnel.
[0041] Similarly, in this embodiment, the upper side block 13 includes a skeleton structure and a steel plate 54 and a steel mesh 53 arranged on the outer arc surface, and the steel plate 54 thereon is located above the steel mesh 53. The top block 14 includes a skeleton structure and a steel plate 54 arranged on the outer arc surface. The skeleton structures on the two blocks also include an I-beam 51 arranged along the circumference and a channel steel 52 arranged along the outer periphery of the block and along the longitudinal direction of the tunnel, and can achieve the above-mentioned effects.
[0042] Steel plates 54 are provided on the periphery of the top block 14 and the upper part of the periphery of the upper side block 13 instead of the steel mesh 53. On the one hand, it can prevent the occurrence of rockfall in the tunnel. On the other hand, the upper part of the support structure formed by the segment structure in the tunnel does not need to be sprayed subsequently, and only the spraying is required in the area with the steel mesh 53, which can simplify the construction procedure and improve the construction efficiency.
[0043] The combined tunnel segment structure disclosed in the present invention is further described below with a specific embodiment. In this embodiment, the shell 41 of the bottom block 11 is welded from a 12 mm thick steel plate, with an outer diameter of 4.4 m and an inner diameter of 4.0 m. The welded steel shell 41 is filled with C30 plain concrete, and a hoisting hole is reserved in the middle part in combination with the structure of the assembly machine, and bolt holes for the lower and side steel segments are reserved on both sides.
[0044] One end of the two side lower blocks 12 is bolted to the bottom block 11, and the other end is bolted to the side upper block 13. In the skeleton structure of the side lower block 12, the main support is made of I14 I-steel, and the reinforcing rib is made of [14 channel steel bent and welded. The outer arc surface of its skeleton structure is welded firmly with φ10@100*100 steel mesh. The lower ends of the two side upper blocks 13 are bolted to the side lower block 12, and the upper end of the side upper block 13 is bolted to the top block 14. In the skeleton structure of the side upper block 13, the main support is made of I14 I-steel, and the reinforcing rib is made of [14 channel steel bent and welded. The lower 1 / 2 area of the outer arc surface of its skeleton structure is welded firmly with φ10@100*100 steel mesh, and the upper 1 / 2 area of the outer arc surface of the skeleton is welded firmly with a 10mm thick steel plate. The top block 14 is bolted to the side upper block 13 on both sides. The main support of the skeleton structure of the top block 14 is made of I14 I-beam, and the reinforcing rib is made of [14 channel steel bent and welded. The entire area of the outer arc surface of the skeleton structure is welded firmly with a 10mm thick steel plate.
[0045] In this embodiment, except for the bottom block 11, the other blocks are in a hexagonal structure as a whole, and the two sides of the front and rear ends are parallel and have the same length along the circumferential direction. The two ends along the circumferential direction are the first splicing surface 21 and the second splicing surface 22 of the same length, and the angle between the two is 120°, which can form the above-mentioned continuous bending installation seam. On this basis, the bottom block 11 is also provided with a recessed portion 32 and a raised portion 31 at the front and rear ends, respectively, to facilitate the connection of two adjacent bottom blocks 11 together.
[0046] It should be noted that in this embodiment, each block is provided with a structure that is a combination of a steel plate 54 and concrete 42, or a structure that is a combination of a steel skeleton, a steel mesh 53, and later concrete, or a structure that is a combination of a steel skeleton and a steel plate 54, so as to achieve different specific effects at different locations. In other embodiments, each block may also be a prefabricated concrete component, as long as the structural setting of the first splicing surface 21 and the second splicing surface 22 is met, a continuously bent construction joint can be achieved, and the corresponding technical effect can be achieved.
[0047] The combined tunnel segment structure adopts staggered assembly, and each block is roughly in the form of a hexagon. When it is assembled into a ring, the installation space of the last block is in an outward eight-shaped shape that is open to one end. Even if the blocks in the ring are deformed to a certain extent, the last block can be easily inserted to form a ring structure. In contrast, if the conventional quadrilateral steel pipe segment is locally deformed, it is difficult to insert the last block into the installation space. Therefore, the combined tunnel segment structure can avoid the situation where the conventional quadrilateral steel pipe segment cannot be installed due to local deformation. The combined tunnel segment structure has three blocks for assembly at a time, which is easy to assemble and convenient for construction. It is easy to position during assembly, and the positioning is relatively accurate. The longitudinal bolts and annular bolts are relatively easy to install. The assembly construction stress is small and the longitudinal compaction is good. At the same time, the bottom block is composed of steel plate and concrete, with high compressive strength, which can provide local propulsion reaction force for TBM to meet the excavation requirements.
[0048] In addition, when a plurality of the above-mentioned combined tunnel segment structures are continuously spliced together to form a larger support structure, in the process of continuous forward assembly, as the TBM advances forward, for example, after 0.9m of excavation, three installation positions of the blocks will first appear (i.e., the portion that is recessed longitudinally backward in the single ring lining structure), and then the corresponding blocks will be assembled at the position to achieve the purpose of longitudinal extension of the combined tunnel lining structure. In the forward construction process, the number of blocks assembled at a time is three, which is easy to assemble and construct, and the positioning is easy and accurate during assembly, the longitudinal bolts and annular bolts are relatively easy to install, the assembly construction stress is small, and the longitudinal compaction is good.
[0049] In addition, the combined tunnel segment structure is particularly suitable for the tunnel excavation process of an open TBM, for situations where poor geological sections are encountered during the excavation process. For example, when encountering soft bedrock that is prone to collapse, or hard bedrock that is prone to rock bursts, the above-mentioned combined tunnel segment structure can be constructed in this section to replace the reinforced concrete support structure, and support can be quickly formed in this section to avoid collapse and rock bursts. Moreover, the combined tunnel segment structure itself has a high compressive strength in the longitudinal direction, and can provide a support point for the auxiliary propulsion system of the TBM equipment for excavation. During the tunnel excavation process, the support shoe in the main propulsion system does not need to be tightly pressed against the inner wall of the segment structure, but only relies on the oil cylinder in the auxiliary propulsion system to be tightly pressed against the front end face of the segment structure to achieve forward excavation. While ensuring normal excavation, the main body of the combined tunnel segment structure will not be damaged.
[0050] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention, and any figure mark in the claims should not be regarded as limiting the claims involved.
Claims
1. A combined tunnel segment structure, characterized in that: It comprises a bottom block, two side lower blocks, two side upper blocks and a top block, a total of six arc-shaped blocks, and the six blocks are sequentially spliced together to form an annular pipe segment structure; wherein Each of the blocks is provided with a first splicing surface and a second splicing surface at both ends along the circumferential direction, and the angle between the first splicing surface and the second splicing surface is 60°-150°. Any first splicing surface is abutted against the second splicing surface adjacent to the circumferential direction, and the lengths of the abutting first splicing surface and the second splicing surface are the same.
2. The combined tunnel segment structure according to claim 1, characterized in that: The front and rear ends of the bottom block are formed with raised parts and / or recessed parts of the same shape.
3. The combined tunnel segment structure according to claim 1, characterized in that: The bottom block comprises a shell formed by splicing steel plates and concrete filled therein.
4. The combined tunnel segment structure according to claim 3, characterized in that: The upper end of the bottom block is reserved with a hoisting hole matching the assembling machine; Bolt holes for splicing with adjacent blocks are provided on the side.
5. The combined tunnel segment structure according to claim 1, characterized in that: The side lower block comprises a skeleton structure and a steel mesh arranged on the outer arc surface.
6. The combined tunnel segment structure according to claim 5, characterized in that: The skeleton structure includes I-beams arranged along the circumferential direction and channel steels arranged along the outer periphery of the block and along the longitudinal direction of the tunnel.
7. The combined tunnel segment structure according to claim 1, characterized in that: The side upper block comprises a skeleton structure and a steel plate and a steel mesh arranged on the outer arc surface, and the steel plate is located above the steel mesh.
8. The combined tunnel segment structure according to claim 7, characterized in that: The skeleton structure includes I-beams arranged along the circumferential direction and channel steels arranged along the outer periphery of the block and along the longitudinal direction of the tunnel.
9. The combined tunnel segment structure according to claim 1, characterized in that: The top block comprises a skeleton structure and a steel plate arranged on the outer arc surface.
10. The combined tunnel segment structure according to any one of claims 1 to 9, characterized in that: Also includes: The inverted arch block has a bottom surface which is the same arc surface as the bottom block, and a top surface which is a plane.
Citation Information
Cited By
Combined tunnel lining structure and construction method
CN118187917A
Concrete subway segment and combined connecting structure thereof
CN119352991A
A concrete subway pipe segment and its combined connection structure
CN119352991B
Tunnel spiral lining based on hexagonal duct pieces and continuous tunneling construction method
CN121088426A