Pile foundation project management system based on BIM technology

By introducing components such as main body, control panel, main controller and model placement rack into the pile foundation engineering management system based on BIM technology, the inconvenience of the existing system in observation and control is solved, and the practicality and safety of the device are improved. , achieving more efficient management and operation.

CN222014695UActive Publication Date: 2024-11-15GUANGZHOU RAPID TRANSIT CONSTR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420597326.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-26
Publication Date
2024-11-15
Estimated Expiration
2034-03-26

AI Technical Summary

Technical Problem

The existing pile foundation engineering management system based on BIM technology is inconvenient for observation and control when used, the device management and practicality are low, and the control violation is strong.

Method used

A management system including the main body, control panel, main controller, model placement rack and reinforced column was designed. Through the coordinated arrangement of these components, the ease of control and management of the device is increased, and the reinforced column and model placement rack are used to The arrangement improves the stability and observability of the device.

Benefits of technology

The device is easy to control and manage, and the device is increased, the device is practical and safe, the model is stable and controllable, and the overall operation convenience and safety are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222014695U_ABST
    Figure CN222014695U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of pile foundation engineering management systems, and discloses a BIM (Building Information Modeling) technology-based pile foundation engineering management system which comprises a control panel of which one side is fixedly provided with a main body, one side of the main body is fixedly provided with a model placing frame for placing, and the bottom of the model placing frame is fixedly provided with a reinforcing column for supporting; and a main controller for displaying is fixedly mounted at the top of the main body. According to the management system of the pile foundation engineering based on the BIM technology, through arrangement of the reinforcing columns and the model placement frame, the device can be more convenient to compare and detect during use, through arrangement of the reinforcing columns, the bottom of the device can be more stable, the practicability and safety of the device are improved, and a model at the top is prevented from collapsing; a building model can be placed, so that the device is more convenient to observe, the controllability of the device is improved, and the device can be more convenient to control during use through cooperative arrangement of the main body, the control panel and the main controller.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pile foundation engineering management systems, in particular to a management system for pile foundation engineering based on BIM technology. Background Art

[0002] The pile foundation project management system based on BIM technology is a system that uses BIM technology to provide management and coordination for pile foundation projects. Through this system, the design, construction and monitoring of pile foundation projects can be integrated and collaboratively managed to improve the efficiency and quality of the project.

[0003] Chinese patent announcement No. CN210491365U discloses a construction engineering management system platform based on BIM network technology, wherein the back of the lock is fixedly connected to the middle part of the bottom surface of the upper box body, the back of the sleeve block is fixedly connected to the middle part of the top surface of the lower box body, the right ends of the two support rods are respectively fixedly connected to the left top and bottom of the sleeve block, the top and bottom of the right side of the connecting plate are respectively fixedly connected to the left ends of the two support rods, and the left end of the support plate is fixedly connected to the middle part of the right side of the connecting plate. The construction engineering management system platform based on BIM network technology provided by the utility model has the function of buffering and protecting the display screen. At the same time, silica gel has good thermal conductivity, can dissipate heat, improve the performance of the management system platform, lock stably, not easy to loosen, simple to operate, easy to use, protect the management system platform, enhance the safety of carrying, and the pop-up component automatically pops up the upper box body for easy use.

[0004] However, the utility model has the following problems when actually used:

[0005] 1. The utility model is not convenient for observation during use, the device management is more inconvenient, and the device is not practical;

[0006] 2. The utility model is not easy to control when in use, the control of the device is highly inconsistent, and its practicality is low. Utility Model Content

[0007] 1. Technical issues to be resolved

[0008] In order to overcome the above-mentioned defects of the prior art, the utility model provides a management system for pile foundation engineering based on BIM technology, which solves the following problems in the prior art:

[0009] 1. The utility model is not convenient for observing the model when in use, the device management is more inconvenient, and the device is not practical;

[0010] 2. The utility model is not easy to control when in use, the control of the device is highly inconsistent, and the practicality is low.

[0011] (II) Technical solution

[0012] To achieve the above objectives, the utility model is implemented through the following technical solutions: a management system for pile foundation engineering based on BIM technology, comprising a control panel with a main body fixedly installed on one side, a model placement rack for placing is fixedly installed on one side of the main body, a reinforcement column for support is fixedly installed on the bottom of the model placement rack, and a main controller for display is fixedly installed on the top of the main body.

[0013] Optionally, a placement cabinet for opening and closing is fixedly installed on one side of the main body, and a master controller for controlling is fixedly connected to the top of the main body.

[0014] Optionally, a keyboard for manipulation is fixedly mounted on the top of the control panel, and a pull groove for pulling is provided on one side of the control panel.

[0015] Optionally, limit blocks for fixing are fixedly installed on both sides of the model placement frame, and a soil-raising groove for stabilization is opened in the middle of the model placement frame.

[0016] Optionally, an expansion screw for fixing is fixedly installed on the top of the reinforcement column, and a fixing seat for stabilization is fixedly installed on the bottom of the reinforcement column.

[0017] Optionally, a heat dissipation valve for heat dissipation is fixedly installed on the top of the main controller, and a screen for display is provided on one side of the main controller.

[0018] (III) Beneficial effects

[0019] The utility model provides a management system for pile foundation engineering based on BIM technology, which has the following features:

[0020] Beneficial effects:

[0021] 1. The management system of the pile foundation project based on BIM technology can make the device easier to control and increase the management convenience of the device during use through the coordinated setting of the main body, control panel and main controller. The setting of the main body can make the device easier to operate and increase the practicality of the device during use. At the same time, the coordination of the control panel and the main controller can make the device easier to control and increase the manageability of the device.

[0022] 2. The management system of the pile foundation project based on BIM technology can make the device easier to compare and detect during use through the coordinated setting of reinforcement columns and model placement racks. The setting of reinforcement columns can make the bottom of the device more stable, increase the practicability and safety of the device, and prevent the top model from collapsing. At the same time, the setting of the model placement rack can place the building model, making the device easier to observe and increasing the controllability of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the structure of the utility model;

[0024] Figure 2 This is a schematic diagram of the explosion structure of the utility model;

[0025] Figure 3 This is a schematic diagram of the structure of the placement cabinet of the utility model;

[0026] Figure 4 This is a schematic diagram of the keyboard structure of the utility model;

[0027] Figure 5 This is a schematic diagram of the structure of the reinforcement column of the utility model.

[0028] In the figure: 1. Main body; 2. Control panel; 3. Model placement rack; 4. Reinforcement column; 5. Main controller; 6. Placement cabinet; 7. Master control; 8. Keyboard; 9. Groove; 10. Limit block; 11. Soil groove; 12. Expansion screw; 13. Fixing seat; 14. Heat dissipation valve; 15. Screen. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0030] Embodiment 1:

[0031] See also Figure 1 , the utility model provides a technical solution: a management system for pile foundation engineering based on BIM technology, in order to make the device easier to control when in use, a device control panel 2 and a main controller 5 are provided;

[0032] The device comprises a control panel 2 with a main body 1 fixedly mounted on one side, a main controller 5 for display fixedly mounted on the top of the main body 1, a keyboard 8 for operation fixedly mounted on the top of the control panel 2, a pull groove 9 for pulling is provided on one side of the control panel 2, a heat dissipation valve 14 for heat dissipation is fixedly mounted on the top of the main controller 5, and a screen 15 for display is provided on one side of the main controller 5. Therefore, when in use, the keyboard 8 can make the device more convenient to operate the device, and the heat dissipation valve 14 on the top can make the device more convenient to dissipate heat and more convenient to use. At the same time, the screen 15 can observe the changes of the device, thereby increasing the practicality of the device.

[0033] Embodiment 2:

[0034] See also Figure 1 and Figure 5In order to make the device more convenient to observe the model when in use and to make the device easier to manage, a device model placement rack 3 and a reinforcement column 4 are provided;

[0035] A reinforcement column 4 for support is fixedly installed at the bottom of the model placement frame 3, and limit blocks 10 for fixation are fixedly installed on both sides of the model placement frame 3. A soil-building groove 11 for stabilization is opened in the middle of the model placement frame 3, and an expansion screw 12 for fixation is fixedly installed on the top of the reinforcement column 4. A fixing seat 13 for stabilization is fixedly installed at the bottom of the reinforcement column 4. Therefore, when in use, the limit block 10 can fix the device to ensure that the device will not fall. At the same time, the soil-building groove 11 can place the model of the building to increase the stability of the model. In addition, the expansion screws 12 at the bottom cooperate with the fixing seat 13 to make the bottom of the device more stable and increase the practicality of the device.

[0036] Embodiment three:

[0037] See also Figure 2 In order to make the device easier to control and easier to observe during use, a device body 1 is provided;

[0038] It includes a control panel 2 with a main body 1 fixedly installed on one side, a placement cabinet 6 for opening and closing fixedly installed on one side of the main body 1, and a master control 7 for control fixedly connected to the top of the main body 1. Therefore, the placement cabinet 6 can make the device more convenient to place the internal devices. At the same time, the master control 7 can be used to control the entire device, thereby increasing the practicality of the device.

[0039] The electrical components mentioned in this article are all connected to an external main controller and 220V mains electricity, and the main controller can be a conventional known device for controlling a computer or the like.

[0040] In the utility model, the working steps of the device are as follows:

[0041] First, use the main body 1 and the control panel 2 for installation to ensure that the device is easier to control when in use. At the same time, the model placement rack 3 can be used to place the model of the building to increase the practicality of the device. At the same time, the reinforcement column 4 at the bottom can stabilize the device and increase the safety of the device. Finally, check whether the device is installed correctly. If there is no problem, it can be used.

[0042] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A management system for pile foundation engineering based on BIM technology, comprising a control panel (2) with a main body (1) fixedly mounted on one side, characterized in that: A model placement rack (3) for placing is fixedly mounted on one side of the main body (1), a reinforcement column (4) for supporting is fixedly mounted on the bottom of the model placement rack (3), and a main controller (5) for display is fixedly mounted on the top of the main body (1).

2. According to the management system of pile foundation engineering based on BIM technology in claim 1, it is characterized by: A placement cabinet (6) for opening and closing is fixedly installed on one side of the main body (1), and a master control (7) for controlling is fixedly connected to the top of the main body (1).

3. According to the management system of pile foundation engineering based on BIM technology as claimed in claim 1, it is characterized by: A keyboard (8) for operation is fixedly mounted on the top of the control panel (2), and a pull groove (9) for pulling is provided on one side of the control panel (2).

4. The management system for pile foundation engineering based on BIM technology according to claim 1, characterized in that: Limiting blocks (10) for fixing are fixedly installed on both sides of the model placement frame (3), and a soil-raising groove (11) for stabilization is provided in the middle of the model placement frame (3).

5. The management system for pile foundation engineering based on BIM technology according to claim 1 is characterized by: An expansion screw (12) for fixing is fixedly installed on the top of the reinforcement column (4), and a fixing seat (13) for stabilization is fixedly installed on the bottom of the reinforcement column (4).

6. The management system for pile foundation engineering based on BIM technology according to claim 1 is characterized by: A heat dissipation valve (14) for dissipating heat is fixedly mounted on the top of the main controller (5), and a screen (15) for display is provided on one side of the main controller (5).