Pipeline leaking stoppage test device with independent pipeline liquid control structure

By designing a separate pipeline liquid control structure and mobile components in the pipeline leakage plugging test device, the problem of frequent equipment replacement during pipe training with different diameters is solved, which improves training efficiency and reduces costs, and achieves efficient damage training for pipes of different sizes .

CN222014888UActive Publication Date: 2024-11-15WUHU HAITONG SHIPBUILDING TECH CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202420576491.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-25
Publication Date
2024-11-15
Estimated Expiration
2034-03-25

AI Technical Summary

Technical Problem

When handling pipes of different diameters, existing pipeline leak plugging test devices require frequent replacement of equipment, resulting in high time cost, low efficiency, and increased purchase cost.

Method used

A pipeline leakage plugging test device with a separate pipeline liquid control structure was designed. By setting up multiple experimental pipes and valve pipes, the connecting components and mobile components were used to achieve separate damage training for different pipelines, reducing the number of equipment replacements, and passing through tens of thousands of yuan. The wheel facilitates the device to move.

Benefits of technology

It improves training efficiency, reduces the purchase cost of the test device, realizes efficient damage training for pipes of different sizes, and enhances the practicality of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222014888U_ABST
    Figure CN222014888U_ABST
Patent Text Reader

Abstract

The utility model discloses a pipeline leaking stoppage test device with an independent pipeline liquid control structure, which comprises a connecting pipe, a leaking stoppage test mechanism is arranged on the outer side of the connecting pipe and is used for simulating the damage condition of a naval vessel pipeline, and the pipeline leaking stoppage test device relates to the technical field of pipeline leaking stoppage test devices. According to the pipeline leaking stoppage test device with the independent pipeline liquid control structure, damage training can be independently carried out through the first test pipe, the second test pipe and the third test pipe, and when the pipeline leaking stoppage test device is used, hot water and steam are discharged into the first valve pipe, the second valve pipe, the third valve pipe and the third test pipe through the connecting assemblies; during use, the first valve pipe is opened to enable water flow to be injected into the first experiment pipe for breakage training, when replacement is needed, the first valve pipe is closed, the third valve pipe is opened to enable water flow to be injected into the second experiment pipe for breakage training, then the third valve pipe is closed, the fourth valve pipe is opened to enable water flow to be injected into the third experiment pipe for breakage training, and efficiency is improved. And the acquisition cost of the test device is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pipeline plugging test devices, in particular to a pipeline plugging test device with a separate pipeline liquid control structure. Background Art

[0002] The pipeline plugging test device is used to simulate the damage condition of ship pipelines and is a device for daily training personnel's bandaging and plugging capabilities.

[0003] The existing pipeline plugging test device still has the following problems. In real life, the operations for plugging leaks in pipelines of different diameters will be different, and the existing test device generally uses a fixed diameter pipeline for damage training. When it is necessary to conduct damage training on pipelines of different sizes, it is necessary to replace the experimental equipment, or set up different pipeline equipment for training at the same time.

[0004] However, the existing devices of the above technology need to be replaced back and forth when performing damage training on different pipelines, which has high time cost and low efficiency. In addition, the experimental equipment needs to be replaced for damage training on pipelines of different sizes, which increases the purchase cost of the test device. Utility Model Content

[0005] In view of the deficiencies in the prior art, the utility model provides a pipeline leak testing device with a separate pipeline liquid control structure, which solves the problem that the existing pipeline leak testing device with a separate pipeline liquid control structure needs to be replaced back and forth when conducting damage training on different pipelines, which has high time cost and low efficiency, and the experimental equipment needs to be replaced for pipelines of different sizes, which increases the purchase cost of the test device.

[0006] To achieve the above purpose, the utility model is implemented by the following technical scheme: a pipeline plugging test device with a separate pipeline liquid control structure includes a connecting pipe, and a plugging test mechanism is arranged on the outside of the connecting pipe to simulate the damage condition of the ship pipeline. The plugging test mechanism includes:

[0007] A connection assembly is arranged at both ends of the connection pipe to control the flow of liquid into the pipeline for subsequent damage training, the connection assembly comprises a first side pipe fixedly installed on the left end of the connection pipe, a second side pipe fixedly installed on the right side of the connection pipe, and a bottom pipe fixedly installed on the bottom end of the second side pipe;

[0008] A control component is arranged on the top surface of the connecting pipe and is used to control the flow of liquid into a certain pipeline for damage training. A first valve pipe is fixedly installed on the top of the first side pipe, a first experimental pipe is fixedly installed on the top of the first valve pipe, a first blocking plate is fixedly installed on the right end of the first experimental pipe, a second experimental pipe is fixedly installed on the right side of the first blocking plate, a second blocking plate is fixedly installed on the right side of the second experimental pipe, a third experimental pipe is fixedly installed on the right side of the second blocking plate, a fourth valve pipe is fixedly installed on the right end of the third experimental pipe, a second valve pipe is fixedly installed on the bottom surface of the first experimental pipe, and a third valve pipe is fixedly installed on the bottom surface of the second experimental pipe;

[0009] The moving assembly is arranged at the bottom end of the bottom tube for facilitating the movement of the device.

[0010] Preferably, the bottom ends of the second valve tube and the third valve tube both penetrate the top surface of the connecting tube and extend to the inside of the connecting tube.

[0011] Preferably, the bottom end of the fourth valve tube is fixedly mounted on the top end of the second side tube.

[0012] Preferably, the connecting assembly also includes a high-temperature ball valve fixedly installed on the right side of the second side tube, a first equal-diameter tee pipe is fixedly installed on the bottom end of the first side tube, and a flange stop valve is fixedly installed on the left side of the first equal-diameter tee pipe.

[0013] Preferably, the moving assembly also includes a mounting frame fixedly mounted on the bottom end of the bottom tube, two 90-degree equal-diameter elbows are fixedly mounted on both the front and rear sides of the first side tube, and universal wheels are fixedly mounted on the bottom surfaces of the two 90-degree equal-diameter elbows.

[0014] Preferably, the left side of the top surface of the mounting frame is fixedly mounted on the bottom end of the first equal-diameter tee pipe, and the right side of the top surface of the mounting frame is fixedly mounted on the bottom end of the bottom pipe.

[0015] Beneficial Effects

[0016] The utility model provides a pipeline plugging test device with a separate pipeline liquid control structure. Compared with the prior art, it has the following beneficial effects:

[0017] (1) The pipeline plugging test device with a separate pipeline liquid control structure can perform damage training separately through the first test tube, the second test tube and the third test tube. When in use, hot water and steam are discharged into the first valve tube, the second valve tube, the third valve tube and the third test tube through the connecting component. When the first test tube needs to be damaged, the first valve tube is opened to allow water to flow into the first test tube for damage training. When the second test tube needs to be damaged, the first valve tube is closed and the third valve tube is opened to allow water to flow into the second test tube for damage training. When the third test tube needs to be damaged, the third valve tube is closed and the first valve tube is opened to allow water to flow into the first test tube for damage training. Damage training can be performed without replacing the valves back and forth, thereby improving efficiency and reducing the purchase cost of the test device.

[0018] (2) The pipeline plugging test device with a separate pipeline liquid control structure is convenient to move through the universal wheels. When in use, the device can be pushed to a suitable position for damage training through the universal wheels, which is easy to move and has good practicality. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a three-dimensional appearance schematic diagram of the utility model;

[0020] Figure 2 This is a three-dimensional schematic diagram of the appearance of the connection assembly of the utility model;

[0021] Figure 3 This is a three-dimensional schematic diagram of the control component of the utility model;

[0022] Figure 4 It is a schematic diagram of the three-dimensional appearance of the mobile component of the utility model.

[0023] In the figure: 1-connecting pipe, 2-leakage plugging test mechanism, 21-connecting assembly, 211-flange stop valve, 212-first equal-diameter tee, 213-first side pipe, 214-bottom pipe, 215-second side pipe, 216-high-temperature ball valve, 22-control assembly, 221-first valve pipe, 222-first test pipe, 223-second valve pipe, 224-first plugging plate, 225-second test pipe, 226-third valve pipe, 227-second plugging plate, 228-third test pipe, 229-fourth valve pipe, 23-moving assembly, 231-mounting frame, 232-universal wheel, 233-ninety-degree equal-diameter elbow. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] The utility model provides two technical solutions:

[0026] Figure 1-Figure 3 The first embodiment is shown: a pipeline plugging test device with a separate pipeline liquid control structure includes a connecting pipe 1, and a plugging test mechanism 2 is arranged on the outside of the connecting pipe 1 to simulate the damage condition of the ship pipeline. The plugging test mechanism 2 includes:

[0027] The connection assembly 21 is arranged at both ends of the connection pipe 1 to control the liquid to flow into the pipeline for subsequent damage training. The connection assembly 21 includes a first side pipe 213 fixedly installed on the left end of the connection pipe 1, a second side pipe 215 fixedly installed on the right side of the connection pipe 1, and a bottom pipe 214 fixedly installed at the bottom end of the second side pipe 215;

[0028] The control component 22 is arranged on the top surface of the connecting pipe 1 and is used to control the flow into a certain pipeline for damage training. The top of the first side pipe 213 is fixedly installed with a first valve pipe 221, and the top of the first valve pipe 221 is fixedly installed with a first experimental pipe 222. The right end of the first experimental pipe 222 is fixedly installed with a first blocking plate 224, and the right side of the first blocking plate 224 is fixedly installed with a second experimental pipe 225. The right side of the second experimental pipe 225 is fixedly installed with a second blocking plate 227, and the second experimental pipe 225 can be separated by the first blocking plate 224 and the second blocking plate 227 to facilitate separate experiments. The right side of the second blocking plate 227 is fixedly installed with a third experimental pipe 228, and the right end of the third experimental pipe 228 is fixedly installed with a fourth valve pipe 229. The bottom surface of the first experimental pipe 222 is fixedly installed with a second valve pipe 223, and the bottom surface of the second experimental pipe 225 is fixedly installed with a third valve pipe 226;

[0029] The movable component 23 is arranged at the bottom end of the bottom tube 214 to facilitate the movement of the device. The bottom ends of the second valve tube 223 and the third valve tube 226 both pass through the top surface of the connecting tube 1 and extend to the interior of the connecting tube 1, and hot water and steam can be discharged into the interior of the second valve tube 223 and the third valve tube 226 through the connecting tube 1. The bottom end of the fourth valve tube 229 is fixedly installed on the top end of the second side tube 215, and hot water and steam can be discharged into the interior of the fourth valve tube 229 through the connecting tube 1.

[0030] The first experimental tube 222, the second experimental tube 225 and the third experimental tube 228 can be individually subjected to damage training. When in use, hot water and steam are discharged into the first valve tube 221, the second valve tube 223, the third valve tube 226 and the third experimental tube 228 through the connecting component 21. When the first experimental tube 222 needs to be subjected to damage training, the first valve tube 221 is opened to allow water to flow into the first experimental tube 222 for damage training. When the second experimental tube 225 needs to be subjected to damage training, the first valve tube 221 is closed and the third valve tube 226 is opened to allow water to flow into the second experimental tube 225 for damage training. When the third experimental tube 228 needs to be subjected to damage training, the third valve tube 226 is closed and the fourth valve tube 229 is opened to allow water to flow into the third experimental tube 228 for damage training. There is no need to replace the valves back and forth, which improves efficiency and reduces the purchase cost of the test device.

[0031] Figure 1-Figure 4 A second embodiment is shown, which mainly differs from the first embodiment in that: the connecting component 21 also includes a high-temperature ball valve 216 fixedly installed on the right side of the second side pipe 215, a first equal-diameter three-way pipe 212 is fixedly installed at the bottom end of the first side pipe 213, a flange stop valve 211 is fixedly installed on the left side of the first equal-diameter three-way pipe 212, and the discharge of steam and hot water can be controlled by the flange stop valve 211, the moving component 23 also includes a mounting frame 231 fixedly installed at the bottom end of the bottom pipe 214, two ninety-degree equal-diameter elbows 233 are fixedly installed on the front and rear sides of the first side pipe 213, and universal wheels 232 are fixedly installed on the bottom surfaces of the two ninety-degree equal-diameter elbows 233, and the device can be moved conveniently by the universal wheels 232, the left side of the top surface of the mounting frame 231 is fixedly installed on the bottom end of the first equal-diameter three-way pipe 212, and the right side of the top surface of the mounting frame 231 is fixedly installed on the bottom end of the bottom pipe 214.

[0032] The universal wheels 232 are provided to facilitate the movement of the device. When in use, the device can be pushed to a suitable position for damage training through the universal wheels 232, which is easy to move and has good practicality.

[0033] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art, and the model parameters of each electrical appliance are not specifically limited, and conventional equipment can be used.

[0034] When in use, the device can be pushed to a suitable position through the universal wheel 232, and then the flange stop valve 211 is connected to the pipeline. When conducting experiments, the first valve pipe 221 is opened to discharge hot water and steam into the first valve pipe 221, the second valve pipe 223, the third valve pipe 226 and the third experimental pipe 228 through the first side pipe 213, the connecting pipe 1 and the second side pipe 215. When the first experimental pipe 222 needs to be damaged, the first valve pipe 221 is opened to allow water to flow into the first experimental pipe 222 for damage training. When the second experimental pipe 225 needs to be damaged, the first valve pipe 221 is opened to allow water to flow into the first experimental pipe 222 for damage training. When performing damage training, close the first valve tube 221 and open the third valve tube 226 to allow water to flow into the interior of the second experimental tube 225 for damage training. When it is necessary to perform damage training on the third experimental tube 228, close the third valve tube 226 and open the fourth valve tube 229 to allow water to flow into the interior of the third experimental tube 228 to perform damage training. When it is necessary to perform damage training on the first experimental tube 222, the second experimental tube 225 and the third experimental tube 228 at the same time, it is only necessary to open the first valve tube 221, the second valve tube 223, the third valve tube 226 and the fourth valve tube 229 at the same time.

[0035] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include"-"comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process-method-article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process-method-article or device.

[0036] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A pipeline plugging test device with a separate pipeline liquid control structure, comprising a connecting pipe (1), characterized in that: The outer side of the connecting pipe (1) is provided with a leak-proof test mechanism (2) for simulating the damage condition of a ship pipeline. The leak-proof test mechanism (2) comprises: A connection assembly (21) is arranged at both ends of the connection pipe (1) and is used to control the flow of liquid into the pipeline for subsequent damage training, wherein the connection assembly (21) comprises a first side pipe (213) fixedly mounted on the left end of the connection pipe (1), a second side pipe (215) fixedly mounted on the right side of the connection pipe (1), and a bottom pipe (214) fixedly mounted on the bottom end of the second side pipe (215); A control component (22) is arranged on the top surface of the connecting pipe (1) and is used to control the flow of liquid into a certain pipeline for damage training. A first valve pipe (221) is fixedly installed on the top of the first side pipe (213), a first experimental pipe (222) is fixedly installed on the top of the first valve pipe (221), a first blocking plate (224) is fixedly installed on the right end of the first experimental pipe (222), a second experimental pipe (225) is fixedly installed on the right side of the first blocking plate (224), a second blocking plate (227) is fixedly installed on the right side of the second experimental pipe (225), a third experimental pipe (228) is fixedly installed on the right side of the second blocking plate (227), a fourth valve pipe (229) is fixedly installed on the right end of the third experimental pipe (228), a second valve pipe (223) is fixedly installed on the bottom surface of the first experimental pipe (222), and a third valve pipe (226) is fixedly installed on the bottom surface of the second experimental pipe (225); The moving assembly (23) is arranged at the bottom end of the bottom tube (214) to facilitate the movement of the device.

2. The pipeline plugging test device with a separate pipeline liquid control structure according to claim 1 is characterized in that: The bottom ends of the second valve tube (223) and the third valve tube (226) both penetrate the top surface of the connecting tube (1) and extend into the interior of the connecting tube (1).

3. The pipeline plugging test device with a separate pipeline liquid control structure according to claim 1 is characterized in that: The bottom end of the fourth valve tube (229) is fixedly mounted on the top end of the second side tube (215).

4. The pipeline plugging test device with a separate pipeline liquid control structure according to claim 1 is characterized in that: The connection assembly (21) further comprises a high-temperature ball valve (216) fixedly mounted on the right side of the second side pipe (215); a first equal-diameter tee pipe (212) is fixedly mounted on the bottom end of the first side pipe (213); and a flange stop valve (211) is fixedly mounted on the left side of the first equal-diameter tee pipe (212).

5. The pipeline plugging test device with a separate pipeline liquid control structure according to claim 1 is characterized in that: The moving assembly (23) further comprises a mounting frame (231) fixedly mounted on the bottom end of the bottom tube (214); two 90-degree equal-diameter elbows (233) are fixedly mounted on both the front and rear sides of the first side tube (213); and universal wheels (232) are fixedly mounted on the bottom surfaces of the two 90-degree equal-diameter elbows (233).

6. The pipeline plugging test device with a separate pipeline liquid control structure according to claim 5 is characterized in that: The left side of the top surface of the mounting frame (231) is fixedly mounted on the bottom end of the first equal-diameter three-way pipe (212), and the right side of the top surface of the mounting frame (231) is fixedly mounted on the bottom end of the bottom pipe (214).

Citation Information

Cited By

  • Petrochemical scene robot disposal operation simulation test platform and test method

    CN119927940A

  • A petrochemical scene robot disposal operation simulation test platform and test method

    CN119927940B