Device applied to linkage of secondary sedimentation tank and sludge storage tank

By designing a linkage device between the second sedimentation tank and the sludge storage tank, real-time monitoring and automatic control of sludge transport and suction, the problem of low sludge overflow and dehydration efficiency is solved, and more efficient sludge treatment and energy reduction are achieved Effects of consumption and drug consumption.

CN222018999UActive Publication Date: 2024-11-19GUIZHOU ZHUXIN WATER ENVIRONMENT IND CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420187488.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-25
Publication Date
2024-11-19
Estimated Expiration
2034-01-25

AI Technical Summary

Technical Problem

In the sewage treatment plant, due to the small area of ​​the mud storage tank and insufficient sludge concentration, the dehydration of the sludge requires increasing the consumption of chemicals, and the sludge is not dehydrated in time. The second sedimentation tank discharges mud to the mud storage tank, and the mud storage tank overflows. The flow to the inlet canal affects the online parameter judgment of the sewage treatment plant, resulting in an increase in sludge aging and efficient phosphorus removal agent consumption.

Method used

Design a device for the linkage between the second sedimentation tank and the mud storage tank, including control components, sludge interface instrument, sludge transport components and suction components, and monitor the mud and liquid levels of the second sedimentation tank and the mud storage tank in real time. , automatically control sludge transport and suction, prevent sludge overflow, and optimize sludge concentration and liquid level control.

Benefits of technology

Effectively prevent sludge overflow, improve the treatment effect of biochemical tanks, reduce the operating efficiency and drug consumption of sludge dewatering machines, reduce manual operation and power consumption, ensure the stable operation of the biochemical system, and reduce environmental protection risks during sewage treatment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222018999U_ABST
    Figure CN222018999U_ABST
Patent Text Reader

Abstract

The utility model provides a device applied to linkage of a secondary sedimentation tank and a sludge storage tank. The device comprises a control assembly, a first sludge interface instrument, a second sludge interface instrument, a sludge conveying assembly and a suction assembly, the first sludge interface instrument is arranged on the secondary sedimentation tank and is used for measuring the sludge level of the secondary sedimentation tank; the second sludge interface instrument is arranged on the sludge storage tank and is used for measuring the sludge level of the sludge storage tank; the secondary sedimentation tank is communicated with the sludge storage tank through the sludge conveying assembly, and the suction assembly is communicated with the sludge storage tank; the first sludge interface instrument, the second sludge interface instrument, the sludge conveying assembly and the suction assembly are electrically connected with the control assembly. The utility model relates to liquid level control for a sludge storage tank, which is suitable for linkage between a secondary sedimentation tank and the sludge storage tank, prevents sludge from overflowing from the sludge storage tank to inlet water or a biochemical tank to cause repeated treatment, improves the treatment effect of the biochemical tank, greatly reduces the operation efficiency of a sludge dewatering machine, and reduces chemical consumption and energy consumption.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of sludge storage tanks, in particular to a device applied to the linkage between a secondary sedimentation tank and a sludge storage tank. Background Art

[0002] Due to the large amount of sludge removed by the sewage treatment plant, the small area occupied by the sludge storage tank, and the insufficient sludge concentration, the unit consumption of the chemicals required for sludge dehydration in the dehydration room increases. At the same time, if the sludge is not dehydrated in time, the sludge in the secondary sedimentation tank is discharged into the sludge storage tank, and the sludge storage tank overflows into the inlet channel, which affects the judgment of the actual values ​​of COD, ammonia nitrogen, SS and other parameters of the sewage treatment plant inlet water, prolongs the sludge age of the biochemical system, causes sludge aging, affects the high total phosphorus online in the effluent, and increases the unit consumption of high-efficiency phosphorus removal agents and costs.

[0003] Therefore, it is necessary to propose a new technical solution to improve the above technical problems. Utility Model Content

[0004] In view of the defects in the prior art, the purpose of the utility model is to provide a device for linkage between a secondary sedimentation tank and a sludge storage tank.

[0005] According to the utility model, a device for linkage between a secondary sedimentation tank and a sludge storage tank is provided, comprising: a control component, a first sludge interface meter, a second sludge interface meter, a sludge conveying component and a suction component;

[0006] The first sludge interface meter is arranged on the secondary sedimentation tank, and is used to measure the sludge level of the secondary sedimentation tank; the second sludge interface meter is arranged on the sludge storage tank, and is used to measure the sludge level of the sludge storage tank;

[0007] The secondary sedimentation tank is connected to the sludge storage tank through the sludge conveying component, and the suction component is connected to the sludge storage tank;

[0008] The first sludge interface meter, the second sludge interface meter, the sludge conveying component and the suction component are all electrically connected to the control component.

[0009] Preferably, it also includes a liquid level meter;

[0010] The liquid level meter is arranged on the mud storage tank and is used to measure the liquid level of the mud storage tank. The liquid level meter is electrically connected to the control component.

[0011] Preferably, the suction assembly comprises a self-priming pump and a suction pipeline;

[0012] One end of the suction pipe is located in the mud storage tank, the self-priming pump is connected to the suction pipe, and the self-priming pump is electrically connected to the control component.

[0013] Preferably, the suction assembly further comprises a floating plate, the suction pipe is fixed on the floating plate, the pipe opening of the suction pipe is 6 cm away from the floating plate surface, the bottom of the suction pipe is blocked, and fine holes are opened on the side.

[0014] Preferably, the control assembly includes a PLC control box, a first controller and a second controller;

[0015] The first controller and the second controller are both electrically connected to the PLC control box, the first sludge interface meter is electrically connected to the first controller, and the liquid level meter and the second sludge interface meter are both electrically connected to the second controller.

[0016] Preferably, the sludge conveying assembly comprises a residual sludge pump;

[0017] The bottom of the secondary sedimentation tank, the residual sludge pump and the bottom of the sludge storage tank are connected in sequence; the residual sludge pump is electrically connected to the control component.

[0018] Preferably, the sludge conveying assembly further comprises a first sludge discharge pipe and a first sludge discharge pipe valve;

[0019] The secondary sedimentation tank, the residual sludge pump and the sludge storage tank are connected in sequence through the first sludge discharge pipe, and the first sludge discharge pipe valve is arranged on the first sludge discharge pipe.

[0020] Preferably, the excess sludge pumps are provided in two numbers, namely a first excess sludge pump and a second excess sludge pump;

[0021] The secondary sedimentation tank, the first excess sludge pump, the second excess sludge pump and the sludge storage tank are sequentially connected through the first sludge discharge pipe, and the first sludge discharge pipe valve is arranged on the first sludge discharge pipe between the first excess sludge pump and the second excess sludge pump.

[0022] Preferably, it also includes an overflow pipe;

[0023] An overflow port is arranged on the top of the mud storage tank, and the overflow pipe is connected to the overflow port.

[0024] Preferably, it also includes a second mud discharge pipe and a second mud discharge pipe valve;

[0025] One end of the second mud discharge pipe is connected to the bottom of the mud storage tank, and the second mud discharge pipe valve is arranged on the second mud discharge pipe.

[0026] Compared with the prior art, the utility model has the following beneficial effects:

[0027] 1. The utility model relates to a liquid level control for a sludge storage tank, which is suitable for the linkage between the secondary sedimentation tank and the sludge storage tank, preventing the sludge from overflowing from the sludge storage tank to the water inlet or the biochemical tank, causing multiple treatments, improving the treatment effect of the biochemical tank, and greatly reducing the operating efficiency of the sludge dewatering machine, reducing drug consumption and energy consumption;

[0028] 2. This device can reduce manual operation, power consumption and drug consumption, while ensuring the stable operation of the biochemical system and reducing environmental risks in the sewage treatment process;

[0029] 3. The utility model mainly solves the control of the sludge discharge system of the secondary sedimentation tank and the sludge storage tank in the sewage treatment plant, prevents the sludge in the sludge storage tank from overflowing into the water inlet or biochemical tank, and at the same time increases the sludge concentration in the sludge storage tank, reduces the operating efficiency of the sludge dewatering machine, and reduces the drug consumption and energy consumption;

[0030] 4. With the help of the above technical scheme of the utility model, the sludge screw pump can be automatically started when the liquid level rises or falls, the sludge discharge control of the secondary sedimentation tank and the inclined tube sedimentation tank can be adjusted, the liquid level of the sludge storage tank can be controlled, and the suction component can be controlled to extract the supernatant of the sludge storage tank according to the difference between the mud level height and the liquid level height of the sludge storage tank to prevent the sewage in the sludge storage tank from overflowing into the inlet water, affecting the judgment of the inlet water parameters and affecting the process adjustment, which can reduce the sewage treatment time, enhance the sludge efficiency, and save the energy consumption and drug consumption of sewage and sludge treatment. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Other features, objects and advantages of the present invention will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings:

[0032] Figure 1 It is a structural schematic diagram of the utility model;

[0033] Figure 2 It is an enlarged schematic diagram of the floating plate of the utility model.

[0034] in:

[0035] PLC control box 1 Overflow port 10

[0036] First controller 2 overflow pipe 11

[0037] Second controller 3 suction component 12

[0038] Secondary sedimentation tank 4 Liquid level meter 13

[0039] The first sludge interface instrument 5 The second sludge interface instrument 14

[0040] The first row of mud pipe 6 The second row of mud pipe 15

[0041] Residual sludge pump 7 Second drain pipe valve 16

[0042] First mud pipe valve 8 floating plate 17

[0043] Mud storage tank 9 Suction pipe 18 DETAILED DESCRIPTION

[0044] The utility model is described in detail below in conjunction with specific embodiments. The following embodiments will help those skilled in the art to further understand the utility model, but do not limit the utility model in any form. It should be pointed out that for those of ordinary skill in the art, several changes and improvements can be made without departing from the concept of the utility model. These all belong to the protection scope of the utility model.

[0045] Embodiment 1:

[0046] According to the utility model, a device for linkage between a secondary sedimentation tank and a sludge storage tank is provided, comprising: a control component, a first sludge interface meter 5, a second sludge interface meter 14, a sludge conveying component and a suction component 12; the first sludge interface meter 5 is arranged on the secondary sedimentation tank 4, and is used to measure the sludge level of the secondary sedimentation tank 4; the second sludge interface meter 14 is arranged on the sludge storage tank 9, and is used to measure the sludge level of the sludge storage tank 9; the secondary sedimentation tank 4 is connected to the sludge storage tank 9 through the sludge conveying component, and the suction component 12 is connected to the sludge storage tank 9; the first sludge interface meter 5, the second sludge interface meter 14, the sludge conveying component and the suction component 12 are all electrically connected to the control component.

[0047] A device applied to the linkage of the secondary sedimentation tank and the sludge storage tank also includes a liquid level meter 13; the liquid level meter 13 is arranged on the sludge storage tank 9, and is used to measure the liquid level of the sludge storage tank 9, and the liquid level meter 13 is electrically connected to the control component.

[0048] The suction component 12 includes a self-priming pump and a suction pipe; one end of the suction pipe is located in the mud storage tank 9, the self-priming pump is connected to the suction pipe, and the self-priming pump is electrically connected to the control component; the suction component 12 also includes a floating plate; the suction pipe is fixed on the floating plate, the suction pipe mouth is 6 cm away from the floating plate surface, the bottom of the suction pipe is blocked, and fine holes are opened on the side.

[0049] The control component includes a PLC control box 1, a first controller 2 and a second controller 3; the first controller 2 and the second controller 3 are both electrically connected to the PLC control box 1, the first sludge interface meter 5 is electrically connected to the first controller 2, and the liquid level meter 13 and the second sludge interface meter 14 are both electrically connected to the second controller 3.

[0050] The sludge conveying assembly includes a residual sludge pump 7; the bottom of the secondary sedimentation tank 4, the residual sludge pump 7 and the bottom of the sludge storage tank 9 are connected in sequence; the residual sludge pump 7 is electrically connected to the control assembly.

[0051] The sludge conveying assembly also includes a first sludge discharge pipe 6 and a first sludge discharge pipe valve 8 ; the secondary sedimentation tank 4 , the residual sludge pump 7 and the sludge storage tank 9 are sequentially connected through the first sludge discharge pipe 6 , and the first sludge discharge pipe valve 8 is arranged on the first sludge discharge pipe 6 .

[0052] There are two residual sludge pumps 7, namely a first residual sludge pump and a second residual sludge pump; the secondary sedimentation tank 4, the first residual sludge pump, the second residual sludge pump and the sludge storage tank 9 are connected in sequence through the first sludge discharge pipe 6, and the first sludge discharge pipe valve 8 is arranged on the first sludge discharge pipe 6 between the first residual sludge pump and the second residual sludge pump.

[0053] A device applied to the linkage of the secondary sedimentation tank and the sludge storage tank also includes an overflow pipe 11; an overflow port 10 is arranged on the top of the sludge storage tank 9, and the overflow pipe 11 is connected to the overflow port 10.

[0054] A device used for linkage between a secondary sedimentation tank and a sludge storage tank also includes a second sludge discharge pipe 15 and a second sludge discharge pipe valve 16 ; one end of the second sludge discharge pipe 15 is connected to the bottom of the sludge storage tank 9 , and the second sludge discharge pipe valve 16 is arranged on the second sludge discharge pipe 15 .

[0055] Embodiment 2:

[0056] The utility model relates to a liquid level control for a sludge storage tank, which is suitable for the linkage between a secondary sedimentation tank and the sludge storage tank, preventing sludge from overflowing from the sludge storage tank to an inlet water or a biochemical tank, causing multiple treatments, improving the treatment effect of the biochemical tank, and greatly reducing the operating efficiency of a sludge dewatering machine, reducing drug consumption and energy consumption.

[0057] Due to the large amount of sludge removed by the sewage treatment plant, the small area occupied by the sludge storage tank, and the insufficient sludge concentration, the unit consumption of the chemicals required for sludge dehydration in the dehydration room increases. At the same time, if the sludge is not dehydrated in time, the secondary sedimentation tank will discharge sludge into the sludge storage tank, and the sludge storage tank will overflow into the inlet channel, which will affect the judgment of the actual values ​​of COD, ammonia nitrogen, SS and other parameters of the sewage treatment plant inlet water, prolong the sludge age of the biochemical system, cause sludge aging, affect the high total phosphorus online in the effluent, increase the unit consumption of high-efficiency phosphorus removal agents, and increase the cost. This device can reduce the amount of manual operation and reduce power consumption and drug consumption, while ensuring the stable operation of the biochemical system and reducing environmental risks in the sewage treatment process.

[0058] The utility model mainly solves the control of the sludge discharge system of the secondary sedimentation tank and the sludge storage tank in the sewage treatment plant, prevents the sludge in the sludge storage tank from overflowing into the water inlet or the biochemical tank, and at the same time improves the sludge concentration in the sludge storage tank, reduces the operating efficiency of the sludge dewatering machine, and reduces drug consumption and energy consumption.

[0059] In the sewage treatment process, the secondary sedimentation tank is not linked with the sludge storage tank for control. When the liquid level in the sludge storage tank reaches a high level, the residual pump of the secondary sedimentation tank will not be automatically stopped. The excess sludge will enter the water inlet channel or biochemical tank again, affecting the production process. The sludge in the sludge storage tank cannot be precipitated, resulting in high desludge drug consumption and poor desludge effect. In order to solve the above technical problems, a sludge interface meter is installed in the secondary sedimentation tank. The first controller collects the mud level monitoring information of the sludge interface meter in real time. A liquid level meter and a sludge interface meter are installed in the sludge storage tank. According to the liquid level height of the sludge storage tank, the liquid level height is fed back to the second controller to set the appropriate liquid level height of the sludge storage tank. The PLC control box controls the operation of the residual sludge pump of the secondary sedimentation tank according to the liquid level height of the sludge storage tank and the mud level information of the secondary sedimentation tank. The second sludge interface meter of the sludge storage tank monitors the sludge level information of the sludge storage tank in real time. When the difference between the sludge level and the liquid level of the sludge storage tank is within a certain height difference range, the suction component of the sludge storage tank starts to operate. The suction component can automatically control the extraction of supernatant at different mud level heights in the sludge storage tank according to the liquid level difference. After the liquid level difference between the sludge interface meter and the sludge level meter is reduced to a certain height, the suction component stops running, and the remaining sludge pump starts running under the control of the PLC control box. This device can control the sludge discharge of the secondary sedimentation tank and increase the concentration effect of the sludge storage tank, and prevent the sludge from overflowing from the sludge storage tank to the water inlet or biochemical tank, causing multiple treatments, improving the treatment effect of the biochemical tank, and greatly reducing the operating efficiency of the sludge dewatering machine, reducing drug consumption and energy consumption.

[0060] With the help of the above-mentioned technical scheme of the utility model, the sludge screw pump can be automatically started when the liquid level rises or falls, the sludge discharge control of the secondary sedimentation tank and the inclined tube sedimentation tank can be adjusted, the liquid level height of the sludge storage tank can be controlled, and the suction component can be controlled to extract the supernatant of the sludge storage tank according to the difference between the mud level height and the liquid level height of the sludge storage tank to prevent the sewage in the sludge storage tank from overflowing into the inlet water, affecting the judgment of the inlet water parameters and affecting the process adjustment, which can reduce the sewage treatment time, enhance the sludge efficiency, and save the energy consumption and drug consumption of sewage and sludge treatment.

[0061] The utility model device adopts the installation of a liquid level meter, uses the liquid level of the sludge storage tank to control the residual sludge pump, and allows the secondary sedimentation tank and the sludge storage tank to be linked. The device is composed of the following components: 1 is a PLC control box, 2 is a first controller, 3 is a second controller, 4 is a secondary sedimentation tank, 5 is a first sludge interface meter, 6 is a first sludge discharge pipe, 7 is a residual sludge pump, 8 is a first sludge discharge pipe valve, 9 is a sludge storage tank, 10 is an overflow port, 11 is an overflow pipe, 12 is a suction assembly, 13 is a liquid level meter, 14 is a second sludge interface meter, 15 is a second sludge discharge pipe, and 16 is a second sludge discharge pipe valve. The first sludge interface meter 5 is installed on the secondary sedimentation tank 4, and the first controller 2 collects the mud level monitoring information of the first sludge interface meter 5 in real time. The liquid level meter 13 and the second sludge interface meter 14 are installed in the sludge storage tank 9. According to the liquid level height of the sludge storage tank 9, the liquid level height is fed back to the second controller 3 to set a suitable sludge storage tank liquid level height. The PLC controller 1 controls the sludge discharge of the secondary sedimentation tank according to the liquid level of the sludge storage tank 9 and the mud level information of the secondary sedimentation tank 4. The second sludge interface instrument 14 in the sludge storage tank 9 monitors the mud level information of the sludge storage tank in real time. When the mud level and the liquid level difference of the sludge storage tank are within a certain height difference range, the sludge storage tank suction component 12 starts to operate. The suction component 12 can automatically control the extraction of supernatant at different liquid level heights in the sludge storage tank 9 according to the liquid level difference. When the liquid level difference drops to a certain range, the suction component 12 stops running. The PLC control box controls the operation of the residual sludge pump 7.

[0062] The first controller 2 sends a signal according to the PLC control box 1 to control the operation of the residual sludge pump 7.

[0063] The second controller 3 sends a signal according to the PLC control box 1 to control the operation of the suction component 12 .

[0064] The suction assembly 12 includes a self-priming pump, a suction pipe, and a floating plate, and controls the corresponding water pumping pipe assembly to work according to the corresponding liquid level height.

[0065] Those skilled in the art may understand this embodiment as a more specific description of Embodiment 1.

[0066] In the description of the present application, it should be understood that the terms "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0067] The above describes the specific embodiments of the present invention. It should be understood that the present invention is not limited to the above specific embodiments, and those skilled in the art can make various changes or modifications within the scope of the claims, which does not affect the essence of the present invention. In the absence of conflict, the embodiments of the present application and the features in the embodiments can be combined with each other at will.

Claims

1. A device for linkage between a secondary sedimentation tank and a sludge storage tank, characterized in that: include: A control component, a first sludge interface instrument (5), a second sludge interface instrument (14), a sludge conveying component and a suction component (12); The first sludge interface meter (5) is arranged on the secondary sedimentation tank (4) and is used to measure the sludge level of the secondary sedimentation tank (4); the second sludge interface meter (14) is arranged on the sludge storage tank (9) and is used to measure the sludge level of the sludge storage tank (9); The secondary sedimentation tank (4) is connected to the sludge storage tank (9) via the sludge conveying component, and the suction component (12) is connected to the sludge storage tank (9); The first sludge interface meter (5), the second sludge interface meter (14), the sludge conveying component and the suction component (12) are all electrically connected to the control component.

2. The device for linkage between a secondary sedimentation tank and a sludge storage tank according to claim 1 is characterized in that: Also includes a liquid level gauge (13); The liquid level meter (13) is arranged on the mud storage tank (9) and is used to measure the liquid level of the mud storage tank (9). The liquid level meter (13) is electrically connected to the control component.

3. The device for linkage between a secondary sedimentation tank and a sludge storage tank according to claim 1, characterized in that: The suction assembly (12) comprises a self-priming pump and a suction pipeline; One end of the suction pipe is located in the mud storage tank (9), the self-priming pump is connected to the suction pipe, and the self-priming pump is electrically connected to the control component.

4. The device for linkage between a secondary sedimentation tank and a sludge storage tank according to claim 3 is characterized in that: The suction assembly (12) also includes a floating plate, the suction pipe is fixed on the floating plate, the suction pipe opening is 6 cm away from the floating plate surface, the bottom of the suction pipe is blocked, and fine holes are opened on the side.

5. The device for linkage between a secondary sedimentation tank and a sludge storage tank according to claim 2, characterized in that: The control component comprises a PLC control box (1), a first controller (2) and a second controller (3); The first controller (2) and the second controller (3) are both electrically connected to the PLC control box (1), the first sludge interface meter (5) is electrically connected to the first controller (2), and the liquid level meter (13) and the second sludge interface meter (14) are both electrically connected to the second controller (3).

6. The device for linkage between a secondary sedimentation tank and a sludge storage tank according to claim 1, characterized in that: The sludge conveying assembly comprises a residual sludge pump (7); The bottom of the secondary sedimentation tank (4), the residual sludge pump (7) and the bottom of the sludge storage tank (9) are connected in sequence; the residual sludge pump (7) is electrically connected to the control component.

7. The device for linkage between a secondary sedimentation tank and a sludge storage tank according to claim 6, characterized in that: The sludge conveying assembly further comprises a first sludge discharge pipe (6) and a first sludge discharge pipe valve (8); The secondary sedimentation tank (4), the residual sludge pump (7) and the sludge storage tank (9) are connected in sequence through the first sludge discharge pipe (6), and the first sludge discharge pipe valve (8) is arranged on the first sludge discharge pipe (6).

8. The device for linkage between a secondary sedimentation tank and a sludge storage tank according to claim 7, characterized in that: The excess sludge pumps (7) are provided in two numbers, namely a first excess sludge pump and a second excess sludge pump; The secondary sedimentation tank (4), the first excess sludge pump, the second excess sludge pump and the sludge storage tank (9) are connected in sequence via the first sludge discharge pipe (6), and the first sludge discharge pipe valve (8) is arranged on the first sludge discharge pipe (6) between the first excess sludge pump and the second excess sludge pump.

9. The device for linkage between a secondary sedimentation tank and a sludge storage tank according to claim 1, characterized in that: Also includes an overflow pipe (11); An overflow port (10) is provided at the top of the mud storage tank (9), and the overflow pipe (11) is connected to the overflow port (10).

10. The device for linkage between a secondary sedimentation tank and a sludge storage tank according to claim 1, characterized in that: It also includes a second mud discharge pipe (15) and a second mud discharge pipe valve (16); One end of the second mud discharge pipe (15) is connected to the bottom of the mud storage tank (9), and the second mud discharge pipe valve (16) is arranged on the second mud discharge pipe (15).

Citation Information

Cited By

  • Accurate operation system and method for sludge storage tank of sewage treatment plant

    CN121449294A