Offshore ultra-large type draught fan tower tube tail slipping and turning-over tool
By setting up hanging disks and spreaders on the tower of super-large offshore fan, combined with the roof disk, balance ring and other structures, the problems of bumps and low lifting efficiency caused by the tower tail are solved, and the stable turnover and high efficiency of the tower are achieved Lifting.
Patent Information
- Application Number
- CN202420856776.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-23
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-04-23
AI Technical Summary
During the lifting of the tower of super-large fan at sea, the tower is prone to slip, resulting in bumps and contact between the spreader and the tower, causing deformation or paint scratching, and low lifting efficiency.
Design a super-large offshore fan tower tilt-up tooling. By setting up hanging disks and slings at both ends of the tower, fixing them with the flange of the end of the tower, increasing the contact area and reducing single-point action force. Through structures such as top plate, balance ring, balance belt and adjustment parts, the tower rollover process is optimized to avoid bumps and tilts.
It effectively reduces the bumps during the tower lifting process, improves the protection integrity and lifting efficiency of the tower, and ensures the stability and accuracy of the tower during the turnover process.
Smart Images

Figure CN222023903U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of wind turbine tower installation, in particular to a tail-sliding and turning tool for an offshore super-large wind turbine tower. Background Art
[0002] At present, my country's wind power market is developing rapidly, the onshore wind turbine market is gradually saturated, and offshore wind power has become the main development trend. The assembly of offshore wind turbines usually involves driving the seabed fixed piles into the seabed first, and then hoisting the tower to the seabed fixed piles. A flange is fixed on the inner wall of the tower end. The tower is hoisted to the seabed fixed piles by a crane, and the tower and the seabed fixed piles are fixed and installed through the bolt holes on the flange. The wind turbine and blades are then hoisted to the tower by a crane.
[0003] As offshore wind power projects become more distant from shore and the tower diameter increases, tower manufacturers are increasingly strict with their requirements for finished product protection. During the hoisting process, it is absolutely forbidden to bump into the tower to prevent problems such as tower deformation or paint scratches. As the tower diameter increases, it is more likely to slip during the hoisting process, causing the tower to easily bump into the crane's hoisting equipment and slings. Therefore, it is urgent to develop a tail-slipping and turning tool for offshore super-large wind turbine towers that can meet the needs of turning over super-large wind turbine towers while ensuring the complete protection of the finished tower. Utility Model Content
[0004] In order to reduce the occurrence of collisions during tower hoisting, the present application provides a tail-sliding and turning tool for an offshore super-large wind turbine tower.
[0005] The present application provides an offshore super-large wind turbine tower tail turning tooling that adopts the following technical solution:
[0006] A tail-turning tool for an offshore super-large wind turbine tower comprises a hanging plate arranged at both ends of the tower, the hanging plate is provided with a plurality of connection holes, and a plurality of the connection holes are adapted to a plurality of bolt holes of a flange at an end of the tower, the hanging plate and the tower are fixed by bolts and nuts; the hanging plate is provided with a hanging device, the hanging device is used to connect the hanging rope of a crane, and the two ends of the tower are connected to the crane by the hanging rope of the crane.
[0007] By adopting the above technical solution, the lifting plate is fixed to the tower end flange, and then the lifting device is installed on the tower end, so that when the tower is turned over by the crane, the lifting device and the tower are prevented from colliding, thereby reducing the collision during the tower hoisting process. At the same time, by fixing the lifting plate to the tower end flange, the contact area between the lifting device and the tower end flange is increased, reducing the force of the lifting device on the tower end flange at a single point, and reducing the deformation under its own weight.
[0008] Preferably, the hanging plate includes a top plate and a bottom plate, and when the tower is turned over to be vertical, the top plate is located at the top of the tower, and the bottom plate is located at the bottom of the tower; the hanging device arranged on the bottom plate is provided with a bottom buckle, and the bottom buckle is used to connect the lifting rope of the crane, and when the tower is turned over to be vertical, the bottom buckle limits the lifting rope of the crane to abut against the outer wall of the tower.
[0009] By adopting the above technical solution, a bottom buckle is set to limit the distance between the lifting rope and the outer wall of the tower, so that the tower can be further protected from being scratched by the lifting rope due to shaking during the tower lifting and turning process.
[0010] Preferably, the top plate is provided with a plurality of hangers.
[0011] By adopting the above technical solution, a number of hangers are arranged on the top plate, so that multiple hangers share the weight of the tower itself, avoiding the tower's own weight. However, there are fewer stress points on the top plate and the tower end flange, which leads to deformation of the tower end flange, further protecting the tower end flange.
[0012] Preferably, the top plate is also provided with a balance ring and a plurality of balance belts, the plurality of slings are evenly distributed along the circumference of the top plate, one ends of the plurality of balance belts are respectively connected to the plurality of slings of the top plate, and the other ends are all connected to the balance ring, and the balance belts are evenly distributed along the circumference of the balance ring; the balance ring is used to connect the lifting rope of the crane.
[0013] By adopting the above technical solution, a sling is connected to the top plate by setting a balance ring and a balance belt, and the balance belts are evenly distributed along the circumference of the top plate and the balance ring. When the crane turns the tower over to a horizontal level through the balance ring and the balance belt, the tower can be kept vertical more easily when its own gravity and the length of the balance belt are consistent, thereby reducing the work of adjusting the verticality of the tower and improving the efficiency of the tower turning over.
[0014] Preferably, the balance ring is also provided with a plurality of intermediate belts and balance hooks, and the balance hook is provided with a plurality of hooks, one end of the plurality of intermediate belts is provided on the balance ring, and the other end is respectively hung in the hooks, the balance hook is used to connect the lifting rope of the crane, and when the crane lifts the balance ring through the balance hook, the balance ring is horizontal.
[0015] By adopting the above technical solution, the balance ring and the crane are connected by using an intermediate belt and a balance hook, so that the crane's lifting rope is connected to the balance ring at a single point, reducing the situation where the balance ring is tilted due to being pulled by the crane's lifting rope at multiple points. This makes it easier for the balance ring to remain horizontal under the gravity of the tower, greatly reducing the inclination of the tower after turning over, and improving the tower hoisting efficiency.
[0016] Preferably, the balancing ring is further provided with an adjusting member, and the adjusting member is used to adjust the tower to be vertical.
[0017] By adopting the above technical solution, the tower is adjusted to be vertical by using the adjusting member, thereby reducing the situation where the inclination of the tower is large and the tower is difficult to install.
[0018] Preferably, the adjusting member comprises a plurality of adjusting buckles slidably disposed on the balancing ring, and the plurality of balancing belts are respectively connected to the plurality of adjusting buckles.
[0019] By adopting the above technical solution, when the tower is flipped to be nearly vertical, one end of the balance belt is connected to the hanger of the top plate, and the other end is connected to the adjusting buckle. The length of the balance belt is fixed, so that the balance belt is stretched straight under the gravity of the tower and slides relative to the balance ring through the adjusting buckle. The tower drives the adjusting buckle to slide until the tower is vertical under its own gravity, thereby further reducing the inclination of the tower after flipping.
[0020] Preferably, the balance ring is provided with a plurality of adjustment slots, and the plurality of adjustment buckles are respectively located in the plurality of adjustment slots for sliding.
[0021] By adopting the above technical solution, during the tower turning process, the tension on the balance belt changes, and the adjustment buckles at various positions on the balance ring are prone to slide relative to the balance ring due to the change in the tension of the balance belt, causing the balance belt to easily get knotted. By setting the adjustment slot to limit the sliding range of the adjustment buckle, the balance belt can be prevented from getting knotted.
[0022] Preferably, the adjustment buckle is also provided with a limiting block, and the adjustment slot is provided with a limiting slot, the limiting block is inserted into the limiting slot and slides in the limiting slot, and the limiting block and the limiting slot limit the adjustment buckle from leaving the adjustment slot.
[0023] By adopting the above technical solution and providing the limiting block and the limiting groove, the adjustment buckle can be prevented from being separated from the adjustment groove, thereby reducing the damage to the adjustment ring.
[0024] In summary, the present application includes at least one of the following beneficial technical effects:
[0025] 1. By setting up a hoist and a sling, fixing the hoisting plate with the flange at the end of the tower, and then installing the sling on the end of the tower, when the tower is turned over by a crane, the sling and the tower are prevented from colliding, thereby reducing the collision during the tower hoisting process. At the same time, by fixing the hoisting plate with the flange at the end of the tower, the contact area between the sling and the flange at the end of the tower is increased, reducing the force of the sling on a single point at the end of the tower and the deformation under its own weight.
[0026] 2. By setting up the top plate, balance belt, balance ring, middle belt and balance hook, when the crane turns the tower to the horizontal through the balance ring and balance belt, the tower is easier to keep vertical when its own gravity and the length of the balance belt are consistent, reducing the work of adjusting the verticality of the tower and improving the efficiency of tower turning. The balance ring and the crane are connected by the middle belt and balance hook, so that the crane's hoisting rope is connected to the balance ring at a single point, reducing the situation where the balance ring is tilted due to multiple points being pulled by the crane's hoisting rope, so that the balance ring is easier to keep horizontal under the gravity of the tower, greatly reducing the inclination of the tower after turning over, and improving the efficiency of tower hoisting. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the overall structure of an offshore super-large wind turbine tower tail-turning tooling for hoisting the tower in an embodiment of the present application.
[0028] Figure 2 yes Figure 1 A local diagram of .
[0029] Figure 3 It is a schematic diagram of the structure in which the balance ring and the adjustment block are separated in an embodiment of the present application.
[0030] Description of reference numerals:
[0031] 11. Tower; 12. Lifting rope; 21. Top plate; 22. Chassis; 221. Cross bar; 222. Bottom buckle; 23. Lifting device; 31. Balance ring; 311. Adjustment slot; 312. Adjustment block; 313. Limiting block; 32. Balance belt; 33. Connecting plate; 34. Adjustment buckle; 35. Middle belt; 4. Balance hook; 41. Hook. DETAILED DESCRIPTION
[0032] The following is combined with Figure 1-3 This application is described in further detail.
[0033] The present application embodiment discloses a tail-turning tool for an offshore super-large wind turbine tower. Figure 1 as well as Figure 2 The tail-turning tooling for the offshore super-large wind turbine tower includes a hanging plate arranged at both ends of the tower 11. The hanging plate is in a circular ring shape and has a plurality of connection holes. The plurality of connection holes are adapted to a plurality of bolt holes of the end flange of the tower 11, so that the hanging plate and the end flange of the tower 11 are fixed by bolts and nuts, so that the hanging plate is temporarily fixed to the end of the tower 11. The hanging plate is also fixed with a sling 23 for connecting the crane rope 12. In this embodiment, the hanging plate includes a top plate 21 and a bottom plate 22. When the tower 11 is turned over to be vertical, the top plate 21 is located at the top of the tower 11, and the bottom plate 22 is located at the bottom of the tower 11.
[0034] Reference Figure 1The chassis 22 is fixed to the flange at the end of the tower 11 by a plurality of pairs of bolts and nuts. The hanger 23 on the chassis 22 is fixed with a crossbar 221. One end of the crossbar 221 is fixed to the side of the hanger 23 away from the center of the chassis 22. The length direction of the crossbar 221 is consistent with the radial direction of the chassis 22. A bottom buckle 222 is penetrated at one end of the crossbar 221 away from the tower 11. The bottom buckle 222 is used to connect the hoisting rope 12 of the crane, so that the crossbar 221 and the bottom buckle 222 restrict the hoisting rope 12 of the crane from abutting against the outer wall of the tower 11. When the tower 11 is turned over to vertical, the crossbar 221 and the bottom buckle 222 restrict the hoisting rope 12 of the crane from abutting against the outer wall of the tower 11, thereby reducing the situation in which the hoisting rope 12 of the crane used to fix the bottom height of the tower 11 hits the outer wall of the tower 11 during the turning over of the tower 11.
[0035] Reference Figure 1 as well as Figure 2 The top plate 21 is fixed to the end flange of the tower 11 by several pairs of bolts and nuts. Five hangers 23 are fixed to the top plate 21. The five hangers 23 of the top plate 21 are evenly distributed along the circumference of the top plate 21. The top plate 21 is also provided with a balance ring 31 and several balance belts 32. In this embodiment, there are five balance belts 32, which are respectively passed through the five hangers 23 of the top plate 21, and the balance belts 32 are connected end to end to form a ring shape, so that the balance belt 32 is convenient to hang on the balance ring 31, and the balance belt 32 is integrally connected to the top plate 21, reducing the work of disassembling and assembling the balance belt 32.
[0036] Reference Figure 1 as well as Figure 2 The balance ring 31 is cylindrical, and a plurality of adjustment grooves 311 are recessed on one side of the balance ring 31 along the thickness direction. In this embodiment, there are five adjustment grooves 311, and the five adjustment grooves 311 are evenly distributed along the circumference of the balance ring 31. The adjustment grooves 311 are arc-shaped, and the centers of the five adjustment grooves 311 coincide and are all located on the axis of the balance ring 31. The balance ring 31 is also slidably connected with five adjustment blocks 312, and the five adjustment blocks 312 are respectively located in the five adjustment grooves 311 for sliding, and one end of the adjustment block 312 extends out of the adjustment groove 311.
[0037] Reference Figure 2 as well as Figure 3 The end of the adjustment block 312 located in the adjustment groove 311 is also fixedly connected to the limiting block 313. The side walls of the adjustment groove 311 on both sides along the width direction are also recessed with limiting grooves (not shown in the figure) for the two ends of the limiting block 313 to be inserted into. The two ends of the limiting block 313 are respectively inserted into the limiting grooves on both sides of the adjustment groove 311. The two ends of the limiting groove along the arc direction are respectively flush with the two ends of the adjustment groove 311 along the arc direction, so that the adjustment block 312 slides in the adjustment groove 311, and the adjustment block 312 slides along the circumferential direction of the balance ring 31.
[0038] Reference Figure 1 as well as Figure 2 The balance ring 31 is also provided with an adjusting member for adjusting the tower 11 to a vertical position. In this embodiment, the adjusting member includes an adjusting buckle 34 which is passed through an adjusting block 312 and is located outside the adjusting groove 311. The adjusting buckle 34 is used to hang the balance belt 32 so that the balance belt 32 can be hung on the balance ring 31.
[0039] Reference Figure 1 as well as Figure 2 The balance ring 31 is also fixed with a connecting plate 33 and connected with an intermediate belt 35 and a balance hook 4. There are three connecting plates 33, which are located on the balance ring 31 away from the adjustment buckle 34, and the three connecting plates 33 are evenly distributed along the circumference of the balance ring 31. There are three intermediate belts 35, which are respectively inserted into the three connecting plates 33, and the intermediate belts are connected end to end to form a ring shape, so that the intermediate belt 35 and the balance ring 31 are connected as a whole.
[0040] Reference Figure 1 as well as Figure 2 The balance hook 4 is used to connect the hoist rope 12 of the crane, and the balance hook 4 is fixed with three hooks 41, the three hooks 41 are evenly distributed along the circumference of the balance hook 4, and the three hooks 41 are used to hang three middle belts 35, so that the crane can hoist the tower 11 through the balance ring 31. When the crane hoists the balance ring 31 through the balance hook 4, the balance ring 31 is horizontal.
[0041] The implementation principle of the tail-turning tooling of an offshore super-large wind turbine tower in the embodiment of the present application is as follows:
[0042] When the tower 11 needs to be turned over, the tower 11 is placed horizontally on the bearing surface, and the chassis 22 is first installed at the bottom of the tower 11, and the chassis 22 and the bottom flange of the tower 11 are fixed by bolts and nuts, and the cross bar 221 is vertically set and the bottom buckle 222 is located above the tower 11, so that the hanger 23 of the chassis 22 is connected to the hoisting rope 12 of the crane through the cross bar 221 and the bottom buckle 222. Then the top plate 21 is installed on the top of the tower 11, and the top plate 21 and the bottom flange of the tower 11 are fixed by bolts and nuts, and the hangers 23 of the top plate 21, one of which is located at the bottom of the tower 11, and the other four are divided into two groups, and the hangers 23 of the top plates 21 of the same group are at the same horizontal height, so that when the tower 11 is turned over, it is avoided to be affected by its circumferential rotation. Then the balance hook 4 is connected to the hoisting rope 12 of the crane, and then the middle belt 35 is hung on the hook 41, so that the balance ring 31 is hung on the balance hook 4. Then, five balancing belts 32 are hung on five adjusting buckles 34 respectively, so that the sling 23 of the top plate 21 is hung on the hoisting rope 12 of the crane through the balancing belt 32, the balancing ring 31, the middle belt 35 and the balancing hook 4. Then, the hoisting rope 12 of another crane is connected to the bottom buckle 222, and then the two cranes are started at the same time to lift the tower 11.
[0043] Then, the crane connected to the bottom buckle 222 is suspended to fix the height of the bottom end of the tower 11. Then, the crane connected to the balance hook 4 is started to drive the top of the tower 11 to continue to rise, so that the tower 11 turns over. When the tower 11 turns over, the adjustment block 312 slides in the adjustment groove 311, and the adjustment groove 311 restricts the balance belt 32 from being knotted. When the tower 11 tends to be vertical, the five balance belts 32 are gradually tightened, and the adjustment block 312 slides relative to the balance ring 31 under the gravity of the tower 11. Under the restriction of the balance hook 4 and the balance ring 31, the gravity direction of the tower 11 gradually approaches the vertical downward, so that the tower 11 automatically adjusts to the vertical under its own weight.
[0044] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A tail-turning tool for an offshore super-large wind turbine tower, characterized in that: The invention comprises a hanging plate arranged at both ends of a tower (11), wherein the hanging plate is provided with a plurality of connection holes, and the plurality of connection holes are adapted to a plurality of bolt holes of an end flange of the tower (11), and the hanging plate and the tower (11) are fixed by bolts and nuts; the hanging plate is provided with a hanging device (23), and the hanging device (23) is used to connect a hanging rope (12) of a crane, and the two ends of the tower (11) are connected to the crane by the hanging rope (12) of the crane.
2. The offshore super-large wind turbine tower tail turning tool according to claim 1 is characterized in that: The hanging plate comprises a top plate (21) and a bottom plate (22), and when the tower (11) is turned over to be vertical, the top plate (21) is located at the top of the tower (11), and the bottom plate (22) is located at the bottom of the tower (11); the hanging device (23) arranged on the bottom plate (22) is provided with a bottom buckle (222), and the bottom buckle (222) is used to connect the hanging rope (12) of the crane, and when the tower (11) is turned over to be vertical, the bottom buckle (222) limits the hanging rope (12) of the crane from contacting the outer wall of the tower (11).
3. The offshore super-large wind turbine tower tail turning tool according to claim 2 is characterized in that: The top plate (21) is provided with a plurality of hangers (23).
4. The offshore super-large wind turbine tower tail turning tool according to claim 3 is characterized in that: The top plate (21) is also provided with a balance ring (31) and a plurality of balance belts (32); the plurality of slings (23) are evenly distributed along the circumference of the top plate (21); one end of the plurality of slings (23) is respectively connected to the plurality of slings (23) of the top plate (21), and the other end is connected to the balance ring (31); and the balance belts (32) are evenly distributed along the circumference of the balance ring (31); the balance ring (31) is used to connect the lifting rope (12) of the crane.
5. The offshore super-large wind turbine tower tail turning tool according to claim 4 is characterized in that: The balancing ring (31) is further provided with a plurality of intermediate belts (35) and a balancing hook (4). The balancing hook (4) is provided with a plurality of hooks (41). One end of the plurality of intermediate belts (35) is provided on the balancing ring (31), and the other end is respectively hung in the hooks (41). The balancing hook (4) is used to connect a hoisting rope (12) of a crane, and when the crane lifts the balancing ring (31) through the balancing hook (4), the balancing ring (31) is horizontal.
6. The offshore super-large wind turbine tower tail turning tool according to claim 4 is characterized in that: The balancing ring (31) is also provided with an adjusting member, and the adjusting member is used to adjust the tower (11) to be vertical.
7. The offshore super-large wind turbine tower tail turning tool according to claim 6 is characterized in that: The adjusting member comprises a plurality of adjusting buckles (34) slidably arranged on the balancing ring (31), and a plurality of balancing belts (32) are respectively connected to the plurality of adjusting buckles (34).
8. The offshore super-large wind turbine tower tail turning tool according to claim 7, characterized in that: The balance ring (31) is provided with a plurality of adjustment slots (311), and the plurality of adjustment buckles (34) are respectively located in the plurality of adjustment slots (311) and slide.
9. The offshore super-large wind turbine tower tail turning tool according to claim 8, characterized in that: The adjusting buckle (34) is also provided with a limiting block (313), and the adjusting groove (311) is provided with a limiting groove, the limiting block (313) is inserted into the limiting groove and slides in the limiting groove, and the limiting block (313) and the limiting groove limit the adjusting buckle (34) from leaving the adjusting groove (311).