Titanium basket for continuous nickel preplating of strip steel

By using copper material in the titanium basket for explosive composite, the problem of uneven current distribution of the titanium basket is solved, the uniformity of the nickel layer and the efficiency of the electroplating process are improved, and the risks of electricity waste and equipment damage are reduced.

CN222024533UActive Publication Date: 2024-11-19HANDAN JINTAI PACKAGING MATERIALS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420681687.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-03
Publication Date
2024-11-19
Estimated Expiration
2034-04-03

AI Technical Summary

Technical Problem

The current distribution of existing titanium baskets is uneven, resulting in uneven consumption of internal nickel angles and uneven thickness of nickel layer plated on strip steel, resulting in an increase in the temperature of the plating solution, wasted electricity and equipment damage.

Method used

The copper material with excellent conductivity is used to explode and combine it with the titanium basket to form copper strips, which improves the overall conductivity and current uniformity of the titanium basket and reduces heat generation.

Benefits of technology

The overall conductivity of the titanium basket is achieved, which reduces the problem of uneven consumption of nickel angles, and reduces the waste of electricity and the risk of equipment damage during the electroplating process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222024533U_ABST
    Figure CN222024533U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of titanium baskets, and provides a titanium basket for continuous nickel preplating of strip steel, which comprises a titanium rod, the first frames are arranged at the two ends of the titanium rod, and each first frame is provided with a mounting space; and the copper bar piece is arranged in the mounting space. By means of the technical scheme, the problems that in the prior art, current distribution of a titanium basket is not uniform, consequently, consumption of internal nickel angles is not uniform, and the thickness of a nickel layer plated on strip steel is not uniform are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of titanium baskets, in particular to a titanium basket used for continuous pre-nickel plating of strip steel. Background Art

[0002] As the width of the strip produced by the strip pre-nickel plating production line becomes wider and the speed of the production line increases, the size and length of the titanium basket for storing the anode nickel corners are also getting larger and larger. Titanium has poor conductivity. Generally, the current of the hook outside the water is not more than 0.24A / mm², and the current of the hook in the water is not more than 1.5A / mm². Otherwise, the hook body will heat up, causing the temperature of the electroplating solution to rise, the cooling capacity to increase, and waste electricity. It may even damage the plastic tank due to heat.

[0003] Increasing the size of the titanium basket will lead to uneven current distribution in the titanium basket, uneven consumption of internal nickel corners, and uneven thickness of the nickel layer plated on the strip. Therefore, we use copper with excellent conductivity as a conductor, and through the explosive composite process, the copper and the titanium basket are tightly fitted together, so that the titanium basket as a whole is evenly conductive and generates less heat. Utility Model Content

[0004] The utility model provides a titanium basket for continuous pre-nickel plating of steel strips, which solves the problem in the related art that the current distribution of the titanium basket is uneven, resulting in uneven consumption of internal nickel corners and uneven thickness of the nickel layer plated on the steel strips.

[0005] The technical solution of the utility model is as follows:

[0006] A titanium basket for continuous pre-nickel plating of steel strips, comprising:

[0007] Titanium rods;

[0008] A first frame is arranged at both ends of the titanium rod, and the first frame has an installation space;

[0009] The copper busbar is arranged in the installation space.

[0010] Optionally, the first framework includes:

[0011] The first frame has a mounting hole at the top, and the titanium rod passes through the mounting hole;

[0012] A second frame body is arranged on the first frame body, and the first frame body and the second frame body form a first installation gap;

[0013] The third frame is arranged on the titanium rod, and the third frame has a second installation gap, the second installation gap leads to the first installation gap, the second installation gap and the first installation gap form the installation space, and the third frame and the first frame form a clamping space, and the clamping space is used to clamp the reaction pool.

[0014] Optionally, the third frame has a first side, a second side and a third side connected in sequence, the first side and the third side are perpendicular to the second side to form the clamping space, the first side is arranged on the first frame, and the second side is arranged on the titanium rod.

[0015] Optionally, the copper bar comprises:

[0016] A first copper busbar is arranged in the first installation gap;

[0017] A second copper busbar is arranged in the second installation gap;

[0018] A connecting member is arranged in the first installation gap, one end of the connecting member is arranged on the first copper busbar, and the other end of the connecting member is arranged on the second copper busbar.

[0019] Optionally, it also includes:

[0020] A second frame, with two ends respectively arranged on the bottom ends of the first frame body;

[0021] The titanium mesh is arranged between the first frames, and the titanium mesh, the first frame and the second frame enclose a processing space.

[0022] Optionally, it also includes:

[0023] There are a plurality of first reinforcing plates, which are arranged on the titanium mesh at intervals, and two ends of which are respectively arranged on the two first frames.

[0024] Optionally, it also includes:

[0025] A plurality of second reinforcing plates are provided on the titanium mesh and located in the processing space.

[0026] Optionally, it also includes:

[0027] There are two balancing members, which are respectively arranged in the two clamping spaces, and the balancing members are used to abut against the reaction pool. The balancing members include:

[0028] A mounting seat having a mounting groove, wherein the mounting groove is clamped on the titanium rod and the third frame;

[0029] The mounting plate is rotatably arranged on the mounting seat and opens or closes the mounting slot after being rotated.

[0030] Optionally, it also includes:

[0031] A screw rod passes through the mounting seat, the titanium rod and the mounting plate in sequence, and a thread is arranged on the mounting seat;

[0032] A supporting plate is rotatably arranged on the screw rod. After the screw rod rotates, the supporting plate approaches or moves away from the mounting seat, and the mounting seat abuts against the reaction pool through the supporting plate.

[0033] Optionally, the mounting plate has an avoidance hole, and the screw rod passes through the avoidance hole.

[0034] The working principle and beneficial effects of the utility model are:

[0035] In the utility model, in order to solve the problem of uneven current distribution in the titanium basket in the prior art, which leads to uneven consumption of internal nickel corners and uneven thickness of the nickel layer plated on the strip steel, thereby accelerating the reaction rate, a copper bar is designed on the first frame in this scheme. The copper bar is made of red copper. The copper bar and the first frame are explosively composited together, which improves the overall conductivity of the titanium basket and the uniformity of the current above and below the titanium basket, thereby reducing the conductive heat generation of the titanium basket. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] The preferred implementation modes will be described below in a clear and understandable manner with reference to the accompanying drawings to further illustrate the above-mentioned characteristics, technical features, advantages and implementation methods of the present utility model.

[0037] Figure 1 It is a schematic diagram of the structure of the utility model;

[0038] Figure 2 It is a schematic diagram of the local structure of the utility model;

[0039] Figure 3 for Figure 2 A magnified schematic diagram of point A;

[0040] Figure 4 for Figure 2 An enlarged schematic diagram of point B;

[0041] Figure 5 This is an enlarged schematic diagram of the avoidance hole of the utility model;

[0042] Figure 6 This is a schematic diagram of the structure of the balancing member of the utility model;

[0043] In the figure: 1. titanium rod, 2-1. first frame, 2-2. installation space, 2-2-1. installation hole, 3. copper busbar, 2-2. first frame, 2-3. second frame, 2-4. first installation gap, 2-5. third frame, 2-6. second installation gap, 2-7. clamping space, 2-8. first side, 2-9. second side, 2-10. third side, 3-1. first copper busbar, 3-2. second copper busbar, 3-3. connector, 2-11. second frame, 2-12. titanium mesh, 2-12-1. processing space, 2-16. first reinforcing plate, 4. second reinforcing plate, 5. balancing member, 5-1. mounting seat, 5-1-1. mounting groove, 5-2. mounting plate, 5-3. avoidance hole, 5-5. through hole, 6. screw, 7. support plate. DETAILED DESCRIPTION

[0044] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the specific implementation methods of the utility model will be described below with reference to the accompanying drawings. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, they can also be understood as further technical solutions without paying creative work. In some figures, components with the same structure or function are only schematically illustrated, or only one of them is marked. In this article, "one" not only means "only one", but also means "more than one", and "several" includes "two" and "more than two".

[0045] In this article, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this utility model can be understood according to specific circumstances.

[0046] In addition, in the description of the present application, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0047] Reference Figure 1 to Figure 6 , which is the first embodiment of the utility model, proposes

[0048] A titanium basket for continuous pre-nickel plating of steel strips, comprising:

[0049] Titanium rod 1;

[0050] A first frame 2-1 is arranged at both ends of the titanium rod 1, and the first frame 2-1 has an installation space 2-2;

[0051] The copper bar 3 is arranged in the installation space 2-2.

[0052] In this embodiment, in order to solve the problem of uneven current distribution in the titanium basket in the prior art, which leads to uneven consumption of internal nickel corners and uneven thickness of the nickel layer plated on the strip steel, the present scheme designs a copper bar 3 on the first frame 2-1. The copper bar 3 is made of red copper. The copper bar 3 and the first frame 2-1 are explosively composited together, thereby improving the overall conductivity of the titanium basket and the uniformity of the current above and below the titanium basket, and reducing the conductive heat generation of the titanium basket.

[0053] Furthermore, the first framework 2-1 includes:

[0054] The first frame 2-2 has a mounting hole 2-2-1 at the top, and the titanium rod 1 passes through the mounting hole 2-2-1;

[0055] The second frame 2-3 is arranged on the first frame 2-2, and the first frame 2-2 and the second frame 2-3 form a first installation gap 2-4;

[0056] The third frame 2-5 is arranged on the titanium rod 1, and the third frame 2-5 has a second installation gap 2-6. The second installation gap 2-6 leads to the first installation gap 2-4. The second installation gap 2-6 and the first installation gap 2-4 form an installation space 2-2. The third frame 2-5 and the first frame 2-2 form a clamping space 2-7, and the clamping space 2-7 is used to clamp the reaction pool.

[0057] The third frame 2-5 has a first side 2-8, a second side 2-9 and a third side 2-10 connected in sequence, the first side 2-8 and the third side 2-10 are perpendicular to the second side 2-9 to form a clamping space 2-7, the first side 2-8 is arranged on the first frame 2-2, and the second side 2-9 is arranged on the titanium rod 1.

[0058] Further, the copper bar 3 comprises:

[0059] The first copper bar 3-1 is arranged in the first installation gap 2-4;

[0060] The second copper bar 3-2 is arranged in the second installation gap 2-6;

[0061] The connecting member 3-3 is arranged in the first installation gap 2-4, one end of the connecting member 3-3 is arranged on the first copper busbar 3-1, and the other end is arranged on the second copper busbar 3-2.

[0062] In this embodiment, the first frame 2-2 is a titanium plate with a thickness of about 6 mm, the first copper bar 3-1 is a copper bar with a thickness of about 14 mm, the first frame 2-2 and the first copper bar 3-1 are explosively combined together, the first copper bar 3-1 is about 40×14 mm, and is wrapped by a titanium plate with a thickness of about 3 mm, and the titanium plate with a thickness of about 3 mm and the titanium plate with a thickness of about 6 mm are continuously sealed and welded together, and the structure of the third frame 2-5 is to be clamped on the reaction pool, and when the titanium basket is used, multiple titanium baskets are arranged at intervals and hung on the reaction pool. The connector 3-3 is a conductive copper bar or a wire nose, which ensures the electrical connection between the first copper bar 3-1 and the second copper bar 3-2.

[0063] Furthermore, it also includes:

[0064] The second frame 2-11 has two ends respectively disposed on the bottom end of the first frame body 2-2;

[0065] The titanium mesh 2-12 is arranged between the first frames 2-2. The titanium mesh 2-12, the first frame 2-1 and the second frame 2-11 enclose a processing space 2-12-1.

[0066] In this embodiment, in order to make a complete titanium mesh 2-12, a second frame 2-11 is designed between the two first frames 2-1. The second frame 2-11 and the two first frames 2-1 form a U-shaped structure. The two titanium meshes 2-12 are arranged at intervals in the U-shaped structure and fixed to form a processing space 2-12-1. The processing space 2-12-1 is used to store nickel corners and serve as an anode during electroplating.

[0067] Furthermore, it also includes:

[0068] The first reinforcing plates 2-16 are provided in plurality and are arranged on the titanium mesh 2-12 at intervals, and the two ends are arranged on the two first frames 2-2 respectively.

[0069] The second reinforcing plates 4, which are in plurality, are disposed on the titanium mesh 2-12 and are located in the processing space 2-12-1.

[0070] In this embodiment, in order to ensure the installation strength of the titanium mesh 2-12, the present scheme designs a first reinforcing plate 2-16 and a second reinforcing plate 4. The two ends of the first reinforcing plate 2-16 are respectively welded to the two first frames 2-1, and the titanium mesh 2-12 and the first reinforcing plate 2-16 are welded as a whole, thereby ensuring the installation strength of the titanium mesh 2-12 and preventing the titanium mesh 2-12 from falling off. At the same time, since the volume of the titanium mesh 2-12 is very large, there is a gap between the two titanium meshes 2-12. In order to prevent the two titanium meshes 2-12 from deformation, a number of second reinforcing plates 4 are designed between the two titanium meshes 2-12 as support.

[0071] Furthermore, it also includes:

[0072] There are two balancing members 5, which are respectively arranged in the two clamping spaces 2-7. The balancing members 5 are used to abut against the reaction pool. The balancing members 5 include:

[0073] The mounting seat 5-1 has a mounting groove 5-1-1, and the mounting groove 5-1-1 is clamped on the titanium rod 1 and the third frame 2-5;

[0074] The mounting plate 5-2 is rotatably disposed on the mounting seat 5-1, and opens or closes the mounting slot 5-1-1 after being rotated.

[0075] Also includes:

[0076] The screw rod 6 passes through the mounting seat 5-1, the titanium rod 1 and the mounting plate 5-2 in sequence, and the thread is set on the mounting seat 5-1;

[0077] The supporting plate 7 is rotatably arranged on the screw rod 6 . After the screw rod 6 rotates, the supporting plate 7 approaches or moves away from the mounting seat 5 - 1 , and the mounting seat 5 - 1 abuts against the reaction pool through the supporting plate 7 .

[0078] The mounting plate 5 - 2 has an avoidance hole 5 - 3 , and the screw rod 6 passes through the avoidance hole 5 - 3 .

[0079] In this embodiment, in order to ensure that the titanium basket can maintain a vertical downward structure after being connected to the reaction pool, this solution designs a balance piece 5. The lower bottom surface area of ​​the balance piece 5 is relatively large. The contact between the lower bottom surface and the reaction pool increases the contact area between the two, ensuring that the titanium basket is vertically downward when in use. At the same time, in order to realize the two fixing methods of the titanium basket in the reaction pool, this solution designs the balance piece 5 as a structure in which the mounting plate 5-2 rotates on the mounting seat 5-1. The two separate structures not only speed up the production process of the titanium basket, but also after the mounting plate 5-2 is rotated, the mounting plate 5-2 can be completely rotated out due to the avoidance of the avoidance hole 5-3. After being rotated out, the mounting plate 5-2 can be used as a hook to hang on one side of the reaction pool. At the same time, by twisting the screw 6, the distance between the support plate 7 and the mounting seat 5-1 can be adjusted. When the reaction pool is uneven, the titanium basket can be vertically downward by adjusting the screw 6. When the mounting plate 5-2 is rotated between the supporting plate 7 and the mounting seat 5-1, the supporting plate 7 is in contact with the reaction pool, the titanium basket can span the reaction pool, and the clamping spaces 2-7 at both ends are clamped on both sides of the reaction pool.

[0080] It should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the technical solution of the utility model can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the utility model, which should be included in the scope of the claims of the utility model.

Claims

1. A titanium basket for continuous pre-nickel plating of steel strips, characterized in that: include: Titanium rod (1); A first frame (2-1) is arranged at two ends of the titanium rod (1), and the first frame (2-1) has an installation space (2-18); The copper bar (3) is arranged in the installation space (2-18).

2. The titanium basket for continuous pre-nickel plating of steel strip according to claim 1, characterized in that: The first framework (2-1) includes: A first frame (2-2) has a mounting hole (2-2-1) at the top, and the titanium rod (1) passes through the mounting hole (2-2-1); A second frame (2-3) is arranged on the first frame (2-2), and the first frame (2-2) and the second frame (2-3) form a first installation gap (2-4); The third frame (2-5) is arranged on the titanium rod (1), the third frame (2-5) has a second installation gap (2-6), the second installation gap (2-6) leads to the first installation gap (2-4), the second installation gap (2-6) and the first installation gap (2-4) form the installation space (2-18), the third frame (2-5) and the first frame (2-2) form a clamping space (2-7), and the clamping space (2-7) is used for clamping the reaction pool.

3. The titanium basket for continuous pre-nickel plating of steel strip according to claim 2, characterized in that: The third frame (2-5) has a first side (2-8), a second side (2-9) and a third side (2-10) connected in sequence, the first side (2-8) and the third side (2-10) are both perpendicular to the second side (2-9) to form the clamping space (2-7), the first side (2-8) is arranged on the first frame (2-2), and the second side (2-9) is arranged on the titanium rod (1).

4. A titanium basket for continuous pre-nickel plating of steel strip according to claim 3, characterized in that: The copper bar (3) comprises: A first copper bar (3-1) is arranged in the first installation gap (2-4); A second copper busbar (3-2) is arranged in the second installation gap (2-6); A connecting piece (3-3) is arranged in the first installation gap (2-4), one end of the connecting piece (3-3) is arranged on the first copper busbar (3-1), and the other end is arranged on the second copper busbar (3-2).

5. The titanium basket for continuous pre-nickel plating of steel strip according to claim 2, characterized in that: Also includes: A second frame (2-11), two ends of which are respectively arranged on the bottom ends of the first frame body (2-2); The titanium mesh (2-12) is arranged between the first frames (2-2); the titanium mesh (2-12), the first frame (2-1) and the second frame (2-11) enclose a processing space (2-12-1).

6. The titanium basket for continuous pre-nickel plating of steel strip according to claim 5, characterized in that: Also includes: A plurality of first reinforcing plates (2-16) are arranged at intervals on the titanium mesh (2-12), and two ends are respectively arranged on the two first frames (2-2).

7. The titanium basket for continuous pre-nickel plating of steel strip according to claim 5, characterized in that: Also includes: A plurality of second reinforcing plates (4) are arranged on the titanium mesh (2-12) and are located in the processing space (2-12-1).

8. The titanium basket for continuous pre-nickel plating of steel strip according to claim 2, characterized in that: Also includes: The balancing member (5) has two balancing members, which are respectively arranged in the two clamping spaces (2-7). The balancing member (5) is used to abut against the reaction pool. The balancing member (5) comprises: A mounting seat (5-1) having a mounting groove (5-1-1), wherein the mounting groove (5-1-1) is clamped on the titanium rod (1) and the third frame (2-5); The mounting plate (5-2) is rotatably disposed on the mounting seat (5-1) and opens or closes the mounting groove (5-1-1) after rotation.

9. The titanium basket for continuous pre-nickel plating of steel strip according to claim 8, characterized in that: Also includes: A screw rod (6) passes through the mounting seat (5-1), the titanium rod (1) and the mounting plate (5-2) in sequence, and a thread is provided on the mounting seat (5-1); A support plate (7) is rotatably disposed on the screw rod (6); after the screw rod (6) rotates, the support plate (7) moves closer to or farther away from the mounting seat (5-1), and the mounting seat (5-1) abuts against the reaction pool via the support plate (7).

10. The titanium basket for continuous pre-nickel plating of steel strip according to claim 9, characterized in that: The mounting plate (5-2) has an avoidance hole (5-3), and the screw rod (6) passes through the avoidance hole (5-3).