Novel bridge temporary support

By designing new bridge temporary bearings with adjustable heights, the problems of inconvenience and high cost of traditional temporary bearings are solved, and a larger scope of use and cost reduction are achieved.

CN222024883UActive Publication Date: 2024-11-19HUNAN NO 6 ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420596570.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-26
Publication Date
2024-11-19
Estimated Expiration
2034-03-26

AI Technical Summary

Technical Problem

The traditional temporary support of sand cylinder is not conducive to the reuse of sand, the scope of use is fixed, and it is inconvenient to remove, which increases the cost of bridge construction.

Method used

A new type of temporary bridge bearing is designed, including the base plate and the support, which is connected by rebar and anchor. The anchor can be adjusted in height. After the process is completed, it can be removed and reused. The support and anchor are fixed by rebar to achieve Transition from temporary support to permanent support.

Benefits of technology

The scope of use of temporary support is expanded, easy to remove, reduces the cost of bridge construction, and the anchors and support can be reused.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222024883U_ABST
    Figure CN222024883U_ABST
Patent Text Reader

Abstract

The utility model discloses a novel bridge temporary support which comprises a bottom plate, a supporting piece is welded on the bottom plate, two sides of the supporting piece penetrate through and are provided with anchoring pieces through deformed steel bars, and the two anchoring pieces are bilaterally symmetrical about the central axis of the supporting piece. According to the novel bridge temporary support, the high-strength bolt is arranged on the third steel plate at the top of the third double-spliced channel steel, and the length of the high-strength bolt extending out of the top of the third double-spliced channel steel is adjusted by screwing the high-strength bolt, so that the overall height of the temporary support is adjusted, and the application range of the temporary support is widened; the anchoring parts and the supporting parts of the support are fixed through bolts, after the procedures of continuous beam concrete pouring, tensioning and the like are completed, the deformed steel bars are detached, the anchoring parts slide down along the grooves in the tops of the second double-spliced steel channels, and then conversion from temporary support stress to permanent support stress can be completed; and the anchoring piece and the supporting piece can be repeatedly used after being detached, so that the cost of bridge construction is effectively reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge construction, in particular to a novel temporary bridge support. Background Art

[0002] In the construction of urban and highway bridges, precast beams are widely used. When hoisting precast beams, temporary supports need to be set on the cap beams or piers in advance. After the continuous section of concrete is poured and all processes such as tensioning are completed, the subsequent system conversion is completed to achieve the connection between the precast beams and the fixed supports. Currently, commonly used temporary supports generally use sulfur mortar and sand cylinder temporary supports, with sand cylinder temporary supports being the first choice. Traditional sand cylinder temporary supports use the method of discharging sand from the middle and lower sides, which is not conducive to the reuse of sand and increases the cost of bridge construction. In addition, the height of traditional sand cylinder temporary supports is fixed, resulting in a low range of use and is not easy to dismantle.

[0003] For this purpose, we design a new type of temporary bridge bearing here. Utility Model Content

[0004] The purpose of the utility model is to provide a new type of temporary bridge support in view of the deficiencies of the prior art to solve the problems raised in the background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a set of new temporary bridge supports, including a bottom plate, a support member is welded on the bottom plate, and both sides of the support member are penetrated by threaded steel bars and installed with anchor members, and the two anchor members are symmetrical about the central axis of the support member;

[0006] The support member comprises a first double-jointed channel steel, the bottom of the first double-jointed channel steel is welded to the bottom plate, the top of the first double-jointed channel steel is welded with a first steel plate, a second double-jointed channel steel is welded on both sides of the first double-jointed channel steel, the bottoms of the two second double-jointed channel steels are welded to the bottom plate, the tops of the two second double-jointed channel steels are both provided with grooves, and the grooves are both welded with second steel plates, and the two second double-jointed channel steels are symmetrical about the central axis of the first double-jointed channel steel;

[0007] The anchoring piece comprises a third double-jointed channel steel, a third steel plate is welded on the top of the third double-jointed channel steel, screw holes are arranged on the third steel plate, and high-strength bolts are connected to the screw holes through threads, a groove is arranged on the bottom of the third double-jointed channel steel, and a fourth steel plate is welded at the groove.

[0008] Preferably, the height of the first double-jointed channel steel is higher than that of the second double-jointed channel steel, and screw holes penetrating the first double-jointed channel steel are reserved on both sides of the first double-jointed channel steel, and the screw holes are located above the second double-jointed channel steel.

[0009] Preferably, a screw hole penetrating through the third double-jointed channel steel is provided on the side surface of the third double-jointed channel steel.

[0010] Preferably, when the anchor is fixed on the support, the groove at the top of the second double-jointed channel steel fits with the groove at the bottom of the third double-jointed channel steel.

[0011] Compared with the prior art, the utility model provides a new type of temporary bridge support, which has the following beneficial effects:

[0012] This new type of temporary bridge support is equipped with high-strength bolts on the third steel plate at the top of the third double-jointed channel steel. The length of the high-strength bolts extending from the top of the third double-jointed channel steel can be adjusted by screwing the high-strength bolts, thereby adjusting the overall height of the temporary support, thereby expanding the scope of use of the temporary support. Moreover, the anchor and support of the support are fixed by bolts. After completing the continuous beam concrete pouring and tensioning processes, the force conversion from the temporary support to the permanent support can be completed by removing the threaded steel and allowing the anchor to slide down along the slope of the top of the second double-jointed channel steel, thereby facilitating the subsequent removal of the temporary support. The anchor and support can be reused after removal, effectively reducing the cost of bridge construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0014] Figure 2 It is a schematic diagram of the structure of each component of the utility model;

[0015] Figure 3 This is a schematic diagram of the structure of the support member of the utility model;

[0016] Figure 4 This is a schematic diagram of the structure of the anchoring piece of the utility model.

[0017] Figure numerals: 1. base plate; 2. support member; 21. first double-jointed channel steel; 22. first steel plate; 23. second double-jointed channel steel; 24. second steel plate; 3. anchor member; 31. third double-jointed channel steel; 32. third steel plate; 33. fourth steel plate; 34. high-strength bolt; 4. threaded steel; 5. cap beam; 6. prefabricated box beam. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0019] See also Figure 1-Figure 4In this embodiment: a group of new temporary bridge bearings includes a bottom plate 1, a support member 2 is welded on the bottom plate 1, and both sides of the support member 2 are penetrated by threaded steel bars 4 and installed with anchors 3, and the two anchors 3 are symmetrical about the central axis of the support member 2. When the temporary bearing is in use, the bottom plate 1 is fixedly installed on the bridge cap beam 5, and the anchors 3 are used to support the prefabricated box beam 6 of the bridge;

[0020] See also Figure 3 The bottom plate 1 and the support member 2 are an integral whole, and the support member 2 includes a first double-jointed channel steel 21, the bottom of the first double-jointed channel steel 21 is welded to the bottom plate 1, and a first steel plate 22 is welded to the top of the first double-jointed channel steel 21. A second double-jointed channel steel 23 is welded to each side of the first double-jointed channel steel 21, and the bottoms of the two second double-jointed channel steels 23 are welded to the bottom plate 1. The tops of the two second double-jointed channel steels 23 are provided with grooves, and the grooves are welded with second steel plates 24. The two second double-jointed channel steels 23 are symmetrical about the central axis of the first double-jointed channel steel 21, and the height of the first double-jointed channel steel 21 is higher than that of the second double-jointed channel steel 23. Screw holes penetrating the first double-jointed channel steel 21 are reserved on both sides of the first double-jointed channel steel 21, and the screw holes are located above the second double-jointed channel steel 23. The two reserved screw holes are used for the subsequent installation of anchors 3;

[0021] See also Figure 4 The anchor 3 includes a third double-piece channel steel 31, a third steel plate 32 is welded to the top of the third double-piece channel steel 31, a screw hole is provided on the third steel plate 32, and a high-strength bolt 34 is threadedly connected to the screw hole. After the anchor 3 is fixed to the support 2, the length of the high-strength bolt 34 extending from the top of the third double-piece channel steel 31 can be adjusted by rotating the high-strength bolt 34, so as to adjust the overall height of the temporary support, thereby making the temporary support have a wider range of use. The bottom of the third double-piece channel steel 31 is provided with a groove, and a fourth steel plate 33 is welded at the groove. A screw hole that penetrates the third double-piece channel steel 31 is provided on the side of the third double-piece channel steel 31, which is used The threaded steel bar 4 passes through the screw hole and the screw hole reserved on the first double-jointed channel steel 21, and the anchor 3 can be fixedly installed on the support 2. When the anchor 3 is fixed on the support 2, the distance from the top of the third double-jointed channel steel 31 to the bottom plate 1 is greater than the distance from the top of the first double-jointed channel steel 21 to the bottom plate 1, and the groove at the top of the second double-jointed channel steel 23 fits with the groove at the bottom of the third double-jointed channel steel 31. After completing the continuous beam concrete pouring and tensioning processes, the threaded steel bar 4 is removed, and the third double-jointed channel steel 31 can slide down along the groove at the top of the second double-jointed channel steel 23. At this time, the anchor 3 will be detached from the prefabricated box girder 6 of the bridge, thereby completing the conversion of temporary support force to permanent support force.

[0022] The working principle and use process of the utility model are as follows: when the new temporary bridge support is in use, the various accessories of the temporary support are processed in the factory in advance and transported to the construction site, and the various components are hoisted onto the cap beam 5 by a crane, and the support member 2 is placed on the cap beam 5 with the base plate 1 facing downward, and then the two anchors 3 are fixedly installed on both sides of the support member 2 with threaded steel bars 4 for use in bridge construction. After completing the continuous beam concrete pouring and tensioning processes, the threaded steel bars 4 are removed, and the third double-jointed channel steel 31 can slide down along the slope of the top of the second double-jointed channel steel 23. At this time, the anchor 3 will be separated from the prefabricated box beam 6 of the bridge, thereby completing the conversion of the temporary support force to the permanent support force, and finally the two anchors 3 are removed from the support member 2, and the disassembled support member 2 and anchor 3 can be reused.

[0023] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A new type of temporary bridge support, comprising a bottom plate (1), Features: A support member (2) is welded to the bottom plate (1), and threaded steel bars (4) penetrate through both sides of the support member (2) and are provided with anchor members (3) installed thereon, wherein the two anchor members (3) are symmetrical with respect to the central axis of the support member (2); The support member (2) comprises a first double-jointed channel steel (21), the bottom of the first double-jointed channel steel (21) is welded to the bottom plate (1), the top of the first double-jointed channel steel (21) is welded with a first steel plate (22), a second double-jointed channel steel (23) is welded to each side of the first double-jointed channel steel (21), the bottoms of the two second double-jointed channel steels (23) are welded to the bottom plate (1), the tops of the two second double-jointed channel steels (23) are provided with grooves, and the grooves are welded with second steel plates (24), and the two second double-jointed channel steels (23) are symmetrical about the central axis of the first double-jointed channel steel (21); The anchor (3) comprises a third double-jointed channel steel (31), a third steel plate (32) being welded to the top of the third double-jointed channel steel (31), a screw hole being provided on the third steel plate (32), and a high-strength bolt (34) being threadedly connected to the screw hole, and a groove being provided at the bottom of the third double-jointed channel steel (31), and a fourth steel plate (33) being welded to the groove.

2. A new type of temporary bridge support according to claim 1, Features: The height of the first double-jointed channel steel (21) is higher than that of the second double-jointed channel steel (23), and screw holes penetrating the first double-jointed channel steel (21) are reserved on both sides of the first double-jointed channel steel (21), wherein the screw holes are located above the second double-jointed channel steel (23).

3. A new type of temporary bridge support according to claim 1, Features: A screw hole penetrating the third double-jointed channel steel (31) is provided on the side surface of the third double-jointed channel steel (31).

4. A new type of temporary bridge support according to claim 1, Features: When the anchor (3) is fixed to the support (2), the groove at the top of the second double-jointed channel steel (23) fits with the groove at the bottom of the third double-jointed channel steel (31).