Experimental device for simulating ice force of steel pipe pile
By designing an ice force experimental device for simulated steel pipe piles, using jacks and fine-rolled rebars to transmit forces, the ice force experimental structure is simplified, the authenticity is improved, and the problem of complex structure and insufficient authenticity in the existing technology is solved.
Patent Information
- Application Number
- CN202323667617.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-29
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2033-12-29
AI Technical Summary
In the prior art, when bridge construction detects the impact of ice load on steel pipe piles in cold-zone reservoirs, the structure is complex and the authenticity is insufficient, and there is a lack of effective solutions.
Design an experimental device for simulating the ice force of steel pipe piles, including load detection parts, left pull rods, right pull rods, left steel pipe piles and right steel pipe piles, apply force through jacks, and use fine-rolled rebar and cross beams to transmit force. Ice force experiments under simple structures are realized, and the left steel pipe pile and the right steel pipe pile are fixed in the reservoir to simulate the ice load.
It realizes a simple structural design for ice force experiments in a real environment, improves the authenticity and simplicity of the experiment, and solves the problem of complex structure and insufficient authenticity.
Smart Images

Figure CN222025119U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of bridge construction, and in particular to a device for simulating ice forces of steel pipe piles. Background Art
[0002] When the bridge project is located in a reservoir in a cold region, it is necessary to build a steel trestle in the water. However, the ice load generated by the freezing of the reservoir in winter affects the steel pipe piles of the steel trestle.
[0003] In the prior art, it is often necessary to establish a steel trestle model and a reservoir environment, and then use corresponding load detection devices to detect the ice load generated by ice and analyze the impact of the ice load generated by ice on the steel pipe piles of the steel trestle; the structure is very complex and the realism is not enough.
[0004] With regard to the problems of complex structures and insufficient realism in related technologies, no effective solution has been proposed so far. Summary of the invention
[0005] The main purpose of the present application is to provide a simulated steel pipe pile ice force test device to solve the problems of a very complex structure and insufficient realism.
[0006] In order to achieve the above-mentioned purpose, according to one aspect of the present application, a device for simulating ice force of steel pipe piles is provided.
[0007] The simulated steel pipe pile ice force experimental device according to the present application includes: a load detection part, the right end of the load detection part is connected to a left pull rod part, and the left end is connected to a right pull rod part, the left end of the left pull rod part is connected to a left steel pipe pile, and the right end of the right pull rod part is connected to a right steel pipe pile, and the left steel pipe pile and the right steel pipe pile are fixed in a reservoir.
[0008] Furthermore, the load detection component is a jack.
[0009] Furthermore, a left support frame is provided at the right end of the left tie rod, and the left support frame is fixed on the left steel pipe pile; a right support frame is provided at the left end of the right tie rod, and the right support frame is fixed on the right steel pipe pile.
[0010] Furthermore, the left tie rod and the right tie rod are two parallel-arranged precision-rolled threaded steel bars.
[0011] Furthermore, a left cross beam is provided at the left end of the left pull rod, a right cross beam is provided at the right end of the right pull rod, the right end of the load detection member abuts against the left side surface of the left cross beam, and the left end abuts against the right side surface of the right cross beam.
[0012] Furthermore, the left cross beam is connected to the left end of the left tie rod through a threaded fastener; and the right cross beam is connected to the right end of the right tie rod through a threaded fastener.
[0013] Furthermore, the diameter of the left steel pipe pile is smaller than the diameter of the right steel pipe pile.
[0014] Furthermore, the upper parts of the left steel pipe pile and the right steel pipe pile are poured with concrete.
[0015] Furthermore, the distance between the left steel pipe pile and the right steel pipe pile is 6m.
[0016] Furthermore, the left steel pipe pile is buried to a depth of 10 m, and the right steel pipe pile is buried to a depth of 6 m.
[0017] In the embodiment of the present application, a method of simulating the effect of ice load on steel pipe piles is adopted, through a load detection part, the right end of the load detection part is connected to a left pull rod part, and the left end is connected to a right pull rod part, the left end of the left pull rod part is connected to a left steel pipe pile, and the right end of the right pull rod part is connected to a right steel pipe pile, and the left steel pipe pile and the right steel pipe pile are fixed in a reservoir; the purpose of using a simple structure to conduct ice force experiments in a real environment is achieved, thereby achieving a technical effect of simple structure and high authenticity, and further solving the technical problem of very complex structure and insufficient authenticity. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The drawings constituting a part of this application are used to provide a further understanding of this application, so that other features, purposes and advantages of this application become more obvious. The schematic embodiment drawings and their descriptions of this application are used to explain this application and do not constitute an improper limitation on this application. In the drawings:
[0019] Figure 1 is a structural schematic diagram of a simulated steel pipe pile ice force experimental device according to an embodiment of the present application;
[0020] Figure 2 is a top view of a simulated steel pipe pile ice force test device according to an embodiment of the present application;
[0021] Figure 3 It is a partial schematic diagram of a simulated steel pipe pile ice force test device according to an embodiment of the present application.
[0022] Reference numerals
[0023] 1. Load detection part; 2. Left tie rod; 3. Right tie rod; 4. Left steel pipe pile; 5. Right steel pipe pile; 6. Left support frame; 7. Right support frame; 8. Left cross beam; 9. Right cross beam; 10. Concrete. DETAILED DESCRIPTION
[0024] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0025] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0026] In this application, the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings. These terms are mainly used to better describe the utility model and its embodiments, and are not used to limit the indicated devices, elements or components to have a specific orientation, or to be constructed and operated in a specific orientation.
[0027] In addition, some of the above terms may be used to express other meanings in addition to indicating orientation or positional relationship. For example, the term "on" may also be used to express a certain dependency or connection relationship in some cases. For those skilled in the art, the specific meanings of these terms in this utility model can be understood according to specific circumstances.
[0028] In addition, the terms "installed", "set", "provided with", "connected", "connected", and "socketed" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection, or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be an internal connection between two devices, elements, or components. For those of ordinary skill in the art, the specific meanings of the above terms in this utility model can be understood according to specific circumstances.
[0029] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0030] like Figure 1-3 As shown, the present application relates to a simulated steel pipe pile ice force experimental device, which comprises: a load detection component 1, the right end of the load detection component 1 is connected to a left tie rod 2, and the left end is connected to a right tie rod 3, the left end of the left tie rod 2 is connected to a left steel pipe pile 4, the right end of the right tie rod 3 is connected to a right steel pipe pile 5, and the left steel pipe pile 4 and the right steel pipe pile 5 are fixed in a reservoir.
[0031] Specifically, the load detection member 1 is used to detect the load generated at its installation position; preferably, the load detection member 1 is a jack; if a load is generated at the jack installation position, the load size at this moment can be determined by reading the jack value. The left tie rod 2 and the right tie rod 3 have the function of transmitting force to the left steel pipe pile 4 and the right steel pipe pile 5; in this embodiment, the left tie rod 2 and the right tie rod 3 are two parallel fine-rolled threaded steel bars, which are convenient for threaded connection; further, the left cross beam 8 is connected to the left end of the left tie rod 2 by a threaded fastener; the right cross beam 9 is connected to the right end of the right tie rod 3 by a threaded fastener; since the left tie rod 2 and the right tie rod 3 have threads, it is only necessary to connect nuts at the connection to achieve fixation. The left steel pipe pile 4 and the right steel pipe pile 5 have the function of simulating the supporting part of the steel trestle; in this embodiment, preferably, the diameter of the left steel pipe pile 4 is smaller than the diameter of the right steel pipe pile 5; further, the upper parts of the left steel pipe pile 4 and the right steel pipe pile 5 are poured with concrete 10; further, the spacing between the left steel pipe pile 4 and the right steel pipe pile 5 is 6m; further, the burial depth of the left steel pipe pile 4 is 10m, and the burial depth of the right steel pipe pile 5 is 6m.
[0032] The specific experimental process is as follows: before the reservoir freezes, the left and right steel pipe piles 5 are driven into the riverbed, and the above structure is combined into a simulated steel pipe pile ice force experimental device. After the ice layer is formed, the jack is slowly driven to apply force to the left tie rod 2 and the right tie rod 3 on both sides. The force is transmitted to the left steel pipe pile 4 and the right steel pipe pile 5 through the left tie rod 2 and the right tie rod 3. At the same time, the left steel pipe pile 4 and the right steel pipe pile 5 generate a reaction force that acts on the jack through the above path. In this way, the force applied to the jack can display the value of the load; since the jack slowly applies force to both sides, when the force reaches a certain level, it will cause the ice to break. At this time, the load value of the jack is the load value that breaks the ice.
[0033] Obviously, the thickness of the ice will determine the load force that ultimately breaks it. Therefore, the above-mentioned experimental method can also be used to measure the force value that breaks the ice when the ice thickness is different.
[0034] From the above description, it can be seen that the present application achieves the following technical effects:
[0035] In the embodiment of the present application, a method of simulating the effect of ice load on steel pipe piles is adopted, through a load detection component 1, the right end of the load detection component 1 is connected to a left pull rod 2, and the left end is connected to a right pull rod 3, the left end of the left pull rod 2 is connected to a left steel pipe pile 4, the right end of the right pull rod 3 is connected to a right steel pipe pile 5, and the left steel pipe pile 4 and the right steel pipe pile 5 are fixed in the reservoir; the purpose of using a simple structure to conduct ice force experiments in a real environment is achieved, thereby achieving a technical effect of simple structure and high authenticity, and then solving the technical problem of very complex structure and insufficient authenticity.
[0036] Preferably, the right end of the left tie rod 2 is provided with a left support frame 6, and the left support frame 6 is fixed to the left steel pipe pile 4; the left end of the right tie rod 3 is provided with a right support frame 7, and the right support frame 7 is fixed to the right steel pipe pile 5. The left and right support frames 7 are used to fix the left and right tie rods 3 and the left and right steel pipe piles 5, and the connection is simple and reliable.
[0037] Preferably, the left end of the left tie rod 2 is provided with a left cross beam 8, the right end of the right tie rod 3 is provided with a right cross beam 9, the right end of the load detection member 1 is against the left side of the left cross beam 8, and the left end is against the right side of the right cross beam 9. The left and right cross beams 9 can be used to support the jack, so that the force can be effectively transmitted to the left and right steel pipe piles 5.
[0038] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A simulated steel pipe pile ice force test device, characterized in that: include: A load detection member (1), wherein the right end of the load detection member (1) is connected to a left tie rod member (2), and the left end is connected to a right tie rod member (3), the left end of the left tie rod member (2) is connected to a left steel pipe pile (4), and the right end of the right tie rod member (3) is connected to a right steel pipe pile (5), and the left steel pipe pile (4) and the right steel pipe pile (5) are fixed in a reservoir.
2. The simulated steel pipe pile ice force experimental device according to claim 1 is characterized in that: The load detection component (1) is a jack.
3. The simulated steel pipe pile ice force experimental device according to claim 1 is characterized in that: The right end of the left tie rod (2) is provided with a left support frame (6), and the left support frame (6) is fixed on the left steel pipe pile (4); the left end of the right tie rod (3) is provided with a right support frame (7), and the right support frame (7) is fixed on the right steel pipe pile (5).
4. The simulated steel pipe pile ice force experimental device according to claim 1 is characterized in that: The left pull rod (2) and the right pull rod (3) are two parallel-arranged precision-rolled threaded steel bars.
5. The simulated steel pipe pile ice force experimental device according to claim 1 is characterized in that: The left end of the left pull rod (2) is provided with a left cross beam (8), the right end of the right pull rod (3) is provided with a right cross beam (9), the right end of the load detection component (1) abuts against the left side surface of the left cross beam (8), and the left end abuts against the right side surface of the right cross beam (9).
6. The simulated steel pipe pile ice force experimental device according to claim 5 is characterized in that: The left cross beam (8) is connected to the left end of the left tie rod (2) via a threaded fastener; and the right cross beam (9) is connected to the right end of the right tie rod (3) via a threaded fastener.
7. The simulated steel pipe pile ice force experimental device according to claim 1 is characterized in that: The diameter of the left steel pipe pile (4) is smaller than the diameter of the right steel pipe pile (5).
8. The simulated steel pipe pile ice force experimental device according to claim 1 is characterized in that: The upper parts of the left steel pipe pile (4) and the right steel pipe pile (5) are poured with concrete (10).
9. The simulated steel pipe pile ice force experimental device according to claim 1, characterized in that: The distance between the left steel pipe pile (4) and the right steel pipe pile (5) is 6m.
10. The simulated steel pipe pile ice force experimental device according to claim 1, characterized in that: The left steel pipe pile (4) is embedded in the ground to a depth of 10 m, and the right steel pipe pile (5) is embedded in the ground to a depth of 6 m.
