Obstacle removing device for building construction
By designing a construction cleaner device with lifting mechanism and shovel assembly, the problem of low cleaning efficiency and inability to take into account large and small obstacles in the prior art is solved, and efficient obstacle cleaning and safety at the construction site are achieved. Sex improvement.
Patent Information
- Application Number
- CN202323459586.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-18
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2033-12-18
AI Technical Summary
In existing construction, the cleaning efficiency of construction waste and obstacles is low, the labor intensity is high, and the existing barrier cleaning device is difficult to take into account the cleaning of large and small obstacles, especially for small sand and gravel and solidified cement blocks.
A construction wreck cleaning device for construction including a lifting mechanism and a shovel assembly is designed. The lifting mechanism controls the length of the lifting boom through a hydraulic rod. The shovel assembly has a bucket and a bucket teeth, which can lift and shovel large and small sizes. Obstacles and place them in storage baskets or stacking chambers.
It realizes efficient lifting and eradication of large obstacles, saves labor costs, and can effectively clean up fine sand and gravel and solidified cement blocks, improving the cleaning efficiency and safety of the construction site.
Smart Images

Figure CN222025132U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of construction obstacle removal, in particular to an obstacle removal device for building construction. Background Art
[0002] When existing construction is completed or in use, a lot of construction waste or daily garbage, sand and gravel, etc. will remain on the construction site. These remaining garbage will affect the safety of road use. Most of these garbage are cleared manually, which greatly reduces work efficiency, increases labor intensity and increases labor costs. Therefore, a roadblock removal device for construction is needed.
[0003] Most of the existing obstacle removal devices are rough, and obstacles in many places cannot be completely removed. Large obstacles need to be lifted and moved to a storage place when clearing, and many traces will be left in the process of moving, which also needs to be cleaned manually. In addition, fine sand and gravel or solidified cement blocks cannot be taken into account. Therefore, a obstacle removal device for construction is proposed to address the above problems. Utility Model Content
[0004] The utility model aims to solve the shortcomings in the prior art and proposes an obstacle clearing device for construction.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] A barrier clearing device for construction, the barrier clearing device comprising a first base and a second base, the front end of the first base being fixedly connected to the second base, a movably connected storage basket being provided on the top of the first base, a lifting mechanism being installed on the top of the second base near the first base, a stacking cavity being provided on the top of the second base, a baffle being fixedly connected to the second base, an end of the second base away from the lifting mechanism being connected to a shovel assembly, the shovel assembly comprising a bucket, the interior of the bucket being hollow, and a third rotating shaft being fixedly connected to the outer walls on both sides of the bucket.
[0007] Preferably, the lifting mechanism includes a slewing bearing and a motor, a rotatably connected slewing bearing is provided on the top of the second base, the top of the slewing bearing is connected to a support seat, a fixedly connected motor is provided on the support seat, the output end at the bottom of the motor passes through the support seat and is rotatably connected to a pinion, the pinion engages with the edge of the slewing bearing, a first bracket and a second bracket are fixedly connected to the support seat, the tops of the first bracket and the second bracket are simultaneously connected to a lifting arm, a fixedly connected first mounting seat is provided on the side wall of the second bracket, the first mounting seat is rotatably connected to a first hydraulic rod, and the end of the first hydraulic rod away from the first mounting seat is slidably connected to the lifting arm.
[0008] Preferably, the shovel assembly includes a second hydraulic rod, a third rotating shaft rotatably connected to the second hydraulic rod, a second fixed mounting seat is provided on the top of the second base, one end of the second hydraulic rod away from the third rotating shaft is rotatably connected to the second mounting seat, one end of the bucket is rotatably connected to the first rotating shaft, the first rotating shaft is simultaneously rotatably connected to the side wall of the second base, a rotatably connected top cover is provided on the top of the bucket, the top cover is rotatably connected to the bucket through the second rotating shaft, and evenly distributed bucket teeth are provided on the bottom of the bucket.
[0009] Preferably, evenly distributed moving wheels are provided at the bottom of the first base and the second base, and the number of the moving wheels is six.
[0010] Preferably, a movably connected steel wire rope is installed inside the lifting arm, and one end of the steel wire rope away from the lifting arm is connected to a hook.
[0011] Preferably, a fixedly connected push handle is provided on the top of the first base, and the push handle is symmetrically distributed.
[0012] Preferably, the third rotating shaft and the second hydraulic rod are symmetrically distributed on both sides of the bucket.
[0013] Compared with the prior art, the beneficial effects of the utility model are:
[0014] 1. In the utility model, the length of the lifting arm can be controlled by setting the first hydraulic rod, so that obstacles at different positions can be lifted by the lifting mechanism. The slewing bearing and the storage basket can be set so that the lifting mechanism can be rotated after the obstacle is lifted to place the obstacle in the storage basket without moving the obstacle separately.
[0015] 2. In the utility model, fine sand and gravel can be cleaned by setting a shovel assembly, and the sand and gravel are scooped up with a bucket, and the sand and gravel are placed in a stacking cavity by turning the bucket over. Bucket teeth are distributed at the bottom of the bucket, and solidified cement blocks can also be scooped up with the bucket teeth, which is more convenient to use. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a schematic diagram of the overall structure of an obstacle removal device for construction proposed by the utility model;
[0017] Figure 2 This is a cross-sectional view of an obstacle removal device for construction proposed by the utility model;
[0018] Figure 3 This is a front view of an obstacle removal device for construction proposed by the utility model;
[0019] Figure 4 It is a schematic structural diagram of a shovel assembly of an obstacle removal device for construction proposed in the utility model;
[0020] In the figure: 1. first base; 2. second base; 3. storage basket; 4. shovel assembly; 5. first bracket; 6. first hydraulic rod; 7. lifting arm; 8. motor; 9. slewing bearing; 10. second bracket; 11. first mounting seat; 12. wire rope; 13. hook; 14. support seat; 15. baffle; 16. moving wheel; 17. push handle; 18. lifting mechanism; 19. stacking chamber; 41. bucket; 42. first rotating shaft; 43. third rotating shaft; 44. second mounting seat; 45. second hydraulic rod; 46. second rotating shaft; 47. bucket teeth; 48. top cover. DETAILED DESCRIPTION
[0021] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0022] Reference Figure 1-4 A barrier clearing device for construction, the barrier clearing device comprises a first base 1 and a second base 2, the first base 1 and the second base 2 are fixedly connected, a movably connected storage basket 3 is provided on the top of the first base 1, which can be used to place large obstacles for lifting, a lifting mechanism 18 is installed on the second base 2 near the top of the first base 1, when a large obstacle hinders the construction, the lifting mechanism 18 can be used to remove it, a stacking cavity 19 is provided on the top of the second base 2, the stacking cavity 19 is separated from the lifting mechanism 18 by a baffle 15, the baffle 15 is fixedly connected to the second base 2, the end of the second base 2 away from the lifting mechanism 18 is connected to a shovel assembly 4, the shovel assembly 4 comprises a bucket 41, the bucket 41 is hollow inside, and a third rotating shaft 43 is fixedly connected to the outer walls on both sides of the bucket 41, and the shovel assembly 4 can be used to clear fine sand and gravel on the road.
[0023] The lifting mechanism 18 includes a slewing bearing 9 and a motor 8. A rotatably connected slewing bearing 9 is provided on the top of the second base 2. The top of the slewing bearing 9 is connected to a support seat 14. A fixedly connected motor 8 is provided on the support seat 14. The output end at the bottom of the motor 8 passes through the support seat 14 and is rotatably connected to a pinion gear. The pinion gear meshes with the edge of the slewing bearing 9. When the motor 8 is started, the slewing bearing 9 can be driven to rotate, and the support seat 14 also rotates accordingly, so that the rotation direction of the lifting mechanism 18 can be controlled. The first bracket 5 and the second bracket 10 are fixedly connected to the support seat 14. The first bracket 5 and the second bracket 10 form a triangular stable structure to ensure the stability of the lifting mechanism 18. The tops of the first bracket 5 and the second bracket 10 are simultaneously connected to the lifting arm 7. A fixedly connected first mounting seat 11 is provided on the side wall of the second bracket 10. The first mounting seat 11 is rotatably connected to the first hydraulic rod 6. The end of the first hydraulic rod 6 away from the first mounting seat 11 is slidably connected to the lifting arm 7. When there are large obstacles in the construction, the lifting mechanism 18 can be used to lift it, and then the lifting mechanism 18 is rotated to move it to the storage basket 3.
[0024] The shovel assembly 4 includes a second hydraulic rod 45, a third rotating shaft 43 is rotatably connected to the second hydraulic rod 45, a second mounting seat 44 is fixedly connected to the top of the second base 2, one end of the second hydraulic rod 45 away from the third rotating shaft 43 is rotatably connected to the second mounting seat 44, one end of the bucket 41 is rotatably connected to the first rotating shaft 42, and the first rotating shaft 42 is rotatably connected to the side wall of the second base 2 at the same time, and the stretching of the second hydraulic rod 45 drives the overturning of the bucket 41, and a rotatably connected top cover 48 is provided on the top of the bucket 41, and the top cover 48 is rotatably connected to the bucket 41 through the second rotating shaft 46, and the bottom of the bucket 41 is provided with evenly distributed bucket teeth 47. After the bucket 41 is used to clean fine sand and gravel during construction, the second hydraulic rod 45 is stretched to overturn the bucket 41, and the top cover 48 is pushed open by the weight of the sand and gravel, and the sand and gravel are poured into the stacking cavity 19 from the lower part of the top cover 48. Pouring sand and gravel from the lower part of the top cover 48 can reduce the probability of sand and gravel leaking into the gap of the second rotating shaft 46 and affecting the rotation function.
[0025] The first base 1 and the second base 2 are provided with evenly distributed moving wheels 16 at the bottom. The number of the moving wheels 16 is six. When the obstacle removal device is used, the moving wheels 16 can be used to move it at the construction site, which is convenient for movement and saves labor costs.
[0026] A fixed push handle 17 is provided on the top of the first base 1. The push handles 17 are symmetrically distributed and there are two push handles 17. An operator can use the push handles 17 to push the obstacle removal device to a desired location, which is convenient for the operator to use.
[0027] A movably connected steel wire rope 12 is installed inside the lifting arm 7, and one end of the steel wire rope 12 away from the lifting arm 7 is connected to a hook 13. The length of the steel wire rope 12 is adjustable, and the hook 13 can lift large obstacles.
[0028] The third rotating shaft 43 and the second hydraulic rod 45 are symmetrically distributed on both sides of the bucket 41 . When the bucket 41 turns over, it will not roll over due to unbalanced stretching, thereby improving the stability of the bucket 41 .
[0029] In the utility model, during actual use, the operator uses the push handle 17 and the moving wheel 16 to push the obstacle removal device to the required location. When the obstacle is relatively large, the first hydraulic rod 6 is stretched to move the lifting arm 7 to the bottom of the obstacle, and the wire rope 12 moves downward with the hook 13. After the hook 13 hooks the obstacle, the motor 8 is started, the motor 8 starts to rotate, driving the slewing bearing 9 to rotate, and the support seat 14 also rotates accordingly. The lifting mechanism 18 starts to rotate, and when the obstacle is rotated to the bottom of the storage basket 3, the obstacle is placed in the storage basket 3, and then the obstacle removal device is removed. There is no need to find other operators or devices to clear the obstacle. When the obstacle is removed, there is still fine sand on the construction site. The stones cannot be lifted away by the lifting mechanism 18, but can be cleared by using the shovel assembly 4. The obstacle removal device is pushed to push the sand and stones into the bucket 41, and the bucket 41 is turned over by stretching the second hydraulic rod 45. The top cover 48 is pushed open by the weight of the sand and stones, and the sand and stones are poured into the stacking cavity 19 from the bottom of the top cover 48. Pouring the sand and stones from the bottom of the top cover 48 can reduce the probability of sand and stones leaking into the gap of the second rotating shaft 46 and affecting the rotation function. The bottom of the bucket 41 is provided with evenly distributed bucket teeth 47. The bucket teeth 47 can also shovel up the residual cement blocks on the construction road surface. The cement blocks are solidified on the ground. The bucket teeth 47 are sharp and cleaning is simpler and more labor-saving. After the obstacles on the construction site are cleared, the obstacle removal device can be pushed to the storage place.
[0030] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. An obstacle clearing device for construction, the obstacle clearing device comprising a first base (1) and a second base (2), characterized in that: The front end of the first base (1) is fixedly connected to the second base (2); a movably connected storage basket (3) is provided on the top of the first base (1); a lifting mechanism (18) is installed on the top of the second base (2) near the first base (1); a stacking cavity (19) is provided on the top of the second base (2); a baffle (15) is fixedly connected to the second base (2); an end of the second base (2) away from the lifting mechanism (18) is connected to a shovel assembly (4); the shovel assembly (4) comprises a bucket (41); the bucket (41) is hollow inside; and third rotating shafts (43) are fixedly connected to the outer walls on both sides of the bucket (41).
2. The obstacle removal device for construction according to claim 1, characterized in that: The lifting mechanism (18) comprises a slewing bearing (9) and a motor (8). A rotatably connected slewing bearing (9) is provided on the top of the second base (2). The top of the slewing bearing (9) is connected to a support seat (14). A fixedly connected motor (8) is provided on the support seat (14). The bottom output end of the motor (8) passes through the support seat (14) and is rotatably connected to a pinion. The pinion engages with the edge of the slewing bearing (9). A first bracket (5) and a second bracket (10) are fixedly connected to the support seat (14). The tops of the first bracket (5) and the second bracket (10) are simultaneously connected to a lifting arm (7). A fixedly connected first mounting seat (11) is provided on the side wall of the second bracket (10). The first mounting seat (11) is rotatably connected to a first hydraulic rod (6). The end of the first hydraulic rod (6) away from the first mounting seat (11) is slidably connected to the lifting arm (7).
3. The obstacle removal device for construction according to claim 2, characterized in that: The shovel assembly (4) comprises a second hydraulic rod (45), a third rotating shaft (43) rotatably connected to the second hydraulic rod (45), a second mounting seat (44) fixedly connected to the top of the second base (2), an end of the second hydraulic rod (45) away from the third rotating shaft (43) rotatably connected to the second mounting seat (44), one end of the bucket (41) rotatably connected to the first rotating shaft (42), the first rotating shaft (42) is rotatably connected to the side wall of the second base (2), a rotatably connected top cover (48) is provided on the top of the bucket (41), the top cover (48) is rotatably connected to the bucket (41) through the second rotating shaft (46), and evenly distributed bucket teeth (47) are provided on the bottom of the bucket (41).
4. The obstacle removal device for construction according to claim 3, characterized in that: The bottom of the first base (1) and the second base (2) are provided with evenly distributed moving wheels (16), and the number of the moving wheels (16) is six.
5. The obstacle removal device for construction according to claim 4, characterized in that: A push handle (17) is fixedly connected to the top of the first base (1), and the push handle (17) is symmetrically distributed.
6. The obstacle clearing device for construction according to claim 5, characterized in that: A movably connected steel wire rope (12) is installed inside the lifting arm (7), and one end of the steel wire rope (12) away from the lifting arm (7) is connected to a hook (13).
7. The obstacle removal device for construction according to claim 6, characterized in that: The third rotating shaft (43) and the second hydraulic rod (45) are symmetrically distributed on both sides of the bucket (41).