Fabricated multi-step energy-dissipation self-resetting beam-column joint with shaft pin

By setting up a shaft pin mechanism, friction device and self-resetting mechanism between the steel pipe concrete column and the concrete beam, the problem of no reset function in the existing technology under the action of high-strength earthquakes is solved, and the self-resetting and seismic resistance of the beam and column structure is realized. Improvement.

CN222025254UActive Publication Date: 2024-11-19FUJIAN JIUDING CONSTR GRP CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420148968.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-22
Publication Date
2024-11-19
Estimated Expiration
2034-01-22

AI Technical Summary

Technical Problem

The existing self-reset square steel pipe concrete column foot nodes with friction anchoring devices do not have a reset function under high-strength seismic action, and have poor seismic resistance and cannot effectively reduce structural damage.

Method used

A prefabricated multi-step energy-consuming self-reset beam and column node with shaft pin is designed, and the steel pipe concrete column and concrete beam are connected through shaft pin mechanism, and a friction device and a self-reset mechanism are set up therein. The friction device is used to perform small earthquakes. Time-consuming energy, reduce seismic energy level gradually during medium and large earthquakes, and restore the original state after the earthquake is over through a self-reset mechanism.

Benefits of technology

It effectively reduces damage to the beam and column structure in earthquakes, realizes self-resetting of the structure, reduces maintenance and replacement costs, and improves seismic resistance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222025254U_ABST
    Figure CN222025254U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of earthquake prevention and disaster reduction of building structures, and particularly relates to an assembly type multi-step energy dissipation self-resetting beam column joint with a shaft pin. According to the utility model, the concrete-filled steel tubular column and the concrete beam are connected through the shaft pin mechanism, so that the concrete-filled steel tubular column and the concrete beam can move relatively, and the friction device is arranged between the concrete-filled steel tubular column and the concrete beam, so that the concrete-filled steel tubular column and the concrete beam can move relatively in case of small earthquakes; at the moment, the friction device and the self-resetting mechanism simultaneously consume energy; when a medium-large earthquake occurs, the shaft pin mechanism rotates to a limit position, at the moment, the friction device achieves yield energy consumption, earthquake energy is reduced step by step, and therefore damage to a beam column structure is reduced. And through the arrangement of the self-resetting mechanism, the concrete-filled steel tubular column and the concrete beam can recover to the original state after the earthquake is finished, and the maintenance and replacement cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of earthquake prevention and disaster reduction of building structures, and particularly relates to an assembled multi-stage energy-absorbing self-resetting beam-column node with an axle pin. Background Art

[0002] The Chinese patent with publication number CN219621951U discloses a self-resetting square steel tube concrete column foot node with a friction anchor device, including steel beam one and steel beam two, a steel beam U-shaped frame, a fixed plate, and an installation mechanism. The installation mechanism includes a movable installation plate, and a limit bearing, a sliding groove, a movable block, and an installation slide are fixedly connected in the middle of the movable installation plate. This assembled beam-column node can be installed without welding, thereby reducing the difficulty of installation and increasing the construction rate. However, the defect of this technical solution is that it has no reset function under the action of high-intensity earthquakes, and the seismic performance is poor. Therefore, there is an urgent need for an assembled multi-stage energy-consuming self-resetting beam-column node with an axle pin. Utility Model Content

[0003] The utility model aims to provide an assembled multi-stage energy-absorbing self-resetting beam-column node with an axle pin to solve the above-mentioned problem.

[0004] To achieve the above purpose, the utility model provides the following solutions:

[0005] An assembled multi-stage energy-absorbing self-resetting beam-column node with an axle pin comprises: a vertically arranged steel tube concrete column and a horizontally arranged concrete beam, wherein the steel tube concrete column and the concrete beam are connected by an axle pin mechanism, and a friction device and a self-resetting mechanism are also arranged between the steel tube concrete column and the concrete beam.

[0006] Preferably, a ring plate is fixed to the outer wall of the steel tube concrete column, a vertically arranged first end plate is fixed to one side of the ring plate, the first end plate is arranged parallel to the side wall of the steel tube concrete column, a second end plate is fixed to one end of the concrete beam, the second end plate is perpendicular to the axis of the concrete beam, and the axle pin mechanism and the friction device are both located between the second end plate and the first end plate.

[0007] Preferably, the first end plate comprises a first perforated end plate fixedly connected to the ring plate, and the first perforated end plate is parallel to the side wall of the steel tube concrete column;

[0008] The second end plate comprises a second end plate with holes fixed to one end of the concrete beam, wherein the second end plate with holes is perpendicular to the axis of the concrete beam;

[0009] The shaft pin mechanism includes a first arc-shaped connecting plate fixedly connected to the side of the first opening end plate away from the ring plate, the first arc-shaped connecting plate is vertically arranged and located in the middle of the first opening end plate, the first arc-shaped connecting plate is rotatably connected to the second arc-shaped connecting plate by a first bolt, the second arc-shaped connecting plate is vertically arranged, and one end of the second arc-shaped connecting plate away from the first arc-shaped connecting plate is fixedly connected to the second opening end plate.

[0010] Preferably, the friction device includes a plurality of first friction plates fixedly connected to a side of the first opening end plate away from the ring plate, the plurality of first friction plates are respectively located on both sides of the first arc-shaped connecting plate, and the plurality of first friction plates located on the same side are arranged at equal intervals, the first friction plates are arranged vertically, a plurality of first through holes are opened on the first friction plate, the plurality of first through holes are divided into two rows, the two rows of first through holes are respectively close to the upper and lower ends of the first friction plate, a second friction plate is in friction contact between two adjacent first friction plates, the second friction plate is fixedly connected to the second opening end plate, a plurality of second through holes are opened on the second friction plate, the plurality of second through holes are divided into two rows, the two rows of second through holes are respectively close to the upper and lower ends of the second friction plate, the second through holes are arranged one-to-one with the first through holes, second bolts are penetrated through the corresponding second through holes and the first through holes, and the diameters of the second through holes and the first through holes are both larger than the diameter of the second bolts.

[0011] Preferably, a plurality of first collapse holes are formed on the first friction plate, and the plurality of first collapse holes are arranged at equal intervals along the length direction of the first friction plate and are all located in the middle of the first friction plate;

[0012] The second friction plate is provided with a plurality of second collapse holes, which are arranged at equal intervals along the length direction of the second friction plate and are all located in the middle of the second friction plate;

[0013] The plurality of first collapse holes and the plurality of second collapse holes are arranged in one-to-one correspondence.

[0014] Preferably, the self-resetting mechanism includes four first through holes respectively opened at the four corners of the first opening end plate, and second through holes are respectively opened at the four corners of the second opening end plate, the second through holes penetrate the concrete beam, the axis of the second through hole is arranged parallel to the axis of the concrete beam, the first through holes and the second through holes are arranged one by one, and steel strands are passed through the corresponding first through holes and the second through holes, and two ends of the steel strands respectively pass through the first through holes and the second through holes and are fixed with anchors.

[0015] Preferably, the second friction plate includes two parallel friction main plates, the friction main plates are vertically arranged, the two friction main plates are arranged up and down, a crush plate is fixedly connected between the two second friction plates, a plurality of second through holes are respectively opened on the two friction main plates and are arranged at equal intervals along the length direction of the friction main plates, and a plurality of second crush holes are all opened on the crush plate and are arranged at equal intervals along the length direction of the crush plate.

[0016] Compared with the prior art, the utility model has the following advantages and technical effects:

[0017] In the utility model, the steel tube concrete column and the concrete beam are connected by an axle pin mechanism, so that the steel tube concrete column and the concrete beam can move relative to each other, and a friction device is arranged between the steel tube concrete column and the concrete beam. When a small earthquake occurs, the steel tube concrete column and the concrete beam can move relative to each other, and at this time, the friction device and the self-resetting mechanism consume energy at the same time; when a medium or large earthquake occurs, the axle pin mechanism rotates to the extreme position, and at this time, the friction device realizes yield energy consumption, gradually reduces the earthquake energy, thereby reducing the damage to the beam-column structure; the setting of the self-resetting mechanism enables the steel tube concrete column and the concrete beam to return to their original state after the earthquake, thereby reducing the cost of maintenance and replacement. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor:

[0019] Figure 1 It is an overall schematic diagram of the utility model;

[0020] Figure 2 The structure of the friction device in the utility model is schematically shown;

[0021] Figure 3 This is a schematic diagram of the structure of the central axis pin mechanism of the utility model;

[0022] Figure 4 It is a schematic diagram of the structure of the second friction plate in the utility model;

[0023] Among them, 1. steel tube concrete column; 2. ring plate; 3. first end plate; 4. friction device; 5. second bolt; 6. steel strand; 7. second end plate; 8. concrete beam; 3-1. first perforated end plate; 3-2. first arc-shaped connecting plate; 4-1. first friction plate; 4-2. second friction plate; 7-1. second perforated end plate; 7-2. second arc-shaped connecting plate. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0026] Reference Figures 1 to 4 The utility model discloses an assembled multi-stage energy-absorbing self-resetting beam-column node with an axle pin, comprising: a vertically arranged steel tube concrete column 1 and a horizontally arranged concrete beam 8, the steel tube concrete column 1 and the concrete beam 8 are connected by an axle pin mechanism, and a friction device 4 and a self-resetting mechanism are also arranged between the steel tube concrete column 1 and the concrete beam 8.

[0027] In the utility model, the steel tube concrete column 1 and the concrete beam 8 are connected by an axle pin mechanism, so that the steel tube concrete column 1 and the concrete beam 8 can move relative to each other, and a friction device is arranged between the steel tube concrete column 1 and the concrete beam 8. When a small earthquake occurs, the steel tube concrete column 1 and the concrete beam 8 can move relative to each other, and at this time, the friction device and the self-resetting mechanism consume energy at the same time; when a medium or large earthquake occurs, the axle pin mechanism rotates to the extreme position, and at this time, the friction device realizes yield energy consumption, and the friction device can gradually reduce the earthquake energy, thereby reducing the damage to the beam-column structure; the setting of the self-resetting mechanism enables the steel tube concrete column 1 and the concrete beam 8 to return to their original state after the earthquake, thereby reducing the cost of maintenance and replacement.

[0028] A further optimized solution is that a ring plate 2 is fixed to the outer wall of the steel tube concrete column 1, a vertically arranged first end plate 3 is fixed to one side of the ring plate 2, the first end plate 3 is arranged parallel to the side wall of the steel tube concrete column 1, a second end plate 7 is fixed to one end of the concrete beam 8, the second end plate 7 is perpendicular to the axis of the concrete beam 8, and the axle pin mechanism and the friction device 4 are both located between the second end plate 7 and the first end plate 3.

[0029] A ring plate 2 is fixed to the outer wall of the steel tube concrete column 1, the first end plate 3 is fixed to the ring plate 2, the second end plate 7 is fixed to one end of the concrete beam 8, and the first end plate 3 and the second end plate 7 are connected by an axle pin mechanism, thereby connecting the steel tube concrete column 1 and the concrete beam 8.

[0030] According to a further optimized solution, the first end plate 3 includes a first perforated end plate 3-1 fixedly connected to the ring plate 2, and the first perforated end plate 3-1 is parallel to the side wall of the steel tube concrete column 1;

[0031] The second end plate 7 comprises a second perforated end plate 7-1 fixedly connected to one end of the concrete beam 8, and the second perforated end plate 7-1 is perpendicular to the axis of the concrete beam 8;

[0032] The shaft pin mechanism includes a first arc-shaped connecting plate 3-2 fixedly connected to the side of the first opening end plate 3-1 away from the ring plate 2. The first arc-shaped connecting plate 3-2 is vertically arranged and located in the middle of the first opening end plate 3-1. The first arc-shaped connecting plate 3-2 is rotatably connected to the second arc-shaped connecting plate 7-2 through a first bolt. The second arc-shaped connecting plate 7-2 is vertically arranged, and one end of the second arc-shaped connecting plate 7-2 away from the first arc-shaped connecting plate 3-2 is fixedly connected to the second opening end plate 7-1.

[0033] A second arc-shaped connecting plate 7-2 is fixedly connected to one side of the second opening end plate 7-1, and a first arc-shaped connecting plate 3-2 is fixedly connected to one side of the first opening end plate 3-1. The first arc-shaped connecting plate 3-2 and the second arc-shaped connecting plate 7-2 are hinged by a first bolt, thereby connecting the steel tube concrete column 1 and the concrete beam 8, so that the steel tube concrete column 1 and the concrete beam 8 can move relative to each other.

[0034] According to a further optimization scheme, the friction device 4 includes a plurality of first friction plates 4-1 fixedly connected to the side of the first opening end plate 3-1 away from the ring plate 2, the plurality of first friction plates 4-1 are respectively located on both sides of the first arc-shaped connecting plate 3-2, and are arranged at equal intervals between the plurality of first friction plates 4-1 on the same side, the first friction plates 4-1 are arranged vertically, a plurality of first through holes are opened on the first friction plate 4-1, the plurality of first through holes are divided into two rows, the two rows of first through holes are respectively close to the upper and lower ends of the first friction plate 4-1, a second friction plate 4-2 is in friction contact between two adjacent first friction plates 4-1, the second friction plate 4-2 is fixedly connected to the second opening end plate 7-1, a plurality of second through holes are opened on the second friction plate 4-2, the plurality of second through holes are divided into two rows, the two rows of second through holes are respectively close to the upper and lower ends of the second friction plate 4-2, the second through holes are arranged one-to-one with the first through holes, and second bolts 5 are penetrated through the corresponding second through holes and the first through holes, and the diameters of the second through holes and the first through holes are both larger than the diameter of the second bolts 5.

[0035] The first friction plate 4-1 and the second friction plate 4-2 are tightened by the second bolt 5, thereby increasing the friction between the first friction plate 4-1 and the second friction plate 4-2. The diameters of the second through hole and the first through hole are both larger than the diameter of the second bolt 5. When an earthquake occurs, a relative displacement occurs between the steel tube concrete column 1 and the concrete beam 8. At this time, the first friction plate 4-1 and the second friction plate 4-2 move relative to each other, and energy is consumed by the friction between the first friction plate 4-1 and the second friction plate 4-2. After the earthquake, the friction plate 4-1 and the second friction plate 4-2 are restored to their original state under the action of the self-resetting mechanism.

[0036] According to a further optimization scheme, a plurality of first collapse holes are provided on the first friction plate 4-1, and the plurality of first collapse holes are arranged at equal intervals along the length direction of the first friction plate 4-1 and are all located in the middle of the first friction plate 4-1;

[0037] The second friction plate 4-2 is provided with a plurality of second collapse holes, which are arranged at equal intervals along the length direction of the second friction plate 4-2 and are all located in the middle of the second friction plate 4-2;

[0038] The plurality of first collapse holes and the plurality of second collapse holes are arranged in one-to-one correspondence.

[0039] When a medium or large earthquake occurs, the first friction plate 4-1 and the second friction plate 4-2 move to the extreme position, at which time the first friction plate 4-1 and the second friction plate 4-2 yield and collapse at the first collapse hole and the second collapse hole to consume earthquake energy.

[0040] A further optimized solution is provided, wherein the self-resetting mechanism comprises four first through holes respectively opened at the four corners of the first opening end plate 3-1, and second through holes respectively opened at the four corners of the second opening end plate 7-1, the second through holes penetrate the concrete beam 8, and the axis of the second through holes is arranged parallel to the axis of the concrete beam 8, the first through holes and the second through holes are arranged one by one, and steel strands 6 are passed through the corresponding first through holes and second through holes, and both ends of the steel strand 6 respectively pass through the first through holes and the second through holes and are fixed with anchors.

[0041] By pulling the concrete beam 8 and the steel tube concrete column 1 through the steel strand 6, the concrete beam 8 and the steel tube concrete column 1 can be self-reset after the earthquake; at the same time, during an earthquake, the concrete beam 8 and the steel tube concrete column 1 produce relative movement, and the steel strand 6 can also consume earthquake energy.

[0042] A further optimized solution is that the second friction plate 4-2 includes two parallel friction main boards, the friction main boards are vertically arranged, and the two friction main boards are arranged up and down. A crush plate is fixedly connected between the two second friction plates 4-2, and a plurality of second through holes are respectively opened on the two friction main boards and are arranged at equal intervals along the length direction of the friction main boards. A plurality of second crush holes are all opened on the crush plate and are arranged at equal intervals along the length direction of the crush plate.

[0043] Such arrangement makes it easier for the second friction plate 4-2 to collapse and absorb energy when encountering an earthquake.

[0044] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0045] The embodiments described above are only descriptions of the preferred methods of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should fall within the protection scope determined by the claims of the present invention.

Claims

1. An assembled multi-stage energy-absorbing self-resetting beam-column node with an axle pin, characterized in that: include: A vertically arranged steel tube concrete column (1) and a horizontally arranged concrete beam (8), wherein the steel tube concrete column (1) and the concrete beam (8) are connected via a shaft pin mechanism, and a friction device (4) and a self-resetting mechanism are also provided between the steel tube concrete column (1) and the concrete beam (8).

2. The assembled multi-stage energy-absorbing self-resetting beam-column node with axle pins according to claim 1 is characterized in that: A ring plate (2) is fixedly connected to the outer wall of the steel tube concrete column (1), a vertically arranged first end plate (3) is fixedly connected to one side of the ring plate (2), the first end plate (3) is arranged parallel to the side wall of the steel tube concrete column (1), one end of the concrete beam (8) is fixedly connected to a second end plate (7), the second end plate (7) is perpendicular to the axis of the concrete beam (8), and the shaft pin mechanism and the friction device (4) are both located between the second end plate (7) and the first end plate (3).

3. The assembled multi-stage energy-absorbing self-resetting beam-column node with axle pins according to claim 2 is characterized in that: The first end plate (3) comprises a first perforated end plate (3-1) fixedly connected to the ring plate (2), and the first perforated end plate (3-1) is parallel to the side wall of the steel tube concrete column (1); The second end plate (7) comprises a second perforated end plate (7-1) fixedly connected to one end of the concrete beam (8), and the second perforated end plate (7-1) is perpendicular to the axis of the concrete beam (8); The shaft pin mechanism comprises a first arc-shaped connecting plate (3-2) fixedly connected to a side of the first opening end plate (3-1) away from the ring plate (2); the first arc-shaped connecting plate (3-2) is vertically arranged and located in the middle of the first opening end plate (3-1); the first arc-shaped connecting plate (3-2) is rotatably connected to a second arc-shaped connecting plate (7-2) via a first bolt; the second arc-shaped connecting plate (7-2) is vertically arranged; and one end of the second arc-shaped connecting plate (7-2) away from the first arc-shaped connecting plate (3-2) is fixedly connected to the second opening end plate (7-1).

4. The assembled multi-stage energy-absorbing self-resetting beam-column node with axle pins according to claim 3 is characterized in that: The friction device (4) comprises a plurality of first friction plates (4-1) fixedly connected to a side of the first perforated end plate (3-1) away from the ring plate (2), the plurality of first friction plates (4-1) being respectively located on both sides of the first arc-shaped connecting plate (3-2), the plurality of first friction plates (4-1) being equally spaced between the plurality of first friction plates (4-1) located on the same side, the first friction plates (4-1) being vertically arranged, the first friction plates (4-1) being provided with a plurality of first through holes, the plurality of first through holes being divided into two rows, the two rows of first through holes being respectively close to the upper and lower ends of the first friction plates (4-1), and the two adjacent rows of first through holes being spaced apart from each other. A second friction plate (4-2) is frictionally contacted between the first friction plates (4-1), the second friction plate (4-2) is fixedly connected to the second perforated end plate (7-1), a plurality of second through holes are opened on the second friction plate (4-2), the plurality of second through holes are divided into two rows, the two rows of second through holes are respectively close to the upper and lower ends of the second friction plate (4-2), the second through holes are arranged in a one-to-one correspondence with the first through holes, a second bolt (5) is passed through the second through holes and the first through holes corresponding to each other, and the diameters of the second through holes and the first through holes are both larger than the diameter of the second bolt (5).

5. The assembled multi-stage energy-absorbing self-resetting beam-column node with axle pins according to claim 4 is characterized in that: The first friction plate (4-1) is provided with a plurality of first collapse holes, which are arranged at equal intervals along the length direction of the first friction plate (4-1) and are all located in the middle of the first friction plate (4-1); The second friction plate (4-2) is provided with a plurality of second collapse holes, which are arranged at equal intervals along the length direction of the second friction plate (4-2) and are all located in the middle of the second friction plate (4-2); The plurality of first collapse holes and the plurality of second collapse holes are arranged in one-to-one correspondence.

6. The assembled multi-stage energy-absorbing self-resetting beam-column node with axle pins according to claim 3 is characterized in that: The self-resetting mechanism comprises four first through holes respectively opened at the four corners of the first opening end plate (3-1), and second through holes respectively opened at the four corners of the second opening end plate (7-1), the second through holes penetrate the concrete beam (8), the axis of the second through holes is arranged parallel to the axis of the concrete beam (8), the first through holes and the second through holes are arranged one by one, and steel strands (6) are passed through the corresponding first through holes and the second through holes, and the two ends of the steel strands (6) respectively pass through the first through holes and the second through holes and are both fixed with anchors.

7. The assembled multi-stage energy-absorbing self-resetting beam-column node with axle pins according to claim 5 is characterized in that: The second friction plate (4-2) comprises two parallel friction main plates, the friction main plates are vertically arranged, the two friction main plates are arranged up and down, a crush plate is fixedly connected between the two second friction plates (4-2), a plurality of second through holes are respectively opened on the two friction main plates and are arranged at equal intervals along the length direction of the friction main plates, and a plurality of second crush holes are all opened on the crush plate and are arranged at equal intervals along the length direction of the crush plate.