Tail anti-ash-blocking system of pure-combustion sludge boiler

By installing vibrators and dust cleaning structures at the tail of pure sludge boiler, the ash blockage problem caused by ash accumulation is solved, and the timely cleaning of dust at the tail of the boiler is achieved, fuel consumption and operation risks are reduced, and the efficient operation of the boiler is ensured. .

CN222026965UActive Publication Date: 2024-11-19SHANDONG LIJIN BOILER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420683796.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-03
Publication Date
2024-11-19
Estimated Expiration
2034-04-03

AI Technical Summary

Technical Problem

The bottom of the purely burned sludge boiler is blocked due to ash accumulation, which affects heat exchange efficiency, increases fuel consumption and operating risks, and may cause pipe bursting and corrosion problems.

Method used

Design a tail anti-blocking system including a vibrator, a sealed ash structure and a dust cleaning structure. The sealed ash structure consisting of a driving motor, a drive screw, a connecting plate, ash bucket, a side sealing plate and a top sealing plate , and a dust cleaning structure composed of cylinder structure and dust cleaning board to achieve timely cleaning of dust.

Benefits of technology

Effectively avoid congestion of the tail flue, ensure normal and efficient operation of the boiler, reduce operation risks, and prevent thermal efficiency reduction and corrosion problems caused by ash blockage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222026965U_ABST
    Figure CN222026965U_ABST
Patent Text Reader

Abstract

The utility model discloses a tail anti-ash-blocking system of a pure-combustion sludge boiler, which belongs to the technical field of boiler tail anti-ash-blocking and comprises a vibrator, a sealed ash receiving structure and an ash cleaning structure, and the vibrator and the sealed ash receiving structure are both fixedly mounted on a tail flue. The sealing dust receiving structure is composed of a driving motor, a driving screw rod, a connecting plate, a dust hopper, a side sealing plate and a top sealing plate, the driving screw rod is fixedly installed on an output shaft of the driving motor, the connecting plate is installed on the driving screw rod, the dust hopper is fixedly installed at one end of the connecting plate, the side sealing plate is fixedly installed at one end of the dust hopper, and the top sealing plate is fixedly installed at the other end of the dust hopper. By arranging the tail anti-dust-blocking system composed of the vibrator, the sealed dust receiving structure and the dust cleaning structure, dust attached to the inner wall of the tail flue can be effectively cleaned in time, and therefore the situation that a large amount of dust is blocked in the tail flue can be avoided, a boiler body can operate normally and efficiently, and the service life of the boiler body is prolonged. And the operation risk of the boiler body is finally reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of boiler tail ash blocking prevention, in particular to a tail ash blocking prevention system for a pure sludge-fired boiler. Background Art

[0002] A pure-fired sludge boiler is a device specially designed for burning sludge. Its core function is to render the sludge harmless, decompose the organic matter in the sludge through high-temperature combustion and oxidation, and convert the inorganic matter into ash. In a pure-fired sludge boiler, the sludge is first dried and obtains a certain calorific value, and then the dried sludge is sent into the furnace and air is sprayed into it for ignition. The burned sludge generates a large amount of heat energy in the furnace, which can be recovered and utilized through the water pipes in the boiler. During the use of a pure-fired sludge boiler, due to the complex composition of the sludge, the volatile substances and unburned organic matter contained in it will produce ash during the combustion process. Due to the different composition and particle size, these ash slags are easy to deposit when flowing in the furnace, especially on the rear heating surface. As the heat intensifies, the dust will accumulate to form a thick ash layer. When ash blockage occurs at the rear of the pure sludge boiler, it will cause ash accumulation and coking on the heating surface, weakening the heat exchange between the working fluid and the flue gas, increasing the flue gas resistance, thereby affecting the heat transfer efficiency of the heating surface, and reducing the overall thermal efficiency of the boiler, which will lead to increased fuel consumption and power waste. When the ash blockage is serious, it may cause the boiler to "burst". This is because high-temperature slagging will cause the high-temperature zone of the boiler to move backward, causing the boiler with a superheater to operate at an overtemperature. At the same time, the economizer may also corrode due to ash blockage and acid corrosion, further increasing the operating risk of the boiler. Therefore, a tail anti-ash blockage system for a pure sludge boiler is needed to reduce the probability of the above problems. Utility Model Content

[0003] The main purpose of the utility model is to provide a tail ash blocking prevention system for a pure sludge-fired boiler, which can effectively solve the problems in the background technology.

[0004] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0005] A tail ash blocking prevention system for a pure sludge-fired boiler comprises a vibrator, a sealed ash connecting structure and a dust cleaning structure, wherein the vibrator and the sealed ash connecting structure are both fixedly mounted on the tail flue, and the sealed ash connecting structure is composed of a driving motor, a driving screw, a connecting plate, an ash hopper, a side sealing plate and a top sealing plate, the driving screw is fixedly mounted on the output shaft of the driving motor, the connecting plate is mounted on the driving screw, the ash hopper is fixedly mounted on one end of the connecting plate, the side sealing plate is fixedly mounted on one end of the ash hopper, the top sealing plate is fixedly mounted on the upper end of the side sealing plate, the dust cleaning structure is mounted on the connecting flue, and the dust cleaning structure is composed of a cylinder structure and a dust cleaning plate, and the dust cleaning plate is fixedly mounted on a telescopic rod on the cylinder structure.

[0006] Preferably, the connecting flue is fixedly installed on the upper end of the boiler body, and a smoke and dust passage groove is provided on the connecting flue.

[0007] Preferably, the tail flue is fixedly mounted on the connecting flue, and a dust cleaning groove is provided on the lower side wall of the tail flue, and the dust cleaning groove penetrates the lower side wall of the tail flue from top to bottom.

[0008] Preferably, the vibrator is fixedly mounted at the upper end of the tail flue.

[0009] Preferably, the driving motor on the sealed ash connecting structure is fixedly mounted at the lower end of the tail flue, a threaded hole is opened on the connecting plate, the connecting plate is mounted on the driving screw through the threaded hole, the top sealing plate is movably mounted in the dust cleaning groove, and the ash hopper is located directly below the top sealing plate.

[0010] Preferably, the cylinder structure on the dust cleaning structure is fixedly mounted on the outer wall of the connecting flue, the dust cleaning plate is located in the connecting flue, and the dust cleaning plate can pass through the smoke groove into the tail flue under the push of the cylinder structure, and the dust cleaning plate can contact the inner wall of the tail flue.

[0011] Compared with the prior art, the utility model has the following beneficial effects:

[0012] By setting up a tail ash anti-blocking system consisting of a vibrator, a sealed ash receiving structure and a dust cleaning structure, the dust attached to the inner wall of the tail flue can be effectively cleaned in time, thereby avoiding a large amount of dust blocking the tail flue, thereby enabling the boiler body to operate normally and efficiently, and ultimately reducing the risk of boiler body operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0014] Figure 2 It is a schematic diagram of the structure of the dust cleaning structure and the connecting flue of the utility model;

[0015] Figure 3 It is a top view of the sealed ash receiving structure and the tail flue of the utility model;

[0016] Figure 4 It is a bottom view of the sealed ash receiving structure and the tail flue of the utility model.

[0017] In the figure: 1. vibrator; 2. sealed ash connection structure; 3. dust cleaning structure; 4. tail flue; 5. connecting flue; 6. boiler body; 7. dust cleaning groove; 8. smoke and dust groove; 9. driving motor; 10. driving screw rod; 11. connecting plate; 12. ash hopper; 13. side sealing plate; 14. top sealing plate; 15. cylinder structure; 16. dust cleaning plate. DETAILED DESCRIPTION

[0018] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.

[0019] See also Figure 1 , Figure 2 , Figure 3 , Figure 4As shown, a tail ash blocking prevention system of a pure sludge-fired boiler comprises a vibrator 1, a sealed ash connection structure 2 and a dust cleaning structure 3. The vibrator 1 and the sealed ash connection structure 2 are both fixedly mounted on the tail flue 4, and the sealed ash connection structure 2 is composed of a driving motor 9, a driving screw 10, a connecting plate 11, an ash hopper 12, a side sealing plate 13 and a top sealing plate 14. The driving screw 10 is fixedly mounted on the output shaft of the driving motor 9, the connecting plate 11 is mounted on the driving screw 10, the ash hopper 12 is fixedly mounted on one end of the connecting plate 11, the side sealing plate 13 is fixedly mounted on one end of the ash hopper 12, and the top sealing plate 14 is fixedly mounted on the upper end of the side sealing plate 13. The vibrator 1 is fixedly mounted on the upper end of the tail flue 4, the driving motor 9 on the sealed ash connection structure 2 is fixedly mounted on the lower end of the tail flue 4, a threaded hole is opened on the connecting plate 11, the connecting plate 11 is mounted on the driving screw 10 through the threaded hole, and the top sealing plate 14 is movably mounted on the ash In the dust cleaning groove 7, the ash hopper 12 is located directly below the top sealing plate 14, the dust cleaning structure 3 is installed on the connecting flue 5, and the dust cleaning structure 3 is composed of a cylinder structure 15 and a dust cleaning plate 16, the dust cleaning plate 16 is fixedly mounted on the telescopic rod on the cylinder structure 15, the cylinder structure 15 on the dust cleaning structure 3 is fixedly mounted on the outer wall of the connecting flue 5, the dust cleaning plate 16 is located in the connecting flue 5, and the dust cleaning plate 16 can pass through the smoke groove 8 into the tail flue 4 under the push of the cylinder structure 15, and the dust cleaning plate 16 can contact the inner wall of the tail flue 4, by setting a tail anti-blocking ash system composed of a vibrator 1, a sealing ash connection structure 2 and a dust cleaning structure 3, the dust attached to the inner wall of the tail flue 4 can be effectively cleaned in time, thereby avoiding a large amount of dust blocking in the tail flue 4, thereby enabling the boiler body 6 to operate normally and efficiently, and ultimately reducing the risk of operation of the boiler body 6.

[0020] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 As shown, the connecting flue 5 is fixedly installed on the upper end of the boiler body 6, and a smoke through groove 8 is opened on the connecting flue 5, and the tail flue 4 is fixedly installed on the connecting flue 5, and a dust cleaning groove 7 is opened on the lower side wall of the tail flue 4, and the dust cleaning groove 7 penetrates the lower side wall of the tail flue 4 from top to bottom.

[0021] It should be noted that the utility model is a tail ash blocking prevention system for a pure sludge-burning boiler. When in use, an ash monitoring device can be installed in the tail flue 4, and the ash monitoring device can be connected to the vibrator 1, the drive motor 9 and the cylinder structure 15 through the control module. During the operation of the boiler main body 6, the ash monitoring device located in the tail flue 4 can monitor the amount of ash in the tail flue 4 in real time. When a certain amount of ash is attached to the inner wall of the tail flue 4, the ash monitoring device can transmit the information to the control module. At this time, the control module will first start the vibrator 1. When the vibrator 1 is working, it will drive the tail flue 4 to vibrate. During the vibration of the tail flue 4, the ash attached to the inner wall will become loose, and some of the ash will fall off. Then the control module will start the cylinder structure 15 and the drive motor 9. At this time, the drive motor 9 will drive the drive screw 10 to rotate, and as the drive screw 10 rotates, the connecting plate 11 will move on the drive screw 10. The top sealing plate 14 moves upward, so that the top sealing plate 14 moves out of the dust cleaning groove 7 and enters the interior of the tail flue 4, until the top sealing plate 14 contacts the top wall of the tail flue 4, and then the cylinder structure 15 that is started can push the dust cleaning plate 16, so that the dust cleaning plate 16 passes through the smoke dust groove 8 and enters the tail flue 4, and then the dust cleaning plate 16 will rub against the inner wall of the tail flue 4, and finally the dust cleaning plate 16 will scrape off the ash attached to the inner wall of the tail flue 4 Finally, as the dust cleaning plate 16 continues to move, it will push the scraped ash out of the dust cleaning groove 7, and then the ash will fall into the ash hopper 12. At this time, the cleaning of the ash attached to the inner wall of the tail flue 4 is completed, and then the control module will first start the cylinder structure 15, so as to use the cylinder structure 15 to reset the dust cleaning plate 16 to the connecting flue 5, and then the control module will start the drive motor 9, so as to use the drive motor 9 to reset the top sealing plate 14 to the dust cleaning groove 7.

[0022] The above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the aforementioned embodiments, it is still possible for a person skilled in the art to modify the technical solutions described in the aforementioned embodiments or to replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model. The protection scope of the utility model is defined by the attached claims and their equivalents.

Claims

1. A tail ash blocking prevention system for a pure sludge-fired boiler, characterized in that: The invention comprises a vibrator (1), a sealed ash receiving structure (2) and a dust cleaning structure (3), wherein the vibrator (1) and the sealed ash receiving structure (2) are both fixedly mounted on a tail flue (4), and the sealed ash receiving structure (2) is composed of a drive motor (9), a drive screw rod (10), a connecting plate (11), an ash hopper (12), a side sealing plate (13) and a top sealing plate (14), wherein the drive screw rod (10) is fixedly mounted on the output shaft of the drive motor (9), and the connecting plate (11) is mounted on the drive screw rod. The ash hopper (12) is fixedly mounted on the connecting plate (11), the side sealing plate (13) is fixedly mounted on the side sealing plate (13), the top sealing plate (14) is fixedly mounted on the upper end of the side sealing plate (13), the dust cleaning structure (3) is mounted on the connecting flue (5), and the dust cleaning structure (3) is composed of a cylinder structure (15) and a dust cleaning plate (16), and the dust cleaning plate (16) is fixedly mounted on the telescopic rod on the cylinder structure (15).

2. The tail ash blocking prevention system of a pure sludge-fired boiler according to claim 1 is characterized by: The connecting flue (5) is fixedly mounted on the upper end of the boiler body (6), and a smoke and dust passage groove (8) is provided on the connecting flue (5).

3. The tail ash blocking prevention system of a pure sludge-fired boiler according to claim 2 is characterized by: The tail flue (4) is fixedly mounted on the connecting flue (5), and a dust cleaning groove (7) is provided on the lower side wall of the tail flue (4), and the dust cleaning groove (7) penetrates the lower side wall of the tail flue (4) from top to bottom.

4. The tail ash blocking prevention system of a pure sludge-fired boiler according to claim 3 is characterized by: The vibrator (1) is fixedly mounted on the upper end of the tail flue (4).

5. The tail ash blocking prevention system of a pure sludge-fired boiler according to claim 4 is characterized by: The driving motor (9) on the sealed ash receiving structure (2) is fixedly mounted on the lower end of the tail flue (4); a threaded hole is provided on the connecting plate (11); the connecting plate (11) is mounted on the driving screw (10) through the threaded hole; the top sealing plate (14) is movably mounted in the dust cleaning groove (7); and the ash hopper (12) is located directly below the top sealing plate (14).

6. The tail ash blocking prevention system of a pure sludge-fired boiler according to claim 5 is characterized by: The cylinder structure (15) on the dust cleaning structure (3) is fixedly mounted on the outer wall of the connecting flue (5), the dust cleaning plate (16) is located in the connecting flue (5), and the dust cleaning plate (16) can pass through the smoke channel (8) and enter the tail flue (4) under the push of the cylinder structure (15), and the dust cleaning plate (16) can contact the inner wall of the tail flue (4).