Boiler denitration device with economizer

By using the heat reflux and gasification of the boiler tail exhaust gas in the boiler denitrification device, the use and waste gas treatment of ammonia water are optimized, and the problems of ammonia water waste and insufficient reaction are solved, and the effect of saving raw materials and reducing waste gas emissions is achieved.

CN222026967UActive Publication Date: 2024-11-19DEQING ZHONGNENG THERMOELECTRIC CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323652240.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-30
Publication Date
2024-11-19
Estimated Expiration
2033-12-30

AI Technical Summary

Technical Problem

The ammonia water in the existing boiler denitrification device does not react sufficiently with the boiler tail exhaust gas, resulting in waste of raw material ammonia water and low treatment efficiency.

Method used

Design a boiler denitrification device with economizer, including a superior economizer, SCR reactor, catalyst layer, air pre-order and gas storage chamber, and mix and gasification with ammonia water through heat reflux at the boiler tail exhaust gas to optimize the use of ammonia water and Exhaust gas treatment.

Benefits of technology

Effectively save ammonia water from raw materials, reduce usage costs, reduce waste gas emissions, improve treatment efficiency, and reduce daily savings of 2-2.3 tons of ammonia water and 180,000 cubic meters of waste gas emissions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222026967U_ABST
    Figure CN222026967U_ABST
Patent Text Reader

Abstract

The utility model relates to a boiler denitration device with a coal economizer, which comprises a main flue, an upper-level coal economizer, an air pre-heater and an SCR (selective catalytic reduction) reactor, the upper-level coal economizer and the air pre-heater are respectively arranged in the main flue, the upper-level coal economizer is arranged on one side close to an inlet of the main flue of a boiler, and a partition plate is arranged below the upper-level coal economizer. A first mounting opening and a second mounting opening are respectively formed in the side bodies of the upper flue and the lower flue and are respectively connected with an inlet pipeline and an outlet pipeline of the SCR reactor, an ammonia supplementing grid is arranged on the inlet pipeline of the SCR reactor, a flue gas rectifying device, a catalyst layer and a lower-stage economizer are sequentially arranged in the SCR reactor from top to bottom, and the lower-stage economizer is connected with the ammonia supplementing grid. An air pre-heater is installed at the position, close to the bottom of the main flue, below the SCR reactor, and a gas storage cavity is further formed in the position, located on the main flue, between the air pre-heater and an outlet pipeline of the SCR reactor. The device has the advantages that the structure is simple, installation is convenient, raw materials can be effectively saved, and therefore the use cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a boiler denitration device with an economizer, belonging to the technical field of denitration devices. Background Art

[0002] In order to prevent excessive NOx pollution from being generated by the exhaust gas at the tail of the boiler after the combustion of coal in the boiler, ammonia water plays an important role in desulfurization and denitrification in the boiler flue gas treatment. In the process of boiler flue gas treatment, the addition of ammonia water can react with sulfur dioxide and nitrogen oxides in the flue gas to generate ammonium sulfate and ammonium nitrate, thereby achieving the effect of purifying the flue gas, thereby reducing the exhaust gas emission at the tail of the boiler and ensuring that the treated exhaust gas at the tail of the boiler meets the emission conditions. However, the existing equipment has the problem of insufficient reaction between ammonia water and the exhaust gas at the tail of the boiler, resulting in the waste of raw ammonia water and low overall treatment efficiency.

[0003] Therefore, a boiler denitration device with an economizer is designed to overcome the above problems. Utility Model Content

[0004] The utility model aims to overcome the deficiencies of the prior art and to provide a boiler denitration device with an economizer which has a simple structure, is easy to install, can effectively save raw materials (ammonia water), and thus reduces the use cost.

[0005] The utility model is realized by the following technical scheme: a boiler denitration device with economizer, comprising a main flue connected to the boiler, an upper economizer and an air preheater arranged in the main flue, and an SCR reactor connected to the main flue, wherein the upper economizer is arranged on the side close to the inlet of the main flue of the boiler, a partition is arranged on the main flue below the upper economizer to divide the main flue into an upper flue and a lower flue, and a first installation port and a second installation port are respectively arranged on the side of the upper flue and the lower flue, and the first installation port and the second installation port are respectively connected to the inlet pipe of the SCR reactor with and an outlet pipe, an ammonia supplement grid is arranged on the inlet pipe of the SCR reactor, a flue gas rectifying device, a catalyst layer and a lower economizer are arranged in sequence from top to bottom in the SCR reactor, and an air preheater is installed below the SCR reactor near the bottom of the main flue, and an air storage chamber is also arranged on the main flue between the air preheater and the outlet pipe of the SCR reactor, for ensuring that the treated flue gas after passing through the upper economizer and the SCR reactor in sequence is first accumulated in the air storage chamber, and then processed by the air preheater, and finally discharged through an outlet arranged on the side of the main flue on one side of the air preheater.

[0006] Preferably, the catalyst layer consists of a first catalyst layer and a second catalyst layer arranged vertically, and a sonic soot blower is respectively installed on the side wall of the SCR reactor directly above the first catalyst layer and the second catalyst layer, and the sonic soot blowers are respectively connected to the first compressed air pipe on the outside, and an air compressor is installed at the end of the first compressed air pipe away from the sonic soot blower, and a pressure gauge and a control valve are respectively provided on each first compressed air pipe.

[0007] Preferably, the ammonia supply grid is connected to the top outlet of the evaporator through an ammonia pipeline, the middle part of the side of the evaporator is connected to the compressed air and ammonia water mixing pipeline, and the bottom inlet of the evaporator is connected to the exhaust gas at the tail of the boiler through a dilution air pipeline.

[0008] Preferably: the compressed air and ammonia water mixing pipeline is composed of a second compressed air pipeline and an ammonia water pipeline arranged in parallel, the second compressed air pipeline is externally connected to the owner's compressed air, and a pressure gauge and an alarm are respectively provided on the second compressed air pipeline, and a pressure gauge and a control valve are provided on the ammonia water pipeline, the second compressed air pipeline and the ammonia water pipeline are combined into one pipeline and connected to the evaporator, and a spray gun is provided at the connection between the second compressed air pipeline and the ammonia water pipeline, the spray gun is used to gasify the compressed air and ammonia water mixture and send it into the evaporator to react with the boiler tail exhaust gas transported from the dilution air pipeline to the evaporator.

[0009] Preferably, a pressure gauge and a temperature gauge are provided on the ammonia pipeline respectively to ensure normal use of the ammonia pipeline.

[0010] Preferably, the dilution air pipeline is provided with a control valve, a pressure gauge, a temperature gauge and a dilution air heater in sequence.

[0011] The beneficial effects of the utility model are as follows:

[0012] The utility model is designed to provide a boiler denitration device with a coal economizer, which has many advantages such as simple structure, convenient installation, and can effectively save raw materials (ammonia water), thereby reducing use costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 This is a schematic diagram of the structure of the utility model Figure 1 .

[0014] Figure 2 This is a schematic diagram of the structure of the utility model Figure 2 (Evaporator part). DETAILED DESCRIPTION

[0015] In order to enable ordinary technicians in the field to more clearly understand the purpose, technical solutions and advantages of the utility model, the utility model is further explained below in conjunction with the accompanying drawings and embodiments.

[0016] In the description of the present invention, it is necessary to understand that the directions or positional relationships indicated by terms such as "upper", "lower", "left", "right", "inner", "outer", "horizontal" and "vertical" are based on the directions or positional relationships shown in the accompanying drawings and are only for the convenience of describing the present invention. They do not indicate or imply that the device or component referred to must have a specific direction and therefore should not be understood as a limitation on the present invention.

[0017] The utility model will be described in detail below with reference to the accompanying drawings: Figure 1 As shown, a boiler denitration device with an economizer comprises a main flue 1 connected to the boiler, an upper economizer 2 and an air preheater 3 respectively arranged in the main flue 1, and an SCR reactor 4 connected to the main flue 1, wherein the upper economizer 2 is arranged on the inlet side of the main flue 1 of the boiler, a partition plate 5 is arranged on the main flue 1 below the upper economizer 2, and the main flue 1 is divided into an upper flue 6 and a lower flue 7, and a first installation port 8 and a second installation port 9 are respectively arranged on the sides of the upper flue 6 and the lower flue 7, and the first installation port 8 and the second installation port 9 are respectively connected to the inlet pipe 10 and the outlet pipe 11 of the SCR reactor 4, and the SCR reactor 4 is connected to the upper economizer 2. An ammonia supplement grid 12 is arranged on the inlet pipe 10 of the CR reactor, and a flue gas rectification device 13, a catalyst layer 14 and a lower economizer 15 are arranged in sequence in the SCR reactor 4 from top to bottom, and an air preheater 3 is installed below the SCR reactor 4 near the bottom of the main flue 1. An air storage chamber 16 is also arranged on the main flue 1 between the air preheater 3 and the outlet pipe 11 of the SCR reactor 4, which is used to ensure that the treated flue gas after passing through the upper economizer 2 and the SCR reactor 4 in sequence is first accumulated in the air storage chamber 16, and then processed by the air preheater 3, and finally discharged through the outlet 17 arranged on the side of the main flue 1 and located on the side of the air preheater 3.

[0018] The catalyst layer 14 is composed of a first catalyst layer 18 and a second catalyst layer 19 arranged up and down. A sonic soot blower 20 is installed on the side wall of the SCR reactor 4 directly above the first catalyst layer 18 and the second catalyst layer 19. The sonic soot blowers 20 are respectively connected to the first compressed air pipeline 21 on the outside. An air compressor 22 is installed at the end of the first compressed air pipeline 21 away from the sonic soot blower 20, and a first pressure gauge 30 and a first control valve 31 are respectively provided on each first compressed air pipeline 21.

[0019] like Figure 2As shown, the ammonia supplement grid 12 is connected to the top outlet of the evaporator 24 through an ammonia pipeline 23, the middle side of the evaporator 24 is connected to the compressed air ammonia water mixing pipeline 25, and the bottom inlet of the evaporator 24 is connected to the boiler tail exhaust gas 27 through a dilution air pipeline 26.

[0020] The compressed air and ammonia water mixing pipeline 25 is composed of a second compressed air pipeline 28 and an ammonia water pipeline 29 arranged in parallel. The second compressed air pipeline 28 is externally connected to the owner's compressed air 41. A second pressure gauge 39 and an alarm 43 are respectively provided on the second compressed air pipeline 28. A third pressure gauge 32 and a second control valve 33 are provided on the ammonia water pipeline. The second compressed air pipeline 28 and the ammonia water pipeline 29 are combined into one pipeline and connected to the evaporator 24. A spray gun 40 is provided at the connection between the second compressed air pipeline 28 and the ammonia water pipeline 29. The spray gun 40 is used to gasify the compressed air and ammonia water mixture and send it into the evaporator 24 to react with the boiler tail exhaust gas transported from the dilution air pipeline 26 to the evaporator 24.

[0021] The ammonia pipeline 23 is provided with a fifth pressure gauge 37 and a second temperature gauge 38 to ensure normal use of the ammonia pipeline. The dilution air pipeline 26 is provided with a third control valve 42, a fourth pressure gauge 34, a first temperature gauge 35 and a dilution air heater 36 in sequence.

[0022] The utility model optimizes and updates the existing old ammonia water conveying system, aiming at reducing the consumption of denitrified ammonia water, the exhaust gas emission, and the exhaust gas heat recovery to improve the economic benefits.

[0023] The key points of this utility model are:

[0024] 1. Utilize the heat of the exhaust gas at the tail of the boiler to reflux and mix it with ammonia water in the evaporator to gasify it and send it to the catalyst inlet for injection to react.

[0025] 2. Ensure that environmental protection facilities operate stably and meet emission standards.

[0026] By implementing the utility model, the raw material (ammonia water) can be renewed and saved by 2-2.3 tons / day and the exhaust gas emission can be reduced by 180,000 m³ / day.

[0027] The specific embodiments described herein are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the technology may modify or change the above embodiments without violating the spirit and scope of the present invention. Therefore, all equivalent modifications or changes made by a person of ordinary skill in the art without departing from the spirit and technical ideas disclosed in the present invention shall still be covered by the claims of the present invention.

Claims

1. A boiler denitration device with an economizer, comprising a main flue (1) connected to the boiler, an upper economizer (2) and an air preheater (3) respectively arranged in the main flue (1), and an SCR reactor (4) connected to the main flue (1), characterized in that: The upper economizer (2) is arranged near the inlet side of the boiler main flue (1). A partition (5) is arranged on the main flue (1) below the upper economizer (2) to divide the main flue (1) into an upper flue (6) and a lower flue (7). A first mounting port (8) and a second mounting port (9) are respectively arranged on the sides of the upper flue (6) and the lower flue (7). The first mounting port (8) and the second mounting port (9) are respectively connected to the inlet pipe (10) and the outlet pipe (11) of the SCR reactor (4). An ammonia supplement grid (12) is arranged on the inlet pipe (10) of the SCR reactor. A flue gas rectifying device (13), a catalyst layer (14) and a lower economizer (15) are sequentially arranged downwardly, and an air preheater (3) is installed below the SCR reactor (4) near the bottom of the main flue (1). An air storage chamber (16) is also arranged on the main flue (1) between the air preheater (3) and the outlet pipe (11) of the SCR reactor (4), so as to ensure that the treated flue gas after passing through the upper economizer (2) and the SCR reactor (4) in sequence is first accumulated in the air storage chamber (16), then processed by the air preheater (3), and finally discharged through an outlet (17) arranged on the side of the main flue (1) and located on one side of the air preheater (3).

2. The boiler denitration device with economizer according to claim 1, characterized in that: The catalyst layer (14) is composed of a first catalyst layer (18) and a second catalyst layer (19) arranged vertically. A sonic soot blower (20) is respectively installed on the side wall of the SCR reactor (4) directly above the first catalyst layer (18) and the second catalyst layer (19). The sonic soot blower (20) is respectively connected to the first compressed air pipeline (21) on the outside. An air compressor (22) is installed at the end of the first compressed air pipeline (21) away from the sonic soot blower (20), and a first pressure gauge (30) and a first control valve (31) are respectively provided on each first compressed air pipeline (21).

3. The boiler denitration device with economizer according to claim 1, characterized in that: The ammonia supply grid (12) is connected to the top outlet of the evaporator (24) through an ammonia pipeline (23); the middle part of the side of the evaporator (24) is connected to the compressed air and ammonia water mixing pipeline (25); and the bottom inlet of the evaporator (24) is connected to the boiler tail exhaust gas (27) through a dilution air pipeline (26).

4. The boiler denitration device with economizer according to claim 3, characterized in that: The compressed air and ammonia water mixing pipeline (25) is composed of a second compressed air pipeline (28) and an ammonia water pipeline (29) arranged in parallel. The second compressed air pipeline (28) is externally connected to the owner's compressed air (41). A second pressure gauge (39) and an alarm (43) are respectively provided on the second compressed air pipeline (28). A third pressure gauge (32) and a second control valve (33) are provided on the ammonia water pipeline. The second compressed air pipeline (28) and the ammonia water pipeline (29) are combined into one pipeline and connected to the evaporator (24). A spray gun (40) is provided at the connection between the second compressed air pipeline (28) and the ammonia water pipeline (29). The spray gun (40) is used to gasify the compressed air and ammonia water mixture and send it into the evaporator (24) to react with the boiler tail exhaust gas (27) transported from the dilution air pipeline (26) to the evaporator (24).

5. The boiler denitration device with economizer according to claim 3, characterized in that: The ammonia pipeline (23) is provided with a fifth pressure gauge (37) and a second temperature gauge (38) respectively, for ensuring normal use of the ammonia pipeline.

6. The boiler denitration device with economizer according to claim 4, characterized in that: The dilution air pipeline (26) is provided with a third control valve (42), a fourth pressure gauge (34), a first temperature gauge (35) and a dilution air heater (36) in sequence.