Power plant vacuumizing system

By using the parallel connection of multiple vacuum units and intelligently allocating power in the power plant vacuum system, the problem of high construction cost of vacuum systems in the existing technology is solved, and the number of vacuum units and construction cost is reduced. effect.

CN222027449UActive Publication Date: 2024-11-19CHINA ENERGY ENG GRP GUANGDONG ELECTRIC POWER DESIGN INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323623765.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-28
Publication Date
2024-11-19
Estimated Expiration
2033-12-28

AI Technical Summary

Technical Problem

The existing power plant vacuum system requires more vacuum units to be installed, resulting in high construction costs.

Method used

The multi-vacuum unit is connected in parallel, and the power of the vacuum unit is intelligently distributed through the control valve group. The power of the vacuum unit is used to provide efficient suction force during the startup stage. After the equipment is fully started, it switches to the unit with lower power, which reduces the Number of vacuum units required by the system.

Benefits of technology

It effectively reduces the amount of vacuum unit required for the power plant vacuum system, reduces construction costs, and improves the efficiency and flexibility of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222027449U_ABST
    Figure CN222027449U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of power plant equipment, in particular to a power plant vacuum-pumping system which comprises a first condenser connected with a power generation turbine, a second condenser connected with a water feeding pump turbine, a first vacuum-pumping unit, a second vacuum-pumping unit and a third vacuum-pumping unit. A first control valve group is connected between the first vacuumizing unit and the first condenser, a second control valve group is connected between the first vacuumizing unit and the second condenser, a third control valve group is connected between the second vacuumizing unit and the first condenser, and a fourth control valve group is connected between the third vacuumizing unit and the second condenser; according to the power plant vacuum-pumping system, the first vacuum-pumping unit can be used for carrying out suction operation on the first condenser and the second condenser, the number of vacuum-pumping units needed by the power plant vacuum-pumping system is reduced, and the construction cost of a power plant is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of power plant equipment, in particular to a vacuum pumping system for a power plant. Background Art

[0002] During the power generation process of a power plant, a condenser is needed to cool the exhaust steam of the steam turbine, condense it into saturated water under a constant pressure, and create a high vacuum at the exhaust port of the steam turbine, so that the steam expands to the minimum pressure in the steam turbine, increases the available enthalpy drop of the steam in the steam turbine, and improves the cycle thermal efficiency of the steam turbine. The condenser is a surface heat exchanger, with cooling water passing through the copper tube and the exhaust steam of the steam turbine outside the copper tube. After the exhaust steam enters the condenser, it is cooled by the cooling water and condenses into water, and its specific volume decreases sharply, thus creating a high vacuum. The condensed water is continuously sent to the feed water heat recovery system by the condensation pump to realize the recycling of water resources; in order to maintain a high vacuum in the condenser, in addition to ensuring the tightness of the condenser and the vacuum system, it is also necessary to install an exhaust device to extract the air leaking from the condenser and steam turbine and the air brought in by the steam.

[0003] The formation of vacuum in the condenser can be divided into two situations. During the startup process, the vacuum in the condenser is formed by the vacuum equipment extracting the air inside it. During the operation of the condenser, the vacuum in the condenser is formed by the rapid reduction of the specific volume of the turbine exhaust steam when it is suddenly condensed into water by circulating water cooling in the condenser. The vacuum equipment continuously extracts the non-condensable gas and air to maintain the vacuum. At this time, the formation of vacuum mainly depends on the condensation of steam. Therefore, during the startup of the condenser, the vacuum equipment needs to have a higher output power, and during the operation of the condenser, the output power required by the vacuum equipment is lower. At this time, vacuuming is required.

[0004] The condenser for a power plant includes a first condenser connected to a power generation steam turbine and a second condenser connected to a water supply pump steam turbine. At present, in order to ensure that the first condenser and the second condenser can quickly establish a vacuum during the startup process, a first vacuum pumping unit and a second vacuum pumping unit connected to the first condenser, as well as a third vacuum pumping unit and a fourth vacuum pumping unit connected to the second condenser are often provided. The power of the first vacuum pumping unit is higher than that of the second vacuum pumping unit. The first vacuum pumping unit is put into use when the first condenser is started, and the second vacuum pumping unit is put into use when the first condenser is in operation; the power of the third vacuum pumping unit is higher than that of the fourth vacuum pumping unit. The fourth vacuum pumping unit is put into use when the second condenser is started, and the fourth vacuum pumping unit is put into use when the second condenser is in operation. Therefore, the existing power plant vacuum pumping system needs to be equipped with more vacuum pumping units, resulting in a high construction cost of the power plant. Utility Model Content

[0005] The technical problem to be solved by the utility model is that the existing vacuum pumping system of a power plant needs to be equipped with a large number of vacuum pumping units, which leads to a high construction cost of the power plant.

[0006] In order to solve the above technical problems, the purpose of the utility model is to provide a power plant vacuum system, including: a first condenser connected to a power generation steam turbine, a second condenser connected to a feed water pump steam turbine, a first vacuum unit, a second vacuum unit and a third vacuum unit, the power of the first vacuum unit being greater than the power of the second vacuum unit and the power of the third vacuum unit; a first control valve group is connected between the first vacuum unit and the first condenser, a second control valve group is connected between the first vacuum unit and the second condenser, a third control valve group is connected between the second vacuum unit and the first condenser, and a fourth control valve group is connected between the third vacuum unit and the second condenser.

[0007] As a preferred embodiment, the first condenser is a dual-pressure condenser, which is provided with a low-pressure end and a high-pressure end. The first control valve group includes a first control valve and a second control valve. One end of the first control valve is connected to the low-pressure end, and the other end of the first control valve is connected to the first vacuum pumping unit; one end of the second control valve is connected to the high-pressure end, and the other end of the second control valve is connected to the first vacuum pumping unit.

[0008] As a preferred embodiment, the third control valve group includes a third control valve, one end of the third control valve is connected to the low-pressure end, and the other end of the third control valve is connected to the second vacuum pumping unit; the power plant vacuum pumping system includes a fourth control valve, one end of the fourth control valve is connected to the high-pressure end, and the other end of the fourth control valve is connected to the third vacuum pumping unit.

[0009] As a preferred solution, the second control valve group includes a fifth control valve, one end of the fifth control valve is connected to the first vacuum pumping unit, and the other end of the fifth control valve is connected to the second condenser.

[0010] As a preferred solution, the fourth control valve group includes a sixth control valve, one end of the sixth control valve is connected to the second condenser, and the other end of the sixth control valve is connected to the third vacuum pumping unit.

[0011] As a preferred solution, the first vacuum pumping unit includes a plurality of first water ring vacuum pumps arranged in parallel.

[0012] As a preferred solution, the second vacuum pumping unit and the third vacuum pumping unit both include a Roots pump, a first heat exchanger and a second water ring vacuum pump arranged in sequence; the first heat exchanger is used to condense the gas flowing out of the Roots pump into liquid.

[0013] As a preferred embodiment, the first heat exchanger is provided with a liquid storage chamber for storing the liquid, and the power plant vacuum system includes a circulating water pipe, one end of which is connected to the liquid storage chamber, and the other end of which is connected to the air inlet of the Roots pump.

[0014] As a preferred solution, the second vacuum pumping unit and the third vacuum pumping unit both include a gas-liquid separator, and the air inlet of the gas-liquid separator is connected to the air outlet of the second water ring vacuum pump.

[0015] As a preferred embodiment, the second vacuum pumping unit and the third vacuum pumping unit both include a second heat exchanger, the second heat exchanger is provided with a cooling chamber, the cooling chamber is connected to the liquid storage chamber of the gas-liquid separator, and the cooling chamber is also connected to the coolant inlet of the second water ring vacuum pump.

[0016] Compared with the prior art, the beneficial effects of the utility model are:

[0017] The utility model provides a power plant vacuum pumping system, comprising: a first condenser connected to a power generation steam turbine, a second condenser connected to a feedwater pump steam turbine, a first vacuum pumping unit, a second vacuum pumping unit and a third vacuum pumping unit, wherein a first control valve group is connected between the first vacuum pumping unit and the first condenser, a second control valve group is connected between the first vacuum pumping unit and the second condenser, a third control valve group is connected between the second vacuum pumping unit and the first condenser, and a fourth control valve group is connected between the third vacuum pumping unit and the second condenser; since the feedwater pump steam turbine will not start until the power generation steam turbine is fully started, when starting the power generation unit, the first control valve group is first used to connect the first vacuum pumping unit and the first condenser, and the first vacuum pumping unit with larger power is used to supply steam to the third vacuum pumping unit. A condenser provides suction force at startup. After the first condenser is fully started, the first control valve group is closed, the third control valve group is opened, and the second vacuum unit with lower power is used to provide suction force to the running first condenser. After the first condenser is fully started, the second control valve group is opened, and the first vacuum unit with higher power is used to provide suction force to the second condenser at startup. After the second condenser is fully started, the second control valve group is closed, the fourth control valve group is opened, and the third vacuum unit with lower power is used to provide suction force to the running second condenser. Therefore, the power plant vacuum system of the utility model can use the first vacuum unit to perform suction operations on the first condenser and the second condenser, reducing the number of vacuum units required for the power plant vacuum system and reducing the construction cost of the power plant. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a structural schematic diagram of the vacuum pumping system of a power plant of the utility model;

[0019] Figure 2 is a structural schematic diagram of the second vacuum pumping unit;

[0020] In the figure, 11, the first condenser, 111, the high-pressure end, 112, the low-pressure end, 12, the second condenser, 21, the first vacuum pumping unit, 211, the first water ring vacuum pump, 22, the second vacuum pumping unit, 221, the Roots pump, 222, the second water ring vacuum pump, 223, the first heat exchanger, 224, the circulating water pipe, 225, the gas-liquid separator, 226, the second heat exchanger, 23, the third vacuum pumping unit, 31, the first control valve, 32, the second control valve, 33, the fourth control valve, 34, the fourth control valve, 35, the fifth control valve, 36, the sixth control valve, 37, the seventh control valve, 38, the eighth control valve, 39, the ninth control valve. DETAILED DESCRIPTION

[0021] The following is a further detailed description of the specific implementation of the present invention in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0022] In the description of the present utility model, it should be understood that the terms "upper", "lower", "left", "right", "top", "bottom", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. It should be understood that the terms "first", "second", etc. are used in the present utility model to describe various information, but such information should not be limited to these terms, which are only used to distinguish the same type of information from each other. For example, without departing from the scope of the present utility model, the "first" information may also be referred to as the "second" information, and similarly, the "second" information may also be referred to as the "first" information.

[0023] like Figure 1 As shown, a preferred embodiment of the power plant vacuum system of the utility model comprises: a first condenser 11 connected to the power generation steam turbine, a second condenser 12 connected to the feed water pump steam turbine, a first vacuum unit 21, a second vacuum unit 22 and a third vacuum unit 23, the power of the first vacuum unit 21 is greater than the power of the second vacuum unit 22 and the power of the third vacuum unit 23; a first control valve group is connected between the first vacuum unit 21 and the first condenser 11, a second control valve group is connected between the first vacuum unit 21 and the second condenser 12, a third control valve group is connected between the second vacuum unit 22 and the first condenser 11, and a fourth control valve group is connected between the third vacuum unit 23 and the second condenser 12.

[0024] Specifically, since the feedwater pump turbine will not start until the power generation steam turbine is fully started, when starting the power generation unit, the first control valve group is first used to connect the first vacuum pumping unit 21 and the first condenser 11, and the first vacuum pumping unit 21 with a larger power is used to provide the first condenser 11 with suction force during startup. After the first condenser 11 is fully started, the first control valve group is closed, the third control valve group is opened, and the second vacuum pumping unit 22 with a lower power is used to provide suction force to the running first condenser 11. After the first condenser 11 is fully started, the second control valve group is opened. The valve group uses the first vacuum pumping unit 21 with higher power to provide the second condenser 12 with suction force during startup. After the second condenser 12 is fully started, the second control valve group is closed, the fourth control valve group is opened, and the third vacuum pumping unit 23 with lower power is used to provide suction force to the running second condenser 12. Therefore, the power plant vacuum pumping system of the utility model can use the first vacuum pumping unit 21 to perform suction operations on the first condenser 11 and the second condenser 12, which reduces the number of vacuum pumping units required for the power plant vacuum pumping system and reduces the construction cost of the power plant.

[0025] Among them, the first condenser 11 is a double-pressure condenser, which is provided with a low-pressure end 112 and a high-pressure end 111. The first control valve group includes a first control valve 31 and a second control valve 32. One end of the first control valve 31 is connected to the low-pressure end 112, and the other end of the first control valve 31 is connected to the first vacuum pumping unit 21; one end of the second control valve 32 is connected to the high-pressure end 111, and the other end of the second control valve 32 is connected to the first vacuum pumping unit 21. Under the same water consumption, the cooling effect of the double-pressure condenser is higher than that of the ordinary condenser. When starting the low-pressure condenser, the low-pressure vacuum pumping unit is started, and the low-pressure control valve and the second control valve 32 are opened, so that the low-pressure vacuum pumping unit with larger power can be used to vacuum the first condenser 11, and the first condenser 11 can be started smoothly.

[0026] Among them, the vacuum degree required to be maintained at the low-pressure end 112 is relatively low. In order to ensure the vacuum degree of the low-pressure end 112, in this embodiment, during the operation of the low-pressure condenser, the second vacuum pumping unit 22 is completely used to provide suction operations to the low-pressure end 112. Specifically, the third control valve group includes a third control valve, one end of the third control valve is connected to the low-pressure end 112, and the other end of the third control valve is connected to the second vacuum pumping unit 22; the vacuum degree required to be achieved at the high-pressure end 111 is low. During the operation after the first condenser 11 is started, the fourth vacuum pumping unit can not only vacuum the high-pressure end 111, but also provide the second condenser 12 with a vacuum operation to maintain the second condenser 12 after the start-up. Specifically, the power plant vacuum system includes a fourth control valve 34, one end of the fourth control valve 34 is connected to the high-pressure end 111, and the other end of the fourth control valve 34 is connected to the third vacuum pumping unit 23.

[0027] Among them, the second control valve group includes a fifth control valve 35, one end of the fifth control valve 35 is connected to the first vacuum pumping unit 21, and the other end of the fifth control valve 35 is connected to the second condenser 12. The fourth control valve group includes a sixth control valve 36, one end of the sixth control valve 36 is connected to the second condenser 12, and the other end of the sixth control valve 36 is connected to the third vacuum pumping unit 23. Specifically, during the process of starting the second condenser 12, the fifth control valve 35 is opened, the low-pressure control valve is closed, and the first vacuum pumping unit 21 is used to provide vacuuming operation for the start-up process of the second condenser 12. After the start-up of the second condenser 12 is completed, the fifth control valve 35 is closed, the first vacuum pumping unit 21 is closed, the sixth control valve 36 is opened, and the third vacuum pumping valve group is used to provide vacuuming operation during operation for the second condenser 12. At this time, the fourth control valve 34 is also in an open state, and the third vacuum pumping unit 23 provides suction force to the second condenser 12 and the high-pressure end 111 at the same time. For the convenience of maintenance, in this embodiment, the gas outlet of the second condenser 12 is connected to the seventh control valve 37 , the high-pressure end 111 is connected to the ninth control valve 39 , and the low-pressure end 112 is connected to the eighth control valve 38 .

[0028] In this embodiment, in order to maintain a large air extraction capacity of the first vacuum pumping valve group when the first condenser and the second condenser are started, the first vacuum pumping unit 21 includes a plurality of first water ring vacuum pumps arranged in parallel. In this embodiment, three first water ring vacuum pumps are provided, and the air extraction capacity of each first water ring vacuum pump is 50% of the air extraction capacity required by the high pressure end 111.

[0029] In this embodiment, Figure 2As shown, the second vacuum pumping unit 22 and the third vacuum pumping unit 23 both include a Roots pump 221, a first heat exchanger 223 and a second water ring vacuum pump 222 arranged in sequence; the first heat exchanger 223 is used to condense the gas flowing out of the Roots pump 221 into liquid. Specifically, the Roots pump 221 is insensitive to air temperature and water temperature. The Roots pump 221 is arranged at the front end of the second water ring vacuum pump 222, which can avoid the influence of the temperature of the gas drawn from the first condenser 11 on the vacuum pumping efficiency. Moreover, after being cooled by the first heat exchanger 223, the temperature of the gas-liquid mixture flowing into the second water ring vacuum pump 222 is relatively low, which can avoid cavitation of the second water ring vacuum pump 222.

[0030] Furthermore, in order to prevent the temperature of the Roots pump 221 from being too high, in this embodiment, the first heat exchanger 223 is provided with a liquid storage chamber for storing liquid, and the power plant vacuum system includes a circulating water pipe 224, one end of which is connected to the liquid storage chamber, and the other end of which is connected to the air inlet of the Roots pump 221. Specifically, under the negative pressure generated by the Roots pump 221 itself, it is not necessary to set a circulating water pump in the circulating water pipe 224, so that the coolant in the liquid storage chamber can flow into the Roots pump 221, thereby reducing the system manufacturing cost.

[0031] In this embodiment, the second vacuum pumping unit 22 and the third vacuum pumping unit 23 both include a gas-liquid separator 225, and the air inlet of the gas-liquid separator 225 is connected to the air outlet of the second water ring vacuum pump 222. Specifically, the gas-liquid separator 225 can separate the gas-liquid mixture in the second water ring vacuum pump 222 to achieve the recycling of the liquid.

[0032] Furthermore, in order to avoid the temperature rise of the second water ring vacuum pump 222, in this embodiment, the second vacuum pumping unit 22 and the third vacuum pumping unit 23 both include a second heat exchanger 226, and the second heat exchanger 226 is provided with a cooling cavity, which is communicated with the liquid storage cavity of the gas-liquid separator 225, and the cooling cavity is also communicated with the cooling liquid inlet of the second water ring vacuum pump 222.

[0033] In summary, the power plant vacuum system of the utility model comprises: a first condenser 11 connected to the power generation steam turbine, a second condenser 12 connected to the feed water pump steam turbine, a first vacuum pumping unit 21, a second vacuum pumping unit 22 and a third vacuum pumping unit 23, a first control valve group is connected between the first vacuum pumping unit 21 and the first condenser 11, a second control valve group is connected between the first vacuum pumping unit 21 and the second condenser 12, a third control valve group is connected between the second vacuum pumping unit 22 and the first condenser 11, and a fourth control valve group is connected between the third vacuum pumping unit 23 and the second condenser 12; since the feed water pump steam turbine will not be started until the power generation steam turbine is fully started, when starting the power generation unit, the first control valve group is first used to connect the first vacuum pumping unit 21 and the first condenser 11, and the first vacuum pumping unit 21 with larger power is used to supply steam to the first condenser The first control valve group is used to provide suction force for the first condenser 11 during startup. After the first condenser 11 is fully started, the first control valve group is closed, the third control valve group is opened, and the second vacuum pumping unit 22 with lower power is used to provide suction force for the running first condenser 11. After the first condenser 11 is fully started, the second control valve group is opened, and the first vacuum pumping unit 21 with higher power is used to provide suction force for the second condenser 12 during startup. After the second condenser 12 is fully started, the second control valve group is closed, the fourth control valve group is opened, and the third vacuum pumping unit 23 with lower power is used to provide suction force for the running second condenser 12. Therefore, the power plant vacuum pumping system of the utility model can utilize the first vacuum pumping unit 21 to perform suction operations on the first condenser 11 and the second condenser 12, thereby reducing the amount of vacuum pumping units required for the power plant vacuum pumping system and reducing the construction cost of the power plant.

[0034] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principle of the present invention. These improvements and substitutions should also be regarded as the protection scope of the present invention.

Claims

1. A vacuum pumping system for a power plant, It is characterized in that include: A first condenser (11) connected to a power generation steam turbine, a second condenser (12) connected to a feed water pump steam turbine, a first vacuum pumping unit (21), a second vacuum pumping unit (22) and a third vacuum pumping unit (23), wherein the power of the first vacuum pumping unit (21) is greater than the power of the second vacuum pumping unit (22) and the power of the third vacuum pumping unit (23); a first control valve group is connected between the first vacuum pumping unit (21) and the first condenser (11), a second control valve group is connected between the first vacuum pumping unit (21) and the second condenser (12), a third control valve group is connected between the second vacuum pumping unit (22) and the first condenser (11), and a fourth control valve group is connected between the third vacuum pumping unit (23) and the second condenser (12).

2. The power plant vacuum system according to claim 1, It is characterized in that The first condenser (11) is a double-pressure condenser, and the double-pressure condenser is provided with a low-pressure end (112) and a high-pressure end (111); the first control valve group comprises a first control valve (31) and a second control valve (32); one end of the first control valve (31) is connected to the low-pressure end (112), and the other end of the first control valve (31) is connected to the first vacuum pumping unit (21); one end of the second control valve (32) is connected to the high-pressure end (111), and the other end of the second control valve (32) is connected to the first vacuum pumping unit (21).

3. The power plant vacuum system according to claim 2, It is characterized in that The third control valve group comprises a third control valve, one end of the third control valve is connected to the low-pressure end (112), and the other end of the third control valve is connected to the second vacuum pumping unit (22); the power plant vacuum pumping system comprises a fourth control valve (34), one end of the fourth control valve (34) is connected to the high-pressure end (111), and the other end of the fourth control valve (34) is connected to the third vacuum pumping unit (23).

4. The power plant vacuum system according to claim 1, It is characterized in that The second control valve group comprises a fifth control valve (35), one end of the fifth control valve (35) is connected to the first vacuum pumping unit (21), and the other end of the fifth control valve (35) is connected to the second condenser (12).

5. The power plant vacuum system according to claim 1, It is characterized in that The fourth control valve group comprises a sixth control valve (36), one end of the sixth control valve (36) is connected to the second condenser (12), and the other end of the sixth control valve (36) is connected to the third vacuum pumping unit (23).

6. The power plant vacuum system according to claim 1, It is characterized in that The first vacuum pumping unit (21) comprises a plurality of first water ring vacuum pumps arranged in parallel.

7. The power plant vacuum system according to claim 1, It is characterized in that The second vacuum pumping unit (22) and the third vacuum pumping unit (23) both comprise a Roots pump (221), a first heat exchanger (223) and a second water ring vacuum pump (222) which are arranged in sequence; the first heat exchanger (223) is used to condense the gas flowing out of the Roots pump (221) into liquid.

8. The power plant vacuum system according to claim 7, It is characterized in that The first heat exchanger (223) is provided with a liquid storage chamber for storing the liquid, and the power plant vacuum system comprises a circulating water pipe (224), one end of the circulating water pipe (224) is connected to the liquid storage chamber, and the other end of the circulating water pipe (224) is connected to the air inlet of the Roots pump (221).

9. The power plant vacuum system according to claim 7, It is characterized in that The second vacuum pumping unit (22) and the third vacuum pumping unit (23) both comprise a gas-liquid separator (225), and an air inlet of the gas-liquid separator (225) is connected to an air outlet of the second water ring vacuum pump (222).

10. The power plant vacuum system according to claim 9, It is characterized in that The second vacuum pumping unit (22) and the third vacuum pumping unit (23) both comprise a second heat exchanger (226), the second heat exchanger (226) being provided with a cooling chamber, the cooling chamber being in communication with the liquid storage chamber of the gas-liquid separator (225), and the cooling chamber being in communication with the cooling liquid inlet of the second water ring vacuum pump (222).