Automatic sampling device for muck at soil outlet of shield
By installing an automatic sampling device at the discharge port of the screw conveyor, the problem of inaccurate test results caused by changes in the properties of the excavated soil was solved, realizing automated sampling and shaping of the excavated soil properties, and improving the efficiency and safety of tunnel boring machine construction.
Patent Information
- Application Number
- CN202420462629.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-11
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-03-11
AI Technical Summary
During earth pressure balance shield tunneling, the properties of the excavated soil change after it is transported from the soil chamber to the ground, causing the test results to be inconsistent with the actual situation and affecting the construction effect.
An automatic sampling device is installed at the outlet of the screw conveyor. The device automatically receives and forms soil samples via a soil collection conveyor belt, maintaining the original properties of the soil during the sampling process. The device includes a frame, a moving platform, a soil collection conveyor belt, and a control mechanism to achieve automated sampling.
It improves the accuracy and reliability of soil property testing, reduces construction costs, increases tunnel boring efficiency, and avoids the safety risks of manual sampling.
Smart Images

Figure CN222027976U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of shield tunneling slag, and in particular to an automatic sampling device for slag at a shield tunneling exit. Background Art
[0002] During the earth pressure balance shield tunneling process, the debris is cut by the cutter head into the soil compartment and discharged from the shield machine through a screw conveyor.
[0003] The properties of the slag in the shield soil chamber are particularly important to the safety of shield excavation. If the slag has poor flow plasticity, or too high friction or permeability, the water and soil pressure on the excavation surface will be difficult to balance, which can easily lead to a series of problems such as increased wear of the shield cutterhead, mud cake formation, gushing at the outlet, over-excavation of the stratum, and even induce excessive settlement.
[0004] Therefore, it is usually necessary to conduct corresponding tests on the properties of the slag during the excavation process, and carry out or adjust the slag improvement construction according to the test results.
[0005] At present, the test and detection of shield slag mainly involves sampling the slag transported to the ground. After the slag is transported horizontally and vertically over long distances after excavation, a large amount of water, fine particles, and improved materials may be lost, resulting in a large difference between the properties of the slag after being transported to the ground and the properties of the slag in the shield soil compartment, causing problems such as the test results being inconsistent with the actual situation and the improvement effect being poor. Utility Model Content
[0006] The purpose of this application is to provide an automatic sampling device for debris at the shield tunneling exit, which can automatically sample at the screw conveyor exit closest to the soil compartment, retaining the original properties of the debris in the soil compartment, effectively improving the detection effect of the property test, and more realistically restoring the properties of the debris in the shield tunneling soil compartment, providing guidance for the operation of shield excavation, effectively improving the shield excavation efficiency, and thus reducing construction costs.
[0007] In order to achieve the above-mentioned purpose, the utility model provides an automatic sampling device for slag at a shield excavation port, which is installed on a connecting bridge main beam at the side of a screw conveyor excavation port, and comprises: a frame, the frame is fixedly installed on the connecting bridge main beam and a mobile platform is arranged on the frame;
[0008] The movable platform is provided with a soil conveyor belt for receiving soil samples, the soil conveyor belt is provided with a slag baffle for obtaining formed soil samples, the height of the movable platform on the frame is adjustable, and the position of the soil conveyor belt on the movable platform is adjustable.
[0009] In an optional embodiment, the mobile platform is installed on the frame in a liftable manner via a lifting mechanism, a translation mechanism is provided on the mobile platform, the translation mechanism is connected to the soil-extracting conveyor belt, and the soil-extracting conveyor belt is installed on the mobile platform in a liftable manner via the translation mechanism.
[0010] In an optional embodiment, the soil conveyor belt includes a conveyor belt and a driving electric roller, and the slag baffle includes a surrounding side plate arranged around the conveyor belt, and a top baffle mounted on the surrounding side plate, and the top baffle is installed across the width direction of the conveyor belt and close to the tail end of the conveyor belt.
[0011] In an optional embodiment, the lifting mechanism includes a ball screw and a screw motor, the ball screw is vertically mounted on the frame, the screw motor is mounted on the top of the frame, a lifting connection block is provided on the ball screw, and the movable platform is connected to the lifting connection block.
[0012] In an optional embodiment, the movable platform includes a platform base, the platform base is connected to the lifting connection block, and a guide shaft is provided on the side of the ball screw.
[0013] In an optional embodiment, the frame includes a protective cover, and the ball screw and the guide shaft are arranged in the protective cover.
[0014] In an optional embodiment, a slide rail is provided on the platform base, the soil-extracting conveyor belt is connected to the slide rail via a translation transfer block, and a slide rail motor is provided at the end of the slide rail.
[0015] In an optional embodiment, the frame includes a gantry installed on the main beam of the connecting bridge, the mobile platform is arranged at the lower part of the gantry, and the soil conveyor belt is installed longitudinally relative to the gantry.
[0016] In an optional embodiment, a control mechanism is further included, and the driving electric roller, the screw motor and the slide rail motor are all electrically connected to the control mechanism.
[0017] In an optional embodiment, the frame is connected to the main beam of the connecting bridge by bolts, and an elastic shock-absorbing pad is provided between the frame and the main beam of the connecting bridge.
[0018] The automatic sampling device for shield tunneling excavation port in the present application can automatically receive and collect the excavation port of the screw conveyor through the soil conveyor belt, and can detect the excavation port after forming, thereby enhancing the degree of automation of the sampling process and avoiding the safety risks of manual sampling when the amount of excavation port excavation is large and the impact force of the excavation port is large.
[0019] The frame is fixedly installed on the main beam of the connecting bridge on the side of the screw conveyor excavation port. It is the closest loading position to the screw conveyor excavation port, which can effectively reduce the size of the equipment and the horizontal stroke, and reduce the equipment cost. At the same time, it can reduce the change of the properties of the sampled slag, restore the real condition of the slag in the soil compartment to the greatest extent, and improve the accuracy and reference of the test results.
[0020] By setting the mobile platform on the frame, the position of the soil conveyor belt can be adjusted. Specifically, the height of the mobile platform on the frame and the position of the soil conveyor belt on the mobile platform can be adjusted, and the soil conveyor belt can be adjusted to the position below the soil outlet of the screw conveyor, which is convenient for sampling. At the same time, the soil conveyor belt after sampling can be adjusted to a pedestrian passage close to the main beam of the connecting bridge, which is convenient for adjusting the position of the soil conveyor belt between sampling and slag detection.
[0021] The soil conveyor belt can automatically receive the debris output from the screw conveyor outlet, and can shape the debris falling onto the soil conveyor belt through the debris baffle on the soil conveyor belt, and finally obtain a formed soil sample, which is convenient for subsequent property testing.
[0022] Other features and advantages of the present application will be described in detail in the subsequent detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0024] Figure 1 This is a schematic diagram of the installation position of the automatic sampling device for the slag at the shield tunneling exit in this application;
[0025] Figure 2 This is a schematic diagram of the structure of the automatic sampling device for the slag at the shield tunneling exit in this application;
[0026] Figure 3 It is a transmission structure diagram of the lifting mechanism in this application;
[0027] Figure 4 It is a schematic diagram of the transmission structure of the translation mechanism in this application.
[0028] icon:
[0029] 1-Screw conveyor;
[0030] 2- Connect the bridge beams;
[0031] 3-frame; 31-protective cover;
[0032] 4-mobile stand; 41-stand base;
[0033] 5- soil conveyor belt; 51- soil baffle; 51a- enclosure side plate; 51b- top baffle; 52- conveyor belt; 53- driving electric roller;
[0034] 6-lifting mechanism; 61-ball screw; 62-screw motor; 63-lifting connection block; 64-guide shaft; 65-ball screw nut; 66-reducer; 67-transmission shaft; 68-synchronous pulley; 69-synchronous belt;
[0035] 7-translation mechanism; 71-slide rail; 72-translation transfer block; 73-slide rail motor; 74-slider. DETAILED DESCRIPTION
[0036] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.
[0037] In the description of this application, it should be noted that the terms "inside", "outside", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, or the orientation or positional relationship in which the product of the application is usually placed when in use, which is only for the convenience of describing this application and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on this application. In addition, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.
[0038] In the description of this application, it should also be noted that, unless otherwise clearly specified and limited, the terms "disposed" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0039] The automatic sampling device for debris at the shield exit in the present application is mainly used to sample the debris excavated by the shield and conduct subsequent detection and analysis, so that the debris output from the soil compartment through the screw conveyor can be sampled and tested while maintaining its original state. During the sampling process, the soil conveyor belt is mainly used to automatically take over the fallen debris to restore the original state of the debris in the soil compartment.
[0040] The automatic slag sampling device can perform sampling without changing the state of the sampled slag, so as to improve the accuracy of the slag parameter detection results, truly restore the properties of the slag in the soil chamber, provide a real and reliable guidance basis for subsequent shield operations, effectively improve the shield excavation efficiency, and thus reduce construction costs.
[0041] During the earth pressure balance shield excavation process, the debris is cut off by the shield cutter head and enters the soil compartment. It is then discharged to the excavation belt of the shield connecting bridge by the screw conveyor. The belt is then transported to the debris truck, and then transported to the tunnel entrance, lifted out and placed in the debris pit on the ground.
[0042] The state of the slag in the shield soil chamber is crucial. If the slag flow plasticity is poor, it will cause an increase in shield thrust, torque and other parameters, or mud cake will form on the cutterhead. If the slag permeability is too high, it will cause gushing and cause a large amount of water loss, which will in turn cause a series of problems such as surface subsidence.
[0043] Therefore, the slag is usually sampled to determine the properties of the slag. At present, the slag sampling is mainly carried out in the ground slag pit. As mentioned above, the slag in the surface slag pit has been transported many times, and its properties are quite different from those in the soil cabin. The soil cabin is closed and pressurized, so it is difficult to sample the slag in the soil cabin.
[0044] In addition, the slag discharged from the screw conveyor outlet will fall directly onto the discharge belt. The amount of slag is large and the impact force is large during the discharge process, so manual sampling is difficult to complete. Through the slag automatic sampling device in the utility model, soil can be automatically collected at the screw conveyor outlet, and can be automatically shaped into the molding pattern required for slag detection. After shaping, the shaped pattern can be automatically moved to the pedestrian walkway at the shield connecting bridge, and then the detection work can be carried out.
[0045] See also Figure 1-Figure 2 The automatic slag sampling device in the utility model is installed on the connecting bridge main beam 2 on the side of the excavation port of the screw conveyor 1. The connecting bridge main beam 2 is the closest loading position to the excavation port of the screw conveyor 1. By installing the automatic slag sampling device on it, the size of the equipment and the horizontal movement stroke can be reduced, and the equipment cost can be reduced. At the same time, the slag can be collected at the first time, and the properties of the slag in the soil cabin can be truly restored.
[0046] Furthermore, by mounting the automatic slag sampling device on the main beam 2 of the connecting bridge, the lines of the device can be routed from the centralized wiring position on the upper part of the main beam, reducing the difficulty of wiring the equipment.
[0047] The main structure of the automatic slag sampling device includes a frame 3, which is fixedly installed on the main beam 2 of the connecting bridge to facilitate the installation of other equipment on the frame 3.
[0048] During the shield tunneling process, the connecting bridge part vibrates greatly, and the frame 3 and the connecting bridge main beam 2 need to be connected with bolts to prevent connection failure. Elastic shock-absorbing pads are arranged between the frame 3 and the connecting bridge main beam 2 to ensure the stability and reliability of the equipment operation and prevent equipment damage.
[0049] A mobile platform 4 is arranged on the frame 3 , and a soil conveyor belt 5 for receiving soil samples is installed on the mobile platform 4 . The soil conveyor belt 5 is a main sampling device, and is mainly used to receive the debris dropped from the soil outlet of the screw conveyor 1 .
[0050] The mobile stand 4 can be raised and lowered relative to the fixed frame 3, driving the soil conveyor belt 5 to be raised and lowered. At the same time, the position of the soil conveyor belt 5 on the mobile stand 4 can also be adjusted, so that the position of the soil conveyor belt 5 as the sampling body can be adjusted in both height and horizontal dimensions.
[0051] Specifically, during use, the soil conveyor belt 5 can be transferred to the position directly below the soil outlet of the screw conveyor 1, so that the soil conveyor belt 5 can automatically receive the soil output from the soil outlet of the screw conveyor 1, and after the sampling is completed, the soil conveyor belt 5 can be transferred to the pedestrian passage position to facilitate the subsequent detection of soil properties.
[0052] The soil conveyor belt 5 is provided with a slag baffle 51, which can realize passive shaping of the slag on the soil conveyor belt 5, and is beneficial to automatically shaping the soil sample into the molding pattern required for detection, thereby improving operation efficiency.
[0053] The automatic soil sampling device in the utility model collects and shapes soil samples through a soil conveyor belt 5. The soil conveyor belt 5 rotates dynamically during use and is carried on a mobile stand 4 that can adjust its height position. A translation structure that can drive the soil conveyor belt 5 to move horizontally is provided on the mobile platform, so that the soil conveyor belt 5 can finally move up and down and forward and backward relative to the main body of the frame 3.
[0054] During the sampling process, the mobile platform 4 is first adjusted in height to below the plane of the excavation port of the screw conveyor 1, and then the sampling conveyor belt is moved forward to below the excavation port of the screw conveyor 1, so that the sampling conveyor belt can receive the fallen soil at the excavation port. After adjusting the position of the soil conveyor belt 5, the driving electric roller 53 of the soil conveyor belt 5 is started to rotate the belt, and the soil baffle 51 on the soil conveyor belt 5 is combined to shape the soil until the soil is finally shaped into a rectangular structure.
[0055] After the soil sample is formed, the mobile stand 4 moves the soil conveyor belt 5 backward to a pedestrian passage close to the main beam 2 of the connecting bridge for subsequent testing of the soil sample.
[0056] In one specific embodiment, the mobile platform 4 is installed on the frame 3 in a liftable manner through a lifting mechanism 6. The lifting mechanism 6 can adjust the mobile platform 4 and further adjust the height of the soil conveyor belt 5 installed on the mobile platform 4.
[0057] The mobile platform 4 is provided with a translation mechanism 7, which is connected to the soil conveyor belt 5, and the soil conveyor belt 5 is installed on the mobile platform 4 in a translational manner through the translation mechanism 7. Specifically, the height adjustment of the soil conveyor belt 5 is mainly carried out by driving the mobile platform 4 as a whole through the lifting mechanism 6, while the forward and backward telescopic translation of the soil conveyor belt 5 is regulated separately by the translation mechanism 7 arranged on the mobile platform 4.
[0058] Through the lifting mechanism 6 and the translation mechanism 7, the position of the main structure of soil excavation can be adjusted, so that the soil excavation conveyor belt 5 can be adjusted in both height and horizontal dimensions to meet its position switching in the two states of soil excavation and detection.
[0059] Based on the composition of the main structure of the soil excavation, the soil excavation conveyor belt 5 includes a conveyor belt 52 and a driving electric roller 53. The slag baffle 51 includes a surrounding side plate 51a arranged around the conveyor belt 52, and a top baffle 51b mounted on the surrounding side plate 51a. The top baffle 51b is installed across the width direction of the conveyor belt 52 and is close to the tail end of the conveyor belt 52.
[0060] The conveyor belt 52 can rotate under the drive of the driving electric roller 53 to dynamically output the received soil samples. After the soil conveyor belt 5 is moved below the soil outlet of the screw conveyor 1, the debris will fall onto the conveyor belt 52, and then the driving electric roller 53 of the soil conveyor belt 5 is started to make the conveyor belt 52 start to rotate.
[0061] The slag baffle 51 is fixed to the outer side of the conveyor belt 52. During the rotation of the conveyor belt 52, the slag received by the conveyor belt 52 is gradually accumulated under the blocking effect of the surrounding side plates 51a, and the top baffle 51b cuts off the higher part of the received slag, finally forming a rectangular shape.
[0062] By setting the enclosing side plates 51a and the top baffle 51b, combined with the dynamic operation of the conveyor belt 52, the soil sample can be automatically formed. The conveyor belt 52 has a simple structure, which simplifies the equipment structure. The conveyor belt 52 has strong impact resistance and can effectively prevent damage by the impact of the debris falling from the earth discharge port. In addition, the soil conveyor belt 5 is only provided with a driving electric roller 53, which can reduce the difficulty of automatic control and ensure the stability of sampling.
[0063] The mobile platform 4 in this embodiment is a steel frame structure, which is connected to the lifting mechanism 6 and the translation mechanism 7 respectively. The starting point for setting the steel frame structure is that the soil-extracting conveyor belt 5 is small in size and it is difficult to directly connect it with the mobile platform 4. By installing the soil-extracting conveyor belt 5 on the mobile platform 4 with a steel frame structure, the stability of the equipment during the soil-extracting process can be enhanced, and the conveyor belt 52 and the slag baffle 51 can be prevented from tipping over.
[0064] Combination Figure 3 The lifting mechanism 6 in this embodiment includes a ball screw 61 and a screw motor 62. The ball screw 61 is vertically mounted on the frame 3 and is mainly used to control the height position of the mobile platform 4 on the frame 3. The screw motor 62 is mounted on the top of the frame 3 and is used to drive the ball screw 61 to operate.
[0065] The mobile platform 4 includes a lifting connection block 63, which is connected to the mobile platform 4 as an integral structure. Further, the lifting connection block 63 includes a ball screw nut 65, which is connected to the lifting connection block 63 as an integral structure, and the ball screw 61 is threadedly connected to the ball screw nut 65 of the lifting connection block 63. The screw motor 62 provides power to drive the ball screw 61 to rotate. Combined with the connection between the lifting connection block 63 and the mobile platform 4, and the ball screw nut 65 of the lifting connection block 63 does not rotate, the lifting connection block 63 can move up and down during the driving action, thereby driving the mobile platform 4 to move up and down, and the soil conveyor belt 5 carried on the mobile platform 4 can be adjusted vertically at a position below the soil outlet of the screw conveyor 1 to determine a reasonable soil taking position.
[0066] At the top of the frame 3, the screw motor 62 is connected to the reducer 66, and a synchronous pulley 68 is installed on the output shaft of the reducer 66. The ball screws 61 on both sides of the frame 3 are coaxially connected to the transmission shaft 67, and a synchronous pulley 68 is also installed on the transmission shaft 67. The synchronous transmission is carried out by the synchronous belt 69 arranged therebetween, so that the ball screws 61 on both sides can rotate synchronously with the reducer 66, thereby realizing the adjustment of the height of the movable platform 4 under the drive of the screw motor 62. Screw support seats are respectively arranged between the top and bottom ends of the ball screw 61 and the frame 3 to ensure the stability and reliability of the ball screw 61 during operation.
[0067] The mobile platform 4 specifically includes a platform base 41, and the soil conveyor belt 5 and the translation mechanism 7 are all installed on the platform base 41. The platform base 41 is connected to the lifting connection block 63, which can make the mobile platform 4 and the equipment installed thereon rise and fall and adjust the position as a whole.
[0068] The use of a ball screw 61 to control the up and down movement of the mobile platform 4 and the soil conveyor belt 5 can ensure that the moving process is uniform and controllable. During the control process, only the speed of the screw motor 62 needs to be adjusted to control the lifting speed of the mobile platform 4. In addition, two guide shafts 64 are arranged on both sides of the ball screw 61 to prevent the mobile platform 4 from twisting and enhance the stability of the vertical movement of the mobile platform 4.
[0069] During the shield tunneling construction process, there will be a large amount of dust and water on site. A protective cover 31 is provided on the frame 3, and the ball screw 61 and the guide shaft 64 are arranged in the protective cover 31, which can prevent the intrusion of external water and dust and prevent equipment damage.
[0070] Combination Figure 4 , a slide rail 71 is provided on the platform base 41, the soil conveyor belt 5 is connected to the slide rail 71 through a translation transfer block 72, and a slide rail motor 73 is provided at the end of the slide rail 71. Specifically, the slide rail 71 is fixedly mounted on the platform base 41 of the mobile platform 4, and the slide rail motor 73, the slide rail 71, the translation transfer block 72 and the soil conveyor belt 5 can all move up and down with the mobile platform 4.
[0071] The soil conveyor belt 5 is connected to the slide rail 71, and is powered by the slide rail motor 73 at the end of the slide rail 71, so that the soil conveyor belt 5 can move horizontally on the slide rail 71. The soil conveyor belt 5 can further be switched between sampling and detection working conditions, so that it can move back and forth between the soil outlet position of the screw conveyor 1 and the pedestrian passage.
[0072] A lead screw is connected to the output end of the slide rail motor 73, a slider 74 that can slide on the slide rail 71 is connected to the translation adapter block 72, and a lead screw nut that cooperates with the lead screw is arranged inside the translation adapter block 72, and the lead screw is threadedly connected to the lead screw nut (the lead screw and the lead screw nut are not shown in the figure).
[0073] During operation, the slide rail motor 73 drives the screw rod to rotate synchronously. At the same time, the screw nut set on the translation adapter block 72 does not rotate. During the rotation of the screw rod, the translation adapter block 72 with the screw nut can be translated. Combined with the slider 74 connected to the translation adapter block 72, the translation adapter block 72 can be translated along the slide rail 71, and then combined with the connection between the translation adapter block 72 and the soil conveyor belt 5, the soil conveyor belt 5 can move smoothly.
[0074] Driving electric rollers 53 are arranged at both side ends of the soil conveyor belt 5. When the driving electric rollers 53 rotate, the soil conveyor belt can be driven to rotate.
[0075] After the soil is sampled at the soil outlet of the screw conveyor 1, the soil conveyor belt 5 is closed, and the soil sample is transferred to the pedestrian passage for testing through the translation of the soil conveyor belt 5. During the translation process, the operation of the slide motor 73 is uniform and controllable, ensuring that the movement of the soil conveyor belt 5 is more stable.
[0076] The frame 3 in the utility model comprises a gantry mounted on the main beam 2 of the connecting bridge, the mobile platform 4 is arranged at the lower part of the gantry, and the soil conveyor belt 5 is installed longitudinally relative to the gantry, which can facilitate the position adjustment of the soil conveyor belt 5.
[0077] The automatic sampling device also includes a control mechanism, and the driving electric roller 53, the lead screw motor 62 and the slide rail motor 73 are all electrically connected to the control mechanism.
[0078] The control mechanism specifically includes an upper computer and a lower computer, wherein the upper computer includes a computer with an industrial control screen, and the lower computer is a PLC. The driving electric roller 53, the slide motor 73 and the screw motor 62 of the soil conveyor belt 5 are all connected to the industrial control cabinet including the upper computer and the lower computer, and the above three motors are electrically connected to the PLC. The PLC can transmit signals to the three motors for control.
[0079] PLC cannot directly interact with humans, so PLC programming is performed on the upper industrial computer and downloaded to the PLC's CPU, allowing the PLC to calculate and transmit signals to the motor. On-site personnel can directly operate the motor on the industrial control screen of the industrial computer.
[0080] In order to realize automatic control, a device operation program based on LabVIEW is compiled on the industrial computer. The program is connected to the PLC program. The start and stop time, speed, position, etc. of different mechanisms are programmed in the program. Manual operation or debugging of each mechanism can be performed, and a one-key start program is written, which can enable all mechanisms to automatically run according to the plan, thereby realizing the automatic control of each mechanism. This can save a lot of manual operation and facilitate automatic soil extraction.
[0081] In the actual operation process, the start and stop timing, running speed and position of each mechanism must first be debugged according to the on-site conditions. For example, it is necessary to determine the moving time point and running speed to ensure that the soil conveyor belt 5 can move smoothly to the appropriate soil taking position, or the moving time point and running speed of the slide rail 71 to ensure that the soil conveyor belt 5 can move smoothly to the detection position. After determining the corresponding indicators, enter them in the operating program of the equipment, and after turning on the one-key start, the mechanism will start to run automatically according to the indicators.
[0082] In addition, an emergency stop button must be installed on the industrial control cabinet, which can bypass the human-computer interaction program and directly stop the operation of all mechanism motors to deal with equipment debugging collisions or automatic operation errors of the equipment.
[0083] Before and during sampling, the indicators that need to be debugged and obtained specifically include: the vertical moving speed and distance of the mobile platform 4 moving below the plane of the excavation port of the screw conveyor 1; the horizontal moving speed and distance of the soil conveyor belt 5 moving to just below the excavation port of the screw conveyor 1; the start and stop time and rotation speed of the soil conveyor belt 5 to sample the slag.
[0084] After sampling, the indicators that need to be debugged and obtained specifically include: the vertical moving speed and distance of the mobile platform 4 to the pedestrian walkway of the connecting bridge; the horizontal moving speed and distance of the soil conveyor belt 5 to the pedestrian walkway of the connecting bridge.
[0085] In the actual operation process, after the screw conveyor 1 is started, the slag begins to be discharged, and the automatic sampling device is started in the human-computer interaction program of the PLC industrial control cabinet to automatically take the soil. The process is as follows:
[0086] (1) Start the screw motor 62, and the ball screw 61 drives the mobile platform 4 to a position below the plane of the excavation port of the screw conveyor 1;
[0087] (2) Start the slide rail motor 73, and the soil conveyor belt 5 moves horizontally along the slide rail 71 to just below the soil outlet of the screw conveyor 1;
[0088] (3) After the screw conveyor 1 starts to excavate, the soil conveyor belt 5 is started to receive the soil and move it toward the soil baffle 51, gradually forming the molding pattern required for the test;
[0089] (4) The soil conveyor belt 5 is closed, and the slide rail motor 73 is started to move the slide rail 71 back to the pedestrian passage on the side of the trolley, and the soil test is started.
[0090] Among them, in steps (1)-(4), the mobile platform 4 must move at a low and uniform speed to prevent collision.
[0091] Among them, in step (2), limiters must be set on both sides of the slide rail 71, and the position of the limiter is determined comprehensively based on the equipment size, equipment installation position, and the position of the excavation outlet of the screw conveyor 1.
[0092] Among them, in step (3), the soil conveyor belt 5 must rotate at a low and uniform speed to ensure the quality of the soil sample.
[0093] Among them, in step (4), when the slide rail 71 is retracted, people are not allowed to stand in the side pedestrian passage near the equipment to prevent collision.
[0094] Carry out the molding pattern test on the side pedestrian passage near the equipment. After the test is completed, remove the soil sample and proceed to the next step of sampling test.
[0095] It should be noted that, in the absence of conflict, the features in the embodiments of this application may be combined with each other.
[0096] The above are only preferred embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. An automatic sampling device for slag at the shield tunneling exit, installed on the main beam of the connecting bridge on the side of the screw conveyor exit, characterized in that: include: A frame, the frame is fixedly mounted on the main beam of the connecting bridge and a mobile platform is arranged on the frame; The movable platform is provided with a soil conveyor belt for receiving soil samples, the soil conveyor belt is provided with a slag baffle for obtaining formed soil samples, the height of the movable platform on the frame is adjustable, and the position of the soil conveyor belt on the movable platform is adjustable.
2. The automatic sampling device for slag at the shield tunneling exit according to claim 1 is characterized in that: The mobile platform is installed on the frame in a liftable manner through a lifting mechanism. A translation mechanism is provided on the mobile platform. The translation mechanism is connected to the soil-extracting conveyor belt. The soil-extracting conveyor belt is installed on the mobile platform in a translational manner through the translation mechanism.
3. The automatic sampling device for slag at the shield tunneling exit according to claim 2 is characterized in that: The soil conveyor belt includes a conveyor belt and a driving electric roller. The slag baffle includes a surrounding side plate arranged around the conveyor belt and a top baffle mounted on the surrounding side plate. The top baffle is installed across the width direction of the conveyor belt and close to the tail end of the conveyor belt.
4. The automatic sampling device for slag at the shield tunneling exit according to claim 3 is characterized in that: The lifting mechanism includes a ball screw and a screw motor, the ball screw is vertically installed on the frame, the screw motor is installed on the top of the frame, a lifting connection block is provided on the ball screw, and the moving platform is connected to the lifting connection block.
5. The automatic sampling device for slag at the shield tunneling exit according to claim 4 is characterized in that: The movable platform comprises a platform base, the platform base is connected to the lifting connection block, and a guide shaft is arranged on the side of the ball screw.
6. The automatic sampling device for slag at the shield tunneling exit according to claim 5 is characterized in that: The frame comprises a protective cover, and the ball screw and the guide shaft are arranged in the protective cover.
7. The automatic sampling device for slag at the shield tunneling exit according to claim 5 is characterized in that: A slide rail is arranged on the platform base, the soil taking conveyor belt is connected to the slide rail via a translation transfer block, and a slide rail motor is arranged at the end of the slide rail.
8. The automatic sampling device for slag at the shield tunneling exit according to claim 1 is characterized in that: The frame includes a gantry installed on the main beam of the connecting bridge, the mobile platform is arranged at the lower part of the gantry, and the soil conveyor belt is installed longitudinally relative to the gantry.
9. The automatic sampling device for slag at the shield tunneling exit according to claim 7 is characterized in that: It also includes a control mechanism, and the driving electric roller, the lead screw motor and the slide rail motor are all electrically connected to the control mechanism.
10. The automatic sampling device for debris at the shield tunneling exit according to any one of claims 1 to 9, characterized in that: The frame is connected to the main beam of the connecting bridge by bolts, and an elastic shock-absorbing pad is arranged between the frame and the main beam of the connecting bridge.
Citation Information
Cited By
Mineral exploration sample collection and detection equipment