Construction site temporary power cable erecting device
By designing the closure assembly and support assembly in the cable mount device, the problem of cable drop is solved, and higher support stability is achieved, ensuring the firmness and reliability of the cable mount.
Patent Information
- Application Number
- CN202420486329.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-13
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-03-13
AI Technical Summary
The existing cable mount devices have low support stability, which leads to the problem of easy drop of cables.
A construction site pro-electric cable mount device including a closure assembly and a support assembly is designed. The closure assembly prevents cable wires through a combined structure of movable ring, top half ring, short shell, spring, slider, plug plate and fixing bolt. When dropped, the support assembly increases the stability of cable mount through semicircular blocks, rotary sleeves, side rods, insert rods and other structures.
Effectively prevent cables from falling, increase the support stability of cables, and make the cable mount more firm and reliable.
Smart Images

Figure CN222029569U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of temporary power cable installation at a construction site, in particular to a temporary power cable installation device at a construction site. Background Art
[0002] The cable laying device is an indispensable facility for temporary power work at the construction site. When the workers are carrying out construction work on site, they need to lay temporary power cables to provide power support for the electrical equipment at the construction site. In view of this, the traditional device is not perfect. The traditional cable laying device has low support stability for the cable line, and the cable line is easy to fall.
[0003] Patent document: JP2023241199U cable rack. The above-mentioned public document mainly considers the problem of optimizing the placement of the extruded part while enhancing the strength and reducing the weight.
[0004] The existing cable installation has low support stability and the cables are prone to falling. Utility Model Content
[0005] The utility model aims to provide a temporary power cable installation device at a construction site, which can solve the technical problems in the prior art that the cable installation device has low support stability and the cable line is easy to fall off.
[0006] To achieve the above object, the utility model provides the following technical solutions: a temporary power cable installation device at a construction site, comprising an adjustment rod, a sealing buckle assembly is installed on the outer side of the adjustment rod, and the sealing buckle assembly is used to prevent the cable from falling;
[0007] The buckle assembly includes a movable ring, and a top half ring is installed on the outer side of each movable ring, a short shell is installed on one side of the top half ring, a spring is installed on the inner side of the bottom wall of the short shell, a slider is installed on the top of the spring, and the slider is located on the inner side of the short shell, an insert plate is installed on one side of the slider, and a plug hole is opened inside the insert plate.
[0008] Preferably, four round holes are opened on one side of the adjusting rod, and a top block is installed on the top of the adjusting rod.
[0009] Preferably, an outer rod is installed on the outer side of the adjusting rod, a positioning bolt is installed through a thread on one side of the outer rod, and the positioning bolt is located on the inner side of the circular hole at the bottom of the adjusting rod, and a bottom film is installed at the bottom of the outer rod.
[0010] Preferably, a fixed ring is installed on the outer side of the adjusting rod, and the fixed ring is located at the bottom of the movable ring. A bottom half ring is installed on each side of the fixed ring, and the bottom half ring is located at the bottom of the top half ring.
[0011] Preferably, a frame shell is installed on one side of the bottom half ring, and the frame shell is located on the outside of the plug plate, and a fixing bolt is installed through a thread on one side of the frame shell, and the fixing bolt is located on the inside of the plug hole.
[0012] Preferably, a support assembly is installed on the outer side of the outer rod, and the support assembly is used to support the cable installation. The support assembly includes two limit rings, and the two limit rings are located on the outer side of the outer rod. A rotating sleeve is installed on the outer side of the outer rod, and the rotating sleeve is located between the two limit rings. Two semicircular blocks are installed on each side of the rotating sleeve, and a short bolt is installed between the two semicircular blocks.
[0013] Preferably, a rotating block is installed on the outside of the short bolt, and the rotating block is located between two semicircular blocks, a side rod is installed on the bottom of the rotating block, an insertion rod is installed on the inside of the side rod, an inner circular plate is installed on the top of the insertion rod, and the inner circular plate is located on the inner side of the side rod, a side block is installed on one side of the inner circular plate, and the side block is located on one side of the side rod.
[0014] Compared with the prior art, the beneficial effects of the utility model are as follows:
[0015] 1. The utility model is equipped with a sealing buckle assembly. The staff moves the movable ring in the sealing buckle assembly upwards and then rotates the movable ring horizontally. The staff presses the plug plate downwards. At the same time, the plug plate can be moved into the inner side of the frame shell. The staff twists the fixing bolt so that the fixing bolt can fix the plug plate through the insertion hole, so that the top half ring can be fixed on the top of the bottom half ring, so that the top half ring can cooperate with the bottom half ring to support the cable, so that the sealing buckle assembly can prevent the cable from falling and increase the stability of the supported cable.
[0016] 2. The utility model is equipped with a support assembly. The staff installs the cable laying device at the designated position of the construction site, rotates the semicircular block in the support assembly, vertically rotates the side rod, and then moves the side block, so that the side block can drive the inner circular plate to move under the action of external force, and the inner circular plate can drive the plug rod to move along the inner side of the side rod under the action of external force, so that the tip of the plug rod contacts the ground. The staff hammers the side block with a hammer tool to nail the plug rod into the ground, so that the support assembly can support the outer rod, thereby increasing the stability of the cable laying. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the structure of the utility model;
[0018] Figure 2 This is a schematic diagram of the top view of the outer rod structure of the utility model;
[0019] Figure 3 It is a schematic diagram of the top half ring three-dimensional structure of the utility model;
[0020] Figure 4This is a schematic diagram of the short shell structure of the utility model;
[0021] Figure 5 This is a schematic diagram of the top view of the rotating sleeve of the utility model;
[0022] Figure 6 It is a schematic diagram of the side rod structure of the utility model.
[0023] In the figure: 1. adjusting rod; 2. round hole; 3. top block; 4. outer rod; 5. positioning bolt; 6. bottom film; 7. fixing ring; 8. bottom half ring; 9. frame shell; 10. fixing bolt; 11. movable ring; 12. top half ring; 13. short shell; 14. spring; 15. slider; 16. plug plate; 17. plug hole; 18. limiting ring; 19. rotating sleeve; 20. semicircular block; 21. short bolt; 22. rotating block; 23. side rod; 24. plug rod; 25. inner circular plate; 26. side block. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0025] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "two ends", "one end", "the other end" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0026] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0027] See also Figure 1 , Figure 2 and Figure 5, a temporary power cable installation device for a construction site;
[0028] The utility model comprises an adjusting rod 1, four round holes 2 are opened on one side of the adjusting rod 1, a top block 3 is installed on the top of the adjusting rod 1, an outer rod 4 is installed on the outside of the adjusting rod 1, a positioning bolt 5 is installed through a thread on one side of the outer rod 4, and the positioning bolt 5 is located on the inner side of the round hole 2 at the bottom of the adjusting rod 1, a bottom film 6 is installed on the bottom of the outer rod 4, a fixing ring 7 is installed on the outside of the adjusting rod 1, and the fixing ring 7 is located at the bottom of the movable ring 11, a bottom half ring 8 is installed on each side of the fixing ring 7, and the bottom half ring 8 is located at the bottom of the top half ring 12, and the staff fixes the bottom film 6 by using a hammer tool and a long nail On the ground, screw the positioning bolt 5 so that the positioning bolt 5 moves out of the inner side of a circular hole 2 under the threaded support of the outer rod 4. The staff moves the adjusting rod 1 to the specified height and fixes the adjusting rod 1 by screwing the positioning bolt 5 into the inner side of the specified circular hole 2. The top block 3, with the fixed support of the adjusting rod 1, can prevent the sealing buckle assembly from moving away from the outer side of the adjusting rod 1 under the action of external force. The fixing ring 7, with the fixed support of the adjusting rod 1, can provide support for the two bottom half rings 8, so that the staff can place the cable on the inner side of the bottom half ring 8 so that the bottom half ring 8 can support the cable.
[0029] See also Figure 1 , Figure 3 and Figure 4 , a temporary power cable installation device for a construction site;
[0030] The utility model comprises an adjusting rod 1, and a sealing buckle assembly is installed on the outer side of the adjusting rod 1, and the sealing buckle assembly is used to prevent the cable from falling; the sealing buckle assembly comprises an active ring 11, and a top half ring 12 is installed on the outer side of each active ring 11, a short shell 13 is installed on one side of the top half ring 12, a spring 14 is installed on the inner side of the bottom wall of the short shell 13, a slider 15 is installed on the top of the spring 14, and the slider 15 is located on the inner side of the short shell 13, a plug plate 16 is installed on one side of the slider 15, and a plug plate 16 is penetrated inside the plug plate 16 to open a plug hole 17, a frame shell 9 is installed on one side of the bottom half ring 8, and the frame shell 9 is located on the outer side of the plug plate 16, a fixing bolt 10 is threadedly installed on one side of the frame shell 9, and the fixing bolt 10 is located on the inner side of the plug hole 17, and the short shell 13 can provide a guiding effect for the movement of the spring 14 and the slider 15 under the fixed support of the top half ring 12, and the staff moves the active ring 11 in the sealing buckle assembly upward, so that the active ring 11 can drive the two top half rings 12 upward under the action of external force. The movable ring 11 is moved, and then the movable ring 11 is rotated horizontally, so that the movable ring 11 can drive the two top semi-rings 12 to rotate horizontally together under the action of external force, so that the top semi-ring 12 can move to the top of the bottom semi-ring 8, and the staff presses the plug plate 16 downward, so that the plug plate 16 can drive the slider 15 to move downward under the action of external force, so that the slider 15 can move along the inner side of the short shell 13 under the action of external force. At the same time, the plug plate 16 can move into the inner side of the frame shell 9, and the staff twists the fixing bolt 10 to move the fixing bolt 10 under the thread support of the frame shell 9, so that the fixing bolt 10 can move into the inner side of the insertion hole 17, so that the fixing bolt 10 can fix the plug plate 16 through the insertion hole 17, so that the top semi-ring 12 can be fixed on the top of the bottom semi-ring 8, so that the top semi-ring 12 can cooperate with the bottom semi-ring 8 to support the cable, so that the sealing buckle assembly can prevent the cable from falling and increase the stability of the supported cable.
[0031] When the construction is completed and the cable installation device is to be disassembled, the worker twists the fixing bolt 10 in the opposite direction to move the fixing bolt 10 out of the inner side of the insertion hole 17, so that the spring 14 can use its own elastic force to drive the slider 15 to move upward, so that the slider 15 can drive the plug plate 16 to move out of the inner side of the frame shell 9 under the action of external force, and the worker moves the movable ring 11 upward and rotates the movable ring 11 horizontally.
[0032] See also Figure 1 , Figure 5 and Figure 6 , a temporary power cable installation device for a construction site;
[0033] The cable assembly comprises an outer rod 4, a support assembly is installed on the outer side of the outer rod 4, and the support assembly is used to support the cable installation, the support assembly comprises two limit rings 18, and the two limit rings 18 are located on the outer side of the outer rod 4, a rotating sleeve 19 is installed on the outer side of the outer rod 4, and the rotating sleeve 19 is located between the two limit rings 18, two semicircular blocks 20 are installed on both sides of the rotating sleeve 19, a short bolt 21 is installed between the two semicircular blocks 20, a rotating block 22 is installed on the outer side of the short bolt 21, and the rotating block 22 is located between the two semicircular blocks 20, and the rotating block 22 is installed on the outer side of the short bolt 21. A side rod 23 is installed at the bottom, a plug rod 24 is installed on the inner side of the side rod 23, an inner circular plate 25 is installed on the top of the plug rod 24, and the inner circular plate 25 is located on the inner side of the side rod 23, a side block 26 is installed on one side of the inner circular plate 25, and the side block 26 is located on one side of the side rod 23, two limiting rings 18 can limit the movement of the rotating sleeve 19 under the fixed support of the outer rod 4, and the short bolt 21 can support the rotating block 22 to rotate under the action of external force under the fixed support of the semicircular block 20, and the staff can be at the designated position of the construction site. The cable laying device is installed, and the semicircular block 20 in the support assembly is rotated so that the semicircular block 20 can drive the rotating sleeve 19 to rotate around the outer rod 4 under the action of external force. At the same time, the semicircular block 20 can drive the side rod 23 to rotate horizontally through the short bolt 21 and the rotating block 22. The staff rotates the side rod 23 vertically so that the side rod 23 can drive the rotating block 22 to rotate around the short bolt 21 under the action of external force. At the same time, the side rod 23 can drive the plug rod 24 to rotate vertically. The staff moves the side block 26, so that the side block 26 can drive the inner circular plate 25 to move under the action of external force, so that the inner circular plate 25 can drive the plug rod 24 to move along the inner side of the side rod 23 under the action of external force, so that the tip of the plug rod 24 contacts the ground. The staff hammers the side block 26 with a hammer tool, so that the side block 26 drives the plug rod 24 to move downward through the inner circular plate 25 under the action of external force, so that the plug rod 24 is nailed into the ground, so that the support assembly can support the outer rod 4, thereby increasing the stability of the cable installation.
[0034] Working principle: Before using the device, you should first check whether there are any problems that affect the use of the device. When the staff needs to use the erection device to temporarily build cables at the construction site, the staff uses a hammer tool and a long nail to fix the bottom film 6 to the ground, unfold the support assembly, and use a hammer tool to nail the insertion rod 24 into the ground. The staff fixes the length of the adjustment rod 1, places the cable on the inner side of the bottom half ring 8, and supports the cable through the sealing buckle assembly and the bottom half ring 8.
[0035] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
Claims
1. A temporary power cable installation device at a construction site, characterized in that: It comprises an adjusting rod (1), a sealing buckle assembly is installed on the outer side of the adjusting rod (1), and the sealing buckle assembly is used to prevent the cable from falling; The buckle assembly comprises a movable ring (11), and a top half ring (12) is installed on the outer side of each movable ring (11), a short shell (13) is installed on one side of the top half ring (12), a spring (14) is installed on the inner side of the bottom wall of the short shell (13), a slider (15) is installed on the top of the spring (14), and the slider (15) is located on the inner side of the short shell (13), an insert plate (16) is installed on one side of the slider (15), and a plug hole (17) is opened through the inside of the insert plate (16).
2. A construction site temporary power cable installation device according to claim 1, characterized in that: Four circular holes (2) are provided on one side of the adjusting rod (1), and a top block (3) is installed on the top of the adjusting rod (1).
3. A construction site temporary power cable installation device according to claim 2, characterized in that: An outer rod (4) is installed on the outer side of the adjusting rod (1), a positioning bolt (5) is installed through a thread on one side of the outer rod (4), and the positioning bolt (5) is located on the inner side of the circular hole (2) at the bottom of the adjusting rod (1), and a bottom plate (6) is installed at the bottom of the outer rod (4).
4. A construction site temporary power cable installation device according to claim 3, characterized in that: A fixed ring (7) is installed on the outer side of the adjusting rod (1), and the fixed ring (7) is located at the bottom of the movable ring (11). A bottom half ring (8) is installed on each side of the fixed ring (7), and the bottom half ring (8) is located at the bottom of the top half ring (12).
5. A construction site temporary power cable installation device according to claim 4, characterized in that: A frame shell (9) is installed on one side of the bottom half ring (8), and the frame shell (9) is located outside the plug plate (16). A fixing bolt (10) is installed through a thread on one side of the frame shell (9), and the fixing bolt (10) is located inside the insertion hole (17).
6. A construction site temporary power cable installation device according to claim 3, characterized in that: A support assembly is installed on the outer side of the outer rod (4), and the support assembly is used to support the installation of cables. The support assembly includes two limit rings (18), and the two limit rings (18) are located on the outer side of the outer rod (4). A rotating sleeve (19) is installed on the outer side of the outer rod (4), and the rotating sleeve (19) is located between the two limit rings (18). Two semicircular blocks (20) are installed on both sides of the rotating sleeve (19), and a short bolt (21) is installed between the two semicircular blocks (20).
7. A construction site temporary power cable installation device according to claim 6, characterized in that: A rotating block (22) is installed on the outer side of the short bolt (21), and the rotating block (22) is located between the two semicircular blocks (20); a side rod (23) is installed on the bottom of the rotating block (22); a plug rod (24) is installed on the inner side of the side rod (23); an inner circular plate (25) is installed on the top of the plug rod (24), and the inner circular plate (25) is located on the inner side of the side rod (23); a side block (26) is installed on one side of the inner circular plate (25), and the side block (26) is located on one side of the side rod (23).