Pilot plant for research and development of asphalt products
By designing the cover plate and extension rod structure, the material barrel is covered, and the mixing efficiency is enhanced by using hollow through holes and spoilers, the problem of excessive evaporation of moisture and long preparation time in the preparation of asphalt product test samples is solved, and the problem of excessive evaporation of moisture and long preparation time is achieved. Guarantee of moisture content and improving mixing efficiency.
Patent Information
- Application Number
- CN202323617491.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-27
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2033-12-27
AI Technical Summary
During the preparation of asphalt products, existing equipment leads to excessive evaporation of moisture and long preparation time, especially in asphalt products with low processing temperatures, it is difficult to minimize moisture loss.
A pilot device for research and development of asphalt products was designed, covering the material barrel with cover plate and extension rod structure, and inserting the shear and agitator through hollow through holes and material holes, combining with spoilers to enhance the mixing efficiency. Reduce steam emission.
It effectively reduces the steam dissipation during the preparation of asphalt test samples, ensures the moisture content, and improves the mixing efficiency of shear and stirring, and shortens the preparation time.
Smart Images

Figure CN222034714U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of asphalt product research and development preparation, and in particular to a device for preparing raw materials on a pilot scale during the asphalt product research and development process. Background Art
[0002] In the research and development process of asphalt products (such as modified asphalt, rubber-plastic asphalt, caulking glue, road tack oil, etc.), after completing the preparation and testing of small-scale samples, it will be necessary to further prepare pilot samples and conduct further testing. The scale of sample preparation each time in the pilot process will be in the range of 10kg-30kg, and asphalt products of corresponding quality will be prepared according to the testing requirements.
[0003] Figure 1 This is a schematic diagram of the structural principle of the existing asphalt pilot preparation equipment, see Figure 1 As shown, the asphalt pilot preparation equipment equipped in the applicant's laboratory includes a cabinet 100, in which a liftable shear 101, a liftable agitator 102, a digital constant temperature electric heater 103 that can move horizontally on a slide rail (the slot for inserting a material barrel is marked with a dotted line in the figure), and a material barrel 104 that can be inserted into the digital constant temperature electric heater 103 are arranged.
[0004] The operating steps of the asphalt pilot preparation equipment are:
[0005] Step 1: Take the material barrel 104 out of the digital display constant temperature electric heater 103, and put a specified mass of liquid asphalt outside the cabinet 100 according to the pilot sample requirements.
[0006] Step 2: insert the material barrel 104 into the digital display constant temperature electric heater 103 , and move the digital display constant temperature electric heater 103 so that the material barrel 104 is located directly below the shear 101 .
[0007] Step 3, turn on the power switch, set the asphalt heating temperature, lower the shear 101 and immerse it in the asphalt sample to wait for it to heat up; when the asphalt temperature reaches the set temperature, manually turn the stirring rod of the shear 101. After the stirring rod can rotate, start the shear 101, adjust the shearing speed and then start shearing.
[0008] Step 4: After the asphalt shearing is completed, raise the shearer 101, move the digital display constant temperature electric heater 103, so that the material barrel 104 is located directly below the agitator 102, lower the agitator 102 and immerse it in the asphalt sample, turn on the agitator switch, stir the sample, turn off the switch when the requirements are met, raise the agitator 102, move the digital display constant temperature electric heater 103 to the middle, and manually pour out the prepared asphalt product.
[0009] Step 5. Turn off the power circuit breaker, clean the equipment, and complete the operation.
[0010] As mentioned above, in the asphalt pilot production equipment currently available in the applicant's laboratory, the inner diameter of the material barrel 104 is about 30 cm, the barrel depth is about 60 cm, and the maximum outer diameters of the shear 101 and the stirrer 102 are both 10 cm. Figure 1 As shown, since the shearer 101 and the agitator 102 are relatively small in size compared to the material barrel 104, when preparing a large amount of asphalt product pilot samples, the shearing time usually needs to be no less than 2 hours, and the subsequent stirring time usually needs to be no less than 1 hour. During the entire operation process, the material barrel 104 is open-type, and the smoke is extracted through the exhaust port on the top of the cabinet 100.
[0011] In the existing asphalt pilot sample preparation process in the laboratory, in order to ensure the fluidity of the material, the initial base asphalt is usually about 160 degrees. For asphalt products with relatively high processing temperatures in industrial production such as rubber and plastic asphalt and caulking glue, various admixtures can be added together according to the formula after the base asphalt is added, and then no material is needed to be added during the shearing and stirring process. However, for emulsified asphalt and road tack oil, there are still a large amount of emulsifiers and coupling agent soap liquid materials in the formula, and the processing temperature in industrial production is relatively low. After processing, the asphalt products need to be cooled and cooled to maintain the moisture content, then after the shearer starts working, the soap liquid material needs to be added to the material barrel 104 in time to avoid excessive evaporation of water in the soap liquid as much as possible. However, as mentioned above, due to the existing asphalt pilot preparation equipment in the preparation of large-volume asphalt product pilot samples, the shearing time usually needs to be no less than 2 hours, and the subsequent stirring time usually needs to be no less than 1 hour, and during the entire operation process, the material barrel 104 is open-type, so it is difficult to avoid excessive water loss to the maximum extent. Utility Model Content
[0012] The technical problem to be solved by the utility model is to provide a pilot plant for the research and development of asphalt products, so as to reduce or avoid the above-mentioned problems.
[0013] In order to solve the above technical problems, the utility model proposes an asphalt product research and development pilot device, which is used to cover the material barrel when preparing asphalt pilot samples to prevent excessive evaporation of water. The device includes a cover plate and a plurality of extension rods fixedly connected to the cover plate. The cover plate is evenly distributed around the circumference with at least three buckles for connecting with the top of the material barrel. A hollow through hole for inserting a shearer and a stirrer into the material barrel is provided in the center of the cover plate. The cover plate is also provided with a material hole for adding soap liquid material, and the extension rods are provided with a plurality of spoilers.
[0014] Preferably, the diameter of the cover plate is 3-5 cm larger than the outer diameter of the material barrel, the diameter of the hollow through hole is 12 cm, and the diameter of the material hole is 5 cm.
[0015] Preferably, the material opening is provided with a detachable cover.
[0016] Preferably, the cover plate is also provided with two handles.
[0017] Preferably, the buckle is a metal sheet with an inwardly arc-shaped protrusion.
[0018] Preferably, the axis of the extension rod is on a circle with a diameter of 23-25 cm and the axis of the cover plate as the center, and the number of the extension rods is four to six evenly distributed in the circumferential direction.
[0019] Preferably, the extension rod is prepared by welding a metal rod with a length of 42 cm and a diameter of not less than 1 cm to the cover plate.
[0020] Preferably, the spoiler is formed by welding a metal sheet with a width of 1 cm and a thickness of 0.2-0.5 mm around the extension rod, and the length of the portion of the spoiler extending out of the extension rod is 1-1.5 cm.
[0021] Preferably, 5-10 spoilers are randomly arranged on the rod body of the extension rod within 35 cm from the bottom end.
[0022] The asphalt product research and development pilot device provided by the utility model has a simple structure and low cost, effectively reduces the emission of steam during the asphalt pilot sample preparation process, ensures the moisture content of the pilot sample, and at the same time increases the mixing efficiency of shearing and stirring. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] The following drawings are only intended to illustrate and explain the present invention, and do not limit the scope of the present invention.
[0024] Figure 1 This is a schematic diagram of the structural principle of the existing asphalt pilot preparation equipment;
[0025] Figure 2 It is a schematic diagram of a partial three-dimensional structure principle of an asphalt product research and development pilot device according to a specific embodiment of the utility model;
[0026] Figure 3 for Figure 2 Schematic diagram of the top view structural principle. DETAILED DESCRIPTION
[0027] In order to have a clearer understanding of the technical features, purpose and effects of the utility model, the specific implementation of the utility model is now described with reference to the accompanying drawings, wherein the same components are marked with the same reference numerals.
[0028] Figure 1 This is a schematic diagram of the structural principle of the existing asphalt pilot preparation equipment; Figure 2 It is a schematic diagram of a partial three-dimensional structure principle of an asphalt product research and development pilot device according to a specific embodiment of the utility model; Figure 3 for Figure 2 Schematic diagram of the top view of the structural principle. Figures 1 to 3 As shown, the utility model provides an asphalt product research and development pilot device, which is used to cover the material barrel 104 when preparing asphalt pilot samples to prevent excessive evaporation of water. It includes a cover plate 1 and a plurality of extension rods 2 fixedly connected to the cover plate 1, the cover plate 1 is circumferentially evenly provided with at least three buckles 3 for connecting with the top of the material barrel 104, a hollow through hole 11 is provided at the center of the cover plate 1 for inserting the shearer 101 and the agitator 102 into the material barrel 104, the cover plate 1 is also provided with a material hole 12 for adding soap liquid material, and the extension rod 2 is provided with a plurality of spoilers 21.
[0029] As described in the background technology section, the asphalt product research and development pilot plant provided in this application is mainly intended to solve the problem of deviation in technical indicators of pilot samples caused by the need to add a large amount of soap liquid material to the asphalt product and to control water evaporation loss as much as possible during the preparation of the asphalt pilot product.
[0030] The cover plate 1 can be made of a 2-5mm thick steel plate, and a hollow through hole 11 is provided in the center for the shear 101 and the agitator 102 to be inserted into the material barrel 104. As described in the background technology section, the maximum outer diameters of the shear 101 and the agitator 102 are both 10cm. Considering that the digital display constant temperature electric heater 103 can move horizontally on the slide rail, the position of the material barrel 104 can be placed more accurately. Therefore, the diameter of the hollow through hole 11 can be set to 12cm, which can fully meet the needs of the shear 101 and the agitator 102 to move up and down, and avoid interference.
[0031] The cover plate 1 is also provided with a material hole 12 for adding soap liquid material. The diameter of the material hole 12 can be set to 5 cm, which can not only meet the need of adding soap liquid material, but also avoid excessive steam discharge caused by too large an opening. The material hole 12 can be additionally equipped with a cover (not shown in the figure), so that the material hole 12 can be opened only when adding soap liquid material, and the material hole 12 can be closed after the addition is completed, which can better prevent the evaporation and loss of water.
[0032] The cover plate 1 is also provided with two handles 13 for easy operation.
[0033] See also Figure 3 As shown, the diameter of the cover plate 1 can be 3-5 cm larger than the outer diameter of the material barrel 104, which is conducive to setting the buckle 3, see Figure 2 As shown, the buckle 3 may be a metal sheet with an inwardly curved protrusion, see Figure 3 As shown, the inner side edge of the mounting portion of the buckle 3 (the dotted line in the figure shows the outline of the connection portion between the buckle 3 and the cover plate 1) can be welded and installed according to the outer diameter size of the material barrel 104. When the cover plate 1 is assembled to the material barrel 104, the arc-shaped protrusion of the buckle 3 will be squeezed outward by the material barrel 104. In this way, when three buckles 3 are evenly distributed at circumferential intervals of 120 degrees, one of them can be arranged opposite to the material hole 12, so that it is convenient to assemble the buckle 3 with the material hole 12 as a reference. When assembled in place, the three arc-shaped protrusions of the buckles 3 can tightly clamp the outer wall of the material barrel 104, so that the cover plate 1 can remain fitted and fixed to the top of the material barrel 104.
[0034] As described in the background technology, since the shearer 101 and the agitator 102 are relatively small in size compared to the material barrel 104, if a turbulent flow can be formed on the material during the preparation process, the shearing and agitation efficiency can be increased and the required working time can be reduced. The present application achieves this purpose by providing the extension rod 2, and the extension rod 2 can be evenly distributed in four to six directions. Specifically, see Figure 2 and Figure 3 As shown, four circumferentially evenly distributed extension rods 2 are used as an example for explanation. Considering that the inner diameter of the material barrel 104 is about 30 cm and the barrel depth is about 60 cm, the present application uses a metal rod with a length of about 42 cm and a diameter of not less than 1 cm to be welded on the cover plate 1 to prepare the extension rod 2. This length can make it easy to take and put the cover plate 1. The spoiler 21 can be formed by welding a metal sheet with a width of 1 cm and a thickness of 0.2-0.5 mm around the extension rod 2. The length of the part of the spoiler 21 extending from the extension rod 2 can be 1-1.5 cm, and the extension direction can be not fixed.
[0035] See also Figure 2 As shown, the axis of the extension rod 2 is on a circle with a diameter of 23-25 cm and the axis of the cover plate 1 as the center.
[0036] On each extension rod 2 , 5-10 spoilers 21 may be randomly deployed on the rod body within 35 cm from the bottom end of the extension rod 2 itself, and the spacing between adjacent spoilers 21 may not be equal as long as they do not interfere with the inner wall of the material barrel 104 .
[0037] When the material in the material barrel 104 generates a rotational motion under the action of the shearer 101 or the agitator 102, the plurality of spoilers 21 can cause the fluid to generate local turbulence, thereby better enhancing the agitation effect. The spoilers 21 are arranged on the rod body within 35 cm from the bottom end of the extension rod 2, so that the spoilers 21 can be basically located in the middle and lower middle parts of the material in the entire material barrel 104, so that a relatively good spoiler effect can be exerted on materials of different weight ratios.
[0038] In actual trials, after using the asphalt product development pilot device provided by the present application on the material barrel 104 in the existing asphalt pilot preparation equipment in the applicant's laboratory, the steam and smoke in the entire shearing and stirring asphalt product preparation process were visibly reduced. Moreover, for each type of asphalt product, only the minimum required shearing time and stirring time are required to obtain a product that meets the test expectations.
[0039] The asphalt product research and development pilot device provided by the utility model has a simple structure and low cost, effectively reduces the emission of steam during the asphalt pilot sample preparation process, ensures the moisture content of the pilot sample, and at the same time increases the mixing efficiency of shearing and stirring.
[0040] Those skilled in the art should understand that although the present invention is described in the form of multiple embodiments, not every embodiment contains only one independent technical solution. Such description in the specification is only for the sake of clarity. Those skilled in the art should understand the specification as a whole and regard the technical solutions involved in each embodiment as being able to be combined into different embodiments to understand the scope of protection of the present invention.
[0041] The above description is only an illustrative embodiment of the present invention and is not intended to limit the scope of the present invention. Any equivalent changes, modifications and combinations made by any technician in the field without departing from the concept and principle of the present invention shall fall within the scope of protection of the present invention.
Claims
1. A pilot plant for the development of asphalt products, characterized in that: It is used to cover the material barrel when preparing asphalt pilot samples, and includes a cover plate and multiple extension rods fixedly connected to the cover plate. The cover plate is evenly distributed around the circumference with at least three buckles for connecting to the top of the material barrel. The center of the cover plate is provided with a hollow through hole for inserting a shearer and a stirrer into the material barrel. The cover plate is also provided with a material hole for adding soap liquid material, and the extension rods are provided with multiple spoilers.
2. The asphalt product development pilot plant according to claim 1, characterized in that: The diameter of the cover plate is 3-5 cm larger than the outer diameter of the material barrel, the diameter of the hollow through hole is 12 cm, and the diameter of the material hole is 5 cm.
3. The asphalt product development pilot plant according to claim 2, characterized in that: The material opening is provided with a detachable cover.
4. The asphalt product development pilot plant according to claim 2, characterized in that: The cover plate is also provided with two handles.
5. The asphalt product development pilot plant according to claim 1, characterized in that: The buckle is a metal sheet with an inwardly arc-shaped protrusion.
6. The asphalt product development pilot plant according to claim 1, characterized in that: The axis of the extension rod is on a circle with a diameter of 23-25 cm and the axis of the cover plate as the center. The number of the extension rods is four to six evenly distributed in the circumferential direction.
7. The asphalt product development pilot plant according to claim 6, characterized in that: The extension rod is prepared by welding a metal rod with a length of 42 cm and a diameter of not less than 1 cm to the cover plate.
8. The asphalt product development pilot plant according to claim 7, characterized in that: The spoiler is formed by welding a metal sheet with a width of 1 cm and a thickness of 0.2-0.5 mm around the extension rod, and the length of the portion of the spoiler extending out of the extension rod is 1-1.5 cm.
9. The asphalt product development pilot plant according to claim 8, characterized in that: The extension rod is provided with 5 to 10 spoilers randomly arranged on the rod body within a range of 35 cm from the bottom end.