Construction production line for self-machining finished steel strand bundle of high-speed rail box girder
By the method of laying the wire set and pulling and cutting off the wires in the construction production line of the self-processed steel stranded wires of the high-speed rail box beam, the occupation of the wire laying mechanism in the existing technology is solved. The problem of large space has improved the adaptability range and processing efficiency of the production line.
Patent Information
- Application Number
- CN202420681529.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-03
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-04-03
AI Technical Summary
In the production of existing high-speed rail prefabricated box beams, the wire laying mechanisms of the finished steel strands are arranged at a distance from each other and are in a shape, occupying a large space, resulting in the use range of production lines when there are a large number of steel strands to make the finished bundles. limit.
The tilt setting of the wire rack group is adopted, and the setting direction of the wire rack group is inclined with the outgoing direction of the wire rack area to form a wire rack group. The wire rack group is set on a straight line, which reduces the space occupied by the wire rack mechanism and passes through The comb flow assembly, buckle assembly and cutting assembly form the finished product bundle of steel strands. The traction area uses a traction machine and roller device to move the finished product bundle, and the winding area uses a wire closure frame and wire closure disk to wrap the finished product bundle.
It effectively avoids the winding interference of steel strands during the release process, improves the braiding efficiency of the finished steel strands, reduces the space occupied by the release mechanism, and improves the adaptability range of the production line.
Smart Images

Figure CN222036657U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of steel strand processing, in particular to a construction production line for self-processing steel strand finished product bundles of high-speed railway box girders. Background Art
[0002] In the construction of high-speed railways, a large number of steel strands are required. For example, when prefabricating box girders, steel strands need to be inserted into each prestressed channel of the prefabricated box girders. When making existing high-speed railway prefabricated box girders, the finished steel strand bundle technology is used. The steel strands are woven into finished bundles on the outside of the beam body and then the whole bundle is dragged into the prestressed channel of the prefabricated box girder by a winch. The finished steel strand bundle technology is to cut the steel strands into equal lengths according to the requirements, comb them into bundles, and then send them to the site after being bundled and packed, and the whole bundle is punched.
[0003] For example, the Chinese patent with the authorization announcement number CN220591406U discloses a prestressed steel strand finished bundle processing equipment, which belongs to the field of prestressed steel strand processing technology, including a pay-off mechanism, a bundle mechanism, a processing mechanism, and a take-up mechanism that are fixedly connected to the ground, spaced apart from each other, and arranged in a straight line; the pay-off mechanism includes a steel strand pay-off drum for carrying the steel strands; the bundle mechanism includes a combing disk, a rear marking plate, and a front marking plate through which the steel strands pass in sequence; the processing mechanism includes a guide rail, and a crimping machine and a grinding wheel cutter that are arranged at both ends of the guide rail and can slide back and forth along the guide rail; the take-up mechanism includes a traction device, a rolling bracket, and a take-up drum. The above document uses multiple steel strands to pay out, pull together, and cut off as a whole, with high processing efficiency.
[0004] The pay-off mechanisms in the above-mentioned public documents are spaced apart from each other and arranged in a straight line. During the pay-off process, the steel strands are parallel to each other and not entangled, thus avoiding the situation where the steel strands are entangled and interfere with each other during the pay-off process, and ensuring that the efficiency of weaving the steel strands into finished bundles is not affected. However, when the number of steel strands for weaving the finished bundles is large, the pay-off mechanisms that are spaced apart from each other and arranged in a straight line require a large space, affecting the use scope of the production line. How to further reduce the space occupied by the pay-off mechanism when the number of steel strands for weaving the finished bundles is large is a technical problem that urgently needs to be solved. Utility Model Content
[0005] In view of the deficiencies in the above-mentioned background technology, the utility model proposes a construction production line for self-processing finished steel strand bundles of high-speed railway box girders, which solves the technical problem that the wire-laying mechanisms in the existing steel strand bundle processing production lines are arranged at intervals from each other and in a straight line, thus occupying a large space.
[0006] The technical solution of the utility model is achieved as follows: a construction production line for self-processing finished steel strand bundles of high-speed railway box girders, including a pay-off area, a processing area, a traction area and a winding area arranged in sequence, the pay-off area includes a plurality of pay-off racks, the steel strands are wound on the pay-off racks, a plurality of the pay-off racks are arranged in a straight line to form a pay-off rack group, and the setting direction of the pay-off rack group is inclined to the wire outlet direction of the pay-off area.
[0007] Preferably, the pay-off area includes a bottom plate, and the pay-off frame is rotatably disposed on the bottom plate.
[0008] Preferably, the angle between the setting direction of the pay-off frame group and the wire outlet direction of the pay-off area is 20°~70°.
[0009] Preferably, two pay-off rack groups are arranged on the bottom plate, and the two pay-off rack groups are arranged in parallel and at intervals.
[0010] Preferably, the bottom plate is a rectangular bottom plate, and one of the two pay-off rack groups is arranged along a diagonal line of the rectangular bottom plate.
[0011] Preferably, two pay-off rack groups are arranged on the bottom plate, and the two pay-off rack groups are arranged in an "eight" shape.
[0012] Preferably, the bottom plate is a rectangular bottom plate, and the two pay-off rack groups are symmetrically arranged along the center line of the rectangular bottom plate.
[0013] Preferably, the processing area includes a combing assembly, a crimping assembly and a cutting assembly. The steel strands are arranged by the combing assembly and extruded by the crimping assembly in sequence to form a finished bundle of steel strands. When the finished bundle of steel strands is pulled to a fixed length by the traction area, the cutting assembly cuts the entire bundle off.
[0014] Preferably, the traction zone includes a traction machine and a roller device, and the finished steel strand bundle moves along the roller device driven by the traction machine.
[0015] Preferably, the winding area includes a take-up frame and a take-up drum, the take-up drum is rotatably arranged on the take-up frame, a rotating motor is arranged on the take-up drum, and the finished steel strand bundle is wound on the take-up drum driven by the rotating motor.
[0016] Beneficial effects of the utility model: 1. The utility model abandons the existing method of setting up wire pay-off frames that are spaced apart from each other and arranged in a straight line, and sets a number of the wire pay-off frames in a straight line to form a wire pay-off frame group, and the setting direction of the wire pay-off frame group is inclined to the wire outlet direction of the wire pay-off area, that is, the wire pay-off frame group is inclined in the wire pay-off area, which avoids the situation that the steel strands are entangled and interfere with each other during the wire pay-off process, and ensures that the efficiency of weaving the steel strands into finished bundles is not affected. Compared with the method of setting them apart from each other and arranged in a straight line, the inclined setting reduces the occupied space and improves the adaptability of the production line.
[0017] 2. The utility model uses multiple steel strands to lay out and pull them together, and cut them off as a whole, so the processing efficiency is high. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the embodiments of the present utility model, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0019] Figure 1 It is a schematic diagram of the utility model.
[0020] Figure 2 This is a schematic diagram of the wire-laying area in Example 5.
[0021] In the figure, 1 is the pay-off area, 2 is the processing area, 3 is the traction area, 4 is the winding area, 5 is the bottom plate, 6 is the pay-off frame, 7 is the combing assembly, 8 is the crimping assembly, 9 is the cutting assembly, 10 is the traction machine, 11 is the roller device, 12 is the take-up frame, 13 is the take-up drum, 14 is the rotating motor, and 15 is the support plate. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] Embodiment 1, a construction production line for self-processing finished steel strand bundles of high-speed railway box girders, such as Figure 1 and Figure 2As shown, it includes a pay-off area 1, a processing area 2, a traction area 3 and a winding area 4 which are arranged in sequence, the pay-off area 1 includes a plurality of pay-off frames 6, the steel strands are wound on the pay-off frames 6, a plurality of the pay-off frames 6 are arranged in a straight line to form a pay-off frame group, and the setting direction of the pay-off frame group is inclined to the outlet direction of the pay-off area 1. The utility model abandons the existing method of setting pay-off frames which are arranged in a straight line and spaced apart from each other, and sets a plurality of the pay-off frames in a straight line to form a pay-off frame group, and the setting direction of the pay-off frame group is inclined to the outlet direction of the pay-off area, that is, the pay-off frame group is inclinedly set in the pay-off area, while avoiding the situation that the steel strands are entangled and interfered with each other during the pay-off process, and ensuring that the efficiency of the steel strands weaving finished bundles is not affected. Compared with the method of setting them in a straight line and spaced apart from each other, the inclined setting reduces the occupied space, improves the adaptability of the production line, and solves the technical problem that the pay-off mechanisms in the existing steel strand finished bundle processing production line are spaced apart from each other and arranged in a straight line, occupying a large space.
[0024] Taking the case where the bottom surface of the space occupied by the pay-off area 1 is a fixed rectangle as an example, a specific analysis is made on how the inclined setting reduces the occupied space as follows: the length direction of the rectangle is the pay-off direction, and when the pay-off racks are arranged at intervals from each other and in a straight line, the longest length of a pay-off rack group formed on a straight line is the width of the rectangle, while when the pay-off racks are set at an angle, the longest length of a pay-off rack group formed on a straight line is the length of the diagonal of the rectangle, and the length of the diagonal is much larger than the width of the rectangle. Therefore, when the space occupied by the pay-off area 1 is fixed, more pay-off racks can be placed on a straight line by the inclined setting. Correspondingly, when the number of pay-off racks is fixed, the width of the rectangle corresponding to the bottom surface of the space occupied by the inclined pay-off racks is smaller, and the occupied space is reduced.
[0025] Example 2, based on Example 1, a construction production line for self-processing finished steel strand bundles of high-speed railway box girders, such as Figure 1 As shown, the pay-off area 1 includes a bottom plate 5, and the pay-off frame 6 is rotatably arranged on the bottom plate 5. The pay-off frame 6 includes a steel strand pay-off drum for carrying steel strands; the steel strand pay-off drum includes a bottom frame, a rotating shaft fixedly connected to the center of the bottom frame, and a pay-off drum bracket rotatably connected to the rotating shaft; the steel strand pay-off drum also includes a fence fixedly connected to the outer periphery of the bottom frame; the pay-off drum bracket can rotate under the action of external force, the fence prevents the steel strand from popping out, and the rotating shaft is fixed on the bottom plate 5. The steel strand bundle is formed by winding a steel strand, a bundle of steel strands is placed on the pay-off drum bracket of the steel strand pay-off drum, and the ends of the steel strands are pulled out. Under the external traction of traction equipment such as a winch, the pay-off drum bracket rotates with the steel strand bundle to achieve pay-off.
[0026] Example 3, based on Example 2, a construction production line for self-processing steel strand finished bundles of high-speed railway box girders, such as Figure 1 As shown, the angle between the setting direction of the pay-off frame group and the outlet direction of the pay-off area 1 is 20°~70°. Preferably, the angle between the setting direction of the pay-off frame group and the outlet direction of the pay-off area 1 is 30°, because when the angle is 30°, the length of the pay-off frame group is the longest, and the distance between adjacent steel strands in the pay-off direction is larger, avoiding the entanglement and interference of adjacent steel strands.
[0027] Example 4, based on Example 3, a construction production line for self-processing finished steel strand bundles of high-speed railway box girders, such as Figure 2 As shown, two pay-off rack groups are arranged on the bottom plate 5, and the two pay-off rack groups are arranged in parallel and at intervals. The pay-off rack groups are inclined and arranged at intervals to avoid the situation where the steel strands are entangled and interfered with each other during the pay-off process, and to ensure that the efficiency of the steel strands weaving finished bundles is not affected, and to make fuller use of the space, which is conducive to reducing the occupied space of the pay-off area 1.
[0028] Example 5, based on Example 4, a construction production line for self-processing finished steel strand bundles of high-speed railway box girders, such as Figure 2 As shown, the bottom plate 5 is a rectangular bottom plate, and one of the two pay-off rack groups is arranged along the diagonal of the rectangular bottom plate. Taking the bottom surface of the space occupied by the pay-off area 1 as an example, the specific analysis of the inclined setting to reduce the occupied space is as follows: the length direction of the rectangle is the pay-off direction. When the pay-off racks are arranged in a straight line with spacing from each other, the longest length of a pay-off rack group formed on a straight line is the width of the rectangle, and when the pay-off racks are arranged in an inclined manner, the longest length of a pay-off rack group formed on a straight line is the length of the diagonal on the rectangle. The length of the diagonal is much greater than the width of the rectangle. Therefore, when the space occupied by the pay-off area 1 is fixed, more pay-off racks can be placed on a straight line with an inclined setting. Correspondingly, when the number of pay-off racks is fixed, the width of the rectangle corresponding to the bottom surface of the space occupied by the inclined pay-off rack is smaller, and the occupied space is also reduced. When the pay-off rack group is arranged along the diagonal of the rectangular bottom plate, the length of the pay-off rack group is the length of the diagonal.
[0029] Example 6, based on Example 3, a construction production line for self-processing finished steel strand bundles of high-speed railway box girders, such as Figure 1 As shown, two pay-off rack groups are arranged on the bottom plate 5, and the two pay-off rack groups are arranged in an "eight" shape. The present application uses the pay-off rack group arranged in an "eight" shape instead of the existing straight line arrangement, which makes fuller use of space and helps to reduce the occupied space of the pay-off area 1.
[0030] Example 7, based on Example 6, a construction production line for self-processing finished steel strand bundles of high-speed railway box girders, such as Figure 1 As shown, the bottom plate 5 is a rectangular bottom plate, and the two pay-off rack groups are symmetrically arranged along the center line of the rectangular bottom plate. At this time, the angle between the center line and the setting direction of the pay-off rack group is 20°~70°. Preferably, the angle between the setting direction of the pay-off rack group and the outlet direction of the pay-off area 1 is 30°. When the angle is 30°, the length of the pay-off rack group is longer, and the distance between adjacent steel strands in the pay-off direction is larger, avoiding the adjacent steel strands from intertwining and interfering with each other.
[0031] Embodiment 8, based on embodiment 5 or 7, a construction production line for self-processing finished steel strand bundles of high-speed railway box girders, such as Figure 1 As shown, the processing area 2 includes a combing assembly 7, a pressing assembly 8 and a cutting assembly 9. The steel strands are arranged by the combing assembly 7 and squeezed by the pressing assembly 8 to form a finished steel strand bundle. When the finished steel strand bundle is pulled to a fixed length by the pulling area 3, the whole bundle is cut by the cutting assembly 9. The combing assembly 7, the pressing assembly 8 and the cutting assembly 9 are all arranged on the support plate 15.
[0032] The combing flow assembly 7 includes a combing disk, a rear marking plate and a front marking plate through which the steel strands are sequentially penetrated; the combing disk is arranged in the line-in-line direction of the steel strands, and a plurality of steel strand insertion holes are provided on the combing disk, the inner diameter of the steel strand insertion hole is 2 to 5 mm larger than the outer diameter of the steel strands; the outer circumference of the steel strand insertion hole is an arc transition to avoid scratching the steel strands during the line-in process; the combing disk is spaced to meters from the pay-off mechanism and is fixedly connected to the ground; the rear marking plate and the front marking plate are sequentially connected to the side of the combing disk in the line-in-line direction. Before processing the steel strands, the rear marking plate and the front marking plate are bonded to the combing disk, and the required number of steel strands are manually matched to the holes of the combing disk, and passed through the combing disk and the rear marking plate and the front marking plate, and then the front marking plate is separated from the rear marking plate, so that the front marking plate and the steel strands move together. After the steel strands are pulled to the set length, the rear marking plate is separated from the combing disk, so that the rear marking plate and the end of the steel strand are kept at a distance of 800mm. The rear marking plate is used to control the end of the steel strand. Numbers or other corresponding marks are set on the edges of the holes of the front marking plate and the rear marking plate, so that after the threading construction, the front and rear ends of the steel strands can be installed in the corresponding positions to ensure that each steel strand is tensioned one by one, avoiding uneven stress caused by winding, and then strength loss.
[0033] The combing plate is a porous steel plate structure. When in use, one steel strand is passed through a steel strand through hole to ensure that multiple steel strands move parallel to each other and prevent the steel strands from getting tangled when being bundled. The shape of the rear mark plate and the front mark plate is set to be consistent with the combing plate. The material is a flexible material, preferably a cloth-inserted rubber plate. The cloth-inserted rubber plate includes a woven fabric layer in the middle and rubber layers attached to both sides of the woven fabric layer, so as to facilitate the deformation or folding of the rear mark plate and the front mark plate, and has a certain toughness.
[0034] The crimping assembly 8 includes a crimping machine, which can buckle a crimping sleeve with one end set as a blind end on one end of the steel strand bundle, and the blind end of the crimping sleeve is provided with a traction ring. The crimping sleeve is fixedly provided with a traction ring on the end face of the steel strand in the direction of the wire feed, and the traction ring can be connected to other traction equipment, such as the wire rope of the winch. Under the traction of the traction equipment, the traction ring drives the steel strand crimped by the crimping sleeve to move forward.
[0035] The cutting assembly 9 includes an abrasive wheel cutter. When the length of the pulled steel strand reaches the design value, the pulling is stopped, the rear marking plate is moved to 800 mm before the design value position, the abrasive wheel cutter is moved to the steel strand, and the steel strand bundle is cut off as a whole at the design value of the steel strand with the abrasive wheel cutter. After the steel strand is cut, the abrasive wheel cutter is moved to a position away from the steel strand. The cut steel strand is the finished steel strand bundle, which also includes a crimping sleeve, a rear marking plate and a front marking plate. The number and length of the steel strands of the finished steel strand bundle are processed according to the needs of the construction site.
[0036] Example 9, based on Example 8, a construction production line for self-processing finished steel strand bundles of high-speed railway box girders, such as Figure 1 As shown, the traction area 3 includes a traction machine 10 and a roller device 11, and the finished steel strand bundle moves along the roller device 11 driven by the traction machine 10. The traction machine 10 is a winch, and the roller device 11 is used to transport the tractioned finished steel strand bundle.
[0037] Example 10, based on Example 9, a construction production line for self-processing finished steel strand bundles of high-speed railway box girders, such as Figure 1As shown, the winding area 4 includes a take-up frame 12 and a take-up drum 13. The take-up drum 13 is rotatably arranged on the take-up frame 12. A rotating motor 14 is arranged on the take-up drum 13. The finished steel strand bundle is wound on the take-up drum 13 driven by the rotating motor 14. The take-up drum 13 includes a take-up drum bracket. The bottom of the take-up drum bracket is circumferentially connected with a plurality of supporting rollers. The supporting rollers are rotatably arranged on the take-up frame 12. The rotating motor 14 is also arranged at the bottom of the take-up drum bracket. The rotating motor 14 can drive the take-up drum bracket to rotate. The take-up drum bracket is used to roll and pack the finished steel strand bundle. When the finished steel strand bundle is rolled into a drum, the traction ring is first removed, and then the front end of the finished steel strand bundle is fixed to the take-up drum 13. Then the rotating motor 14 is rotated. The rotating motor 14 drives the take-up drum 13 to rotate. The finished steel strand bundle is rolled into a drum as the take-up drum 13 rotates, and finally packaged and hoisted. It should be noted that since the rear mark plate and the front mark plate are made of flexible and tough materials, the rear mark plate and the front mark plate can undergo temporary adaptive deformation according to the distance or relative shape between the steel strands.
[0038] When Example 10 is implemented, the ends of the steel strands are pulled out, and under the external force of the traction machine 10, the pay-off frame 6 rotates together with the steel strand bundle to pay out the wire; before the steel strands are processed, the rear marking plate and the front marking plate are bonded to the combing disk, and the required number of steel strands are manually matched to the holes of the combing disk one by one, and passed through the combing disk and the rear marking plate and the front marking plate, and then the front marking plate is separated from the rear marking plate, so that the front marking plate and the steel strand move together. After the steel strand is pulled to the set length, the rear marking plate is separated from the combing disk, so that the rear marking plate and the end of the steel strand are kept at a distance of 800 mm, and the rear marking plate is used to control the end of the steel strand. Numbers or other corresponding marks are respectively set on the edges of the holes of the front marking plate and the rear marking plate; a number of steel strands pass through the combing disk, and multiple steel strands keep moving parallel to each other. After the front ends of the steel strands that meet the quantity requirements are gathered at the crimping assembly 8, the crimping machine is moved to the gathered end of the steel strands. Under the crimping of the crimping machine, the crimping sleeve of the cylindrical structure is tightly crimped on the gathered end of the steel strands. After completing the crimping of one end of the steel strand, the crimping machine is moved to a position away from the steel strand. After the length of the pulled steel strand reaches the design value, the pulling is stopped, the rear marking plate is moved to 800mm before the design value position, the grinding wheel cutter is moved to the steel strand, and the finished steel strand bundle is cut off as a whole at the design value of the steel strand with the grinding wheel cutter to obtain the finished steel strand bundle.
[0039] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A production line for the self-processing of finished steel strand bundles for high-speed railway box girders, comprising a wire-laying area (1), a processing area (2), a traction area (3) and a winding area (4) arranged in sequence, characterized in that: The pay-off area (1) comprises a plurality of pay-off frames (6), the steel strands are wound on the pay-off frames (6), a plurality of the pay-off frames (6) are arranged in a straight line to form a pay-off frame group, and the arrangement direction of the pay-off frame group is inclined to the wire outlet direction of the pay-off area (1).
2. The construction production line for self-processing finished steel strand bundles for high-speed railway box girders according to claim 1 is characterized in that: The pay-off area (1) comprises a bottom plate (5), and the pay-off frame (6) is rotatably arranged on the bottom plate (5).
3. The construction production line for self-processing finished steel strand bundles for high-speed railway box girders according to claim 2 is characterized in that: The angle between the arrangement direction of the pay-off frame group and the wire outlet direction of the pay-off area (1) is 20° to 70°.
4. The construction production line for self-processing finished steel strand bundles for high-speed railway box girders according to claim 3 is characterized in that: Two pay-off rack groups are arranged on the bottom plate (5), and the two pay-off rack groups are arranged in parallel and at intervals.
5. The construction production line for self-processing finished steel strand bundles for high-speed railway box girders according to claim 4 is characterized in that: The bottom plate (5) is a rectangular bottom plate, and one of the two pay-off rack groups is arranged along a diagonal line of the rectangular bottom plate.
6. The construction production line for self-processing finished steel strand bundles for high-speed railway box girders according to claim 3 is characterized in that: Two pay-off rack groups are arranged on the bottom plate (5), and the two pay-off rack groups are arranged in an "eight" shape.
7. The construction production line for self-processing finished steel strand bundles for high-speed railway box girders according to claim 6 is characterized in that: The bottom plate (5) is a rectangular bottom plate, and the two pay-off rack groups are symmetrically arranged along the center line of the rectangular bottom plate.
8. The construction production line for self-processing finished steel strand bundles for high-speed railway box girders according to claim 5 or 7, characterized in that: The processing area (2) comprises a combing assembly (7), a crimping assembly (8) and a cutting assembly (9); the steel strands are arranged by the combing assembly (7) and squeezed by the crimping assembly (8) in sequence to form a finished steel strand bundle; when the finished steel strand bundle is pulled to a fixed length by the pulling area (3), the cutting assembly (9) cuts the entire bundle.
9. The construction production line for self-processing finished steel strand bundles for high-speed railway box girders according to claim 8, characterized in that: The traction area (3) comprises a traction machine (10) and a roller device (11), and the finished steel strand bundle moves along the roller device (11) driven by the traction machine (10).
10. The construction production line for self-processing finished steel strand bundles for high-speed railway box girders according to claim 9, characterized in that: The winding area (4) comprises a wire take-up frame (12) and a wire take-up drum (13); the wire take-up drum (13) is rotatably arranged on the wire take-up frame (12); a rotating motor (14) is arranged on the wire take-up drum (13); and the finished steel strand bundle is wound around the wire take-up drum (13) under the drive of the rotating motor (14).