Gap bridge mechanism in food packaging mold production system

Through the split structure of the left ladder frame, right ladder frame and handrail assembly, combined with the design of the reinforcement rod, the existing bridge tray has solved the problem of large space and low applicability, and achieved compactness, high stability and high applicability The bridge mechanism ensures smooth passage of operators and flexible adaptation of production systems.

CN222041714UActive Publication Date: 2024-11-22HAINING XINKAI NEW MATERIAL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420361296.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-27
Publication Date
2024-11-22
Estimated Expiration
2034-02-27

AI Technical Summary

Technical Problem

The bridge structure in the existing food packaging mold production system occupies a large space and has low applicability, which cannot effectively adapt to the needs of different production systems.

Method used

The left ladder frame, right ladder frame and handrail assembly with split structure is adopted to achieve flexible adjustment of the bridge by connecting the handrail assembly of adaptive length, ensuring smooth passage of the operator, and improving structural strength and stability through reinforcement rods.

Benefits of technology

It realizes a compact, high stability and high applicability bridge mechanism, adapts to the needs of different production systems, ensures safe passage of operators, and enhances the practical value of the production system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222041714U_ABST
    Figure CN222041714U_ABST
Patent Text Reader

Abstract

The utility model provides a gap bridge mechanism in a food packaging mold production system, and belongs to the technical field of machinery. The problem of poor stability in the prior art is solved. The gap bridge mechanism in the food packaging mold production system is arranged on a rack and comprises a left ladder assembly, a right ladder assembly and a handrail assembly, the left ladder assembly and the right ladder assembly are located on the two sides of the rack respectively, the handrail assembly is located on the upper portion of the rack, and the two ends of the handrail assembly are fixedly connected with the left ladder assembly and the right ladder assembly respectively. The handrail assembly is positioned at the upper parts of the left ladder frame and the right ladder frame. The gap bridge mechanism in the food packaging mold production system is high in stability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of machinery and relates to a bridge mechanism in a food packaging mold production system. Background Art

[0002] The food packaging mold production system includes a frame, on which a corresponding preparation mechanism and a conveying mechanism are arranged. Since the width of the production system is relatively long, it is necessary to go around a relatively long distance when entering the other side of the production system from one side of the production system.

[0003] In order to solve the above problems, a bridge is usually set at a certain local section of the production system. The existing bridge is usually an integrated structure, which not only occupies a large space, but also can only be applied to the corresponding production system, and its applicability is relatively low. Summary of the invention

[0004] The utility model aims to solve the above problems in the prior art and to provide a bridge mechanism in a food packaging mold production system with a compact structure and high stability.

[0005] The purpose of the utility model can be achieved through the following technical solutions:

[0006] A bridge mechanism in a food packaging mold production system, the food packaging mold production system includes a frame, the bridge mechanism is arranged at the frame, and is characterized in that it includes a left ladder frame, a right ladder frame and a handrail assembly, the left ladder frame and the right ladder frame are respectively located on both sides of the frame, the handrail assembly is located at the upper part of the frame and the two ends of the handrail assembly are respectively fixedly connected to the left ladder frame and the right ladder frame, and the handrail assembly is located at the upper part of the left ladder frame and the right ladder frame.

[0007] The bridge mechanism in the food packaging mold production system creatively adopts a split-structure left ladder frame, a right ladder frame and a handrail assembly.

[0008] The left ladder frame and the right ladder frame are respectively arranged at both sides of the frame. After the positions of the left ladder frame and the right ladder frame are determined, the handrail assembly of the adapted length can be connected to the upper part of the left ladder frame and the right ladder frame.

[0009] In the bridge mechanism in the above-mentioned food packaging mold production system, the left ladder frame includes ladder platform 1 and ladder platform 2, the above-mentioned ladder platform 1 and ladder platform 2 are adjacent to each other on the left and right, and the upper end of ladder platform 2 is located above the upper end of ladder platform 1.

[0010] In the bridge mechanism in the above-mentioned food packaging mold production system, the right ladder frame includes ladder platform three and ladder platform four, and the above-mentioned ladder platform three and ladder platform four are adjacent to each other on the left and right, and the upper end of ladder platform three is located above the upper end of ladder platform four.

[0011] Such a structure enables the operating personnel to conveniently enter the relatively high ladder platform 2 and ladder platform 3, and ultimately ensures that the operating personnel can smoothly cross the rack between the left ladder rack and the right ladder rack.

[0012] When the width of the rack is relatively large, an additional connecting plate may be provided, and two ends of the connecting plate are respectively fixedly connected to the second step and the third step.

[0013] Of course, if the width of the rack is relatively small, the connecting plate can be removed, and the operator can directly cross the rack with big steps.

[0014] In the bridge mechanism in the above-mentioned food packaging mold production system, the handrail assembly includes a handrail rod, a connecting rod one, a connecting rod two, a connecting rod three and a connecting rod four. The above-mentioned handrail rod is arranged horizontally, and the two ends of the above-mentioned connecting rod one are respectively connected to the handrail rod and an edge of the ladder platform, the two ends of the above-mentioned connecting rod two are respectively connected to the handrail rod and the edge of the ladder platform two, the two ends of the above-mentioned connecting rod three are respectively connected to the handrail rod and the edge of the ladder platform three, and the two ends of the above-mentioned connecting rod four are respectively connected to the handrail rod and the edge of the ladder platform four.

[0015] The vertically arranged connecting rods one, two, three and four can make the handrails be located at the upper parts of the left and right ladder frames, thus playing an effective protective role.

[0016] In the bridge mechanism in the above-mentioned food packaging mold production system, one end of the handrail rod has an inclined transition section 1, the upper end of the connecting rod 2 is fixedly connected to the highest point of the transition section 1, and the upper end of the connecting rod 1 is fixedly connected to the lowest point of the transition section 1.

[0017] Since the height of the first step platform is smaller than that of the second step platform, the inclined transition section 1 enables the operator to conveniently hold on to the first step platform when entering the second step platform from the first step platform.

[0018] In the bridge mechanism in the above-mentioned food packaging mold production system, the other end of the handrail rod has an inclined transition section 2, the upper end of the connecting rod 3 is fixedly connected to the highest point of the transition section 2, and the upper end of the connecting rod 4 is fixedly connected to the lowest point of the transition section 2.

[0019] Since the height dimension of the step platform 4 is smaller than the height dimension of the step platform 3, the inclined transition section 2 enables the operator to conveniently hold on to the transition section 2 when entering the step platform 3 from the step platform 4.

[0020] In the bridge mechanism in the above-mentioned food packaging mold production system, there is a reinforcement rod 1 between the connecting rod 1 and the connecting rod 2, and a reinforcement rod 2 is provided between the above-mentioned connecting rod 2 and the handrail rod. The reinforcement rod 1 is arranged parallel to the transition section 1, and the reinforcement rod 2 is arranged on the same axis as the reinforcement rod.

[0021] The strength between the connecting rod 1 and the connecting rod 2 can be effectively improved by reinforcing the connecting rod 1.

[0022] The connection strength between the second connecting rod and the handrail rod can be improved by reinforcing the second connecting rod.

[0023] In the bridge mechanism in the above-mentioned food packaging mold production system, there is a reinforcement rod three between the connecting rod three and the connecting rod four, and a reinforcement rod four is provided between the above-mentioned connecting rod three and the handrail rod. The reinforcement rod three is arranged parallel to the transition section two, and the reinforcement rod four is arranged coaxially with the reinforcement rod three.

[0024] The strength between the connecting rod three and the connecting rod four can be effectively improved by reinforcing the connecting rod three.

[0025] The connection strength between the connecting rod three and the handrail rod can be improved by reinforcing the rod four.

[0026] In the bridge mechanism in the above-mentioned food packaging mold production system, the above-mentioned handrail rod, connecting rod one, connecting rod two, connecting rod three and connecting rod four form an handrail unit, and the number of the handrail units is two, one of which is located on one side of the left ladder frame and the right ladder frame, and the other handrail unit is located on the other side of the left ladder frame and the right ladder frame.

[0027] A passage for workers to pass safely is formed between the two handrail units and the left and right ladder frames.

[0028] Compared with the prior art, the bridge mechanism in the food packaging mold production system is three independent parts, namely, the left and right ladder frames and the handrail assembly are three independent parts. Therefore, by replacing the handrail assembly of corresponding length, the mechanism can be adapted to different production systems, and its applicability is relatively high.

[0029] At the same time, the left and right ladder frames are respectively located at both sides of the rack in the production system, so the structure is relatively compact.

[0030] In addition, since the handrail assembly is stably connected to the left and right ladder frames, its stability is relatively high and has high practical value. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a three-dimensional structural schematic diagram of the bridge mechanism in the food packaging mold production system.

[0032] Figure 2 It is a main structural diagram of the bridge mechanism in the food packaging mold production system.

[0033] In the figure, 1, left ladder frame; 1a, step one; 1b, step two; 2, right ladder frame; 2a, step three; 2b, step four; 3, handrail; 3a, transition section one; 3b, transition section two; 4, connecting rod one; 5, connecting rod two; 6, connecting rod three; 7, connecting rod four; 8, reinforcement rod one; 9, reinforcement rod two; 10, reinforcement rod three; 11, reinforcement rod four. DETAILED DESCRIPTION

[0034] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0035] It should be noted that when a component is referred to as being "mounted on" another component, it may be directly mounted on the other component or there may be a central component. When a component is considered to be "set on" another component, it may be directly set on the other component or there may be a central component at the same time. When a component is considered to be "fixed to" another component, it may be directly fixed on the other component or there may be a central component at the same time.

[0036] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art in the technical field of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "or / and" used herein includes any and all combinations of one or more related listed items.

[0037] like Figure 1 As shown, the food packaging mold production system includes a frame, and the bridge mechanism in the food packaging mold production system is arranged on the frame.

[0038] like Figure 1 and Figure 2 As shown, the bridge mechanism in the food packaging mold production system includes a left ladder frame 1, a right ladder frame 2 and a handrail assembly, the left ladder frame 1 and the right ladder frame 2 are respectively located on both sides of the frame, the handrail assembly is located at the upper part of the frame and the two ends of the handrail assembly are respectively fixedly connected to the left ladder frame 1 and the right ladder frame 2, and the handrail assembly is located at the upper part of the left ladder frame 1 and the right ladder frame 2.

[0039] The left ladder frame 1 includes a step 1a and a step 2 1b, wherein the step 1a and the step 2 1b are adjacent to each other on the left and right sides and the upper end of the step 2 1b is located above the upper end of the step 1a.

[0040] The right ladder frame 2 includes a third step 2a and a fourth step 2b, wherein the third step 2a and the fourth step 2b are adjacent to each other on the left and right and the upper end of the third step 2a is located above the upper end of the fourth step 2b.

[0041] The handrail assembly includes a handrail rod 3, a connecting rod 1 4, a connecting rod 2 5, a connecting rod 3 6 and a connecting rod 4 7. The handrail rod 3 is arranged horizontally, and the two ends of the connecting rod 1 4 are respectively connected to the handrail rod 3 and the edge of the ladder platform 1 1a, the two ends of the connecting rod 2 5 are respectively connected to the handrail rod 3 and the edge of the ladder platform 2 5, the two ends of the connecting rod 3 6 are respectively connected to the handrail rod 3 and the edge of the ladder platform 3 2a, and the two ends of the connecting rod 4 7 are respectively connected to the handrail rod 3 and the edge of the ladder platform 4 2b.

[0042] One end of the handrail rod 3 has an inclined transition section 1 3a, the upper end of the connecting rod 2 5 is fixedly connected to the highest point of the transition section 1 3a, and the upper end of the connecting rod 1 4 is fixedly connected to the lowest point of the transition section 1 3a.

[0043] The other end of the handrail rod 3 has an inclined transition section 2 3b, the upper end of the connecting rod 3 6 is fixedly connected to the highest point of the transition section 2 3b, and the upper end of the connecting rod 4 7 is fixedly connected to the lowest point of the transition section 2 3b.

[0044] A reinforcing rod 1 8 is provided between the connecting rod 1 4 and the connecting rod 2 5 , a reinforcing rod 2 9 is provided between the connecting rod 2 5 and the handrail rod 3 , the reinforcing rod 1 8 is arranged parallel to the transition section 1 3 a , and the reinforcing rod 2 9 is arranged coaxially with the reinforcing rod 1 8 .

[0045] A reinforcement rod three 10 is provided between the connecting rod three 6 and the connecting rod four 7, a reinforcement rod four 11 is provided between the connecting rod three 6 and the handrail rod 3, the reinforcement rod three 10 is arranged parallel to the transition section two 3b, and the reinforcement rod four 11 is arranged coaxially with the reinforcement rod three 10.

[0046] The handrail rod 3, connecting rod 1 4, connecting rod 2 5, connecting rod 3 6 and connecting rod 4 7 form a handrail unit, and the number of the handrail units is two, one of which is located on one side of the left ladder frame 1 and the right ladder frame 2, and the other handrail unit is located on the other side of the left ladder frame 1 and the right ladder frame 2.

[0047] The bridge mechanism in the food packaging mold production system creatively adopts a split-structure left ladder frame, a right ladder frame and a handrail assembly.

[0048] The left ladder frame and the right ladder frame are respectively arranged at both sides of the frame. After the positions of the left ladder frame and the right ladder frame are determined, the handrail assembly of the adapted length can be connected to the upper part of the left ladder frame and the right ladder frame.

[0049] Such a structure enables the operating personnel to conveniently enter the relatively high ladder platform 2 and ladder platform 3, and ultimately ensures that the operating personnel can smoothly cross the rack between the left ladder rack and the right ladder rack.

[0050] When the width of the rack is relatively large, an additional connecting plate may be provided, and two ends of the connecting plate are respectively fixedly connected to the second step and the third step.

[0051] Of course, if the width of the rack is relatively small, the connecting plate can be removed, and the operator can directly cross the rack with big steps.

[0052] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0053] Those skilled in the art should recognize that the above embodiments are only used to illustrate the present invention and are not intended to limit the present invention. As long as they are within the spirit of the present invention, appropriate changes and modifications to the above embodiments are within the scope of protection required by the present invention.

Claims

1. A bridge mechanism in a food packaging mold production system, the food packaging mold production system includes a frame, the bridge mechanism is arranged at the frame, and is characterized in that: It includes a left ladder frame, a right ladder frame and a handrail assembly, wherein the left ladder frame and the right ladder frame are respectively located at both sides of the frame, the handrail assembly is located at the upper part of the frame and the two ends of the handrail assembly are respectively fixedly connected to the left ladder frame and the right ladder frame, and the handrail assembly is located at the upper part of the left ladder frame and the right ladder frame; The left ladder frame includes a first step and a second step, wherein the first step and the second step are adjacent to each other on the left and right sides and the upper end of the second step is located above the upper end of the first step; The right ladder frame includes a third step and a fourth step, wherein the third step and the fourth step are adjacent to each other on the left and right sides and the upper end of the third step is located above the upper end of the fourth step; The handrail assembly includes a handrail rod, a connecting rod one, a connecting rod two, a connecting rod three and a connecting rod four. The handrail rod is arranged horizontally, and the two ends of the connecting rod one are respectively connected to the handrail rod and an edge of the ladder platform, the two ends of the connecting rod two are respectively connected to the handrail rod and the edge of the ladder platform two, the two ends of the connecting rod three are respectively connected to the handrail rod and the edge of the ladder platform three, and the two ends of the connecting rod four are respectively connected to the handrail rod and the edge of the ladder platform four.

2. The bridge mechanism in the food packaging mold production system according to claim 1, characterized in that: One end of the handrail rod is provided with an inclined transition section 1, the upper end of the connecting rod 2 is fixedly connected to the highest point of the transition section 1, and the upper end of the connecting rod 1 is fixedly connected to the lowest point of the transition section 1.

3. The bridge mechanism in the food packaging mold production system according to claim 2, characterized in that: The other end of the handrail rod has an inclined transition section 2, the upper end of the connecting rod 3 is fixedly connected to the highest point of the transition section 2, and the upper end of the connecting rod 4 is fixedly connected to the lowest point of the transition section 2.

4. The bridge mechanism in the food packaging mold production system according to claim 3, characterized in that: A reinforcing rod 1 is provided between the connecting rod 1 and the connecting rod 2, a reinforcing rod 2 is provided between the connecting rod 2 and the handrail rod, the reinforcing rod 1 is arranged parallel to the transition section 1, and the reinforcing rod 2 is arranged on the same axis as the reinforcing rod.

5. The bridge mechanism in the food packaging mold production system according to claim 4, characterized in that: A reinforcing rod three is arranged between the connecting rod three and the connecting rod four, a reinforcing rod four is arranged between the connecting rod three and the handrail rod, the reinforcing rod three is arranged parallel to the transition section two, and the reinforcing rod four is arranged coaxially with the reinforcing rod three.

6. The bridge mechanism in the food packaging mold production system according to claim 5, characterized in that: The handrail rod, connecting rod one, connecting rod two, connecting rod three and connecting rod four form a handrail unit, and the number of the handrail units is two, one of which is located on one side of the left ladder frame and the right ladder frame, and the other handrail unit is located on the other side of the left ladder frame and the right ladder frame.