Prestressed concrete pipe pile holder

By designing an adjustable clamping mechanism and reinforcement mechanism, the problem that can only be used for fixed-size prestressed concrete pipe piles in the prior art is solved, and the stable clamping and lifting stability of pipe piles of different sizes is achieved.

CN222042400UActive Publication Date: 2024-11-22FUJIAN DALI NEW BUILDING MATERIALS TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420890586.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-26
Publication Date
2024-11-22
Estimated Expiration
2034-04-26

AI Technical Summary

Technical Problem

The existing prestressed concrete pipe pile clamps can only be used for fixed-size prestressed concrete pipe piles, resulting in limited applicability and inability to effectively clamp pipe piles of different sizes.

Method used

A prestressed concrete pipe pile clamper including a lifting mechanism and a clamping mechanism is designed. The clamping mechanism drives the gear system and the spring mechanism through the motor, so that the clamping plate can adjust its position, adapt to pipe piles of different sizes, and passes through The reinforcement mechanism reduces the probability of pipe piles falling off.

Benefits of technology

The stable clamping of prestressed concrete pipe piles of different sizes is achieved, which improves the applicability and stability of the clamp and avoids the fall off of the pipe piles during lifting.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222042400U_ABST
    Figure CN222042400U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of prestressed concrete pipe piles, in particular to a prestressed concrete pipe pile clamping device which comprises a hoisting mechanism and further comprises a clamping mechanism used for clamping and fixing a prestressed concrete pipe pile, and the clamping mechanism is installed below the hoisting mechanism. The clamping mechanism is arranged, the device is moved to the outer side surface of one end of the prestressed concrete pipe pile, a motor is started, the motor drives a first gear to rotate, the first gear drives a gear ring to rotate, the gear ring drives a second gear to rotate, the second gear drives a rotating block to rotate through a rotating shaft, and the rotating block rotates to extrude a movable plate; the springs are compressed, the movable plates drive the clamping plates to move through the movable rods, the four clamping plates close to one another jointly cooperate to clamp and fix the prestressed concrete pipe pile, and the positions of the clamping plates in the device are easy to adjust, so that the device can clamp and fix the prestressed concrete pipe piles of different sizes; and the applicability of the device is effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of prestressed concrete pipe piles, in particular to a prestressed concrete pipe pile clamp. Background Art

[0002] Prestressed concrete pipe piles can be divided into post-tensioned prestressed pipe piles and pre-tensioned prestressed pipe piles. Pre-tensioned prestressed pipe piles are hollow cylindrical slender concrete prefabricated components made by pre-tensioned prestressing technology and centrifugal forming. They are mainly composed of cylindrical pile bodies, end plates and steel sleeves. The construction methods of prestressed concrete pipe piles are generally hammer pile driving method and static pile driving method. Each construction method requires the prestressed concrete pipe to be clamped and hoisted first, and then the prestressed concrete pipe piles are placed vertically in the designated pile driving position for construction operations.

[0003] Announcement No. (CN220283334U) discloses a prestressed concrete pipe pile clamp, which starts the hydraulic cylinder to pull the clamping block, so that the clamping block slides on the inner surface of the slide groove through the slider, and the outer surface of the clamping block is fitted with the outer surface of the fixing block to complete the clamping of the prestressed concrete pipe pile. The above device can only clamp and fix prestressed concrete pipe piles of fixed size, which will affect the applicability of the device and needs to be improved. Utility Model Content

[0004] The purpose of the utility model is to provide a prestressed concrete pipe pile clamp in order to solve the above problems.

[0005] The utility model achieves the above-mentioned purpose through the following technical solutions:

[0006] A prestressed concrete pipe pile clamp comprises a hoisting mechanism and a clamping mechanism for clamping and fixing the prestressed concrete pipe pile, wherein the clamping mechanism is installed below the hoisting mechanism;

[0007] The clamping mechanism includes a fixed block, the clamping assembly is installed on the fixed block, the clamping assembly includes a fixed box, the motor is installed above the fixed box, the first gear is installed at the output end of the motor, the fixed seat is installed on the fixed box, the gear ring is installed on the fixed seat, the second gear is meshed on the outside of the gear ring, the rotating shaft is fixed on the second gear, the rotating block is fixed on the rotating shaft, the movable plate is installed inside the fixed box, the movable rod is installed on the movable plate, the spring is arranged on the outside of the movable rod, and the clamping plate is fixed to the end of the movable rod away from the movable plate.

[0008] Preferably, the lifting mechanism comprises a lifting ring, and the lifting rod is fixed below the lifting ring.

[0009] Preferably, a reinforcing mechanism is installed on the clamping mechanism, and the reinforcing mechanism includes an electric push rod, an extrusion block is fixed above the electric push rod, and an anti-slip pad is installed above the extrusion block.

[0010] Preferably, the lifting ring and the lifting rod are welded, and both are made of alloy steel.

[0011] Preferably, the motor is connected to the fixed box by bolts, and the number of rotating blocks on each rotating shaft is two.

[0012] Preferably, the anti-skid pad is bonded to the extrusion block, and the material of the anti-skid pad is rubber.

[0013] Compared with the prior art, the beneficial effects of the utility model are as follows:

[0014] By setting a clamping mechanism, the device is moved to the outer surface of one end of the prestressed concrete pipe pile, and the motor is started. The motor drives the first gear to rotate, the first gear drives the gear ring to rotate, the gear ring drives the second gear to rotate, and the second gear drives the rotating block to rotate through the rotating shaft. The rotating block rotates to squeeze the movable plate, the spring is compressed, and the movable plate drives the clamping plate to move through the movable rod. Four clamping plates close to each other work together to clamp and fix the prestressed concrete pipe pile. The position of the clamping plate in the device is easy to adjust, so that the device can clamp and fix prestressed concrete pipe piles of different sizes, effectively improving the applicability of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0016] Figure 1 It is a structural schematic diagram of a prestressed concrete pipe pile clamp described in the utility model;

[0017] Figure 2 This is a front view of a prestressed concrete pile clamp of the utility model;

[0018] Figure 3 It is a structural schematic diagram of a fixing seat in a prestressed concrete pipe pile clamp described in the utility model;

[0019] Figure 4 It is a schematic diagram of the internal structure of a fixing box in a prestressed concrete pile clamp described in the utility model, viewed from above;

[0020] Figure 5 It is an enlarged structural schematic diagram of the second gear in the prestressed concrete pile clamp of the utility model;

[0021] Figure 6It is an enlarged structural schematic diagram of a reinforcement mechanism in a prestressed concrete pipe pile clamp described in the utility model.

[0022] The following are the descriptions of the reference numerals:

[0023] 1. Lifting mechanism; 101. Lifting ring; 102. Lifting rod; 2. Clamping mechanism; 201. Fixed block; 202. Fixed box; 203. Motor; 204. First gear; 205. Fixed seat; 206. Gear ring; 207. Second gear; 208. Rotating shaft; 209. Rotating block; 210. Movable plate; 211. Movable rod; 212. Spring; 213. Clamping plate; 3. Reinforcement mechanism; 301. Electric push rod; 302. Extrusion block; 303. Anti-slip pad. DETAILED DESCRIPTION

[0024] In the description of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present utility model, unless otherwise specified, "multiple" means two or more.

[0025] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

[0026] The utility model is further described below in conjunction with the accompanying drawings:

[0027] like Figure 1-Figure 6 As shown, a prestressed concrete pipe pile clamp comprises a hoisting mechanism 1 and a clamping mechanism 2 for clamping and fixing the prestressed concrete pipe pile. The clamping mechanism 2 is installed below the hoisting mechanism 1.

[0028] In the utility model, the lifting mechanism 1 includes a lifting ring 101 and a lifting rod 102, and the lifting rod 102 is fixed below the lifting ring 101; the lifting ring 101 and the lifting rod 102 are welded, and both are made of alloy steel; when using the device, the steel cable on the lifting device is connected to the lifting ring 101, and the device is moved to the outer surface of one end of the prestressed concrete pipe pile through the lifting device, and then the clamping operation can be performed.

[0029] In the present utility model, the clamping mechanism 2 includes a fixed block 201, a fixed box 202, a motor 203, a first gear 204, a fixed seat 205, a gear ring 206, a second gear 207, a rotating shaft 208, a rotating block 209, a movable plate 210, a movable rod 211, a spring 212, and a clamping plate 213. The fixed box 202 is mounted on the fixed block 201, the motor 203 is mounted above the fixed box 202, the first gear 204 is mounted on the output end of the motor 203, the fixed seat 205 is mounted on the fixed box 202, the gear ring 206 is mounted on the fixed seat 205, the second gear 207 is meshed on the outside of the gear ring 206, the rotating shaft 208 is fixed on the second gear 207, the rotating block 209 is fixed on the rotating shaft 208, the movable plate 210 is mounted inside the fixed box 202, the movable rod 211 is mounted on the movable plate 210, the spring 212 is arranged on the outside of the movable rod 211, and the clamping plate 213 is fixed to the movable rod 2 11 is far away from one end of the movable plate 210; the motor 203 is connected to the fixed box 202 by bolts, and the number of rotating blocks 209 on each rotating shaft 208 is two; the device is moved to the outer surface of one end of the prestressed concrete pipe pile, and the motor 203 is started. The motor 203 drives the first gear 204 to rotate, the first gear 204 drives the gear ring 206 to rotate, the gear ring 206 drives the second gear 207 to rotate, and the second gear 207 drives the rotating block 209 to rotate through the rotating shaft 208. The rotating block 209 rotates to squeeze the movable plate 210, and the spring 212 is compressed. The movable plate 210 drives the clamping plate 213 to move through the movable rod 211, and the four clamping plates 213 close to each other work together to clamp and fix the prestressed concrete pipe pile. The position of the clamping plate 213 in the device is easy to adjust, so that the device can clamp and fix prestressed concrete pipe piles of different sizes, effectively improving the applicability of the device.

[0030] In the utility model, a reinforcing mechanism 3 is installed on the clamping mechanism 2, and the reinforcing mechanism 3 includes an electric push rod 301, an extrusion block 302, and an anti-skid pad 303. The extrusion block 302 is fixed above the electric push rod 301, and the anti-skid pad 303 is installed above the extrusion block 302; the anti-skid pad 303 is bonded to the extrusion block 302, and the material of the anti-skid pad 303 is rubber; after the prestressed concrete pipe pile is fixed, the electric push rod 301 is started, and the electric push rod 301 is extended to drive the extrusion block 302 and the anti-skid pad 303 to rise, and the anti-skid pad 303 rises and contacts the gear ring 206, so that the gear ring 206 is reinforced, which effectively reduces the probability of the prestressed concrete pipe pile falling off during the lifting process.

[0031] In the above structure: when the device is used, the steel cable on the lifting device is connected to the lifting ring 101, and the device is moved to the outer surface of one end of the prestressed concrete pipe pile by the lifting device, and the motor 203 is started, the motor 203 drives the first gear 204 to rotate, the first gear 204 drives the gear ring 206 to rotate, the gear ring 206 drives the second gear 207 to rotate, the second gear 207 drives the rotating block 209 to rotate through the rotating shaft 208, the rotating block 209 rotates to squeeze the movable plate 210, and the spring 21 2 is compressed, the movable plate 210 drives the clamping plate 213 to move through the movable rod 211, and the four clamping plates 213 close to each other work together to clamp and fix the prestressed concrete pipe pile. After the prestressed concrete pipe pile is fixed, the electric push rod 301 is started, and the electric push rod 301 extends to drive the extrusion block 302 and the anti-skid pad 303 to rise, and the anti-skid pad 303 rises and contacts the gear ring 206, so that the gear ring 206 is reinforced, and finally the prestressed concrete pipe pile is lifted to the desired position by the lifting equipment.

[0032] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, and these changes and improvements fall within the scope of the utility model to be protected.

Claims

1. A prestressed concrete pile clamp, comprising a hoisting mechanism (1), characterized in that: It also includes a clamping mechanism (2) for clamping and fixing the prestressed concrete pipe pile, wherein the clamping mechanism (2) is installed below the lifting mechanism (1); The clamping mechanism (2) comprises a fixed block (201), a clamping assembly is mounted on the fixed block (201), the clamping assembly comprises a fixed box (202), a motor (203) is mounted above the fixed box (202), a first gear (204) is mounted at an output end of the motor (203), a fixed seat (205) is mounted on the fixed box (202), a gear ring (206) is mounted on the fixed seat (205), and a second gear (207) is meshed with the fixed seat (205). The rotating shaft (208) is fixed on the outside of the gear ring (206) on the second gear (207), the rotating block (209) is fixed on the rotating shaft (208), the movable plate (210) is installed inside the fixed box (202), the movable rod (211) is installed on the movable plate (210), the spring (212) is arranged on the outside of the movable rod (211), and the clamping plate (213) is fixed on one end of the movable rod (211) away from the movable plate (210).

2. A prestressed concrete pile clamp according to claim 1, characterized in that: The hoisting mechanism (1) comprises a hoisting ring (101), and a hoisting rod (102) is fixed below the hoisting ring (101).

3. A prestressed concrete pile clamp according to claim 2, characterized in that: A reinforcing mechanism (3) is installed on the clamping mechanism (2), and the reinforcing mechanism (3) comprises an electric push rod (301), an extrusion block (302) is fixed above the electric push rod (301), and an anti-slip pad (303) is installed above the extrusion block (302).

4. A prestressed concrete pile clamp according to claim 2, characterized in that: The lifting ring (101) and the lifting rod (102) are welded, and both are made of alloy steel.

5. The prestressed concrete pile clamp according to claim 1, characterized in that: The motor (203) is connected to the fixed box (202) via bolts, and the number of the rotating blocks (209) on each rotating shaft (208) is two.

6. The prestressed concrete pile clamp according to claim 3, characterized in that: The anti-skid pad (303) is bonded to the extrusion block (302), and the material of the anti-skid pad (303) is rubber.