Bridge construction cofferdam bearing platform tower crane connecting structure
The bolted column insert, slot, and threaded rod structure solves the problem of relying on concrete pouring for the connection between the tower crane base and the foundation, achieving a fast and stable connection and saving construction time.
Patent Information
- Application Number
- CN202420271499.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-04
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-02-04
AI Technical Summary
In existing bridge construction, the connection between the tower crane base and the pier cap mainly relies on concrete pouring, which results in a long construction period and affects the progress.
The tower crane and the foundation are fixed by bolt connection through a combination of column inserts, slots, blocks and threaded rods, avoiding concrete pouring.
It shortened the construction period, improved the stability and firmness of the connection, prevented the column from detaching, and saved construction time.
Smart Images

Figure CN222042490U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of bridge construction pedestal tower crane connection, in particular to a bridge construction cofferdam pedestal tower crane connection structure. Background Art
[0002] At present, the connection method of the steel cap of the tower crane base is mostly concrete pouring. The concrete pouring construction period is long, and the tower crane can only be installed after the concrete reaches the design strength requirements, which affects the construction progress. Therefore, a bridge construction cofferdam cap tower crane connection structure is needed, which can connect the tower crane and the cap with bolts, avoiding the need for users to connect the tower crane and the cap by concrete pouring, saving construction period. Utility Model Content
[0003] The utility model aims to provide a tower crane connection structure for a cofferdam pedestal for bridge construction, which can connect the tower crane and the pedestal by bolts, avoiding the need for users to connect the tower crane and the pedestal by pouring concrete, thus saving the construction period and solving the above-mentioned background technical problems.
[0004] The utility model solves the above-mentioned technical problem with the following technical solutions: A bridge construction cofferdam cap tower crane connection structure, comprising a cap body and a tower seat arranged on the top of the cap body: four symmetrical bottom plates are arranged on the top of the tower seat, a column insert is arranged on the top of the bottom plate, four symmetrical mounting brackets are fixedly connected to the surface of the column insert, a card slot is provided on the opposite side of the mounting bracket, a fixing plate 1 is welded on both sides of the mounting bracket, a mounting hole 1 is provided on the top of the fixing plate 1, four symmetrical fixing brackets are arranged on the top of the bottom plate, a card block is welded on one side of the fixing bracket close to the bottom plate, a fixing plate 2 is welded on both sides of the card block, a mounting hole 2 is provided on the top of the fixing plate 2, three symmetrical support plates are welded on the side of the fixing bracket away from the bottom plate, a connecting plate is welded on the top of the supporting plate, two symmetrical mounting holes 3 are provided on the top of the connecting plate, threaded rods are provided through the inner cavities of the mounting hole 1, the mounting hole 2 and the mounting hole 3, nuts are sleeved on the surface of the threaded rods, and a plurality of openings are provided on the top of the bottom plate.
[0005] Preferably, four symmetrical columns are fixedly connected to the top of the support body, and four symmetrical cofferdams are arranged on the surface of the support body.
[0006] Preferably, the threaded rod is adapted to the opening, and the threaded rod passes through the first mounting hole and the second mounting hole to the bottom of the base plate.
[0007] Preferably, the support plate is an inverted triangle, and the second fixing plate is located above the first fixing plate.
[0008] Preferably, the clamping slot is matched with the clamping block, and the threaded rod is threadedly connected with the nut.
[0009] 1. The beneficial effects of the utility model are as follows: the utility model places the column insert tube on the top of the base plate, engages the card block with the card slot, and fixes it through a threaded rod and a nut, so that the column insert tube is fixed, and the tower crane and the pedestal can be connected by bolts, avoiding the need for users to connect the tower crane and the pedestal by pouring concrete, thereby saving the construction period.
[0010] 2. The utility model supports the card block by setting the support plate, thereby increasing the stability of the card block, preventing the fixing frame from tipping over, improving the firmness, and preventing the column insert from detaching from the top of the bottom plate. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] in:
[0012] Figure 1 It is a three-dimensional schematic diagram of an embodiment of the utility model;
[0013] Figure 2 This is a three-dimensional disassembled schematic diagram of a connecting device according to an embodiment of the utility model;
[0014] Figure 3 This is an embodiment of the utility model Figure 2 A partial enlarged view of point A;
[0015] Figure 4 This is an embodiment of the utility model Figure 2 A partial enlarged view of point B in the middle;
[0016] Figure 5 It is a front cross-sectional schematic diagram of an embodiment of the utility model.
[0017] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0018] 1. Base body, 2. Tower base, 3. Bottom plate, 4. Column insert, 51. Mounting frame, 52. Slot, 53. Fixing plate 1, 54. Mounting hole 1, 61. Fixing frame, 62. Block, 63. Fixing plate 2, 64. Mounting hole 2, 65. Support plate, 66. Connecting plate, 67. Mounting hole 3, 71. Threaded rod, 72. Nut, 8. Opening, 9. Column, 10. Cofferdam. DETAILED DESCRIPTION
[0019] Hereinafter, an embodiment of the bridge construction cofferdam cap tower crane connection structure of the present invention will be described with reference to the accompanying drawings.
[0020] Embodiment 1:
[0021] Figure 1-4 The utility model shows a bridge construction cofferdam cap tower crane connection structure of an embodiment of the present invention, which includes: a cap body 1 and a tower base 2 arranged on the top of the cap body 1: four symmetrical columns 9 are fixedly connected to the top of the cap body 1, four symmetrical cofferdams 10 are arranged on the surface of the cap body 1, four symmetrical bottom plates 3 are arranged on the top of the tower base 2, column inserts 4 are arranged on the top of the bottom plate 3, four symmetrical mounting frames 51 are fixedly connected to the surface of the column inserts 4, and the mounting frames 51 are provided with card grooves 52 on the opposite sides, and fixing plates 53 are welded on both sides of the mounting frames 51, and mounting holes 54 are opened on the top of the fixing plates 53, and four symmetrical fixing frames 61 are arranged on the top of the bottom plate 3, and a card block 62 is welded on the side of the fixing frame 61 close to the bottom plate 3, and both sides of the card block 62 are welded It is connected to a fixing plate 2 63, a mounting hole 2 64 is provided on the top of the fixing plate 2 63, three symmetrical support plates 65 are welded on the side of the fixing frame 61 away from the bottom plate 3, the support plate 65 is an inverted triangle, the fixing plate 2 63 is located above the fixing plate 1 53, and the support plate 65 is provided to support the block 62, thereby increasing the stability of the block 62, preventing the fixing frame 61 from tipping over, improving the firmness of 6, and preventing the column insert 4 from detaching from the top of the bottom plate 3, a connecting plate 66 is welded on the top of the support plate 65, and two symmetrical mounting holes 3 67 are provided on the top of the connecting plate 66, and the inner cavities of the mounting hole 1 54, the mounting hole 2 64, and the mounting hole 3 67 are all penetrated by a threaded rod 71, and a nut 72 is provided on the surface of the threaded rod 71, and a plurality of openings 8 are provided on the top of the bottom plate 3.
[0022] Embodiment 2:
[0023] Figure 1-4The utility model shows a bridge construction cofferdam cap tower crane connection structure of an embodiment of the present invention, which includes: a cap body 1 and a tower base 2 arranged on the top of the cap body 1: four symmetrical bottom plates 3 are arranged on the top of the tower base 2, and a column insert 4 is arranged on the top of the bottom plate 3. Four symmetrical mounting brackets 51 are fixedly connected to the surface of the column insert 4. The mounting brackets 51 are provided with a card slot 52 on the opposite side, and the card slot 52 is adapted to the card block 62. The threaded rod 71 is threadedly connected with the nut 72. A fixing plate 53 is welded on both sides of the mounting bracket 51. A mounting hole 54 is arranged on the top of the fixing plate 53. Four symmetrical fixing brackets 61 are arranged on the top of the bottom plate 3. The fixing brackets 61 are close to the bottom. A block 62 is welded to one side of the plate 3, and a fixing plate 2 63 is welded to both sides of the block 62. A mounting hole 2 64 is provided on the top of the fixing plate 2 63. Three symmetrical support plates 65 are welded to the side of the fixing frame 61 away from the bottom plate 3. A connecting plate 66 is welded to the top of the support plate 65. Two symmetrical mounting holes 3 67 are provided on the top of the connecting plate 66. The inner cavities of the mounting hole 1 54, the mounting hole 2 64 and the mounting hole 3 67 are all penetrated by a threaded rod 71, which is adapted to the opening 8. The threaded rod 71 penetrates the mounting hole 1 54 and the mounting hole 2 64 to the bottom of the bottom plate 3. A nut 72 is sleeved on the surface of the threaded rod 71. A plurality of openings 8 are provided on the top of the bottom plate 3.
[0024] Working principle: When the utility model is used, the user places the column insert tube 4 on the top of the base plate 3, places the fixing frame 61 on the top of the base plate 3, engages the block 62 with the slot 52, and passes the threaded rod 71 through the mounting hole 3 67 to be fixedly connected to the tower base 2, fixes the base plate 3, passes the threaded rod 71 through the mounting hole 1 54, the mounting hole 2 64 and the opening 8, reinforces the column insert tube 4, installs the tower crane column into the inner cavity of the column insert tube 4, fixes the tower crane, and avoids the user fixing the tower crane by pouring concrete. The block 62 is supported by the setting of the support plate 65, which increases the stability of the block 62, avoids the fixing frame 61 from tipping over, improves the firmness of 6, and prevents the column insert tube 4 from detaching from the top of the base plate 3.
[0025] To sum up: the tower crane connection structure of the bridge construction cofferdam pedestal is achieved by placing the column insert 4 on the top of the base plate 3, placing 6 on the top of the base plate 3, so that the block 62 is engaged with the slot 52, and fixing 6 with the threaded rod 71 and the nut 72, so that 6 fixes the column insert 4, and the tower crane and the pedestal can be connected by bolts, avoiding the need for users to connect the tower crane and the pedestal by pouring concrete, thereby saving the construction period.
Claims
1. A bridge construction cofferdam cap tower crane connection structure, characterized in that: The invention comprises a support platform body (1) and a tower base (2) arranged on the top of the support platform body (1): the top of the tower base (2) is provided with four symmetrical bottom plates (3), the top of the bottom plate (3) is provided with a column insert (4), the surface of the column insert (4) is fixedly connected with four symmetrical mounting frames (51), the opposite sides of the mounting frames (51) are provided with a card slot (52), the two sides of the mounting frames (51) are welded with a fixing plate (53), the top of the fixing plate (53) is provided with a mounting hole (54), the top of the bottom plate (3) is provided with four symmetrical fixing frames (61), and the fixing frames (61) are welded with a card block on the side close to the bottom plate (3). (62), both sides of the block (62) are welded with a second fixing plate (63), the top of the second fixing plate (63) is provided with a second mounting hole (64), the side of the fixing frame (61) away from the bottom plate (3) is welded with three symmetrical support plates (65), the top of the support plate (65) is welded with a connecting plate (66), the top of the connecting plate (66) is provided with two symmetrical mounting holes (67), the inner cavities of the first mounting hole (54), the second mounting hole (64), and the third mounting hole (67) are all penetrated by a threaded rod (71), the surface of the threaded rod (71) is provided with a nut (72), and the top of the bottom plate (3) is provided with a plurality of openings (8).
2. A bridge construction cofferdam cap tower crane connection structure according to claim 1, characterized in that: Four symmetrical columns (9) are fixedly connected to the top of the support body (1), and four symmetrical cofferdams (10) are arranged on the surface of the support body (1).
3. A bridge construction cofferdam cap tower crane connection structure according to claim 2, characterized in that: The threaded rod (71) is matched with the opening (8), and the threaded rod (71) passes through the first mounting hole (54) and the second mounting hole (64) to the bottom of the base plate (3).
4. A bridge construction cofferdam cap tower crane connection structure according to claim 3, characterized in that: The support plate (65) is an inverted triangle, and the second fixing plate (63) is located above the first fixing plate (53).
5. A bridge construction cofferdam cap tower crane connection structure according to claim 4, characterized in that: The clamping groove (52) is matched with the clamping block (62), and the threaded rod (71) is threadedly connected with the nut (72).