Hanging basket for bridge construction

By introducing pedaling components and auxiliary components into the hanging basket, the problem of difficulty for construction personnel to reach the shielding shield at high places is solved, safe and high places work is achieved, and the practicality of the hanging basket is improved.

CN222043931UActive Publication Date: 2024-11-22CHINA RAILWAY NO 3 GRP CO LTD +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202420664306.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-01
Publication Date
2024-11-22
Estimated Expiration
2034-04-01

AI Technical Summary

Technical Problem

During bridge construction, the fixed structure of the existing hanging basket makes it difficult for construction personnel to reach the shielding panel at a high level, and it is necessary to climb the bracket for installation, which increases the risk of construction.

Method used

A hanging basket including a hanging basket body, a connecting frame and a pedal assembly is designed. The height of the inner platform of the hanging basket is increased by the deployment function of the pedal assembly, allowing construction personnel to safely carry out high-altitude installation operations.

Benefits of technology

Through the deployment of the pedal assembly, the height of the internal platform of the hanging basket is increased, the demand for construction personnel to climb brackets is reduced, the construction risk is reduced, and the practicality of the hanging basket is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222043931U_ABST
    Figure CN222043931U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of shielding curtain board construction, in particular to a hanging basket for bridge construction, which comprises a hanging basket body, a connecting frame and a treading assembly, the connecting frame is fixedly connected with the upper surface of the hanging basket body, a mooring rope is arranged on the inner wall of the connecting frame, a hook is arranged on the inner wall of the mooring rope, and the treading assembly is arranged on the inner wall of the hanging basket body. The treading assembly comprises a limiting sleeve, a round hole is formed in the side surface of the hanging basket body, the limiting sleeve is fixedly connected with the inner wall of the round hole, a first pedal is rotationally connected to the inner wall of the limiting sleeve, a mounting cavity is formed in the side surface of the first pedal, and a connecting plate is rotationally connected to the inner wall, located in the mounting cavity, of the first pedal. According to the hanging basket, by arranging the treading assembly and the auxiliary assembly, the height of the platform inside the hanging basket can be increased, then the problem that when the height of the platform inside the hanging basket is fixed, a constructor needs to climb on a support to operate in the high-place operation process is solved, and the practicability of the hanging basket is further improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of shielding plate construction, in particular to a hanging basket used for bridge construction. Background Art

[0002] Bridge construction is the process of building a bridge according to the design drawings. During the bridge construction process, it is often necessary to use a hanging basket for operators to stand so that the construction workers can install the shielding panels on both sides of the bridge.

[0003] The inventor discovered in his daily work that in the process of carrying out construction work with the help of a hanging basket, the structure of the existing hanging basket is mostly of fixed design. In the actual operation process, due to the high height of the shielding baffle and the low internal platform of the hanging basket, it is difficult for the construction workers standing in the hanging basket to reach the high place of the shielding baffle, so that the construction workers have to climb on the bracket of the hanging basket to perform installation operations above the shielding baffle. Because the workers' bodies are outside the hanging basket during climbing, the construction process is more dangerous. Utility Model Content

[0004] The utility model aims to solve the problem in the prior art that construction workers need to climb on the bracket of the hanging basket to carry out installation operations above the shielding baffle, and the workers' bodies are outside the hanging basket during climbing, which leads to high danger in the construction process. A hanging basket for bridge construction is proposed to solve the problem.

[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a hanging basket for bridge construction, comprising a hanging basket body, a connecting frame and a pedal assembly, the connecting frame is fixedly connected to the upper surface of the hanging basket body, the inner wall of the connecting frame is provided with a cable, the inner wall of the cable is provided with a hook, the pedal assembly is arranged on the inner wall of the hanging basket body, the pedal assembly comprises a limiting sleeve, a circular hole is opened on the side surface of the hanging basket body, the limiting sleeve is fixedly connected to the inner wall of the circular hole, the inner wall of the limiting sleeve is rotatably connected with a first pedal, the side surface of the first pedal is opened with an installation cavity, the first pedal is located in the inner wall of the installation cavity and is rotatably connected with a connecting plate, and the surface of the connecting plate is rotatably connected with a second pedal.

[0006] Preferably, a rotation groove is provided on the surface of the second pedal, and a handle is rotatably connected to the inner wall of the rotation groove. An assembly cavity is provided on the surface of the second pedal, and a slot is provided on the inner wall of the installation cavity of the first pedal, and a handle is provided, so that construction workers can hold it, thereby facilitating pulling the second pedal to unfold.

[0007] Preferably, a slide groove is provided on the inner wall of the hanging basket body, and the second pedal is slidably connected to the inner wall of the slide groove. A second pedal is provided, and the second pedal cooperates with the first pedal and the connecting plate so that construction workers can stand on it after it is unfolded.

[0008] Preferably, the number of the assembly cavities is two, and the two assembly cavities are arranged symmetrically with respect to the second pedal.

[0009] Preferably, the inner wall of the second pedal located in the assembly cavity is provided with an auxiliary component, the auxiliary component includes a limit slider, the limit slider is slidably connected to the inner wall of the assembly cavity, the side surface of the limit slider is fixedly connected to the limit column, the surface of the limit slider is provided with a threaded groove, the inner wall of the limit slider located in the threaded groove is threadedly connected with a fixing bolt, the surface of the fixing bolt is sleeved with a connecting plate rotatably connected, the surface of the connecting plate is fixedly connected with a pin, the surface of the second pedal is provided with a slot, and a limit slider is provided, and the moving distance of the limit column can be limited by the limit slider, thereby ensuring that the limit column is in the assembly cavity.

[0010] Preferably, there are two limit sliders, which are symmetrically arranged about the second pedal. The limit column is slidably connected to the inner wall of the assembly cavity. The limit column passes through the arc surface of the connecting plate and is plugged into the inner wall of the slot. The limit column is set. By inserting the limit column into the slot and limiting it, the state of the second pedal and the connecting plate can be limited, thereby ensuring that the second pedal is in the expanded state.

[0011] Preferably, there are two bayonet pins, which are symmetrically arranged with respect to the connecting plate. The bayonet pins are plugged into the inner wall of the slot. The bayonet pins are arranged so that the position of the limit slider can be restricted through the cooperation between the bayonet pin and the connecting plate, the fixing bolt and the slot, so that the limit slider can limit the position of the limit column.

[0012] Compared with the prior art, the advantages and positive effects of the utility model are:

[0013] In the utility model, by arranging a treading assembly and an auxiliary assembly, during construction, the hanging basket will be hung on the side of the bridge with the help of a bracket. After the placement of the hanging basket is completed, the construction workers can enter the hanging basket body to carry out the construction operation of the shielding baffle. When the construction workers need to install the shielding baffle at a high place, they pull the handle, and the handle is forced to pull the second pedal. The second pedal is forced and pulls the connecting plate under the guidance of the slide groove. The connecting plate pulls the first pedal under the action of the second pedal. The first pedal is forced and rotates under the constraint of the limiting sleeve. When the first pedal and the second pedal are fully unfolded, the fixing bolt is rotated counterclockwise, and the fixing bolt is gradually screwed out of the threaded groove. At the same time, the connecting plate pulls the latch pin out of the slot under the action of the fixing bolt. When the latch pin is out of the slot, the fixing bolt is pushed. The fixing bolt is forced to push the limiting sleeve. The limit slider and the limit column, the limit column is displaced by force and inserted into the slot. When the limit slider moves to the maximum spacing, the fixing bolt is rotated clockwise, and the fixing bolt is screwed into the threaded groove again. At the same time, the connecting plate pushes the pin into another slot under the action of the fixing bolt. When the fixing bolt is fully tightened, the connecting plate and the pin can be used to limit the position of the limit slider, and then the deployment operation of the pedal assembly is completed. When the pedal assembly is deployed, the construction personnel can stand on it to perform the installation operation above the shielding baffle. By setting the pedal assembly and the auxiliary assembly, the height of the internal platform of the hanging basket can be raised, thereby reducing the problem that the height of the internal platform of the hanging basket is fixed. When performing high-altitude operations, the construction personnel must climb on the bracket to operate, and the practicality of the hanging basket is further improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 The utility model provides a three-dimensional structural schematic diagram of a hanging basket for bridge construction;

[0015] Figure 2 The utility model provides a side view structural schematic diagram of a hanging basket for bridge construction;

[0016] Figure 3 A partial structural schematic diagram of a hanging basket for bridge construction is proposed for the utility model;

[0017] Figure 4 The utility model proposes a hanging basket for bridge construction Figure 3 Schematic diagram of the structure at point A in the middle.

[0018] Legend:

[0019] 1. Basket body; 2. Connecting frame; 3. Cable; 4. Hook; 5. Pedal assembly; 51. Limit sleeve; 52. First pedal; 53. Connecting plate; 54. Second pedal; 55. Handle; 56. Assembly cavity; 57. Slot; 6. Auxiliary assembly; 61. Limit slider; 62. Limit column; 63. Fixing bolt; 64. Connecting plate; 65. Pin; 66. Slot. DETAILED DESCRIPTION

[0020] See also Figure 1-4 The utility model provides a technical solution: a hanging basket for bridge construction, comprising a hanging basket body 1, a connecting frame 2 and a pedal assembly 5, the connecting frame 2 is fixedly connected to the upper surface of the hanging basket body 1, the inner wall of the connecting frame 2 is provided with a cable 3, the inner wall of the cable 3 is provided with a hook 4, the pedal assembly 5 is provided on the inner wall of the hanging basket body 1, and the second pedal 54 is located on the inner wall of the assembly cavity 56 and is provided with an auxiliary assembly 6.

[0021] The specific configuration and functions of the pedal assembly 5 and the auxiliary assembly 6 will be described in detail below.

[0022] In this embodiment: the pedal assembly 5 includes a limiting sleeve 51, a circular hole is opened on the side surface of the hanging basket body 1, the limiting sleeve 51 is fixedly connected to the inner wall of the circular hole, the inner wall of the limiting sleeve 51 is rotatably connected to the first pedal 52, an installation cavity is opened on the side surface of the first pedal 52, the first pedal 52 is located on the inner wall of the installation cavity and is rotatably connected to a connecting plate 53, and the surface of the connecting plate 53 is rotatably connected to a second pedal 54.

[0023] Specifically, a rotation groove is provided on the surface of the second pedal 54, and a handle 55 is rotatably connected to the inner wall of the rotation groove. An assembly cavity 56 is provided on the surface of the second pedal 54, and a slot 57 is provided on the inner wall of the first pedal 52 located in the installation cavity. A handle 55 is provided, and the handle 55 can be used for construction workers to hold it, thereby facilitating pulling the second pedal 54 to unfold.

[0024] Specifically, a slide groove is provided on the inner wall of the hanging basket body 1, and the second pedal 54 is slidably connected to the inner wall of the slide groove.

[0025] In this embodiment, a second pedal 54 is provided. Through the cooperation of the second pedal 54 with the first pedal 52 and the connecting plate 53, the second pedal 54 can be unfolded to provide a place for construction workers to stand.

[0026] Specifically, there are two assembly cavities 56 , and the two assembly cavities 56 are disposed symmetrically with respect to the second pedal 54 .

[0027] In this embodiment: the auxiliary component 6 includes a limit slider 61, which is slidably connected to the inner wall of the assembly cavity 56, and the side surface of the limit slider 61 is fixedly connected to the limit column 62. A threaded groove is provided on the surface of the limit slider 61, and the inner wall of the limit slider 61 located in the threaded groove is threadedly connected with a fixing bolt 63, the surface of the fixing bolt 63 is sleeved with a connecting plate 64 that is rotatably connected, and the surface of the connecting plate 64 is fixedly connected with a locking pin 65, and the surface of the second pedal 54 is provided with a locking groove 66.

[0028] In this embodiment, a limiting slider 61 is provided, through which the moving distance of the limiting column 62 can be limited, thereby ensuring that the limiting column 62 is in the assembly cavity 56 .

[0029] Specifically, there are two limit sliders 61, which are symmetrically arranged about the second pedal 54. The limit column 62 is slidably connected to the inner wall of the assembly cavity 56. The limit column 62 passes through the arc surface of the connecting plate 53. The limit column 62 is plugged into the inner wall of the slot 57. The limit column 62 is set. By inserting the limit column 62 into the slot 57 and limiting it, the state of the second pedal 54 and the connecting plate 53 can be limited, thereby ensuring that the second pedal 54 is in the expanded state.

[0030] Specifically, there are two latch pins 65 , which are disposed symmetrically with respect to the connecting plate 64 , and the latch pins 65 are plugged into the inner wall of the latch slot 66 .

[0031] In this embodiment, a latch 65 is provided, and the position of the limit slider 61 can be limited by the cooperation of the latch 65 with the connecting plate 64 , the fixing bolt 63 and the latch groove 66 , so that the limit slider 61 can limit the position of the limit column 62 .

[0032] Working principle: When the construction workers need to install the shielding shield at a high place, they pull the handle 55, and the handle 55 is forced to pull the second pedal 54, and the second pedal 54 is forced to pull the connecting plate 53 under the guidance of the slide groove, and the connecting plate 53 pulls the first pedal 52 under the action of the second pedal 54, and the first pedal 52 is forced to rotate under the constraint of the limiting sleeve 51. When the first pedal 52 and the second pedal 54 are fully unfolded, the fixing bolt 63 is rotated counterclockwise, and the fixing bolt 63 is gradually screwed out of the thread groove. At the same time, the connecting plate 64 pulls the bayonet 65 out of the slot 66 under the action of the fixing bolt 63. When the bayonet 65 is out of the slot 66, the fixing bolt 63 is pushed. The fixing bolt 63 is forced to push the limiting slider 61 and the limiting column 62, and the limiting column 62 is forced to move and insert into the slot 57. When the limiting When the positioning slider 61 moves to the maximum spacing, the fixing bolt 63 is rotated clockwise, and the fixing bolt 63 is screwed into the threaded groove again. At the same time, the connecting plate 64, under the action of the fixing bolt 63, pushes the pin 65 into another slot 66. When the fixing bolt 63 is fully tightened, the connecting plate 64 and the pin 65 can be used to limit the position of the limit slider 61, and then the deployment operation of the pedal assembly 5 is completed. When the pedal assembly 5 is deployed, the construction personnel can stand on it to perform the installation operation above the shielding plate. By setting the pedal assembly 5 and the auxiliary assembly 6, the height of the internal platform of the hanging basket can be raised, thereby reducing the problem that the height of the internal platform of the hanging basket is fixed, and the construction personnel must climb on the bracket to operate when performing high-altitude operations, and further improve the practicality of the hanging basket.

Claims

1. A hanging basket for bridge construction, comprising a hanging basket body (1), a connecting frame (2) and a pedal assembly (5), characterized in that: The connecting frame (2) is fixedly connected to the upper surface of the hanging basket body (1), the inner wall of the connecting frame (2) is provided with a cable (3), the inner wall of the cable (3) is provided with a hook (4), the pedal assembly (5) is arranged on the inner wall of the hanging basket body (1), the pedal assembly (5) comprises a limiting sleeve (51), a circular hole is provided on the side surface of the hanging basket body (1), the limiting sleeve (51) is fixedly connected to the inner wall of the circular hole, the inner wall of the limiting sleeve (51) is rotatably connected to a first pedal (52), the side surface of the first pedal (52) is provided with an installation cavity, the first pedal (52) is located on the inner wall of the installation cavity and is rotatably connected to a connecting plate (53), and the surface of the connecting plate (53) is rotatably connected to a second pedal (54).

2. A hanging basket for bridge construction according to claim 1, characterized in that: A rotation groove is provided on the surface of the second pedal (54), and a handle (55) is rotatably connected to the inner wall of the rotation groove of the second pedal (54). An assembly cavity (56) is provided on the surface of the second pedal (54), and a slot (57) is provided on the inner wall of the installation cavity of the first pedal (52).

3. A hanging basket for bridge construction according to claim 1, characterized in that: The inner wall of the hanging basket body (1) is provided with a slide groove, and the second pedal (54) is slidably connected to the inner wall of the slide groove.

4. A hanging basket for bridge construction according to claim 2, characterized in that: The number of the assembly cavities (56) is two, and the two assembly cavities (56) are arranged in a left-right symmetrical manner with respect to the second pedal (54).

5. The hanging basket for bridge construction according to claim 1, characterized in that: The second pedal (54) is provided with an auxiliary component (6) on the inner wall of the assembly cavity (56), and the auxiliary component (6) includes a limit slider (61), the limit slider (61) is slidably connected to the inner wall of the assembly cavity (56), the side surface of the limit slider (61) is fixedly connected to a limit column (62), the surface of the limit slider (61) is provided with a threaded groove, the inner wall of the limit slider (61) is threadedly connected to a fixing bolt (63), the surface of the fixing bolt (63) is sleeved with a connecting plate (64) rotatably connected, the surface of the connecting plate (64) is fixedly connected with a bayonet (65), and the surface of the second pedal (54) is provided with a bayonet groove (66).

6. A hanging basket for bridge construction according to claim 5, characterized in that: There are two limit sliders (61), which are symmetrically arranged with respect to the second pedal (54). The limit column (62) is slidably connected to the inner wall of the assembly cavity (56). The limit column (62) passes through the arc surface of the connecting plate (53), and the limit column (62) is plugged into the inner wall of the slot (57).

7. A hanging basket for bridge construction according to claim 5, characterized in that: There are two of the bayonet pins (65), which are disposed symmetrically with respect to the connecting plate (64). The bayonet pins (65) are plugged into the inner wall of the slot (66).

Citation Information

Cited By

  • Hanging basket suspension platform for high-rise building construction

    CN122358848A

  • Movable hanging basket device for bridge construction

    CN224031503U