Sampling system for hydraulic engineering foundation detection
By designing an automated sampling mechanism and collection mechanism, the problems of difficulty in drilling depth control in foundation inspection and inconvenient placement after sampling are solved, and efficient and accurate foundation sampling and placement are achieved.
Patent Information
- Application Number
- CN202420017398.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-04
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-01-04
AI Technical Summary
The sampling technology for existing water conservancy engineering foundation inspection requires manual operation, making it difficult to accurately control the drilling depth, and the foundation is inconvenient to place after sampling.
A system consisting of a sampling mechanism and a collection mechanism is designed. The sampling mechanism consists of a vertical rod, a top plate, an electro-hydraulic rod, a positioning plate, a motor, a sleeve and a clamp. The sampling tube is driven into the foundation through the electro-hydraulic rod and a motor drive sleeve. , and the sampled foundation is placed in the collection box through the collection mechanism.
Automatic foundation sampling and placement is realized, sampling accuracy and efficiency are improved, and complexity and errors of manual operations are reduced.
Smart Images

Figure CN222044140U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy project foundation sampling, in particular to a sampling system for water conservancy project foundation detection. Background Art
[0002] Water conservancy projects are projects built to control and allocate natural surface water and groundwater to achieve the purpose of eliminating harm and promoting benefits. They are also called water projects. Water is a valuable resource that is indispensable to human production and life. The existing sampling of foundation detection of water conservancy projects is generally done by staff using handheld drilling equipment to drill holes in the foundation to sample the soil. Staff need to manually hammer the sampling tube for sampling. When sampling, it is impossible to control the depth of the hole to be drilled according to the required situation, which has a certain impact on subsequent soil sampling and testing, and it is inconvenient to place the foundation after sampling. To this end, we propose a sampling system for foundation detection of water conservancy projects. Utility Model Content
[0003] In view of the problems in the prior art, the utility model provides a sampling system for detecting foundations of water conservancy projects.
[0004] The technical solution adopted by the utility model to solve its technical problems is a sampling system for foundation detection of water conservancy projects, comprising a base plate, a sampling mechanism installed at the top of the base plate, the sampling mechanism is composed of a vertical rod, a top plate, an electric hydraulic rod, a positioning plate, a motor, a sleeve, a threaded rod and a clamping plate combination, a group of symmetrical vertical rods are welded at the top of the base plate, a top plate is installed at the other end of the vertical rod, an electric hydraulic rod is installed at the top of the top plate by bolts, a positioning plate is installed at the output end of the electric hydraulic rod, and the vertical rod passes through the positioning plate, a motor is installed at the top of the positioning plate by bolts, a sleeve is installed at the output end of the motor, a group of symmetrical threaded rods are threadedly connected at the wall of the sleeve, and one end of a group of the threaded rods is connected to a clamping plate for extruding an external sampling tube through a bearing.
[0005] By adopting the above technical scheme, when sampling and testing the foundation of the water conservancy project, since a sampling mechanism is installed at the top of the bottom plate, the sampling mechanism is composed of a vertical rod, a top plate, an electric hydraulic rod, a positioning plate, a motor, a sleeve, a threaded rod and a clamping plate. After the personnel insert the external sampling tube into the sleeve, the personnel twist the threaded rod to make the threaded rod push the clamping plate, so that the clamping plate clamps and fixes the sampling tube. Since a group of symmetrical vertical rods are welded at the top of the bottom plate, and a top plate is welded at the other end of the vertical rod, since an electric hydraulic rod is installed at the top of the top plate by bolts, the electric hydraulic rod is controlled by a controller so that the electric hydraulic rod pushes the positioning plate to achieve quantitative transportation of the positioning plate, so that the positioning rod moves at the rod wall of the vertical rod, so that after the sampling tube is inserted into the foundation, since a motor is installed at the plate wall of the positioning plate by bolts, the sleeve is driven by the motor, so that the sleeve drives the sampling tube to rotate, so as to achieve sampling of the foundation in the water conservancy project.
[0006] Specifically, it also includes a collecting mechanism, and the collecting mechanism is installed at the top of the bottom plate.
[0007] By adopting the above technical solution, the sampled foundation can be placed through the collecting mechanism.
[0008] Specifically, the collecting mechanism is composed of a collecting box, a partition plate, a sealing plate and a locking buckle combination; a collecting box for placing sampling materials is fixedly installed on the top of the bottom plate; a sealing plate is connected to the box wall of the collecting box through a hinge; several groups of partition plates separating the collecting boxes are welded on the inner wall of the collecting box; a locking buckle connected to the sealing plate is installed on the box wall of the collecting box through bolts.
[0009] By adopting the above technical scheme, when placing the foundation in the water conservancy project, since a collecting mechanism is installed at the top of the bottom plate, the collecting mechanism is composed of a collecting box, a partition plate, a sealing plate and a lock combination. Since the collecting box is fixedly installed at the top of the bottom plate, after the personnel opens the lock, the sealing plate is opened. Since several groups of partition plates that separate the collecting boxes are welded on the inner wall of the collecting box, the sampled foundation can be placed in the collecting box, thereby realizing the collection and placement of the foundation.
[0010] Specifically, a controller for controlling the electric hydraulic rod and the motor is installed on the box wall of the collection box.
[0011] By adopting the above technical solution, the electric hydraulic rod and the motor can be conveniently controlled through the controller.
[0012] Specifically, a movable pulley is installed at the bottom of the base plate, and a push rod is welded at the wall of the base plate.
[0013] By adopting the above technical solution, the bottom plate can be conveniently moved through the pulley.
[0014] Beneficial effects of the utility model:
[0015] (1) The sampling system for foundation detection of water conservancy projects described in the utility model, when sampling and detecting the foundation of a water conservancy project, a sampling mechanism is installed at the top of the bottom plate, and the sampling mechanism is composed of a vertical rod, a top plate, an electric hydraulic rod, a positioning plate, a motor, a sleeve, a threaded rod and a clamping plate. After a person inserts an external sampling tube into the sleeve, the person twists the threaded rod so that the threaded rod pushes the clamping plate, so that the clamp clamps and fixes the sampling tube. A group of symmetrical vertical rods are welded at the top of the bottom plate, and a top plate is welded at the other end of the vertical rod. An electric hydraulic rod is installed at the top of the top plate by bolts. The controller controls the electric hydraulic rod so that the electric hydraulic rod pushes the positioning plate to achieve quantitative transportation of the positioning plate, so that the positioning rod moves at the rod wall of the vertical rod, so that after the sampling tube is inserted into the foundation, a motor is installed at the plate wall of the positioning plate by bolts, and the sleeve is driven by the motor, so that the sleeve drives the sampling tube to rotate, so as to achieve sampling of the foundation of the water conservancy project.
[0016] (2) The sampling system for detecting foundations of water conservancy projects described in the utility model, when placing the foundations in water conservancy projects, a collecting mechanism is installed at the top of the bottom plate, and the collecting mechanism is composed of a collecting box, a partition plate, a sealing plate and a lock. Since the collecting box is fixedly installed at the top of the bottom plate, after the personnel opens the lock, the sealing plate is opened. Since a plurality of partition plates for separating the collecting boxes are welded on the inner wall of the collecting box, the sampled foundation can be placed in the collecting box, thereby realizing the collection and placement of the foundation. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The utility model is further described below in conjunction with the accompanying drawings and embodiments.
[0018] Figure 1 It is the main figure of the utility model;
[0019] Figure 2 It is a schematic diagram of the sampling mechanism structure of the utility model;
[0020] Figure 3 This is a schematic diagram of the structure of the collection mechanism of the utility model;
[0021] In the figure: 1. bottom plate; 2. sampling mechanism; 201. vertical rod; 202. top plate; 203. electric hydraulic rod; 204. positioning plate; 205. motor; 206. sleeve; 207. threaded rod; 208. clamping plate; 3. pulley; 4. push rod; 5. controller; 6. collecting mechanism; 601. collecting box; 602. partition plate; 603. sealing plate; 604. lock. DETAILED DESCRIPTION
[0022] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.
[0023] As an embodiment of the present utility model, Figure 1 , Figure 2 and Figure 3 As shown, the sampling system for water conservancy engineering foundation detection described in the utility model comprises a bottom plate 1, a sampling mechanism 2 is installed at the top of the bottom plate 1, and the sampling mechanism 2 is composed of a vertical rod 201, a top plate 202, an electric hydraulic rod 203, a positioning plate 204, a motor 205, a sleeve 206, a threaded rod 207 and a clamping plate 208. A group of symmetrical vertical rods 201 are welded at the top of the bottom plate 1, and the other end of the vertical rod 201 is installed with a top plate 202. An electric hydraulic rod 203 is installed at the top of the plate by bolts, a positioning plate 204 is installed at the output end of the electric hydraulic rod 203, and the vertical rod 201 passes through the positioning plate 204, a motor 205 is installed at the top of the positioning plate 204 by bolts, a sleeve 206 is installed at the output end of the motor 205, a group of symmetrical threaded rods 207 are threadedly connected at the wall of the sleeve 206, and one end of the group of threaded rods 207 is connected to a clamping plate 208 for squeezing an external sampling tube through a bearing.
[0024] When in use, since a sampling mechanism 2 is installed at the top of the bottom plate 1, the sampling mechanism 2 is composed of a vertical rod 201, a top plate 202, an electric hydraulic rod 203, a positioning plate 204, a motor 205, a sleeve 206, a threaded rod 207 and a clamping plate 208. After the personnel insert the external sampling tube into the sleeve 206, the personnel twist the threaded rod 207 so that the threaded rod 207 pushes the clamping plate 208, so that the clamping plate 208 clamps and fixes the sampling tube. Since a group of symmetrical vertical rods 201 are welded at the top of the bottom plate 1, and the other end of the vertical rod 201 is welded with a top plate 202, since an electric hydraulic rod 203 is installed at the top of the top plate 202 by bolts, the electric hydraulic rod 203 is controlled by the controller 5, so that the electric hydraulic rod 203 pushes the positioning plate 204, thereby achieving quantitative transportation of the positioning plate 204, and the positioning rod moves at the rod wall of the vertical rod 201, so that after the sampling tube is inserted into the foundation, since a motor 205 is installed at the plate wall of the positioning plate 204 by bolts, the sleeve 206 is driven by the motor 205, so that the sleeve 206 drives the sampling tube to rotate, thereby achieving sampling of the foundation in the water conservancy project.
[0025] like Figure 1 As shown, a collecting mechanism 6 is also included, and the collecting mechanism 6 is installed at the top of the base plate 1.
[0026] When in use, the sampled foundation can be placed through the collecting mechanism 6 .
[0027] like Figure 1 and Figure 3 As shown, the collecting mechanism 6 is composed of a collecting box 601, a partition plate 602, a sealing plate 603 and a lock 604. The collecting box 601 for placing sampling materials is fixedly installed on the top of the bottom plate 1, and the sealing plate 603 is connected to the box wall of the collecting box 601 through a hinge. Several groups of partition plates 602 for separating the collecting boxes 601 are welded on the inner wall of the collecting box 601, and the lock 604 connected to the sealing plate 603 is installed on the box wall of the collecting box 601 through bolts.
[0028] When in use, since a collecting mechanism 6 is installed at the top of the base plate 1, the collecting mechanism 6 is composed of a collecting box 601, a partition plate 602, a sealing plate 603 and a lock 604. Since the collecting box 601 is fixedly installed at the top of the base plate 1, after the personnel opens the lock 604, the sealing plate 603 is opened. Since several groups of partition plates 602 that separate the collecting box 601 are welded on the inner wall of the collecting box 601, the sampled foundation is placed in the collecting box 601 to realize the collection and placement of the foundation.
[0029] like Figure 1 As shown, a controller 5 for controlling the electric hydraulic rod 203 and the motor 205 is installed on the box wall of the collection box 601 .
[0030] When in use, the electric hydraulic rod 203 and the motor 205 are conveniently controlled through the controller 5 .
[0031] like Figure 1 As shown, a movable pulley 3 is installed at the bottom of the base plate 1, and a push rod 4 is welded at the wall of the base plate 1.
[0032] When in use, the pulley 3 facilitates the movement of the base plate 1 .
[0033] When the utility model is in use, when sampling and testing the foundation of a water conservancy project, since a sampling mechanism 2 is installed at the top of the bottom plate 1, and the sampling mechanism 2 is composed of a vertical rod 201, a top plate 202, an electric hydraulic rod 203, a positioning plate 204, a motor 205, a sleeve 206, a threaded rod 207 and a clamping plate 208, after a person inserts an external sampling tube into the sleeve 206, the person twists the threaded rod 207 so that the threaded rod 207 pushes the clamping plate 208, so that the clamping plate 208 clamps and fixes the sampling tube, since a group of symmetrical vertical rods 201 are welded at the top of the bottom plate 1, and the other end of the vertical rods 201 is welded with the top plate 202, and since an electric hydraulic rod 203 is installed at the top of the top plate 202 by bolts, the electric hydraulic rod 203 is controlled by the controller 5 so that the electric hydraulic rod 203 pushes the positioning plate 204, so as to realize the positioning plate 204. Quantitative conveying is performed so that the positioning rod moves at the rod wall of the vertical rod 201, so that after the sampling tube is inserted into the foundation, since the plate wall of the positioning plate 204 is installed with a motor 205 by bolts, the sleeve 206 is driven by the motor 205, so that the sleeve 206 drives the sampling tube to rotate, so as to sample the foundation in the water conservancy project. When placing the foundation in the water conservancy project, since a collecting mechanism 6 is installed at the top of the bottom plate 1, the collecting mechanism 6 is composed of a collecting box 601, a partition plate 602, a sealing plate 603 and a lock 604. Since the collecting box 601 is fixedly installed at the top of the bottom plate 1, after the personnel opens the lock 604, the sealing plate 603 is opened. Since a plurality of groups of partition plates 602 for separating the collecting box 601 are welded at the inner wall of the collecting box 601, the sampled foundation is placed in the collecting box 601, so as to collect and place the foundation.
[0034] The above shows and describes the basic principles, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions in the specification are only to illustrate the principles of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the protection required by the utility model. The scope of protection required by the utility model is defined by the attached claims and their equivalents.
Claims
1. A sampling system for water conservancy project foundation detection, characterized by: The invention comprises a bottom plate (1), a sampling mechanism (2) is installed at the top of the bottom plate (1), the sampling mechanism (2) is composed of a vertical rod (201), a top plate (202), an electric hydraulic rod (203), a positioning plate (204), a motor (205), a sleeve (206), a threaded rod (207) and a clamping plate (208), a group of symmetrical vertical rods (201) are welded at the top of the bottom plate (1), the other end of the vertical rods (201) is installed with a top plate (202), and the top of the top plate (202) is fixed by bolts. An electric hydraulic rod (203) is installed, a positioning plate (204) is installed at the output end of the electric hydraulic rod (203), and the vertical rod (201) passes through the positioning plate (204), a motor (205) is installed at the top of the positioning plate (204) by bolts, a sleeve (206) is installed at the output end of the motor (205), a group of symmetrical threaded rods (207) are threadedly connected at the wall of the sleeve (206), and one end of the group of threaded rods (207) is connected to a clamping plate (208) for squeezing an external sampling tube through a bearing.
2. The sampling system for water conservancy project foundation detection according to claim 1 is characterized in that: It also comprises a collecting mechanism (6), and the collecting mechanism (6) is installed at the top of the base plate (1).
3. The sampling system for water conservancy project foundation detection according to claim 2 is characterized in that: The collecting mechanism (6) is composed of a collecting box (601), a partition plate (602), a sealing plate (603) and a lock (604). The collecting box (601) for placing the sampled material is fixedly installed on the top of the bottom plate (1). The sealing plate (603) is connected to the wall of the collecting box (601) via a hinge. A plurality of groups of partition plates (602) for separating the collecting boxes (601) are welded to the inner wall of the collecting box (601). The lock (604) connected to the sealing plate (603) is installed on the wall of the collecting box (601) via bolts.
4. The sampling system for water conservancy project foundation detection according to claim 3 is characterized in that: A controller (5) for controlling the electric hydraulic rod (203) and the motor (205) is installed on the box wall of the collection box (601).
5. The sampling system for water conservancy project foundation detection according to claim 1 is characterized in that: A movable pulley (3) is installed at the bottom of the base plate (1), and a push rod (4) is welded at the wall of the base plate (1).
Citation Information
Cited By
Sampling system for hydraulic engineering foundation detection
CN224317337U
