Partially prefabricated assembly type high pile cap joint connecting structure

By leaving holes on steel pipe piles on the offshore high pile bearing foundation and inserting shear nails, combining radial and circumferential steel bars, the problem of insufficient adhesion in traditional connecting structures is solved, and the shear resistance and construction efficiency are improved , suitable for high pile bearing connections in offshore wind farms.

CN222044255UActive Publication Date: 2024-11-22POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323542780.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-25
Publication Date
2024-11-22
Estimated Expiration
2033-12-25

AI Technical Summary

Technical Problem

The lack of bonding force of the traditional offshore high pile bearing foundation at the connection between steel pipe piles and bottom seal concrete leads to structural instability, and increasing steel bars to improve bonding will increase costs and construction complexity.

Method used

The node connection structure of some prefabricated high pile bearings is adopted. By leaving holes on the steel pipe piles and inserting shear nails, combining radial and circumferential steel bars, the bonding force between the steel pipe piles and concrete is improved, and Reduce the connection through welding to reduce the amount of steel bars.

Benefits of technology

It improves the shear bearing capacity of the foundation, reduces the total amount of steel bars and construction complexity, and achieves safe, economical and efficient connections, and is suitable for offshore wind farm construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222044255U_ABST
    Figure CN222044255U_ABST
Patent Text Reader

Abstract

The utility model provides a partially prefabricated assembly type high pile cap joint connecting structure. The partially prefabricated assembly type high pile cap joint connecting structure comprises a second-stage cast-in-place cap, first-stage prefabricated bottom sealing concrete, a steel pipe pile, radial steel bars and annular steel bars. The connecting structure further comprises steel pipe pile body shear nails. The shear nails are welded to the periphery and the top of the end, inserted into the reserved hole, of the steel pipe pile in a welded mode, the cohesiveness of the steel pipe pile, the second-stage cast-in-place bearing platform and the first-stage prefabricated bottom sealing concrete is improved, the foundation structure is firmer, and the using amount of radial steel bars and annular steel bars is reduced. The shear resistance of the shear nails is fully utilized to resist relative sliding and vertical separation at the interface of the steel pipe pile and the concrete generated in the operation of the fan, so that the binding operation time of the offshore pile and the bearing platform connecting steel bar is shortened, the total amount and cost of the steel bar are reduced, and the shear resistance and the construction efficiency of the foundation structure are improved. And the economical efficiency and the safety are remarkably improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of offshore wind farm foundation structure design, in particular to a partially prefabricated assembled high pile cap node connection structure. Background Art

[0002] At present, offshore high pile cap foundation has been widely used in offshore wind farm construction, which has significant advantages such as safety and economy. Offshore high pile cap foundation is usually composed of foundation piles and cap. The foundation piles are generally inclined steel pipe piles. The cap includes cast-in-place and prefabricated caps. The prefabricated cap has the advantages of convenient construction and shortened construction period. The prefabricated high pile cap includes two parts: prefabricated bottom concrete and cast-in-place reinforced concrete structure.

[0003] The deadweight of cast-in-place reinforced concrete structures and steel hanging boxes is mainly borne by the bonding force between prefabricated bottom concrete and steel pipe piles. When the bonding force is less than the deadweight, the high pile cap foundation will become unstable or even destroyed. Therefore, in this type of structure, the connection between the steel pipe piles and the bottom concrete is the focus and difficulty in the design. In the traditional design, the bonding force between the steel pipe piles and the concrete is increased at this node by adding steel bars around the steel pipe piles as shear members. However, the total amount of shear steel bars is large, the cost is high, and the steel bars are densely arranged, which has a great impact on subsequent construction and requires large offshore equipment for construction. Therefore, from the perspective of safety and economy, it is very necessary to develop a new type of partially prefabricated assembled high pile cap node connection structure. Utility Model Content

[0004] The purpose of the utility model is to propose a partially prefabricated high pile cap node connection structure for the offshore prefabricated high pile cap foundation structure, which can reduce the steel consumption of the connection structure while ensuring the shear resistance. To this end, the utility model adopts the following technical solutions:

[0005] A partially prefabricated assembled high pile cap node connection structure, comprising a second-phase cast-in-place cap, a first-phase prefabricated bottom concrete, steel pipe piles, radial steel bars and annular steel bars; the first-phase prefabricated bottom concrete is a land-based prefabricated part, which is provided with a plurality of reserved holes adapted to the steel pipe piles; the steel pipe piles are inserted into the reserved holes, and the load borne by the foundation is transferred to the foundation through the connection between the pile end and the side wall and the concrete;

[0006] The invention is characterized in that: the radial steel bars and the annular steel bars are connecting components between the steel pipe pile and the prefabricated bottom concrete and the cast-in-place concrete cap, so as to improve the bonding force between the steel pipe pile and the concrete; the connecting structure also includes shear nails for the steel pipe pile body;

[0007] The shear nails of the steel pipe pile body are structures that strengthen the connection between the steel pipe pile and the foundation concrete. The shear nails are welded to the periphery and top of the end of the steel pipe pile inserted into the reserved hole by welding, thereby improving the adhesion between the steel pipe pile and the second-phase cast-in-place pedestal and the first-phase prefabricated bottom sealing concrete, making the foundation structure stronger and reducing the use of radial steel bars and annular steel bars.

[0008] The shear nail is a bolt with a convex head on the head, the end of the bolt rod is welded to the surface of the steel pipe pile, and the convex head is buried in the concrete of the inner wall of the reserved hole.

[0009] The utility model proposes a partially prefabricated assembled high pile cap node connection structure, which can be applied to the high pile cap structure of a newly built wind farm, solving the problems faced by the foundation of a newly built wind farm, such as equipment and transportation restrictions, dense steel bar arrangement, and low construction efficiency.

[0010] The utility model is used for the connection part between the pile top and the pedestal. The utility model adopts shear nails as shear-resistant connecting parts, and fully utilizes the shear resistance of the shear nails. The shear nails are pre-buried at the junction of the bottom concrete and the steel pipe piles, and the shear nails are welded around the steel pipe piles, so that the prefabricated bottom concrete and the steel pipe piles form a whole. Under the premise of convenient construction, the shear bearing capacity of the foundation is improved, and the influence on subsequent construction is reduced. Moreover, the on-site welding construction of the shear nails can be completed by small construction equipment, which is safe, efficient, convenient and economical.

[0011] The utility model makes full use of the shear resistance of the shear nails to resist the relative sliding and vertical separation at the interface of the steel pipe pile and the concrete generated during the operation of the wind turbine, reduces the time for binding the steel bars connecting the offshore pile and the cap, reduces the total amount and cost of the steel bars, and improves the shear resistance and construction efficiency of the foundation structure. It has made significant improvements in economy and safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a partial elevation view of the prefabricated assembled high pile cap provided by the utility model;

[0013] Figure 2 It is a three-dimensional diagram of the first phase prefabricated bottom concrete provided by the utility model;

[0014] Figure 3 This is a vertical view of the shear stud connection arrangement provided by the utility model;

[0015] Figure 4 It is a plan view of a partially prefabricated assembled high pile cap provided by the utility model;

[0016] Figure 5 It is a plan view of the shear stud connection arrangement provided by the utility model;

[0017] Figure 6 It is a three-dimensional diagram of the binding connection of the annular steel bars and radial steel bars provided by the utility model;

[0018] 1. Prefabricated bottom concrete for the first phase, 2. Cast-in-place cap for the second phase, 3. Steel pipe piles, 4. Anchor bolts, 5. Tower, 6. Radial steel bars, 7. Circumferential steel bars, 8. Shear nails for steel pipe piles, 21. Reserved holes. DETAILED DESCRIPTION

[0019] The preferred embodiments of the present invention are described in detail below in conjunction with the accompanying drawings so that the advantages and features of the present invention can be more easily understood by those skilled in the art, thereby making a clearer and more definite definition of the protection scope of the present invention.

[0020] First, the utility model is described in combination with the construction process of the utility model, which is applicable to the node connection structure of the partially prefabricated assembled high pile cap, specifically:

[0021] The first step is to determine the foundation diameter and the number and length of the steel pipe piles 3 based on the wind farm site survey report;

[0022] The second step is the construction of the first-phase prefabricated bottom concrete 1. The onshore prefabrication method is adopted to reserve a reserved hole 21 adapted to the steel pipe pile 3, and at the same time reserve radial steel bars 6 around the hole, the radial steel bars 6 extend out of the reserved hole 21, and the length of the radial steel bars 6 matches the thickness of the cap along the axis of the steel pipe pile.

[0023] The third step is shear nail welding. Weld a number of shear nails 8 to the node sections where the steel pipe pile 3 is inserted into the cap to enhance the bonding performance between the steel pipe pile 3 and the cap foundation;

[0024] Step 4: Install the first-stage prefabricated bottom concrete 1. Through the hoisting construction, the steel pipe pile is inserted into the first-stage prefabricated bottom concrete 1 through the reserved hole 21, and the first-stage prefabricated bottom concrete 1 is exposed at the upper end;

[0025] The fifth step is the binding construction of radial reinforcement 6 and annular reinforcement 7.

[0026] Step 6: Construction of anchor bolt 4. The lower end of the anchor bolt is connected to the second-phase cast-in-place cap via a connector, which includes a lower anchor plate, a support stud, and a support base plate. The lower end of the anchor bolt is fixed by the lower anchor plate, and a support stud and a support base plate are set at the lower end of the lower anchor plate. The support base plate is located on the top of the first-phase concrete. The upper end of the anchor bolt is exposed from the top of the second-phase cast-in-place cap; the anchor bolt is used to connect the top of the cap with the wind turbine tower 5; the tower 5 plays a supporting role in the wind turbine generator set;

[0027] Step 7: Construction of the second phase cast-in-place cap 2. This part of the construction includes the cap reinforcement binding and concrete pouring.

[0028] Step 8: Tower hoisting and installation.

[0029] The utility model focuses on the key node connection structure of the prefabricated assembled high pile cap, and does not describe the internal reinforcement of the cast-in-place concrete cap in detail, which is the existing technology.

[0030] The above embodiment is only a preferred technical solution of the present invention. Those skilled in the art should understand that the technical solutions or parameters in the embodiments can be modified or replaced without departing from the principle and essence of the present invention, and all should be included in the protection scope of the present invention.

Claims

1. A partially prefabricated assembled high pile cap node connection structure, comprising a second-phase cast-in-place cap, a first-phase prefabricated bottom concrete, steel pipe piles, radial steel bars and annular steel bars; the first-phase prefabricated bottom concrete is a land-based prefabricated part, which is provided with a number of reserved holes adapted to the steel pipe piles; the steel pipe piles are inserted into the reserved holes, and the load borne by the foundation is transferred to the foundation through the connection between the pile end and the side wall and the concrete; Features: The radial steel bars and the annular steel bars are connecting components between the steel pipe pile and the prefabricated bottom concrete and the cast-in-place concrete cap, which improve the bonding force between the steel pipe pile and the concrete; the connecting structure also includes shear nails for the steel pipe pile body; The shear nails of the steel pipe pile body are structures that strengthen the connection between the steel pipe pile and the foundation concrete. The shear nails are welded to the periphery and top of the end of the steel pipe pile inserted into the reserved hole by welding, thereby improving the adhesion between the steel pipe pile and the second-phase cast-in-place pedestal and the first-phase prefabricated bottom sealing concrete, making the foundation structure stronger and reducing the use of radial steel bars and annular steel bars.

2. A partially prefabricated high pile cap node connection structure as claimed in claim 1, Features The shear nail is a bolt with a convex head on the head, the end of the bolt rod is welded to the surface of the steel pipe pile, and the convex head is buried in the concrete of the inner wall of the reserved hole.