Positioning device for cast-in-place pile of fan foundation
By using positioning rods and positioning ropes to form an isosceles triangle structure based on the fan, the positioning process of cast-injected piles in the fan foundation is simplified, the complex and cumbersome problems of traditional construction are solved, and the rapid and accurate positioning of cast-injected piles is achieved, saving time and cost.
Patent Information
- Application Number
- CN202420476860.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-12
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-03-12
AI Technical Summary
The construction procedures for the positioning of the cast-injected piles in the traditional fan foundation are complicated and cumbersome, and take a lot of time.
The fan-based cast-injected pile positioning device including a positioning rod and a positioning rope is adopted. The central positioning rod and annular positioning rod are used to form an isosceles triangle structure, and the positioning and line laying process is simplified.
It simplifies positioning and line laying construction, saves construction time, improves positioning accuracy, reduces production and installation costs, meets the precise requirements of the construction location of the cast-injected piles, and can be reused.
Smart Images

Figure CN222044296U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of cast-in-place pile construction, in particular to a fan foundation cast-in-place pile positioning device. Background Art
[0002] The wind turbine foundation is a key component supporting the entire wind turbine generator set. Its strength and stability directly affect the operating efficiency and life of the wind turbine. Currently, most wind power projects are located in plateau areas. In order to improve the stability and bearing capacity of the wind turbine foundation, reduce the impact of the natural environment and external forces on the wind turbine, and ensure its safe operation, pile foundations are often used. The pile groups in the pile foundation need to evenly bear the bearing capacity, so the piles are evenly distributed.
[0003] Under traditional technology, the use of GPS positioning and layout work requires multiple measurements and the construction process is complicated and cumbersome. Therefore, there is an urgent need for a wind turbine foundation cast-in-place pile positioning device to solve the problems of the cast-in-place pile positioning and layout construction process being complicated and cumbersome and requiring a lot of time. Utility Model Content
[0004] In order to solve the above problems, the utility model provides a fan foundation cast-in-place pile positioning device.
[0005] The technical solution adopted by the utility model is:
[0006] A wind turbine foundation bored pile positioning device, the wind turbine foundation bored pile positioning device comprises a positioning rod and a positioning rope; the positioning rod comprises a central positioning rod and a first annular positioning rod; the positioning rope comprises a first radius positioning rope and a spacing control positioning rope; the central positioning rod is inserted at the center point of the wind turbine foundation ground, a plurality of first annular positioning rods are inserted annularly on the wind turbine foundation ground with equal spacing around the central positioning rod as the center, each first annular positioning rod is connected to the central positioning rod by a first radius positioning rope, and adjacent first annular positioning rods are connected by a spacing control positioning rope; any two adjacent first annular positioning rods and the central positioning rod form an isosceles triangle structure by two first radius positioning ropes and a spacing control positioning rope, the central positioning rod insertion position is the initial pile position of the bored pile, and the first annular positioning rod insertion position is the bored pile construction position.
[0007] Furthermore, the positioning rod also includes a second annular positioning rod; the positioning rope also includes a second radius positioning rope; a plurality of second annular positioning rods are circumferentially inserted on the ground of the wind turbine foundation with equal intervals around the central positioning rod as the center, each second annular positioning rod is connected to the central positioning rod through a second radius positioning rope, the length of the second radius positioning rope is greater than the length of the first radius positioning rope, the distance between adjacent second annular positioning rods is controlled by a spacing control positioning rope, and any two second annular positioning rods and the central positioning rod form an isosceles triangle structure through two second radius positioning ropes and a spacing control positioning rope.
[0008] Furthermore, the central positioning rod, the first annular positioning rod and the second annular positioning rod are all cylindrical rod structures, and the central positioning rod, the first annular positioning rod and the second annular positioning rod are all provided with grooves for facilitating the hanging of the positioning rope.
[0009] Furthermore, one end of the first radius positioning rope is hung on the central positioning rod, and the other end is hung on the first circumferential positioning rod; one end of the second radius positioning rope is hung on the central positioning rod, and the other end is hung on the second circumferential positioning rod; both ends of the spacing control positioning rope are respectively hung on two adjacent first circumferential positioning rods or two second circumferential positioning rods.
[0010] The beneficial effects of the utility model are:
[0011] The wind turbine foundation bored pile positioning device takes the corresponding length of radius positioning rope and spacing control positioning rope according to the center distance between the wind turbine foundation and the bored pile and the center distance between adjacent bored piles; through the triangle principle, when the length of the three sides of the triangle and the position of two points are known, the third point, i.e. the position of the adjacent circumferential positioning rod, is determined, and the operation is repeated to determine the positions of all circumferential positioning rods. After the positions of all circumferential positioning rods are determined, the positions of the circumferential positioning rods are the construction positions of all bored piles. Compared with the existing GPS positioning and laying out, the wind turbine foundation bored pile positioning device does not require multiple measurements and positioning, simplifies the positioning and laying out construction, and thus saves construction time; the device is simple and low in manufacturing cost, easy to install and disassemble, fast in positioning and high in precision, meets the requirements of accurate construction position of bored piles, and can be reused. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 This is a schematic diagram of the overall structure of the wind turbine foundation cast-in-place pile positioning device;
[0013] Figure 1 Among them, 1 is the center positioning rod, 2 is the first annular positioning rod, 3 is the first radius positioning rope, 4 is the spacing control positioning rope, 5 is the second annular positioning rod, 6 is the second radius positioning rope, 7 is the trough body, and 8 is the foundation ground of the wind turbine. DETAILED DESCRIPTION
[0014] The following will be combined with the drawings of the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0015] This embodiment provides a fan foundation cast-in-place pile positioning device, such as Figure 1As shown, the wind turbine foundation cast-in-place pile positioning device includes a positioning rod and a positioning rope. The positioning rod includes a central positioning rod 1 and a first annular positioning rod 2. Both the central positioning rod 1 and the first annular positioning rod 2 are cylindrical rod structures, and both the central positioning rod 1 and the first annular positioning rod 2 are provided with a slot body 7 for tying the positioning rope. The central positioning rod 1 is inserted at the center point of the wind turbine foundation ground 8. The insertion position of the central positioning rod 1 is the initial pile position of the cast-in-place pile. Six first annular positioning rods 2 are inserted in annular fashion on the wind turbine foundation ground 8 with equal spacing around the central positioning rod 1. The insertion positions of the six first annular positioning rods 2 are the construction positions of the cast-in-place piles. The insertion positions of the six first annular positioning rods 2 need to be determined according to the positioning rope. The positioning rope includes a first radius positioning rope 3 and a spacing control positioning rope 4. One end of the first radius positioning rope 3 is tied to the central positioning rod 1, and the other end is tied to the first annular positioning rod 2. The two ends of the spacing control positioning rope 4 are respectively tied to two adjacent first annular positioning rods 2. The length of the first radius positioning rope 3 is determined according to the center distance between the wind turbine foundation and the cast-in-place piles, and the length of the spacing control positioning rope 4 is determined according to the required center distance between adjacent cast-in-place piles.
[0016] An isosceles triangle structure is formed between any two adjacent first annular positioning rods 2 and the central positioning rod 1 through two first radius positioning ropes 3 and one spacing control positioning rope 4; according to the triangle principle, when the lengths of the three sides of the triangle, i.e., the lengths of the two first radius positioning ropes 3 and one spacing control positioning rope 4, and the two point positions of the triangle, i.e., the insertion positions of the central positioning rod 1 and any first annular positioning rod 2 are known, the third point position of the triangle, i.e., the insertion positions of the adjacent first annular positioning rods 2, can be determined; repeating the operation can determine the insertion positions of all annular positioning rods, i.e., all cast-in-place pile construction positions.
[0017] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, such as:
[0018] like Figure 1As shown, the positioning rod in this embodiment may also include a second annular positioning rod 5; the positioning rope may also include a second radius positioning rope 6, and the second annular positioning rod 5 is also a cylindrical rod body structure, and is provided with a groove body 7 for facilitating the hanging of the positioning rope; the length of the second radius positioning rope is greater than the length of the first radius positioning rope 3, and the length of the second radius positioning rope 6 is determined according to the center distance between the wind turbine foundation and the bored pile, and one end of the second radius positioning rope 6 is hung on the center positioning rod 1, and the other end is hung on the second annular positioning rod 5; similarly, according to the triangle principle, when the lengths of the three sides of the triangle and the positions of two points are known, the third point, that is, the insertion position of the adjacent second annular positioning rod 5 is determined, and the operation is repeated to determine the positions of all second annular positioning rods 5, and the insertion positions of all first annular positioning rods 2 and second annular positioning rods 5 are the construction positions of all bored piles.
[0019] Compared with GPS positioning and laying out work, the wind turbine foundation cast-in-place pile positioning device does not require multiple measurements and positioning, which simplifies the positioning and laying out construction, thereby saving construction time; the device is simple to manufacture and can be made from local materials at the construction site, with low manufacturing costs and easy installation and disassembly. Determining the construction position of the cast-in-place pile by using the wind turbine foundation cast-in-place pile positioning device can meet the requirements for the precise construction position of the cast-in-place pile, and the wind turbine foundation cast-in-place pile positioning device can be reused.
[0020] The utility model may also have various changes and improvements, which all fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.
Claims
1. A fan foundation cast-in-place pile positioning device, characterized in that: The wind turbine foundation cast-in-place pile positioning device includes a positioning rod and a positioning rope; the positioning rod includes a central positioning rod and a first annular positioning rod; the positioning rope includes a first radius positioning rope and a spacing control positioning rope; the central positioning rod is inserted at the center point of the wind turbine foundation ground, and a plurality of first annular positioning rods are inserted annularly on the wind turbine foundation ground with equal spacing around the central positioning rod as the center, each first annular positioning rod is connected to the central positioning rod by a first radius positioning rope, and adjacent first annular positioning rods are connected by a spacing control positioning rope; any two adjacent first annular positioning rods and the central positioning rod form an isosceles triangle structure through two first radius positioning ropes and a spacing control positioning rope, the insertion position of the central positioning rod is the initial pile position of the cast-in-place pile, and the insertion position of the first annular positioning rod is the cast-in-place pile construction position.
2. The wind turbine foundation cast-in-place pile positioning device according to claim 1, characterized in that: The positioning rod also includes a second annular positioning rod; the positioning rope also includes a second radius positioning rope; a plurality of second annular positioning rods are inserted in annular arrangement at equal intervals on the ground of the wind turbine foundation with the central positioning rod as the center, each second annular positioning rod is connected to the central positioning rod by a second radius positioning rope, the length of the second radius positioning rope is greater than the length of the first radius positioning rope, the distance between adjacent second annular positioning rods is controlled by a spacing control positioning rope, and any two second annular positioning rods and the central positioning rod form an isosceles triangle structure through two second radius positioning ropes and a spacing control positioning rope.
3. The wind turbine foundation cast-in-place pile positioning device according to claim 1 or 2, characterized in that: The central positioning rod, the first annular positioning rod and the second annular positioning rod are all cylindrical rod structures, and the central positioning rod, the first annular positioning rod and the second annular positioning rod are all provided with grooves for tying the positioning rope.
4. The wind turbine foundation cast-in-place pile positioning device according to claim 2, characterized in that: One end of the first radius positioning rope is hung on the central positioning rod, and the other end is hung on the first circumferential positioning rod; one end of the second radius positioning rope is hung on the central positioning rod, and the other end is hung on the second circumferential positioning rod; the two ends of the spacing control positioning rope are respectively hung on two adjacent first circumferential positioning rods or two second circumferential positioning rods.