Wall surface slicking device for constructional engineering
By designing an automated construction project wall scraper, the automatic adjustment of scrapers and centralized collection of cement is achieved by using lifting and adjusting components, which solves the problems of manual scraping and cement waste in the prior art, and improves the scraping efficiency and practicality.
Patent Information
- Application Number
- CN202323372199.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-12
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2033-12-12
AI Technical Summary
The existing wall scraping device for construction projects is laborious and wastes cement by manual operation, and cannot effectively scrape it from the bottom, causing the cement to fall directly to the ground, causing waste and pollution.
A construction wall scraper including a support table, lifting assembly and adjustment assembly is designed. Through the motor drive gear and rack, the automatic adjustment and directional movement of the scraper is realized, and the scraper is collected and removed in the storage tank. cement.
It improves the automation and efficiency of the scraper process, avoids scraper lag, realizes centralized collection of cement, reduces labor intensity and waste, and enhances the practicality of the device.
Smart Images

Figure CN222044906U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction engineering, and more specifically, to a wall scraper for construction engineering. Background Art
[0002] Plastering is a traditional decorative project that uses mortar to apply on the walls, floors, ceilings, and surfaces of buildings. In some areas of my country, it is also called "powdering" or "painting". Specifically, it is a systematic construction process in which plastering mortar is applied on the surface of the base material, which has the function of protecting the base and increasing the beauty, and providing special functions for the building. Some wall scraping devices are mostly scraped manually when scraping the wall surface, which is time-consuming and labor-intensive. Some devices cannot plaster from the bottom upwards, and the excess cement slurry will be directly scraped onto the ground, wasting a lot of cement slurry, causing unnecessary waste, and lack of a collection structure. Therefore, those skilled in the art provide a construction engineering wall scraper to solve the problems raised in the above background technology.
[0003] The existing wall scraping device for construction projects scrapes the wall manually, which is laborious and costly to operate. At the same time, the scraped cement falls directly to the ground, causing waste and polluting the ground. It is very inconvenient to use. To solve the above problems, we have launched the following device. Utility Model Content
[0004] Technical issues to be solved
[0005] In view of the deficiencies in the prior art, the utility model aims to provide a wall scraper for construction engineering, which has the characteristics of automatically scraping the wall and centrally collecting the scraped cement.
[0006] Technical Solution
[0007] To achieve the above-mentioned purpose, the utility model provides a wall scraper for construction projects, including a support platform, a lifting assembly and an adjusting assembly, the lifting assembly is fixedly connected to the upper surface of the support platform, the adjusting assembly is arranged on the side of the lifting platform, the side of the adjusting assembly is fixedly connected with a storage groove, the side of the storage groove is fixedly connected with a scraper, the lifting assembly includes a support column, the support column is fixedly connected to the upper surface of the support platform, the side of the support column is provided with a movable frame, the side of the movable frame is fixedly connected with a motor, the other end of the output shaft of the motor is fixedly connected with a gear, the surface of the movable frame is provided with a movable groove, the gear is inserted in the movable groove, the side of the support column is fixedly connected with a rack, and the gear is meshed with the rack.
[0008] When a wall scraper for a construction project using the technical solution is used, a lifting component is set up. When people need to scrape the wall, they only need to control the motor through the control switch to drive the gear to rotate. With the cooperation of the gear and the rack, it is convenient for people to adjust the position of the scraper, thereby driving the scraper to scrape the wall at the designated position. At the same time, with the cooperation of the sliding rod and the sliding sleeve, the movable frame carrying the scraper can be moved in a directional manner to avoid the scraper from getting stuck during the movement, thereby improving the practicality of the device.
[0009] Furthermore, a sliding rod is fixedly connected to the side of the support column, a sliding sleeve is fixedly connected to the inner wall of the movable frame, the sliding sleeve is slidably connected to the surface of the sliding rod, and there are two groups of sliding rods and sliding sleeves, which are symmetrically arranged on the side of the support column.
[0010] Furthermore, the adjustment component includes a fixed platform, the fixed platform is fixedly connected to the side of the movable frame, the side of the fixed platform is fixedly connected to an electric push rod, the other end of the electric push rod is fixedly connected to a support arm, and the storage slot is fixedly connected to the side of the support arm.
[0011] Furthermore, a limit rod is fixedly connected to the side of the fixed platform, a limit ring is fixedly connected to the side of the support arm, the limit rod is passed through the limit ring, the other end of the limit rod is fixedly connected to the limit block, the limit ring and the limit rod each have two groups, and are symmetrically arranged on both sides of the support arm.
[0012] Furthermore, a door is movably connected to the side of the storage slot via a hinge, and a handle is fixedly connected to the side of the door.
[0013] Furthermore, a handle is fixedly connected to the upper surface of the support platform.
[0014] Furthermore, a wheel group is fixedly connected to the lower surface of the support platform, and brake pads are arranged on the sides of the wheel group. There are four wheel groups in total, and they are arranged in a rectangular shape at the lower end of the support platform.
[0015] Furthermore, a battery is fixedly connected to the lower surface of the support platform, and a control switch is fixedly connected to the side surface of the support platform.
[0016] Beneficial Effects
[0017] In summary, the utility model has the following beneficial effects:
[0018] 1. The wall scraper for construction engineering is provided with a lifting assembly. When people need to scrape the wall, they only need to control the motor through the control switch to drive the gear to rotate. With the cooperation of the gear and the rack, it is convenient for people to adjust the position of the scraper, thereby driving the scraper to scrape the wall at the designated position. At the same time, with the cooperation of the slide rod and the slide sleeve, the movable frame carrying the scraper can be moved in a directional manner to avoid the scraper from getting stuck during the movement, thereby improving the practicality of the device.
[0019] 2. This kind of construction engineering wall scraper is provided with an adjustment component. When people need to adjust the horizontal position of the scraper, they only need to control the electric push rod through the control switch to drive the support arm carrying the scraper to move. When the scraper overlaps the wall, people only need to control the electric push rod to stop operating through the control switch;
[0020] 3. The wall scraper for construction projects is provided with a storage trough. Under the action of the storage trough, cement scraped off by the scraper on the wall can fall into the storage trough for centralized collection, thereby preventing cement from falling on the ground and increasing people's work pressure, thereby improving the practicability of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the specific implementation of the utility model or the technical solution in the prior art, the drawings required for describing the specific implementation or the prior art will be briefly introduced below. Obviously, the drawings described below are only one implementation of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0022] Figure 1 It is a schematic diagram of the structure of the utility model in front view and section;
[0023] Figure 2 It is a three-dimensional structural diagram of the lifting component in the utility model;
[0024] Figure 3 It is a three-dimensional structural schematic diagram of the adjustment component in the utility model.
[0025] The symbols in the accompanying drawings are:
[0026] 1. Support platform; 2. Push handle; 3. Lifting assembly; 301. Support column; 302. Movable frame; 303. Motor; 304. Gear; 305. Through hole; 306. Rack; 307. Slide rod; 308. Slide sleeve; 4. Adjustment assembly; 401. Fixed platform; 402. Electric push rod; 403. Support arm; 404. Limit rod; 405. Limit ring; 406. Limit block; 5. Storage slot; 6. Scraper; 7. Warehouse door; 8. Handle; 9. Wheel assembly; 10. Brake pad; 11. Battery; 12. Control switch. DETAILED DESCRIPTION
[0027] In order to make the technical means, creative features, objectives and effects achieved by the utility model easy to understand, the technical scheme in the specific implementation mode of the utility model is clearly and completely described below to further illustrate the utility model. Obviously, the specific implementation mode described is only a part of the implementation mode of the utility model, rather than all styles.
[0028] Example:
[0029] The following is combined with Figure 1-3 The utility model is described in further detail.
[0030] See also Figure 1-3 The utility model provides a technical solution: a construction engineering wall scraper, comprising a support platform 1, a lifting component 3 and an adjusting component 4, the lifting component 3 is fixedly connected to the upper surface of the support platform 1, the adjusting component 4 is arranged on the side of the lifting platform, the side of the adjusting component 4 is fixedly connected with a storage groove 5, and the side of the storage groove 5 is fixedly connected with a scraper 6. The construction engineering wall scraper, by setting the storage groove 5, under the action of the storage groove 5, the scraper 6 can fall into the storage groove 5 for centralized collection after scraping the cement on the wall, so as to avoid cement Falling to the ground increases people's work pressure and improves the practicability of the device. The lifting component 3 includes a support column 301, which is fixedly connected to the upper surface of the support platform 1. A movable frame 302 is arranged on the side of the support column 301, and a motor 303 is fixedly connected to the side of the movable frame 302. The other end of the output shaft of the motor 303 is fixedly connected to a gear 304. A movable groove is opened on the surface of the movable frame 302, and the gear 304 is inserted in the movable groove. A rack 306 is fixedly connected to the side of the support column 301, and the gear 304 is meshed with the rack 306.
[0031] By adopting the above technical solution, the wall scraper for construction projects is provided with a lifting component 3. When people need to scrape the wall, they only need to control the motor 303 through the control switch 12 to drive the gear 304 to rotate. With the cooperation of the gear 304 and the rack 306, it is convenient for people to adjust the position of the scraper 6, thereby driving the scraper 6 to scrape the wall at the specified position. At the same time, with the cooperation of the slide rod 307 and the sleeve 308, the movable frame 302 carrying the scraper 6 can be moved in a directional manner to avoid the scraper 6 from getting stuck during the movement, thereby improving the practicality of the device.
[0032] Specifically, a sliding rod 307 is fixedly connected to the side of the support column 301, and a sliding sleeve 308 is fixedly connected to the inner wall of the movable frame 302. The sliding sleeve 308 is slidably connected to the surface of the sliding rod 307. There are two groups of sliding rods 307 and sliding sleeves 308, and they are symmetrically arranged on the side of the support column 301.
[0033] Specifically, the adjustment component 4 includes a fixed platform 401, which is fixedly connected to the side of the movable frame 302. The side of the fixed platform 401 is fixedly connected to an electric push rod 402, the other end of the electric push rod 402 is fixedly connected to a support arm 403, and the storage slot 5 is fixedly connected to the side of the support arm 403.
[0034] By adopting the above technical solution, the wall scraper for construction projects is provided with an adjustment component 4. When people need to adjust the lateral position of the scraper 6, they only need to control the electric push rod 402 through the control switch 12 to drive the support arm 403 carrying the scraper 6 to move. When the scraper 6 overlaps the wall, people only need to control the electric push rod 402 to stop operating through the control switch 12.
[0035] Specifically, a limiting rod 404 is fixedly connected to the side of the fixed platform 401, a limiting ring 405 is fixedly connected to the side of the support arm 403, the limiting rod 404 is inserted into the limiting ring 405, and the other end of the limiting rod 404 is fixedly connected to the limiting block 406. There are two groups of limiting rings 405 and limiting rods 404, and they are symmetrically arranged on both sides of the support arm 403.
[0036] Specifically, a door 7 is movably connected to the side of the storage slot 5 via a hinge, and a handle 8 is fixedly connected to the side of the door 7.
[0037] Specifically, a handle 8 is fixedly connected to the upper surface of the support platform 1 .
[0038] Specifically, a wheel set 9 is fixedly connected to the lower surface of the support platform 1 , and a brake pad 10 is arranged on the side of the wheel set 9 . There are four wheel sets 9 in total, and they are arranged in a rectangular shape at the lower end of the support platform 1 .
[0039] Specifically, a battery 11 is fixedly connected to the lower surface of the support platform 1 , and a control switch 12 is fixedly connected to the side surface of the support platform 1 .
[0040] The working principle of the utility model is as follows: when in use, people only need to push the device, and with the cooperation of the wheel set 9, it is convenient for people to move the device to a position suitable for the use of the device. When people need to fix the device, people only need to adjust the brake pads 10 arranged on the sides of the wheel set 9 to the braking state, thereby ensuring that the device can maintain a stable working state during normal operation. When people need to adjust the lateral position of the scraper 6, people only need to control the electric push rod 402 to operate through the control switch 12, thereby driving the support arm 403 carrying the scraper 6 to move. When the scraper 6 overlaps the wall, people only need to control the electric push rod 402 to stop operating through the control switch 12. When people need to level the wall, they only need to control the motor 303 through the control switch 12 to drive the gear 304 to rotate. With the cooperation of the gear 304 and the rack 306, it is convenient for people to adjust the position of the scraper 6, thereby driving the scraper 6 to level the wall at the designated position. At the same time, with the cooperation of the slide bar 307 and the sleeve 308, the movable frame 302 carrying the scraper 6 can be moved in a directional manner to avoid the scraper 6 from getting stuck during the movement, thereby improving the practicality of the device. Under the action of the storage groove 5, the scraper 6 can fall into the storage groove 5 for centralized collection after scraping the cement on the wall, thereby avoiding cement falling on the ground and increasing people's work pressure, thereby improving the practicality of the device.
[0041] This specific embodiment is merely an explanation of the present invention and is not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to the present embodiment as needed, but such modifications are protected by patent law as long as they are within the scope of the claims of the present invention.
Claims
1. A wall scraper for construction engineering, comprising a support platform (1), a lifting component (3) and an adjusting component (4), characterized in that: The lifting component (3) is fixedly connected to the upper surface of the support platform (1); the adjusting component (4) is arranged on the side of the lifting platform; a storage groove (5) is fixedly connected to the side of the adjusting component (4); a scraper (6) is fixedly connected to the side of the storage groove (5); the lifting component (3) comprises a support column (301); the support column (301) is fixedly connected to the upper surface of the support platform (1); a movable frame (302) is arranged on the side of the support column (301); a motor (303) is fixedly connected to the side of the movable frame (302); a gear (304) is fixedly connected to the other end of the output shaft of the motor (303); a movable groove is opened on the surface of the movable frame (302); the gear (304) is inserted into the movable groove; a rack (306) is fixedly connected to the side of the support column (301); the gear (304) is meshed with the rack (306).
2. A construction engineering wall scraper according to claim 1, characterized in that: A sliding rod (307) is fixedly connected to the side of the support column (301), and a sliding sleeve (308) is fixedly connected to the inner wall of the movable frame (302). The sliding sleeve (308) is slidably connected to the surface of the sliding rod (307). There are two groups of sliding rods (307) and sliding sleeves (308), and they are symmetrically arranged on the side of the support column (301).
3. A construction engineering wall scraper according to claim 1, characterized in that: The adjustment component (4) comprises a fixed platform (401), the fixed platform (401) is fixedly connected to the side of the movable frame (302), an electric push rod (402) is fixedly connected to the side of the fixed platform (401), the other end of the electric push rod (402) is fixedly connected to a support arm (403), and the storage slot (5) is fixedly connected to the side of the support arm (403).
4. A construction engineering wall scraper according to claim 3, characterized in that: The side of the fixed platform (401) is fixedly connected to a limiting rod (404), the side of the support arm (403) is fixedly connected to a limiting ring (405), the limiting rod (404) is inserted into the limiting ring (405), the other end of the limiting rod (404) is fixedly connected to a limiting block (406), and the limiting ring (405) and the limiting rod (404) each have two groups, and are symmetrically arranged on both sides of the support arm (403).
5. A construction engineering wall scraper according to claim 1, characterized in that: The side of the storage slot (5) is movably connected to a door (7) via a hinge, and the side of the door (7) is fixedly connected to a handle (8).
6. A construction engineering wall scraper according to claim 1, characterized in that: A handle (8) is fixedly connected to the upper surface of the support platform (1).
7. A construction engineering wall scraper according to claim 1, characterized in that: A wheel set (9) is fixedly connected to the lower surface of the support platform (1), and a brake pad (10) is arranged on the side of the wheel set (9). There are four wheel sets (9) in total, which are arranged in a rectangular shape at the lower end of the support platform (1).
8. A construction engineering wall scraper according to claim 1, characterized in that: A storage battery (11) is fixedly connected to the lower surface of the support platform (1), and a control switch (12) is fixedly connected to the side surface of the support platform (1).