Underground inspection room structure for ultra-shallow-buried underground-excavated heating power pipeline
By setting up an inspection room for ultra-shallow buried and concealed thermal pipelines under the current sewage well, using a flat-top straight wall and horseshoe-shaped structure combined with advance small conduit technology, the existing pipeline facilities are achieved at zero distance, and the traditional method cannot achieve The problem of zero-distance travel has the advantages of fast construction, low cost and strong safety.
Patent Information
- Application Number
- CN202323541095.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-25
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2033-12-25
AI Technical Summary
During the urbanization process, when new engineering projects need to cross existing pipeline facilities, traditional methods cannot achieve zero-distance crossing, especially when space size is limited, thermal pipeline dark inspection rooms cannot be set up.
A structure of an ultra-shallow buried and concealed thermal pipeline is designed. By closely setting up a hidden inspection room under the current sewage well, it is connected to the heat source pipeline through standard tunnel sections and gradient sections, and a flat top straight wall is used to initially use. The supporting structure and horseshoe-shaped two-lined structure combine with the advance small conduit and jet concrete technology to form an integral support structure, which is suitable for crossing existing pipelines at zero distances.
It realizes safely crossing existing pipeline facilities at zero distance and meets structural space requirements. It is suitable for installation and maintenance of heat engine equipment. It has fast construction and low cost, and does not affect the normal operation of the current sewage well, solving the construction safety and cost. question.
Smart Images

Figure CN222045772U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of thermal construction, in particular to an ultra-shallow buried dark-dig thermal pipeline dark-construction inspection room structure. Background Art
[0002] As my country's urbanization development becomes increasingly complete, urban underground space resources are becoming increasingly scarce. During the construction process, new construction projects will inevitably be closer and closer to existing underground facilities such as pipelines.
[0003] For thermal engineering projects crossing existing pipelines, the traditional approach is to use advance small-duct grouting support, or to locally compress the thermal pipeline structure to ensure a sufficiently large safety distance from the existing pipeline. However, for projects that do not have an adequate safety distance from existing pipelines and do not meet the compression conditions due to the limitations of the spatial dimensions of the engineering structure itself, construction cannot be carried out according to traditional practices.
[0004] Therefore, how to pass through existing pipeline facilities at zero distance and set up a hidden inspection room for thermal pipelines is a technical problem that needs to be solved urgently. Utility Model Content
[0005] The utility model aims to solve the above-mentioned problems, thereby providing a structure of an ultra-shallow buried dark excavation thermal pipeline dark inspection room, which is suitable for crossing existing pipelines, i.e. existing sewage wells, at zero distance, and can meet projects with strict requirements on structural space, and is suitable for the installation of thermal engine equipment such as compensators and valves, as well as projects for subsequent equipment maintenance, overhaul and replacement; it solves the technical problem of how to cross existing pipeline facilities at zero distance and set up a thermal pipeline dark inspection room under the ultra-shallow buried dark excavation working condition that the tunnel vault settlement is less than the corresponding surface settlement.
[0006] The utility model solves the above problems and adopts the following technical solutions:
[0007] A structure of a concealed inspection room for ultra-shallow buried dark-excavated thermal pipelines, wherein the concealed inspection room is connected to the existing heat source pipeline, the existing pipeline facilities include an existing sewage well, the concealed inspection room is arranged below the existing sewage well and is closely attached to the existing sewage well, a first standard tunnel section is connected on the left side of the concealed inspection room, the concealed inspection room is connected to the existing heat source pipeline through the first standard tunnel section, a gradient section is connected on the right side of the concealed inspection room, and a second standard tunnel section is connected on the other side of the gradient section; the concealed inspection room includes The flat-top straight wall primary support structure has a square cross-section and is in contact with the bottom surface of the existing sewage well. A middle partition wall is vertically arranged between the top and bottom surfaces inside the flat-top straight wall primary support structure. A number of advance small ducts are arranged on the bottom surface of the existing sewage well and on the left and right sides of the flat-top straight wall primary support structure. The several advance small ducts are arranged and extend to the left and right sides of the flat-top straight wall primary support structure. A flat-top straight wall secondary lining structure is commonly arranged on the four inner side surfaces inside the flat-top straight wall primary support structure.
[0008] As a preferred embodiment, a further technical solution of the utility model is:
[0009] Furthermore, the flat-top straight-wall primary support structure includes a plurality of primary support grids, which are connected end to end to form a square structure, meshes are fixed inside and outside the square structure formed by the plurality of primary support grids, and the overall structure is formed by spraying concrete.
[0010] Furthermore, the middle partition wall includes a plurality of primary support grids, which are vertically arranged in a row. Connecting steel plates are fixed on the bottom and top surfaces of the primary support grids arranged in a row, one of which is fixed on the top surface of the flat-top straight wall primary support structure, and the other is fixed on the bottom surface of the flat-top straight wall primary support structure.
[0011] Furthermore, the flat-top straight wall secondary lining structure has a horseshoe-shaped cross-section, including a steel frame, which is arranged along four inner side surfaces inside the flat-top straight wall primary support structure, and a concrete layer is poured on the steel frame.
[0012] Furthermore, thermal pipelines are laid in the second standard tunnel section, the gradient section, the dark inspection room and the first standard tunnel section, and thermal engine equipment is arranged in the flat-top straight-wall second lining structure, and the thermal equipment includes compensators and valves.
[0013] Furthermore, the cross-sections of the first standard tunnel section and the second standard tunnel section are both horseshoe-shaped, and both include a horseshoe-shaped primary support structure, and a horseshoe-shaped secondary lining structure is enclosed by four inner side surfaces inside the horseshoe-shaped primary support structure.
[0014] Furthermore, the clearance size of the gradient section gradually increases from one side connected to the second standard tunnel section to the other side. The gradient section is in a trumpet shape, including a gradient primary support structure, and a gradient secondary lining structure is arranged on the inner side surface inside the gradient primary support structure.
[0015] Furthermore, equipment holes and manholes are provided above the dark inspection room for later equipment maintenance, inspection and replacement.
[0016] Compared with the prior art, the utility model adopting the above technical solution has the following outstanding features:
[0017] The utility model is suitable for crossing existing pipelines, i.e. existing sewage wells, at zero distance, and can meet projects with strict requirements on structural space. It is suitable for the installation of thermal engine equipment such as compensators and valves, as well as projects for subsequent equipment maintenance, inspection and replacement, and has the advantages of strong adaptability, fast construction and low project cost. It solves the technical problem of how to cross existing pipeline facilities at zero distance and set up a concealed inspection room for thermal pipelines. It is suitable for ultra-shallow buried and dark excavation working conditions where the settlement of the tunnel arch is less than the corresponding surface settlement of the thermal pipeline structure, and has strong construction safety. Moreover, the construction of the concealed inspection room does not affect the normal operation of the existing sewage well, and solves the problem of conflict in vertical elevation caused by the new engineering project to maintain a safe distance from the existing underground facilities. In addition, the advance small guide tube has the function of surrounding rock reinforcement and water stopping. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the plane position relationship between the concealed inspection room of the utility model and the existing sewage well;
[0019] Figure 2 It is a schematic diagram of the main structure of the flat-top straight-wall primary support structure of the utility model;
[0020] Figure 3 It is a schematic diagram of the main structure of the flat roof straight wall double lining structure of the utility model;
[0021] In the figure: 1. Existing sewage well; 2. Flat-top straight wall primary support structure; 3. Middle partition wall; 4. Advanced small duct; 5. Flat-top straight wall secondary lining structure; 6. Connecting steel plate; 7. Thermal pipeline; 8. First standard tunnel section; 9. Second standard tunnel section; 10. Gradient section; 11. Horseshoe-shaped primary support structure; 12. Horseshoe-shaped secondary lining structure; 13. Gradient primary support structure; 14. Gradient secondary lining structure; 15. Manhole; 16. Equipment hole. DETAILED DESCRIPTION
[0022] The following description of the embodiments will help the public better understand the present invention, but the specific embodiments given by the applicant cannot and should not be regarded as limitations on the technical solution of the present invention. Any changes to the definitions of components or technical features and / or formal rather than substantive changes to the overall structure should be regarded as the scope of protection defined by the technical solution of the present invention.
[0023] See also Figures 1 to 3 As shown, the technical solution of the utility model is as follows:
[0024] A structure of a concealed inspection room for ultra-shallow buried dark-excavated thermal pipelines, wherein the concealed inspection room is connected to the existing heat source pipeline, and the existing pipeline facilities include an existing sewage well 1. The concealed inspection room is arranged below the existing sewage well 1 and is closely attached to the existing sewage well 1. The existing sewage well 1 is eccentrically located with the concealed inspection room in plane position, and a first standard tunnel section 8 is connected to the left side of the concealed inspection room, and the concealed inspection room is connected to the existing heat source pipeline through the first standard tunnel section 8, and a gradient section 10 is connected to the right side of the concealed inspection room, and a second standard tunnel section 9 is connected to the other side of the gradient section 10, and the concealed inspection room is formed by the second standard tunnel section 9 being gradually transformed through the gradient section 10; the concealed inspection room includes a flat-top straight-wall primary support structure 2, and the flat-top straight-wall primary support structure 2 is square in cross section and abuts against the bottom surface of the existing sewage well 1, and the top straight-wall primary support structure 2 breaks through the traditional thermal inspection room The arch structure realizes the method of the thermal pipeline structure passing through the existing well chamber at zero distance under the ultra-shallow buried dark excavation working condition that the tunnel arch settlement is less than the corresponding surface settlement. A middle partition wall 3 is vertically arranged between the top and bottom surfaces inside the flat-top straight wall primary support structure 2. The middle partition wall 3 supports the top surface inside the flat-top straight wall primary support structure 2. A number of advance small ducts 4 are arranged on the bottom surface of the existing sewage well 1 and the left and right sides of the flat-top straight wall primary support structure 2. The several advance small ducts 4 are arranged and extended to the left and right sides of the flat-top straight wall primary support structure 2. The several advance small ducts 4 are integrated with the grouting construction, which effectively reduces the construction steps, saves construction time, and reduces the construction cost, thereby playing a role of both water stopping and surrounding rock reinforcement. A flat-top straight wall secondary lining structure 5 is commonly arranged on the four inner sides inside the flat-top straight wall primary support structure 2.
[0025] The flat-top straight-wall primary support structure 2 includes a plurality of primary support grids, all of which are steel grids. The plurality of primary support grids are connected end to end to form a square structure. Meshes are fixed inside and outside the square structure formed by the plurality of primary support grids, and a unified whole is formed by spraying concrete. The above-mentioned structural arrangement forms a supporting structure through a plurality of primary support grids, and the plurality of primary support grids are connected as a whole by hanging meshes and spraying concrete to enhance the supporting strength.
[0026] The middle partition wall 3 includes several primary support grids, all of which are steel grids. Several primary support grids are vertically arranged in a row, and connecting steel plates 6 are fixed on the bottom and top surfaces of the primary support grids arranged in a row, one of which is fixed on the top surface of the flat-top straight wall primary support structure 2, and the other is fixed on the bottom surface of the flat-top straight wall primary support structure 2. The above-mentioned structural setting connects the middle partition wall 3 and the flat-top straight wall primary support structure 2 as a whole, thereby supporting the top surface inside the flat-top straight wall primary support structure 2.
[0027] The flat-top straight wall secondary lining structure 5 has a horseshoe-shaped cross-section and includes a steel frame, which is arranged along the four inner side surfaces inside the flat-top straight wall primary support structure 2, and a concrete layer is poured on the steel frame; the flat-top straight wall secondary lining structure 5 is formed by tying the steel frame and pouring concrete inside the flat-top straight wall primary support structure 2, thereby strengthening the support for the flat-top straight wall primary support structure 2.
[0028] A thermal pipeline 7 is laid in the second standard tunnel section 9 , the gradual change section 10 , the dark inspection room and the first standard tunnel section 8 . The thermal pipeline 7 is laid in the flat-top straight-wall second lining structure 5 .
[0029] The cross-sections of the first standard tunnel section 8 and the second standard tunnel section 9 are both horseshoe-shaped, and both include a horseshoe-shaped primary support structure 11 . A horseshoe-shaped secondary lining structure 12 is enclosed on four inner side surfaces of the horseshoe-shaped primary support structure 11 .
[0030] The inner diameter of the gradual section 10 gradually increases from one side connected to the second standard tunnel section 9 to the other side. The gradual section 10 is in a trumpet shape and includes a gradual primary support structure 13. A gradual secondary lining structure 14 is arranged on the inner side surface inside the gradual primary support structure 13. The first standard tunnel section 8 is gradually transformed into a flat-top straight-wall primary support structure 2 through the gradual section 10.
[0031] A manhole 15 and an equipment hole 16 are provided above the dark inspection room for later equipment maintenance, overhaul and replacement.
[0032] The utility model is suitable for crossing existing pipelines, i.e. existing sewage wells, at zero distance, and can meet projects with strict requirements on structural space. It is suitable for the installation of thermal engine equipment such as compensators and valves, as well as projects for subsequent equipment maintenance, inspection and replacement, and has the advantages of strong adaptability, fast construction and low project cost. It solves the technical problem of how to cross existing pipeline facilities at zero distance and set up a concealed inspection room for thermal pipelines. It is suitable for ultra-shallow buried and dark excavation working conditions where the settlement of the tunnel arch is less than the corresponding surface settlement of the thermal pipeline structure, and has strong construction safety. Moreover, the construction of the concealed inspection room does not affect the normal operation of the existing sewage well 1, and solves the problem of conflict in vertical elevation caused by the new engineering project to maintain a safe distance from the existing underground facilities. In addition, the advance small guide tube 4 has the function of surrounding rock reinforcement and water stopping.
[0033] The above description is only a preferred feasible embodiment of the present utility model, and does not limit the scope of rights of the present utility model. All equivalent changes made using the contents of the present utility model specification and its drawings are included in the scope of rights of the present utility model.
Claims
1. A structure of a concealed inspection room for ultra-shallow buried and dark-dug heat pipelines, wherein the concealed inspection room is connected to the existing heat source pipelines, and is characterized by: The existing pipeline facilities include an existing sewage well. The concealed inspection room is arranged below the existing sewage well and is closely attached to the existing sewage well. The concealed inspection room breaks through the traditional arched structure of the thermal inspection room and adopts a flat-top straight wall. The first standard tunnel section is connected on the left side of the concealed inspection room, and the concealed inspection room is connected to the existing heat source pipeline through the first standard tunnel section. The gradient section is connected on the right side of the concealed inspection room, and the second standard tunnel section is connected on the other side of the gradient section. The concealed inspection room includes a flat-top straight wall primary support structure. The cross-section of the flat-top straight wall primary support structure is square and abuts against the bottom surface of the existing sewage well. A middle partition wall is vertically arranged between the top and bottom surfaces inside the flat-top straight wall primary support structure. Several advance small ducts are arranged on the bottom surface of the existing sewage well and on the left and right sides of the top surface of the flat-top straight wall primary support structure. Several advance small ducts are arranged and extend to the left and right sides of the flat-top straight wall primary support structure. A second lining structure is commonly arranged on the four inner sides inside the flat-top straight wall primary support structure.
2. The ultra-shallow buried thermal pipeline concealed inspection room structure according to claim 1 is characterized by: The flat-top straight-wall primary support structure includes a plurality of primary support grids, which are connected end to end to form a square structure. Meshes are fixed inside and outside the square structure formed by the plurality of primary support grids, and the overall structure is formed by spraying concrete.
3. The ultra-shallow buried heat pipeline concealed inspection room structure according to claim 2 is characterized by: The middle partition wall includes a plurality of primary support grids, which are arranged vertically in a row. Connecting steel plates are fixed on the bottom and top surfaces of the primary support grids arranged in a row, one of which is fixed on the top surface of the flat-top straight wall primary support structure, and the other is fixed on the bottom surface of the flat-top straight wall primary support structure.
4. The ultra-shallow buried heat pipeline concealed inspection room structure according to claim 1 is characterized by: The cross-section of the flat-top straight wall secondary lining structure is horseshoe-shaped, including a steel frame. The steel frame is arranged along the four inner sides of the flat-top straight wall primary support structure, and a concrete layer is poured on the steel frame.
5. The ultra-shallow buried and dark-dug thermal pipeline hidden inspection room structure according to claim 4 is characterized by: Thermal pipelines are laid in the second standard tunnel section, the gradient section, the dark inspection room and the first standard tunnel section. Thermal engine equipment is arranged in the flat-top straight-wall second lining structure. The thermal engine equipment includes a compensator and a valve.
6. The ultra-shallow buried and dark-dug thermal pipeline inspection room structure according to claim 1 is characterized by: The cross-sections of the first standard tunnel section and the second standard tunnel section are both horseshoe-shaped, and both include a horseshoe-shaped primary support structure, and a horseshoe-shaped secondary lining structure is enclosed on four inner side surfaces inside the horseshoe-shaped primary support structure.
7. The ultra-shallow buried heat pipeline concealed inspection room structure according to claim 1 is characterized by: The clearance size of the gradual section gradually increases from one side connected to the second standard tunnel section to the other side. The gradual section is in a trumpet shape, including a gradual primary support structure, and a gradual secondary lining structure is arranged on the inner side surface inside the gradual primary support structure.
8. The ultra-shallow buried heat pipeline concealed inspection room structure according to claim 1 is characterized by: There are equipment holes and manholes above the dark inspection room to meet the needs of later maintenance, overhaul and equipment replacement.