Air supply structure of water turbine

By adopting a combination of self-closed air replenishment valve and float valve in the turbine air replenishment device, combining a combined sealing structure and a planar static sealing structure, the water level alarm module and drainage hole are added, and the unit operation is not operated by water leakage due to water leakage. Stability issues improve water stop reliability and safety.

CN222045978UActive Publication Date: 2024-11-22HARBIN ELECTRIC MACHINERY FACTORY (ZHENJIANG) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420834465.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-22
Publication Date
2024-11-22
Estimated Expiration
2034-04-22

AI Technical Summary

Technical Problem

The existing turbine gas replenishment devices are difficult to detect and handle quickly when water leaks, resulting in unstable unit operation and may even pose a devastating threat.

Method used

The combined working mode of self-closed air replenishment valve and float valve is adopted, and combined with a combined sealing structure and a planar static sealing structure, water level alarm module and drainage holes are added to achieve real-time monitoring and rapid drainage.

Benefits of technology

It reduces the risk of flooding caused by damage to a single valve, improves water stop reliability, and ensures the safe and stable operation of the unit.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222045978U_ABST
    Figure CN222045978U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of water turbines, and particularly relates to a water turbine air supply structure which comprises a rack, a main shaft fixedly connected to the lower end of the rack, a generator rotor fixedly connected to the outer side of the main shaft, and a water turbine runner fixedly connected to the end, away from the rack, of the main shaft. The main shaft comprises a first generator shaft fixedly connected to the lower end of the machine frame, the generator rotor is fixedly connected to the outer side of the first generator shaft, the generator rotor is fixedly connected to the outer side of the first generator shaft, and the generator rotor is fixedly connected to the outer side of the first generator shaft. The lower end of the generator shaft is fixedly connected with a second generator shaft, and the lower end of the second generator shaft is fixedly connected with a water turbine shaft. By adopting the combined working mode of the self-closing gulp valve and the floating ball valve, the risk that a unit is flooded by water due to damage of a single valve is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of water turbines, and in particular relates to an air supply structure for a water turbine. Background Art

[0002] Generally, when the Francis turbine is at 30% to 60% of rated output, water vortexes are prone to occur in the tailwater pipe, causing cavity cavitation and unit vibration; the role of the air supply device is to replenish air when the unit is in an unstable operating condition, which can increase the elasticity of water and improve the operating conditions of the unit. At the same time, since air supply destroys the vacuum, it can also prevent the unit from suddenly shedding load and the water guide mechanism from being shut down urgently, resulting in vortexes in the tailwater pipe, thus forming negative water hammer, and the strong impact force or lifting phenomenon caused by the downstream tailwater backwash.

[0003] There are two ways of air replenishment: natural air replenishment and forced air replenishment. Natural air replenishment is generally used. Compressed air forced air replenishment is only used when the negative value of the turbine suction height is large, the pressure in the tailwater pipe is high, and it is difficult to replenish air by natural air replenishment. Commonly used air replenishment devices include axial hole air replenishment device, tailwater cross air replenishment device and tailwater short pipe air replenishment device.

[0004] During the operation of the existing air supply device, when a large amount of water leaks from the air supply valve, on the one hand, the higher tailwater level will provide a continuous flow of river water from the air supply valve, and on the other hand, the upstream and downstream maintenance gates of the turbine generator set need to be closed, and the river water in the tailwater pipe needs to be removed before the air supply valve can be inspected. The process of closing the gates and draining water generally takes 8 hours. If the leakage is large, long-term leakage will pose a devastating threat to the generator set. In addition, the turbine main shaft center air supply valve is designed to be self-closing to prevent downstream tailwater backflow during normal operation of the unit. In the management experience of the operating power station, air supply valves often leak due to carding, sealing failure, etc. Once the air supply valve leaks, the consequences will be very serious. Utility Model Content

[0005] The utility model aims to provide a turbine air supply structure, which reduces the risk of flooding the unit due to damage to a single valve by adopting a self-closing air supply valve and a floating ball valve in a combined working mode.

[0006] The technical solution adopted by the utility model is as follows:

[0007] A water turbine air supply structure comprises a frame, the lower end of the frame is fixedly connected to a main shaft, the outer side of the main shaft is fixedly connected to a generator rotor, the end of the main shaft away from the frame is fixedly connected to a water turbine runner, the interior of the main shaft is provided with a through cavity which passes through from top to bottom, an air supply pipe group is arranged inside the through cavity, a float valve is arranged at the upper end of the air supply pipe group, and an air supply valve body is arranged at the upper end of the float valve.

[0008] Furthermore, the air supply valve body is a self-closing air supply valve.

[0009] Further, the main shaft includes a first generator shaft fixedly connected to the lower end of the frame, the generator rotor is fixedly connected to the outside of the first generator shaft, the lower end of the generator shaft is fixedly connected to a second generator shaft, the lower end of the second generator shaft is fixedly connected to a turbine shaft, and the turbine runner is fixedly connected to the lower end of the turbine shaft;

[0010] The turbine shaft and the generator shaft are both provided with inner cavities, a first air supply pipe is installed in the inner cavity of the first generator shaft, the upper end of the first air supply pipe is connected to the float valve, a second air supply pipe is installed in the inner cavity of the second generator shaft, the upper end of the second air supply pipe is fixedly connected to the lower end of the first air supply pipe, a combined sealing structure is provided at the connection between the first air supply pipe and the second air supply pipe, a third air supply pipe is installed in the inner cavity of the turbine shaft, the upper end of the third air supply pipe is fixedly connected to the lower end of the second air supply pipe, and a planar static pressure sealing structure is provided at the connection between the second air supply pipe and the third air supply pipe.

[0011] Furthermore, the combined sealing structure includes an inner rib arranged at the bottom of the inner wall of the first air supply pipe and a docking ridge arranged at the top of the second air supply pipe, the docking ridge extends to the bottom inner cavity of the first air supply pipe and contacts the inner wall of the first air supply pipe and the bottom of the inner rib, an annular V-shaped groove is arranged at the bottom edge of the inner rib, a V-shaped sealing ring that abuts against the docking ridge is installed inside the V-shaped groove, two first sealing grooves distributed up and down and in a ring shape are arranged at the bottom of the inner wall of the first air supply pipe, a first annular sealing ring that abuts against the side wall of the docking ridge is installed inside the first sealing groove.

[0012] Furthermore, the planar static pressure sealing structure includes a second sealing groove arranged at the top edge of the third air supply pipe, and a second annular sealing ring abutting against the bottom of the second air supply pipe is installed inside the second sealing groove.

[0013] Furthermore, a transverse drainage hole is provided on the turbine shaft.

[0014] Furthermore, a water leakage basin is provided inside the frame and is located directly below the air supply valve body. A drainage pipe extending to the outside of the frame is connected to the water leakage basin.

[0015] Furthermore, a water level alarm module is provided on the inner wall of the leaking basin.

[0016] Furthermore, a maintenance butterfly valve is provided on the first air supply pipe.

[0017] The technical effects achieved by the utility model are:

[0018] (1) A turbine air supply structure of the utility model adopts a self-closing air supply valve and a float valve to work in combination, thereby reducing the risk of flooding the unit due to damage to a single valve.

[0019] (2) The turbine air supply structure of the utility model greatly improves the reliability of water stopping by adopting a combination of a combined sealing structure and a flat static pressure sealing structure.

[0020] (3) A turbine air supply structure of the utility model adds a water level alarm module and a drainage hole to the design of water leakage monitoring, which can realize real-time monitoring during the operation of the unit. The above design can effectively ensure the safe and stable operation of the unit. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the cutaway structure of the utility model;

[0022] Figure 2 It is a schematic diagram of the cutaway structure of the combined sealing structure of the utility model;

[0023] Figure 3 It is a schematic cross-sectional structure diagram of a flat static pressure sealing structure of the utility model.

[0024] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0025] 1. Turbine runner; 2. Turbine shaft; 3. Generator shaft; 4. Generator rotor; 5. Frame; 6. First air supply pipe; 7. Air supply valve body; 8. Float valve; 9. Drain pipe; 10. Leakage basin; 11. Water level alarm module; 12. Maintenance butterfly valve; 13. Second air supply pipe; 14. Third air supply pipe; 15. Combined sealing structure; 16. Flat static pressure sealing structure; 17. Inner rib; 18. Butt convex edge; 19. V-shaped groove; 20. V-shaped sealing ring; 21. First sealing groove; 22. First annular sealing ring; 23. Second sealing groove; 24. Second annular sealing ring. DETAILED DESCRIPTION

[0026] In order to make the purpose and advantages of the utility model more clear, the utility model is specifically described in combination with the following embodiments. It should be understood that the following text is only used to describe one or several specific implementations of the utility model, and does not strictly limit the protection scope of the specific request of the utility model.

[0027] like Figure 1 As shown, a turbine air supply structure includes a frame 5, a main shaft is fixedly connected to the lower end of the frame 5, a generator rotor 4 is fixedly connected to the outer side of the main shaft, and a turbine runner 1 is fixedly connected to the end of the main shaft away from the frame 5;

[0028] A through cavity is provided inside the main shaft, which is connected from top to bottom. An air supply pipe group is provided inside the through cavity. A float valve 8 is provided at the upper end of the air supply pipe group. An air supply valve body 7 is provided at the upper end of the float valve 8. The air supply valve body 7 adopts a self-closing air supply valve. The float valve 8 can be a hollow shell. The upper end opening of the hollow shell is connected to the air supply valve body 7. The lower end opening of the hollow shell is connected to the air supply pipe group. The upper end opening of the hollow shell is in a fully closed position. A float is provided inside the hollow shell. A gap is provided between the float and the surrounding side of the hollow shell for gas to flow.

[0029] The float valve 8 relies on the buoyancy of the downstream tail water to closely contact the seal in the fully closed position to achieve a sealing and water-stopping function. The greater the buoyancy, the tighter the seal. When the pressure drops in the fully closed position below it, the float falls by gravity. When air is replenished, air will be replenished from all sides of the float to the lower pipe. This design optimization adds an automatic water-stopping device to the air replenishment structure, greatly improving the reliability of the air replenishment valve body 7. The self-closing air replenishment valve and the float valve 8 work in combination to reduce the risk of flooding the unit due to damage to a single valve.

[0030] Among them, Figure 1 As shown, the main shaft includes a first generator shaft 3 fixedly connected to the lower end of the frame 5, the generator rotor 4 is fixedly connected to the outer side of the first generator shaft 3, the lower end of the generator shaft 3 is fixedly connected to the second generator shaft 3, the lower end of the second generator shaft 3 is fixedly connected to the turbine shaft 2, and the turbine runner 1 is fixedly connected to the lower end of the turbine shaft 2;

[0031] Both the turbine shaft 2 and the generator shaft 3 have inner cavities, a first air supply pipe 6 is installed in the inner cavity of the first generator shaft 3, the upper end of the first air supply pipe 6 is connected to the float valve 8, a second air supply pipe 13 is installed in the inner cavity of the second generator shaft 3, the upper end of the second air supply pipe 13 is fixedly connected to the lower end of the first air supply pipe 6, and the connection method can be a flange connection, and a combined sealing structure 15 is provided at the connection between the first air supply pipe 6 and the second air supply pipe 13, a third air supply pipe 14 is installed in the inner cavity of the turbine shaft 2, the upper end of the third air supply pipe 14 is fixedly connected to the lower end of the second air supply pipe 13, and the connection method can also be a flange connection, and a planar static pressure sealing structure 16 is provided at the connection between the second air supply pipe 13 and the third air supply pipe 14, by combining the combined sealing structure 15 and the planar static pressure sealing structure 16, the reliability of water stopping is greatly improved.

[0032] like Figure 1As shown, in order to prevent a small amount of water leakage from the air supply valve body 7 from affecting the normal operation of the unit, a water leakage basin 10 is provided inside the frame 5 and is located directly below the air supply valve body 7. The water leakage basin 10 can receive the water leakage of the air supply valve body 7. The water leakage basin 10 is connected to a drain pipe 9 extending to the outside of the frame 5, so that the leaked water can be directly discharged to the outside. In order to monitor the water leakage of the air supply valve body 7 in real time, a water level alarm module 11 is provided on the inner wall of the water leakage basin 10. Once the switch is actuated, it proves that the water leakage is large and relevant inspection and maintenance work needs to be carried out.

[0033] Here, a transverse drainage hole is provided on the turbine shaft 2, and the opening position is preferably close to the upper flange on the turbine shaft 2, which is used to monitor water leakage inside the main shaft. If water flows out of the drainage hole, it means that the accumulated water in the main shaft has reached the drainage hole, and the seal of the air supply pipe segment has failed, and the machine needs to be shut down for maintenance.

[0034] In the design of water leakage monitoring, a water level alarm module 11 and a drain hole are added to realize real-time monitoring during the operation of the unit. The above design can effectively ensure the safe and stable operation of the unit.

[0035] A maintenance butterfly valve 12 is provided on the first air supply pipe 6. The function of the maintenance butterfly valve 12 is to quickly close the maintenance butterfly valve 12 to cut off the river water below it when the air supply valve body 7 leaks but the downstream gate cannot be closed in time, thereby buying time for rescue and handling the air supply valve body 7, ensuring the safety of the unit and avoiding greater accidents. The maintenance butterfly valve 12 is in a fully open state when the unit is operating normally, and does not affect the smooth flow of the air supply pipeline.

[0036] like Figure 1-2As shown, the combined sealing structure 15 includes an inner rib 17 arranged at the bottom of the inner wall of the first air supply pipe 6, and a butt flange 18 arranged at the top of the second air supply pipe 13, the butt flange 18 extends to the bottom inner cavity of the first air supply pipe 6 and contacts with the inner wall of the first air supply pipe 6 and the bottom of the inner rib 17, an annular V-shaped groove 19 is arranged at the bottom edge of the inner rib 17, a V-shaped sealing ring 20 is installed inside the V-shaped groove 19 and abuts against the butt flange 18, the butt flange 18 is connected to the V-shaped groove 19 through the V-shaped sealing ring 20, and two first sealing grooves 21 distributed up and down and in a ring shape are arranged at the bottom of the inner wall of the first air supply pipe 6, and a first annular sealing ring 2 is installed inside the first sealing groove 21 and abuts against the side wall of the butt flange 18 2. The side wall of the butt flange 18 is connected to the two first sealing grooves 21 through two first annular sealing rings 22. The V-shaped groove 19 is a structure with a small top and a large bottom, and the inner rib 17 and the butt flange 18 are both provided with L-shaped openings that match each other. Through the cooperation between the V-shaped sealing ring 20 and the V-shaped groove 19, and the cooperation between the first sealing groove 21 and the first annular sealing ring 22, the width direction of the V-shaped sealing ring 20 is parallel to the gap of the insertion section, which can compensate for the swing amount of the insertion section in time, and will not reduce its service life while reliably filling the gap change. In addition, the first annular sealing ring 22 of the insertion section enhances the tightness of the connection between the second air supply pipe 13 and the first air supply pipe 6. This design can greatly improve the sealing effect of this part.

[0037] like Figure 1 and Figure 3 As shown, the planar static pressure sealing structure 16 includes a second sealing groove 23 arranged at the top edge of the third air supply pipe 14, and a second annular sealing ring 24 is installed inside the second sealing groove 23 to abut against the bottom of the second air supply pipe 13. The bottom of the second air supply pipe 13 is connected to the second sealing groove 23 through the second annular sealing ring 24, and the seal is stationary relative to the flange. This sealing structure is commonly used in flange connections and is a sealing structure with high reliability.

[0038] The working principle of the utility model is as follows: when in use, the opening and closing of the inflation valve group are controlled by the air supply valve body 7 and the float valve 8. When the air supply valve body 7 leaks, the leaked water will enter the interior of the leaking basin 10 and then be discharged through the drain pipe 9. At the same time, the water level alarm module 11 monitors the leakage of the air supply valve body 7 in real time. Once the switch is actuated, it proves that the leakage is large and relevant inspection and maintenance work needs to be carried out.

[0039] The above is only a preferred embodiment of the present invention. It should be noted that, for ordinary technicians in the technical field, several improvements and modifications can be made without departing from the principle of the present invention, and these improvements and modifications should also be regarded as the protection scope of the present invention. The structures, devices and operating methods not specifically described and explained in the present invention shall be implemented according to the conventional means in the field unless otherwise specified and limited.

Claims

1. A turbine air supply structure, comprising a frame (5), a main shaft being fixedly connected to the lower end of the frame (5), a generator rotor (4) being fixedly connected to the outer side of the main shaft, and a turbine runner (1) being fixedly connected to one end of the main shaft away from the frame (5). Features: A through cavity is provided inside the main shaft and passes through from top to bottom. An air supply pipe group is arranged inside the through cavity. A float valve (8) is arranged at the upper end of the air supply pipe group. An air supply valve body (7) is arranged at the upper end of the float valve (8).

2. A turbine air supply structure according to claim 1, Features: The air supply valve body (7) is a self-closing air supply valve.

3. A turbine air supply structure according to claim 1, Features: The main shaft comprises a first generator shaft (3) fixedly connected to the lower end of the frame (5), the generator rotor (4) fixedly connected to the outside of the first generator shaft (3), the lower end of the generator shaft (3) fixedly connected to a second generator shaft (3), the lower end of the second generator shaft (3) fixedly connected to a turbine shaft (2), and the turbine runner (1) fixedly connected to the lower end of the turbine shaft (2); The turbine shaft (2) and the generator shaft (3) are both provided with inner cavities. A first air supply pipe (6) is installed in the inner cavity of the first generator shaft (3). The upper end of the first air supply pipe (6) is connected to the float valve (8). A second air supply pipe (13) is installed in the inner cavity of the second generator shaft (3). The upper end of the second air supply pipe (13) is fixedly connected to the lower end of the first air supply pipe (6). A combined sealing structure (15) is provided at the connection between the first air supply pipe (6) and the second air supply pipe (13). A third air supply pipe (14) is installed in the inner cavity of the turbine shaft (2). The upper end of the third air supply pipe (14) is fixedly connected to the lower end of the second air supply pipe (13). A planar static pressure sealing structure (16) is provided at the connection between the second air supply pipe (13) and the third air supply pipe (14).

4. A turbine air supply structure according to claim 3, Features: The combined sealing structure (15) comprises an inner retaining edge (17) arranged at the bottom of the inner wall of the first air supply pipe (6) and a butt flange (18) arranged at the top of the second air supply pipe (13); the butt flange (18) extends to the bottom inner cavity of the first air supply pipe (6) and contacts the inner wall of the first air supply pipe (6) and the bottom of the inner retaining edge (17); an annular V-shaped groove (19) is arranged at the bottom edge of the inner retaining edge (17); a V-shaped sealing ring (20) is installed inside the V-shaped groove (19) and abuts against the butt flange (18); two first sealing grooves (21) distributed up and down and in an annular shape are arranged at the bottom of the inner wall of the first air supply pipe (6); a first annular sealing ring (22) is installed inside the first sealing groove (21) and abuts against the side wall of the butt flange (18).

5. A turbine air supply structure according to claim 3, Features: The planar static pressure sealing structure (16) comprises a second sealing groove (23) arranged at the top edge of the third air supply pipe (14), and a second annular sealing ring (24) abutting against the bottom of the second air supply pipe (13) is installed inside the second sealing groove (23).

6. A water turbine air supply structure according to claim 3, Features: The turbine shaft (2) is provided with a transverse drainage hole.

7. A turbine air supply structure according to claim 3, Features: A water leakage basin (10) is provided inside the frame (5) and is located directly below the air supply valve body (7). A drainage pipe (9) is connected to the water leakage basin (10) and extends to the outside of the frame (5).

8. A water turbine air supply structure according to claim 7, Features: The inner wall of the leaking basin (10) is provided with a water level alarm module (11).

9. A water turbine air supply structure according to claim 3, Features: The first air supply pipe (6) is provided with a maintenance butterfly valve (12).