Temporary plugging device for municipal water supply and drainage pipeline

By combining the centering and positioning components with the supporting air injection components, the problem of displacement of the sealing airbag during expansion is solved, thereby improving the stability of the sealing effect and the durability of the airbag.

CN222047039UInactive Publication Date: 2024-11-22霍晶
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420847077.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-23
Publication Date
2024-11-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing temporary sealing devices for municipal water supply and drainage pipelines are prone to displacement during expansion, resulting in poor sealing effect and potentially shortening the service life of the airbag.

Method used

The design employs a combination of centering and positioning components and supporting gas injection components to ensure precise alignment between the sealing airbag and the pipeline axis, and to achieve uniform gas injection through the supporting gas injection components, thus avoiding uneven expansion and misalignment.

Benefits of technology

This achieves precise alignment between the sealing airbag and the pipeline axis, avoiding misalignment issues, enhancing the stability and durability of the device, and extending the service life of the airbag.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222047039U_ABST
    Figure CN222047039U_ABST
Patent Text Reader

Abstract

The temporary plugging device for the municipal water supply and drainage pipeline comprises a centering and positioning assembly, a supporting and gas injection assembly and a plugging air bag, the centering and positioning assembly and the supporting and gas injection assembly are connected in a threaded and meshed mode and communicated with each other, and the plugging air bag is fixedly installed on the supporting and gas injection assembly; according to the utility model, the centering and positioning assembly is innovatively designed, so that the precise matching with the supporting gas injection assembly and the plugging gas bag is ensured. The centering and positioning assembly is stably installed on the pipeline flange plate, accurate alignment of the air bag and the axis of the pipeline is achieved, and dislocation is avoided. And the gas injection assembly is supported to uniformly inject gas to prevent non-uniform expansion.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of water supply and drainage pipeline blocking, and in particular relates to a temporary blocking device for a municipal water supply and drainage pipeline. Background Art

[0002] The working principle of the temporary plugging device for water supply and drainage pipes mainly relies on the use of plugging equipment (airbags) or materials. This type of equipment is usually made of high-quality rubber or other elastic materials, which can fit tightly to the inner wall of the pipe to achieve an effective plugging effect. Specifically, when it is necessary to temporarily plug the pipe, the operator will first place the plugging device (airbag) at the designated position of the pipe. Subsequently, the plugging device (airbag) is inflated or unfolded by inflation or mechanical means to make it fit tightly to the inner wall of the pipe. During the expansion of the plugging device (airbag), it will use its own elasticity and the friction of the inner wall of the pipe to form a tight sealing layer, thereby preventing the fluid or gas in the pipe from passing through.

[0003] Currently, after the plugging airbag is precisely placed at the designated position of the pipeline, as the gas is continuously filled, the airbag is prone to shift during the expansion process due to the uneven distribution of gas. This uneven expansion will cause the airbag to be inconsistent with the axis of the pipeline, resulting in misalignment, which greatly reduces the plugging effect. What is more serious is that long-term misalignment may also have an adverse effect on the durability of the airbag and shorten its service life.

[0004] Therefore, it is very necessary to invent a temporary blocking device for municipal water supply and drainage pipelines. Utility Model Content

[0005] In order to solve the above technical problems, the utility model provides a temporary plugging device for municipal water supply and drainage pipes, comprising a centering and positioning component, a supporting gas injection component and a plugging air bag, wherein the centering and positioning component is threadedly engaged with the supporting gas injection component and is connected to each other, and the plugging air bag is fixedly installed on the supporting gas injection component;

[0006] The centering and positioning assembly comprises a centering and positioning body, an air charging valve, a slide groove, a centering and positioning arm and a locking bolt. The centering and positioning body is fixedly mounted with the air charging valve, and the air charging valve is threadedly engaged with the supporting air injection assembly. The centering and positioning body is provided with the slide groove, and the centering and positioning arm is slidably mounted inside the slide groove and fixedly mounted on the centering and positioning body by the locking bolt.

[0007] The support gas injection assembly includes a support gas injection pipe, gas injection holes, a reinforcement plate and a gas injection pipe port. The support gas injection pipe is distributed with a plurality of the gas injection holes. Both ends of the support gas injection pipe are fixedly passed through the blocking airbag and are fixedly connected to the reinforcement plate. The reinforcement plate is fixedly connected to the blocking airbag. Either end of the support gas injection pipe is fixedly passed through the reinforcement plate and is connected to the gas injection pipe port. The gas injection pipe port is threadedly engaged with the inflation valve.

[0008] Preferably, the centering and positioning body is a triangular structure, and three of the slide grooves are provided on the centering and positioning body and are distributed in a circular array. A through hole penetrating the slide groove is provided on the centering and positioning body, and the through hole allows the locking bolt to pass through.

[0009] Preferably, both ends of the centering and positioning arm are provided with holes allowing the locking bolt to pass through, the locking bolt passes through the hole at one end of the centering and positioning arm and is fixed in the slide groove, and the other end of the centering and positioning arm is fixedly connected to the pipe flange through the locking bolt.

[0010] Preferably, the supporting gas injection tube is located inside the blocking airbag, and the axis of the supporting gas injection tube and the blocking airbag is on the same horizontal line as the center of the centering and positioning body.

[0011] Preferably, the reinforcement disk is arranged at two ends of the outside of the blocking airbag, the reinforcement disk is a disc structure, and the reinforcement disk and the supporting air injection pipe are installed together to form an "I"-shaped structure.

[0012] Compared with the prior art, the utility model has the following beneficial effects:

[0013] The utility model innovatively introduces a centering and positioning component, which is firmly installed on the flange at the end of the water supply and drainage pipe. The precise matching of the centering and positioning component and the supporting gas injection component ensures the precise alignment of the plugging airbag with the pipe axis, thereby effectively avoiding the misalignment problem caused by improper placement. In addition, the design of the supporting gas injection component enables the gas to be evenly injected into the plugging airbag, avoiding uneven expansion and misalignment caused by uneven gas distribution.

[0014] What is more worth mentioning is that the centering and positioning components and the supporting gas injection components can also work together with the blocking airbag to jointly resist the impact force of the liquid, further reducing the risk of displacement of the airbag in subsequent use and reducing the friction between the airbag and the pipe wall, thereby significantly extending the service life of the airbag. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a partial cross-sectional structural schematic diagram of the utility model.

[0016] Figure 2It is a schematic diagram of the overall structure of the utility model.

[0017] Figure 3 This utility model Figure 1 Schematic diagram of the local enlarged structure at A.

[0018] In the figure:

[0019] Centering and positioning assembly 1, centering and positioning body 11, inflation valve 12, slide groove 13, centering and positioning arm 14, locking bolt 15, supporting gas injection assembly 2, supporting gas injection pipe 21, gas injection hole 22, reinforcement plate 23, gas injection pipe port 24, and blocking airbag 3. DETAILED DESCRIPTION

[0020] In order to enable those skilled in the art to better understand the solution of the utility model, the technical solution in the embodiment of the utility model will be described clearly and completely below. Obviously, the described embodiment is only a part of the embodiment of the utility model, not all of the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the utility model.

[0021] In the description of the embodiments, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "two ends", "one end", "the other end" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, which are only for the convenience of describing the utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the utility model. In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. In the description of the utility model, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For ordinary technicians in this field, the specific meanings of the above terms in the utility model can be understood according to specific circumstances.

[0022] As attached Figure 1 To Attachment Figure 3 As shown:

[0023] The utility model provides a temporary plugging device for municipal water supply and drainage pipelines, comprising a centering and positioning component 1, a supporting air injection component 2 and a plugging air bag 3. The centering and positioning component 1 is threadedly engaged with the supporting air injection component 2 and is interconnected. The plugging air bag 3 is fixedly mounted on the supporting air injection component 2. The various parts work together to achieve efficient and accurate pipeline plugging.

[0024] The centering and positioning assembly 1 includes a centering and positioning body 11, an inflation valve 12, a slide groove 13, a centering and positioning arm 14 and a locking bolt 15. The inflation valve 12 is fixedly installed at the center of the centering and positioning body 11, and the inflation valve 12 is threadedly engaged with the supporting gas injection assembly 2; the centering and positioning body 11 is provided with the slide groove 13, and the centering and positioning arm 14 is slidably installed inside the slide groove 13 and fixedly installed on the centering and positioning body 11 by the locking bolt 15. This design enables the centering and positioning assembly 1 to be firmly installed on the flange at the end of the pipeline, and by adjusting the position of the centering and positioning arm 14 and the overall angle, the precise alignment of the sealing airbag 3 with the axis of the pipeline is ensured.

[0025] The support gas injection assembly 2 includes a support gas injection tube 21, gas injection holes 22, a reinforcement plate 23 and a gas injection pipe port 24. The support gas injection tube 21 is distributed with a plurality of the gas injection holes 22. Both ends of the support gas injection tube 21 are fixedly passed through the blocking airbag 3 and are fixedly connected to the reinforcement plate 23. The reinforcement plate 23 is fixedly connected to the blocking airbag 3. Either end of the support gas injection tube 21 is fixedly passed through the reinforcement plate 23 and is connected to the gas injection pipe port 24. The gas injection pipe port 24 is threadedly engaged with the inflation valve 12. The support gas injection assembly 2 enables gas to be evenly injected into the blocking airbag 3 to avoid dislocation caused by uneven expansion. Embodiment 1:

[0026] Specifically, the centering and positioning body 11 is a triangular structure, and three slide grooves 13 are provided on the centering and positioning body 11 and distributed in a circular array. A through hole is provided on the centering and positioning body 11 to penetrate the slide groove 13, and the through hole allows the locking bolt 15 to pass through. This design enables the centering and positioning assembly 1 to adapt to pipes of different sizes and achieve more precise centering and positioning by adjusting the position of the centering and positioning arm 14.

[0027] Specifically, holes are provided at both ends of the centering and positioning arm 14 for allowing the locking bolt 15 to pass through. The locking bolt 15 passes through the hole at one end of the centering and positioning arm 14 and is fixed in the slide groove 13. The centering and positioning arm 14 can slide in the slide groove 13 and be firmly locked in a predetermined position by the tightening action of the locking bolt 15. In addition, the other end of the centering and positioning arm 14 is fixedly connected to the pipeline flange through the locking bolt 15, providing solid support for subsequent plugging operations.

[0028] Specifically, the support gas injection tube 21 is located inside the blocking airbag 3, and a plurality of gas injection holes 22 are distributed on its surface. This design ensures that the gas can be evenly distributed when injected into the blocking airbag 3. The axis of the support gas injection tube 21 and the blocking airbag 3 is on the same horizontal line as the center of the centering positioning body 11. This design realizes precise alignment from the gas injection source to the expansion part of the blocking airbag, which not only improves the accuracy of the blocking operation, but also ensures the stability and reliability of the blocking effect.

[0029] Specifically, the reinforcement disk 23 is arranged at both ends of the outside of the plugging airbag 3. The reinforcement disk 23 is a disc structure, which has good pressure resistance and stability, and can effectively resist the impact force from the inside and outside of the pipeline, protecting the plugging airbag 3 from damage. At the same time, the reinforcement disk 23 is installed together with the support gas injection pipe 21 to form a unique "I"-shaped structure. This structure not only makes the support gas injection assembly 2 more sturdy and durable, but also ensures that the gas can flow smoothly when injected into the plugging airbag 3, avoiding the problem of gas blockage or leakage. Embodiment 2:

[0030] First, the centering and positioning assembly 1 is installed on the end flange of the water supply and drainage pipeline. By adjusting the position of the centering and positioning arm 14 in the slide groove 13 and fixing it with the locking bolt 15, the centering and positioning assembly 1 can achieve precise adaptation to pipes of different sizes. At the same time, the other end of the centering and positioning arm 14 is also fixedly connected to the pipe flange by the locking bolt 15 to ensure the stability of the entire assembly. Next, the support gas injection assembly 2 is connected to the centering and positioning assembly 1. The gas injection pipe port 24 is threadedly engaged with the inflation valve 12 to achieve gas circulation. When plugging operation is required, the air pump injects gas into the support gas injection assembly 2 through the inflation valve 12. The gas first enters the support gas injection pipe 21 and is evenly injected into the plugging airbag 3 through the gas injection hole 22. Since the axis of the support gas injection pipe 21 and the plugging airbag 3 is on the same horizontal line as the center of the centering and positioning body 11, the gas can flow in according to a predetermined path to ensure the uniform expansion of the plugging airbag 3. As the gas is continuously injected, the blocking airbag 3 begins to expand and gradually fits to the inner wall of the pipeline. Due to the precise positioning function of the centering and positioning component 1, the blocking airbag 3 can be accurately aligned with the axis of the pipeline to avoid the occurrence of misalignment. At the same time, the presence of the reinforcement plate 23 not only enhances the stability of the entire device, but also can resist the impact force from the inside and outside of the pipeline, protecting the blocking airbag 3 from damage. The "I"-shaped structure formed by the reinforcement plate 23 and the supporting gas injection pipe 21 also ensures the smoothness of gas flow and avoids the problem of gas blockage or leakage. When the blocking airbag 3 expands to an appropriate degree, the temporary blocking of the pipeline can be completed. At this time, due to the synergistic effect of the centering and positioning component 1 and the supporting gas injection component 2, the blocking airbag 3 can be stably maintained in the pipeline and effectively prevent the passage of fluid, while providing a solid support structure for the airbag.

[0031] Utilizing the technical solution described in the utility model, or those skilled in the art designing similar technical solutions inspired by the technical solution of the utility model to achieve the above-mentioned technical effects, all fall within the protection scope of the utility model.

Claims

1. A temporary blocking device for municipal water supply and drainage pipelines, It is characterized in that It comprises a centering and positioning component (1), a supporting gas injection component (2) and a blocking air bag (3), wherein the centering and positioning component (1) is threadedly engaged with the supporting gas injection component (2) and is in communication with each other, and the blocking air bag (3) is fixedly mounted on the supporting gas injection component (2); The centering and positioning assembly (1) comprises a centering and positioning body (11), an air charging valve (12), a slide groove (13), a centering and positioning arm (14) and a locking bolt (15); the air charging valve (12) is fixedly mounted at the center of the centering and positioning body (11), and the air charging valve (12) is threadedly connected to the supporting air injection assembly (2); the slide groove (13) is provided on the centering and positioning body (11), and the centering and positioning arm (14) is slidably mounted inside the slide groove (13) and is fixedly mounted on the centering and positioning body (11) by the locking bolt (15); The support gas injection assembly (2) comprises a support gas injection pipe (21), gas injection holes (22), a reinforcement plate (23) and a gas injection pipe port (24); the support gas injection pipe (21) is provided with a plurality of gas injection holes (22) distributed thereon; both ends of the support gas injection pipe (21) are fixedly passed through the blocking airbag (3) and are fixedly connected to the reinforcement plate (23); the reinforcement plate (23) is fixedly connected to the blocking airbag (3); either end of the support gas injection pipe (21) is fixedly passed through the reinforcement plate (23) and is connected to the gas injection pipe port (24); the gas injection pipe port (24) is threadedly connected to the inflation valve (12).

2. A temporary plugging device for municipal water supply and drainage pipes as claimed in claim 1, Features: The centering and positioning body (11) is a triangular structure. The centering and positioning body (11) is provided with three slide grooves (13) distributed in a circular array. The centering and positioning body (11) is provided with a through hole penetrating the slide groove (13), and the through hole allows the locking bolt (15) to pass through.

3. A temporary plugging device for municipal water supply and drainage pipes as claimed in claim 1, Features: Holes are provided at both ends of the centering and positioning arm (14) to allow the locking bolt (15) to pass through. The locking bolt (15) passes through the hole at one end of the centering and positioning arm (14) and is fixed in the slide groove (13). In addition, the other end of the centering and positioning arm (14) is fixedly connected to the pipeline flange through the locking bolt (15).

4. A temporary plugging device for municipal water supply and drainage pipes as claimed in claim 1, Features: The supporting air injection tube (21) is located inside the blocking air bag (3), and the axis of the supporting air injection tube (21) and the blocking air bag (3) is on the same horizontal line as the center of the centering and positioning body (11).

5. A temporary plugging device for municipal water supply and drainage pipes as claimed in claim 1, Features: The reinforcement disk (23) is arranged at two ends of the outside of the blocking airbag (3); the reinforcement disk (23) is a disc structure; the reinforcement disk (23) and the supporting air injection pipe (21) are installed together to form an "I"-shaped structure.