Air supply system for pneumatic ejection
By designing the gas supply system, the pilot valve is used to achieve rapid gas replenishment from high to low pressure, solving the problem of slow gas replenishment of cluster pneumatic ejection devices, achieving rapid continuous emission and stable air pressure, and improving maneuverability.
Patent Information
- Application Number
- CN202420058768.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-10
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-01-10
AI Technical Summary
The existing cluster pneumatic ejection device has a slow gas replenishment speed, which is difficult to meet the needs of rapid continuous launch, and it has problems such as large size and heavy weight, which affects maneuverability.
A gas supply system is designed, including a second gas path system and a first gas path system. The pilot valve realizes rapid gas replenishment operation from high to low pressure. The second gas path system supplies gas to the first gas path system to ensure emission. The cylinder is rapidly supplied with air during the launch process, and the first gas circuit system structure is optimized to facilitate connection and stabilize air pressure.
It realizes a fast, stable and reliable gas replenishment, meets the fast continuous launch needs of the cluster-type pneumatic ejection system, reduces the launch time, improves maneuverability, and has a simple structure and low cost.
Smart Images

Figure CN222047415U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of pneumatic ejection, and in particular relates to an air supply system for pneumatic ejection. Background Art
[0002] In recent years, with the rapid development of micro-UAVs and cruise missiles, swarm system combat methods have received more and more attention. Pneumatic ejection technology is to control the instantaneous deflation of the low-pressure air storage chamber through the pneumatic components of the ejection device, forming a high-pressure airflow in the launch tube, so that the UAV or cruise missile can reach the required exit speed, and realize the launch operation of the UAV and cruise missile. Existing pneumatic ejection devices are usually single-tube launch and do not have the ability to launch continuously; and cluster pneumatic ejection devices usually have a slow air replenishment speed, which is difficult to meet the needs of rapid and continuous launch. Utility Model Content
[0003] The utility model aims to provide an air supply system for pneumatic ejection, so as to solve the problem of slow air supply speed during the launching operation of a clustered pneumatic ejection device.
[0004] The utility model is realized by the following technical solutions:
[0005] The air supply system for pneumatic ejection includes a second air circuit system, the second air circuit system includes a second air storage tank and an air circuit unit, the air circuit unit includes a first pipeline, the air inlet end of the first pipeline is connected to the second air storage tank, and the air outlet end thereof is connected to the first air circuit system, and a pressure reducing valve is arranged on the first pipeline; a second pipeline is connected to the first pipeline between the air inlet end thereof and the pressure reducing valve, the other end of the second pipeline is connected to the pressure reducing valve, and a pilot valve is arranged on the second pipeline.
[0006] In some embodiments, it also includes a first gas circuit system, which is configured to be connected to multiple launch tubes; the second gas storage tank is connected to the first gas circuit system through an air circuit unit.
[0007] In some embodiments, the first gas circuit system includes a first gas storage tank, the first gas storage tank is provided with a plurality of gas outlets, each gas outlet is connected to a launch valve, and the launch valve is used to connect to a launch tube.
[0008] In some embodiments, the first gas storage tank includes a plurality of vertically arranged gas storage tubes and a flow transverse pipe for connecting the gas storage tubes, and the launch valve is arranged on one side or both sides of the gas storage tubes along the longitudinal direction of the gas storage tubes.
[0009] In some embodiments, the gas storage tube array located in the middle is connected to the flow cross tube through a transition gas storage tube at one end, and the transition gas storage tube is connected to the flow cross tube at multiple locations.
[0010] In some embodiments, the gas outlet end of the first pipeline is connected to a plurality of branch pipes, and the branch pipes are respectively connected to the first gas storage tank.
[0011] In some embodiments, an air delivery pipe is disposed on the first pipeline near its air inlet end.
[0012] Compared with the prior art, the utility model has the following advantages and beneficial effects:
[0013] The second gas circuit system adopts a pilot valve to realize mechanical switching control of the pressure reducing valve, which can realize the rapid gas replenishment operation of the gas circuit unit from high pressure to low pressure, with short gas replenishment time, stable and reliable control and low cost, and can well ensure the stability of the gas pressure value charged into the first gas storage tank.
[0014] By setting up the second air circuit system and the first air circuit system to supply air to each launch tube, it is possible to achieve rapid air supply operation for multiple launch tubes arranged in a cluster during the launching process, which effectively solves the problem that the cluster-type pneumatic ejection system has slow air replenishment and cannot meet the needs of continuous and rapid launching; by optimizing the structure of the second air circuit system and the first air circuit system, while realizing the automatic air replenishment operation from the second air circuit system to the first air circuit system, the stability of the air pressure of the first air circuit system can be guaranteed, so that the entire launching process is stable and reliable.
[0015] By optimizing the structure of the first gas circuit system, the connection and installation between the first gas circuit system and the clustered launching tubes are made more convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0017] Figure 1 It is a schematic diagram of the structure of the gas supply system of the utility model in the assembled state.
[0018] Figure 2 This is a schematic diagram of the structure of the first gas circuit system in the gas supply system of the utility model.
[0019] Figure 3 It is a schematic diagram of the structure of the second gas circuit system in the gas supply system of the utility model.
[0020] Figure 4 It is a schematic diagram of the gas circuit principle of the second gas circuit system in the gas supply system of the utility model.
[0021] in:
[0022] 100, pneumatic ejection assembly, 11, launching tube;
[0023] 200, first gas path system, 21, first gas storage tank, 211, gas storage tube array, 212, circulation cross pipe, 213, transition gas storage pipe, 214, supplementary gas storage pipe, 215, gas inlet, 22, gas outlet, 23, launch valve;
[0024] 300, second gas circuit system, 31, second gas storage tank, 32, first pipeline, 321, branch pipe, 33, second pipeline, 34, pressure reducing valve, 35, pilot valve, 36, gas transmission pipe, 37, ball valve, 38, safety valve, 39, pressure sensor;
[0025] 310. Base station gas source. DETAILED DESCRIPTION
[0026] In order to make the purpose, technical solutions and advantages of the embodiments of the utility model clearer, the technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments.
[0027] In order to reduce the impact between the aircraft when the launch tube is launched, the cluster pneumatic ejection system usually adopts a sequential launch method, so it is necessary to supply the gas required for pneumatic ejection to each launch tube in turn. In the pneumatic ejection system, nitrogen cylinders or air compressors and boosters are usually used as the gas source for providing the gas required for pneumatic ejection to the launch tube. When using this gas supply system and gas supply method to perform the launch operation of the pneumatic ejection, there are problems such as low gas replenishment rate and slow gas replenishment, which increases the time required for the cluster pneumatic ejection system to complete all launch tasks, and it is difficult to meet the needs of rapid and continuous launch.
[0028] At the same time, due to the influence of the launch system and air supply system used in this cluster pneumatic catapult system, there are often problems of large size and weight, which affects the maneuverability of the cluster pneumatic catapult system and limits its application scenarios.
[0029] In some embodiments, an air supply system for pneumatic ejection includes:
[0030] A first gas circuit system 200, which is connected to each launch tube 11 respectively and can supply gas to each launch tube in turn;
[0031] The second gas circuit system 300 is connected to the first gas circuit system and is used to supply gas to the first gas circuit system.
[0032] In this embodiment, the second air circuit system is used to supply air to the first air circuit system, so that the first air circuit system can provide a launch tube with the gas and pressure required for pneumatic ejection. The launch tube is supplied with air through the first air circuit system, and the gas required for pneumatic ejection is provided to the launch tube to complete the launch operation of the launch tube. During the whole process, when one launch tube is launched, the first air circuit system is quickly replenished with air through the second air circuit system for the pneumatic ejection operation of another launch tube, thereby completing the launch operation of all the drones in the launch tubes in turn.
[0033] Since the gas pressure in the second gas circuit system is greater than the gas pressure in the first gas circuit system, it is possible to achieve rapid gas replenishment operation of the first gas circuit system and rapid and continuous firing of the launch tube, which well solves the problem that the existing cluster pneumatic ejection system has slow gas replenishment and cannot meet the requirements of rapid and continuous firing; and by setting the first gas circuit system for intermediate transition, the structure of the entire gas circuit system is simple and easy to control; and when the first gas circuit system supplies gas to each launch tube, the gas pressure is constant, which makes the gas supply control of the launch tube in continuous firing simpler and has better safety and reliability.
[0034] In one embodiment, if Figure 2 The first gas circuit system 200 includes a first gas tank 21, on which a plurality of gas outlets 22 are provided, and each gas outlet 22 is respectively provided with a launch valve 23, and each launch valve 23 is respectively connected to each launch tube 11. By controlling the switch of the launch valve, the first gas tank can supply gas to each launch tube. The launch valve here can, for example, adopt an existing electrically controlled control valve, and the opening and closing of the control valve can be realized by an electrical signal. A mounting flange is provided on each gas outlet 22, and the launch valve 23 is connected to each gas outlet through the mounting flange to facilitate the installation of the launch valve on the first gas tank.
[0035] Reference Figure 2 The first gas storage tank 21 includes a plurality of gas storage tubes 211 arranged vertically and a flow transverse pipe 212 arranged horizontally for connecting the gas storage tubes. The launch valve is arranged on one or both sides of the gas storage tubes along the longitudinal direction of the gas storage tubes, and is used to connect with one or two rows of launch tubes arranged in a row (the launch tube row here refers to a plurality of launch tubes arranged in a row). The first gas storage tank adopts this structural arrangement, which can not only meet the requirements of the overall spatial layout of the system, reduce the volume of the system, and facilitate the connection between the first gas storage tank and each launch tube, but also meet the requirements of the launch tube for gas capacity under low pressure conditions, and provide sufficient gas for the launch operation of the launch tube.
[0036] like Figure 1As shown in , taking the pneumatic ejection assembly arranged in 5 rows as an example, the corresponding first gas storage tank 21 includes three gas storage tubes 211, and the three gas storage tubes 211 are respectively connected to two flow cross pipes 212 at both ends, forming a connected closed container as a whole. The first gas storage tank 21 is arranged at one end of the pneumatic ejection assembly 100 composed of a plurality of launch tubes 11 arranged in an array, wherein two gas storage tubes 211 are respectively located between two rows of launch tubes arranged in a row, and launch valves 23 are respectively arranged on both sides of the two gas storage tubes 211, and the launch valves 23 arranged on both sides of the gas storage tubes are respectively connected to the launch tubes 11 in the launch tube rows located on both sides of the gas storage tubes, so as to optimize the overall layout of the first gas path system in the system and reduce the overall volume of the system.
[0037] In the first gas storage tank 21, the gas storage array pipe 211 located in the middle position is connected to the circulation cross pipe 212 at one end through the transition gas storage pipe 213, wherein the transition gas storage pipe 213 and the circulation cross pipe 212 are connected at multiple positions. At this time, when the first gas storage tank is inflated, each position in the first gas storage tank can be filled evenly and quickly, while ensuring the consistency of the gas pressure at each position in the first gas storage tank, and the capacity of the first gas storage tank can be further increased.
[0038] In the first gas storage tank 21, when two rows of launching valves are arranged on both sides of the gas storage tube, a supplementary gas storage tube 214 is arranged on the gas storage tube 211, and the supplementary gas storage tube 214 is connected to the gas storage tube 211 at multiple positions. While increasing the capacity of the first gas storage tank, it is possible to quickly supply gas to the launching tube corresponding to the position.
[0039] In one embodiment, the second gas circuit system includes a second gas storage tank 31 and a gas circuit unit. The second gas storage tank is connected to the first gas storage tank through the gas circuit unit to supply gas to the first gas storage tank.
[0040] Specifically, Figure 3 and Figure 4 As shown, the gas circuit unit includes a first pipeline 32 and a second pipeline 33, the air inlet end of the first pipeline 32 is connected to the second gas tank 31, and the air outlet end of the first pipeline 32 is connected to the first gas tank 21, and a pressure reducing valve 34 is arranged on the first pipeline 32, which is used to reduce the pressure of the high-pressure gas in the second gas tank 31 and input it into the first gas tank 21, so as to realize a rapid gas replenishment operation from high pressure to low pressure; the second pipeline 33 is connected between the air inlet end of the first pipeline 32 and the pressure reducing valve, and the other end of the second pipeline 33 is connected to the pressure reducing valve 34, and a pilot valve 35 is arranged on the second pipeline 33.
[0041] When the pressure in the first gas tank is lower than the set value, the pilot valve controls the pressure reducing valve to open, and the high-pressure gas in the second gas tank is reduced in pressure by the pressure reducing valve and then filled into the first gas tank; when the pressure in the first gas tank reaches the set value, the pilot valve controls the pressure reducing valve to close, and stops replenishing gas into the first gas tank.
[0042] A pilot valve is used here to realize mechanical switching control of the pressure reducing valve, which can realize rapid air replenishment operation of the air circuit unit from high pressure to low pressure. The air replenishment time is short, the control is stable and reliable, and the cost is low. It can also well ensure the stability of the air pressure value charged into the first air storage tank.
[0043] A relief valve can be provided on the pressure reducing valve. When the gas is overfilled, the relief valve will overflow automatically to provide protection for the gas circuit unit.
[0044] In order to achieve rapid inflation of the first gas tank, multiple air inlets 215 may be provided on the first gas tank 21, multiple branch pipes 321 may be connected to the gas outlet end of the first pipeline 32, and the multiple branch pipes 321 may be respectively connected to the air inlets on the first gas tank to rapidly replenish air to the first gas tank through the multiple air inlets.
[0045] An air delivery pipe 36 is provided on the first pipeline 32 near the air inlet end, through which the second air tank can be inflated. Ball valves 37 are provided on the air delivery pipe 36 and on both sides of the first pipeline 32, respectively, for switching control of the air path system under different working conditions. For example, when it is necessary to inflate the second air tank, the ball valve on the first pipeline near the air outlet end is closed, the other two ball valves are opened, and the second air tank is inflated through the base station air source 310. When it is necessary to replenish air for the first air tank, the ball valve on the air delivery pipe is closed, and the other two ball valves are opened.
[0046] A safety valve 38 and a pressure sensor 39 are provided on the first pipeline 32. The safety valve is used to ensure the safety of the process of the base station gas source charging the second gas tank. The pressure sensor 39 is used to detect the gas pressure in the second gas tank.
[0047] In the description of the present utility model, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc. used to indicate the orientation or position relationship are based on the orientation or position relationship shown in the accompanying drawings, or are the orientation or position relationship in which the utility model product is usually placed when used. They are only for the convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model.
[0048] In addition, if the terms "horizontal" or "vertical" appear in the description of the present invention, it does not mean that the components are required to be absolutely horizontal or suspended, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.
[0049] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0050] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any simple modification or equivalent changes made to the above embodiments based on the technical essence of the present invention shall fall within the protection scope of the present invention.
Claims
1. An air supply system for pneumatic ejection, characterized in that: It includes a second gas circuit system, which includes a second gas storage tank and a gas circuit unit. The gas circuit unit includes a first pipeline, the air inlet end of the first pipeline is connected to the second gas storage tank, and the air outlet end thereof is connected to the first gas circuit system, and a pressure reducing valve is arranged on the first pipeline; a second pipeline is connected to the first pipeline between the air inlet end thereof and the pressure reducing valve, the other end of the second pipeline is connected to the pressure reducing valve, and a pilot valve is arranged on the second pipeline.
2. The air supply system for pneumatic ejection according to claim 1, characterized in that: It also includes a first gas circuit system, which is configured to be connected to multiple launch tubes; the second gas storage tank is connected to the first gas circuit system through a gas circuit unit.
3. The air supply system for pneumatic ejection according to claim 1, characterized in that: The first gas circuit system includes a first gas storage tank, which is provided with a plurality of gas outlets, each of which is connected to a launch valve, and the launch valve is used to be connected to a launch tube.
4. The air supply system for pneumatic ejection according to claim 3, characterized in that: The first gas storage tank includes a plurality of vertically arranged gas storage tubes and a flow transverse pipe for connecting the gas storage tubes, and the launch valve is arranged on one side or both sides of the gas storage tubes along the longitudinal direction of the gas storage tubes.
5. The air supply system for pneumatic ejection according to claim 4, characterized in that: The gas storage array pipes located in the middle are connected to the flow cross pipe through a transition gas storage pipe at one end, and the transition gas storage pipe and the flow cross pipe are connected at multiple positions.
6. The air supply system for pneumatic ejection according to claim 3, characterized in that: The gas outlet end of the first pipeline is connected to a plurality of branch pipes, and the branch pipes are respectively connected to the first gas storage tank.
7. The air supply system for pneumatic ejection according to claim 1, characterized in that: An air delivery pipe is arranged on the first pipeline near its air inlet end.
Citation Information
Cited By
Pneumatic ejection device and assembling method thereof
CN117818940A
Pneumatic ejection device and method of assembling the same
CN117818940B